CN203578007U - Integrated ash bucket beam component structure of dust collector - Google Patents
Integrated ash bucket beam component structure of dust collector Download PDFInfo
- Publication number
- CN203578007U CN203578007U CN201320828562.6U CN201320828562U CN203578007U CN 203578007 U CN203578007 U CN 203578007U CN 201320828562 U CN201320828562 U CN 201320828562U CN 203578007 U CN203578007 U CN 203578007U
- Authority
- CN
- China
- Prior art keywords
- ash bucket
- component structure
- bucket beam
- beam component
- integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Shovels (AREA)
Abstract
The utility model relates to an integrated ash bucket beam component structure of a dust collector. The integrated ash bucket beam component structure comprises an ash bucket, an ash bucket gable wall plate and an ash bucket beam, the ash bucket beam is parallelly and fixedly connected with the ash bucket gable wall plate, a plurality of corresponding bolt connecting holes are formed in horizontal reinforcing ribs on the lower portion of the ash bucket beam and on the upper portion of the ash bucket respectively, and two connecting holes are connected together through a bolt. The integrated ash bucket beam component structure has the advantages that the ash bucket is conveniently mounted, overhead welding performed by operators is omitted, and the safety degree of installation is improved.
Description
Technical field
The utility model relates to a kind of deduster, relates in particular to ash bucket beam modular construction in this deduster.
Background technology
As everyone knows, the deduster technology of using in prior art mainly contains phenanthrene and reaches technology, GE technology and Nuqi Technology, but these technology are for the ash bucket beam of deduster, all adopted and have been welded to connect.
As seen from Figure 1: when existing electrostatic precipitator ash bucket 1 is installed, rely on ash bucket suspension column 11 to be fixed and to locate, when determining behind position, by operative employee, the reinforcement 13 on the connecting plate on ash bucket beam 12 and ash bucket 1 is adopted to overhead welding, the two is coupled together, and the connecting plate 12 on beam is fixedly connected with ash bucket gable board 14.
Said structure formula is used welding manner, and ash bucket beam and ash bucket are coupled together.When welding operation work is when welding ash bucket beam connecting plate and ash bucket reinforcement, need to take overhead welding mode, so, workman's life has been produced safely to very large impact; Two, complete in experience and sensation when operator welds in the overhead position, cause ash bucket connecting plate not weld with ash bucket reinforcement, in the course of time, make ash bucket separation because deadweight or dust stratification and ash bucket beam produce, when serious, will cause ash bucket to come off, threaten operating personnel's life security.
Summary of the invention
The utility model technical issues that need to address have been to provide a kind of deduster integral type ash bucket beam modular construction, are intended to solve the above problems.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions:
The utility model comprises: ash bucket and ash bucket gable board; Also comprise: ash bucket beam; Described ash bucket beam is parallel with ash bucket gable board to be fixedly connected with; On the horizontal stiffener on described ash bucket beam bottom and ash bucket top, have the bolt connecting hole of multiple correspondences; Bolt links together two connecting holes.
Compared with prior art, the beneficial effects of the utility model are: be convenient to the installation of ash bucket, do not need operative employee to use overhead welding, improved the safe coefficient of installation exercise.
Accompanying drawing explanation
Fig. 1 is ash bucket beam modular construction structural representation in prior art.
Fig. 2 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the utility model is described in further detail:
As seen from Figure 2: the utility model comprises: ash bucket 2 and ash bucket gable board 21; Also comprise: ash bucket beam 22; Described ash bucket beam 22 is parallel with ash bucket gable board 21 to be fixedly connected with; On the horizontal stiffener on described ash bucket beam 22 bottoms and ash bucket 2 tops, have the bolt connecting hole 23 of multiple correspondences; Bolt 24 links together two connecting holes 23.
The utility model is by ash bucket gable board, ash bucket beam and ash bucket top are integrated, adopting integral type design is a part by three Element Designs, then the ash bucket beam of integral type design is connected with ash bucket suspension column 25, forms a set of complete integral type ash bucket beam.
On the horizontal stiffener on integral type ash bucket beam bottom and ash bucket top, all have many high-strength bolt connecting holes, when ash bucket is lifted fix in position, operating personnel only need adopt high-strength bolt, and the position of mating holes, installs one by one to the two.In installation process, owing to not re-using welding manner, reduced the degree of danger to operating personnel.And while adopting high-strength bolt to connect, the first examination that can first ash bucket week be made a circle connects, and does not need to close up, and facilitates the adjusting of ash bucket position.After installation site puts in place, all bolts are closed up, strengthened ash bucket and the reliability that ash bucket beam is connected, avoid the accidents such as coming off of ash bucket.
Claims (1)
1. a deduster integral type ash bucket beam modular construction, comprising: ash bucket and ash bucket gable board; Characterized by further comprising: ash bucket beam; Described ash bucket beam is parallel with ash bucket gable board to be fixedly connected with; On the horizontal stiffener on described ash bucket beam bottom and ash bucket top, have the bolt connecting hole of multiple correspondences; Bolt links together two connecting holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320828562.6U CN203578007U (en) | 2013-12-13 | 2013-12-13 | Integrated ash bucket beam component structure of dust collector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320828562.6U CN203578007U (en) | 2013-12-13 | 2013-12-13 | Integrated ash bucket beam component structure of dust collector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203578007U true CN203578007U (en) | 2014-05-07 |
Family
ID=50575986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320828562.6U Expired - Fee Related CN203578007U (en) | 2013-12-13 | 2013-12-13 | Integrated ash bucket beam component structure of dust collector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203578007U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104707729A (en) * | 2013-12-13 | 2015-06-17 | 上海冶金矿山机械厂 | One-piece deduster ash bucket beam part structure |
-
2013
- 2013-12-13 CN CN201320828562.6U patent/CN203578007U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104707729A (en) * | 2013-12-13 | 2015-06-17 | 上海冶金矿山机械厂 | One-piece deduster ash bucket beam part structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204252286U (en) | A kind of rectangular steel-tube concrete column-steel beam connecting joint | |
CN105332422B (en) | A kind of vertical external fin beam column node connection device suitable for assembling type steel structure system | |
CN103015537B (en) | Beam-column joint connecting device of assembled steel structure system | |
CN103243818A (en) | Connection joint of concrete column and steel beam | |
CN203845689U (en) | Indoor assembled large-scale equipment hoisting device | |
CN206396914U (en) | A kind of monoblock type node for connecting beam column | |
CN203578007U (en) | Integrated ash bucket beam component structure of dust collector | |
CN104652616A (en) | Half-welding half-bolt beam-column joint connection device of assembly type steel structure system | |
CN203247717U (en) | Connecting node of concrete column and steel beam | |
CN204850048U (en) | Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel | |
CN202627212U (en) | Steel structure joint assembly | |
CN203866979U (en) | Rigid connection joint node for large-cross-section H-shaped steel and small-cross-section H-shaped steel | |
CN104707729A (en) | One-piece deduster ash bucket beam part structure | |
CN204959965U (en) | A steel construction for building in frame | |
CN204703542U (en) | The assembled passage of a kind of Construction of Steel Structure regularization | |
CN203715156U (en) | Convenient crane | |
CN103790241B (en) | A kind of Bolted angle connection method of H type steel flanged beam beam and laced of battened compression member | |
CN204211397U (en) | Assembly type standard knot | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN208329151U (en) | A kind of assemble welding formula steel construction | |
CN206090277U (en) | Construction of cooperation tunnel shield is with complicated node of landing stage steel construction | |
CN201671186U (en) | Large-span gate type rigid frame column and beam connecting node | |
CN205769648U (en) | A kind of modified model railway freight-car trunk side door plate | |
CN203834502U (en) | Rapid type assembling foundation based on two balance weight modules | |
CN204847839U (en) | From taking spacing hoist girder and connection structure of end beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140507 Termination date: 20141213 |
|
EXPY | Termination of patent right or utility model |