CN206052555U - Hood type safe operation platform - Google Patents

Hood type safe operation platform Download PDF

Info

Publication number
CN206052555U
CN206052555U CN201620902835.0U CN201620902835U CN206052555U CN 206052555 U CN206052555 U CN 206052555U CN 201620902835 U CN201620902835 U CN 201620902835U CN 206052555 U CN206052555 U CN 206052555U
Authority
CN
China
Prior art keywords
seaming element
plate
anchor ear
pairing
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620902835.0U
Other languages
Chinese (zh)
Inventor
丁永军
韩振江
王吉兵
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620902835.0U priority Critical patent/CN206052555U/en
Application granted granted Critical
Publication of CN206052555U publication Critical patent/CN206052555U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of hood type safe operation platform, using hooping structure, it is made up of two pairing parts, each pairing part includes a half anchor ear and two operating platforms to seaming element, two operating platforms are separately positioned on the two ends of half anchor ear to seaming element, half anchor ear is provided with semicircle hoop plate, a wing plate is respectively arranged at the two ends with semicircle hoop plate, wing plate is passed through horizontally disposed upper stiffener and lower stiffener and is connected with semicircle hoop plate, operating platform is provided with terrace part and guardrail part to seaming element, operating platform is put more energy into under to the terrace part of seaming element plate weld, operating platform is connected with semicircle hoop plate by bracing piece to the guardrail part of seaming element, two two relative wing plates of pairing part are with bolts, two two relative operating platforms of pairing part are combined into an operating platform to seaming element.This utility model safety and stability, material consumption are few, efficiency of construction is high.

Description

Hood type safe operation platform
Technical field
This utility model is related to a kind of construction safety operating platform, particularly a kind of hood type safe operation platform.
Background technology
Hold Hoop method construction bridges bent cap because its have light structure, without the need for a large amount of supports, relative other construction methods it is simple, The advantages of strong applicability, short construction period, it is constantly subjected to the favor of construction party.When using Hold Hoop method construction bent cap, need first Anchor ear is installed on pier stud.Anchor ear is generally arranged at position on the lower side at the top of pier stud, higher apart from ground, and is hanging 's.
In order to workman can pacify, anchor ear is torn open, past way generally has:1) set up full hall scaffold.This mode is past Toward there is high material consumption, low construction efficiency, once and to run under bridge be the danger such as river, zanjon, weak soil mud Place, generally requires to process ground, and construction cost is high;2) take hanging basket work high above the ground.This mode hanging basket is often difficult With fixation, stability is not high, there is potential safety hazard.
The content of the invention
This utility model provides a kind of hood type safe operation platform to solve technical problem present in known technology, The platform safety is stable, material consumption is few, efficiency of construction is high.
This utility model is adopted the technical scheme that by solving technical problem present in known technology:A kind of hood type Safe operation platform, using hooping structure, is made up of two pairing parts, each described pairing part include a half anchor ear and Two operating platforms are separately positioned on the two ends of the half anchor ear, institute to seaming element, two operating platforms to seaming element State half anchor ear and be provided with semicircle hoop plate, in the semicircle wing plate that is respectively arranged at the two ends with for binding round plate, the wing plate passes through level The upper stiffener and lower stiffener for arranging is connected with the semicircle hoop plate, and the operating platform is provided with terrace part to seaming element With guardrail part, the operating platform to the terrace part of seaming element with it is described under put more energy into plate weld, the operating platform pairing The guardrail part of component is connected with the semicircle hoop plate by bracing piece, two relative wings of two pairing parts Plate is with bolts, and two two relative operating platforms of the pairing part are combined into an operating platform to seaming element.
This utility model has the advantages and positive effects that:Using anchor ear butted structure, platform safety is stable;During installation Amount of high-altitude operation is few, and working security is good, and efficiency of construction is high;Material consumption is few, and without the need for ground, construction cost is low.And this Utility model light structure, extensively, processing and fabricating is simply rapid for used material source.Can be reduced using this utility model and be held Weight anchor ear pacifies, tears the time open, greatly shortens construction period, cost-saved and resource;Can pacify, offer support is provided open for load-bearing anchor ear Point, saves loop wheel machine holding time, it can be ensured that the safety of construction operation workman is pacified, torn open to load-bearing anchor ear.
Description of the drawings
Fig. 1 is axonometric chart of the present utility model;
Schematic diagrams of the Fig. 2 for this utility model application.
In figure:1st, semi-circular sheet steel;2nd, wing plate;3rd, upper stiffener;4th, lower stiffener;5th, operating platform is put down to seaming element Platform part;6th, guardrail part of the operating platform to seaming element;7th, bracing piece;8th, bolt;9th, load-bearing anchor ear;10th, pier stud.
Specific embodiment
For the content of the invention of the present utility model, feature and effect can be further appreciated that, following examples are hereby enumerated, and is coordinated Accompanying drawing describes in detail as follows:
Refer to Fig. 1 and Fig. 2, a kind of hood type safe operation platform, using hooping structure, by two pairing part groups Into each described pairing part includes a half anchor ear and two operating platforms to seaming element, two operating platform pairings Component is separately positioned on the two ends of the half anchor ear, and the half anchor ear is provided with semicircle hoop plate 1, in the semicircle hoop plate 1 is respectively arranged at the two ends with a wing plate 2, and the wing plate 2 is by horizontally disposed upper stiffener 3 and lower stiffener 4 and the semicircle Hoop plate 1 connects, and the operating platform is provided with terrace part and guardrail part to seaming element, and the operating platform is put down to seaming element Platform part 5 is welded with the lower stiffener 4, and the operating platform is to the guardrail part 6 of seaming element by bracing piece 7 and described half Circular, hoop plate 1 connects;Two two relative wing plates 2 of the pairing part are connected using bolt 8, two pairing portions Two operating platforms of split-phase pair are combined into an operating platform to seaming element.
Semicircle girth of the semicircle girth of above-mentioned hoop plate less than the pier stud for installing hooping structure, to ensure two half anchor ears Between be connected with after can extrude closely with pier stud 11.
After this utility model is installed, you can using loop wheel machine handling load-bearing anchor ear 9 to the pier stud 10, with this reality It is the strong point with the anchor ear in new, then workman just can be installed by this utility model.
Although being described to preferred embodiment of the present utility model above in conjunction with accompanying drawing, this utility model is not Above-mentioned specific embodiment is confined to, above-mentioned specific embodiment is only schematic, is not restricted, ability The those of ordinary skill in domain under enlightenment of the present utility model, without departing from this utility model objective and claimed Under ambit, many forms can also be made, these are belonged within protection domain of the present utility model.

Claims (1)

1. a kind of hood type safe operation platform, it is characterised in that adopt hooping structure, be made up of two pairing parts, each The pairing part includes a half anchor ear and two operating platforms to seaming element, and two operating platforms are distinguished to seaming element The two ends of the half anchor ear are arranged on, the half anchor ear is provided with semicircle hoop plate, it is each at the two ends of the semicircle hoop plate A wing plate is provided with, the wing plate is passed through horizontally disposed upper stiffener and lower stiffener and is connected with the semicircle hoop plate, described Operating platform is provided with terrace part and guardrail part to seaming element, the operating platform to the terrace part of seaming element with it is described under Put more energy into plate weld, the operating platform is connected with the semicircle hoop plate by bracing piece to the guardrail part of seaming element, two Two relative wing plates of the pairing part are with bolts, two relative operating platforms of two pairing parts An operating platform is combined into seaming element.
CN201620902835.0U 2016-08-17 2016-08-17 Hood type safe operation platform Expired - Fee Related CN206052555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620902835.0U CN206052555U (en) 2016-08-17 2016-08-17 Hood type safe operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620902835.0U CN206052555U (en) 2016-08-17 2016-08-17 Hood type safe operation platform

Publications (1)

Publication Number Publication Date
CN206052555U true CN206052555U (en) 2017-03-29

Family

ID=58383460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620902835.0U Expired - Fee Related CN206052555U (en) 2016-08-17 2016-08-17 Hood type safe operation platform

Country Status (1)

Country Link
CN (1) CN206052555U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386113A (en) * 2017-06-23 2017-11-24 中建市政工程有限公司 Climb certainly safe operation platform and its construction method for pier column pouring construction
CN108747069A (en) * 2018-07-02 2018-11-06 中国五冶集团有限公司 A kind of installation method of tower body equipment
CN110644364A (en) * 2019-08-16 2020-01-03 中国一冶集团有限公司 Hoop construction platform and using method thereof
CN110820564A (en) * 2019-10-15 2020-02-21 同济大学 Liftable and openable bent cap construction overhaul multipurpose platform
CN111576195A (en) * 2020-04-16 2020-08-25 中铁城建集团有限公司 Construction method of support-free hoop for cylindrical pier
CN111593666A (en) * 2020-05-26 2020-08-28 中交路桥建设有限公司 Bent cap hoop mounting platform and integral beam hoop mounting process
CN113512948A (en) * 2021-05-06 2021-10-19 丽水市交通工程管理中心 A assembled operation platform that is used for bent cap staple bolt installation and demolishs
CN114775448A (en) * 2022-05-30 2022-07-22 深圳市路桥建设集团有限公司 Hoop type bridge operation lifting platform and using method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386113A (en) * 2017-06-23 2017-11-24 中建市政工程有限公司 Climb certainly safe operation platform and its construction method for pier column pouring construction
CN107386113B (en) * 2017-06-23 2018-12-04 中建市政工程有限公司 Climb certainly safe operation platform and its construction method for pier column pouring construction
CN108747069A (en) * 2018-07-02 2018-11-06 中国五冶集团有限公司 A kind of installation method of tower body equipment
CN110644364A (en) * 2019-08-16 2020-01-03 中国一冶集团有限公司 Hoop construction platform and using method thereof
CN110820564A (en) * 2019-10-15 2020-02-21 同济大学 Liftable and openable bent cap construction overhaul multipurpose platform
CN111576195A (en) * 2020-04-16 2020-08-25 中铁城建集团有限公司 Construction method of support-free hoop for cylindrical pier
CN111593666A (en) * 2020-05-26 2020-08-28 中交路桥建设有限公司 Bent cap hoop mounting platform and integral beam hoop mounting process
CN113512948A (en) * 2021-05-06 2021-10-19 丽水市交通工程管理中心 A assembled operation platform that is used for bent cap staple bolt installation and demolishs
CN114775448A (en) * 2022-05-30 2022-07-22 深圳市路桥建设集团有限公司 Hoop type bridge operation lifting platform and using method thereof
CN114775448B (en) * 2022-05-30 2023-10-27 深圳市路桥建设集团有限公司 Hoop type bridge operation lifting platform and application method thereof

Similar Documents

Publication Publication Date Title
CN206052555U (en) Hood type safe operation platform
CN204960269U (en) Integral pylon
CN204081539U (en) A kind of overhanging type protection canopy had enough to meet the need
CN103669924B (en) A kind of substation framework square-section angle iron frame beam thread gripping-board novel joint structure
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN103991800A (en) Roof surface crane for building
CN204081434U (en) A kind of opening and closing type suspension bridge frame
CN204238537U (en) A kind of elevated hoistway operation platform
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN207079948U (en) A kind of life rope fixed mount
CN205802760U (en) Flexible hinge bearing turning device for ultralong overweight steel-pipe pile waterborne lifting
CN204662937U (en) A kind of fixture being fixed on steel structure girder
CN208869171U (en) One kind lifting reusable porous grade for steelwork tower truss and hangs lid
CN203487805U (en) Rapid purline/steel beam clamping support with safety rope
CN104234402A (en) Openable/closeable suspension bridge frame
CN207158618U (en) Pipeline welding lift hanger
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN207512616U (en) Pier top hanging basket mounting platform
CN201416420Y (en) Oil pumping machine safety belt hanging device
CN206015532U (en) A kind of security protection hanging cable for high pier construction
CN206360392U (en) Attachment type raise scaffold periphery protecting wire net
CN204691206U (en) The erection of scaffold safety net and retracting device
CN202924627U (en) Pin roll dismantling support device of tower crane
CN104631844A (en) Steel column mounting operation platform and mounting method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20210817