CN204703542U - The assembled passage of a kind of Construction of Steel Structure regularization - Google Patents

The assembled passage of a kind of Construction of Steel Structure regularization Download PDF

Info

Publication number
CN204703542U
CN204703542U CN201520370893.9U CN201520370893U CN204703542U CN 204703542 U CN204703542 U CN 204703542U CN 201520370893 U CN201520370893 U CN 201520370893U CN 204703542 U CN204703542 U CN 204703542U
Authority
CN
China
Prior art keywords
steel
access platform
main girder
construction
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520370893.9U
Other languages
Chinese (zh)
Inventor
周焕游
邓志峰
吴少平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201520370893.9U priority Critical patent/CN204703542U/en
Application granted granted Critical
Publication of CN204703542U publication Critical patent/CN204703542U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the assembled passage of a kind of Construction of Steel Structure regularization, it comprises main girder steel, secondary girder steel, steel access platform, guard rail, steel basketry sheet and junction steel plate, main girder steel connects and composes access platform by bolt and time girder steel, platform main girder steel in steel road is welded and fixed the sleeve bearing of protective guard, passage both sides guard rail is fixed in sleeve bearing, the shape of steel basketry sheet and the shaped position of steel access platform match, steel basketry sheet covers and is welded on steel access platform and forms platform, the main girder steel rear and front end of steel access platform is welded with the junction steel plate of perforate, be connected and fixed by bolt and steel work girder steel.The utility model is that the transfer of steel work housing construction equipment uses, and it is little to construction infection, and make the current and small-sized construction equipment of constructor shift safe and feasible more, reduce site operation difficulty, this passage convenient disassembly, recycle, cost is low, safe and reliable.

Description

The assembled passage of a kind of Construction of Steel Structure regularization
Technical field
The utility model relates to the assembled passage of a kind of Construction of Steel Structure regularization, is that the double protection of a kind of regularization escape way for Construction of Steel Structure is built, belongs to the technical field of engineering construction plate.
Background technology
An important feature of current steel building engineering structures is exactly towards high-rise and high-rise future development, high-rise and super highrise building Construction of Steel Structure distinguishing feature be main stress frame construction especially vertical member construction obviously construct prior to horizontal structure (floor), because horizontal floor slab structure obviously lags behind vertical structure, this just brings a new safety management to Construction of Steel Structure and states and ask---at construction steel framework horizontal structure (as girder steel, profiled sheet) time how to take precautions against constructor's falling from high altitude and construction little facility etc. object hit, need the transfer that is current and little facility of constructing for constructor to provide the construction passage of safe and convenient simultaneously.
In the past, this Construction of Steel Structure passage was all build temporarily, the component of partial amorphism, and versatility is low, and dismounting is inconvenient, and be difficult to recycle, site operation efficiency is low.
Summary of the invention
The utility model provides a kind of Construction of Steel Structure regularization assembled passage, its constructor for operation layer in steel work outside framework work progress is current and small-sized construction equipment transfer is flexible, convenient, reduce site operation difficulty, thus reach passage convenient disassembly, recycle, cost is low, the simple object of domain manufacture.
The novel technical scheme taked of the present invention:
The assembled passage of a kind of Construction of Steel Structure regularization, comprise main girder steel, secondary girder steel, guard rail, steel basketry sheet and junction steel plate, it is characterized in that: main girder steel connects and composes access platform by bolt and time girder steel, two main girder steels on access platform are welded with the sleeve bearing of fixed protection railing, the vertical rod of guard rail is fixed in sleeve bearing, horizontal cross bar is located at vertical top, and access platform is provided with steel basketry sheet, and steel basketry sheet is fixed by welding on access platform and forms platform; Steel basketry sheet is provided with through hole, and the position of through hole is corresponding in main girder steel upper bush support position; Be welded with out the junction steel plate of screw in the main girder steel front and back end of steel access platform, junction steel plate is connected to a fixed by bolt and screw and steel work girder steel.
The shape and size of the shape and size steel access platform of described steel basketry sheet match, steel basketry sheet covers and is welded on steel access platform, on steel basketry sheet, through hole is just to sleeve bearing position, and steel basketry sheet does not block the sleeve bearing of the main girder steel upper surface of described steel access platform.
The main girder steel of described steel access platform is provided with lifting earrings, is convenient to hanging lift lifting/lowering and the movement of access platform.
Described pole steel beam and time girder steel are channel-section steel.
The beneficial effects of the utility model:
The utility model is applied to the Construction of Steel Structure stage provides the annular of operation layer to pass through, and for constructor, current and small-sized construction equipment transfer uses.It is little to construction infection, use more flexible in steel work outside framework work progress, the constructor of construction stage operation layer, current and small-sized construction equipment shifts safe and feasible more, reduce site operation difficulty, this passage convenient disassembly, recycle, cost is low, and domain manufacturing process is simple.
Accompanying drawing explanation
Fig. 1 is the utility model steel work access platform planar configuration figure;
Fig. 2 the utility model steel basketry plate plane illustrates;
Fig. 3 is assembled channel side facade diagram;
Fig. 4 is that steel access platform and junction steel plate welding structure illustrate; (in Fig. 1 A);
Fig. 5 the main girder steel of steel access platform lifts earrings structure diagram (in Fig. 1 B);
To be the main girder steel of steel access platform with time girder steel be connected Fig. 6 illustrates (in Fig. 1 C);
To be the main girder steel of steel access platform with guard rail fix Fig. 7 that block set welds illustrates (in Fig. 1 D).
Detailed description of the invention
Contrast accompanying drawing, illustrates its structure.
In Fig. 1 ~ 7, as shown in the figure, in the assembled passage of this kind of Construction of Steel Structure regularization, 1 be junction steel plate, 2 be guard rail, 3 be time girder steel for lifting earrings, 4 is main girder steel, 5,6 be steel basketry sheet, 7 be horizontal cross bar, 8 be sleeve bearing, 9 be weld seam, 10 be connecting bolt.
Main girder steel of the present utility model connects and composes access platform by bolt and time girder steel, two main girder steels of access platform both sides are welded with the sleeve bearing of fixed protection railing, the vertical rod of guard rail is fixed in sleeve bearing, horizontal cross bar is located at the top of vertical rod, access platform is provided with steel basketry sheet, steel basketry sheet is fixed by welding on access platform and forms platform, steel basketry sheet is provided with through hole, the position of through hole is corresponding in main girder steel upper bush support position, the junction steel plate of screw is all welded with out in the main girder steel front and back end of steel access platform, junction steel plate is connected to a fixed by bolt and screw and steel work girder steel.
The utility model provides the circular passage of operation layer for the Construction of Steel Structure stage, and pass through for constructor and small-sized construction equipment transfer use, safe and reliable, easy accessibility, can be recycled.

Claims (4)

1. the assembled passage of Construction of Steel Structure regularization, comprise main girder steel, secondary girder steel, guard rail, steel basketry sheet and junction steel plate, it is characterized in that: main girder steel (4) connects and composes access platform by bolt and time girder steel (5), two main girder steels on access platform are welded with the sleeve bearing (8) of fixed protection railing (2), the vertical rod of guard rail is fixed in sleeve bearing, horizontal cross bar (7) is located at vertical top, access platform is provided with steel basketry sheet (6), steel basketry sheet is fixed by welding on access platform and forms platform, steel basketry sheet is provided with through hole, and the position of through hole is corresponding in main girder steel upper bush support position, be welded with out the junction steel plate (1) of screw in the main girder steel front and back end of steel access platform, junction steel plate is connected to a fixed by bolt and screw and steel work girder steel.
2. the assembled passage of Construction of Steel Structure regularization according to claim 1, it is characterized in that: the shape and size of the shape and size steel access platform of described steel basketry sheet match, steel basketry sheet covers and is welded on steel access platform, on steel basketry sheet, through hole is just to sleeve bearing position, and steel basketry sheet does not block the sleeve bearing of the main girder steel upper surface of described steel access platform.
3. the assembled passage of Construction of Steel Structure regularization according to claim 1, is characterized in that: the main girder steel of described steel access platform is provided with lifting earrings, is convenient to hanging lift lifting/lowering and the movement of access platform.
4. the assembled passage of Construction of Steel Structure regularization according to claim 1, is characterized in that: described main girder steel and time girder steel are channel-section steel.
CN201520370893.9U 2015-06-02 2015-06-02 The assembled passage of a kind of Construction of Steel Structure regularization Expired - Fee Related CN204703542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520370893.9U CN204703542U (en) 2015-06-02 2015-06-02 The assembled passage of a kind of Construction of Steel Structure regularization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520370893.9U CN204703542U (en) 2015-06-02 2015-06-02 The assembled passage of a kind of Construction of Steel Structure regularization

Publications (1)

Publication Number Publication Date
CN204703542U true CN204703542U (en) 2015-10-14

Family

ID=54283168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520370893.9U Expired - Fee Related CN204703542U (en) 2015-06-02 2015-06-02 The assembled passage of a kind of Construction of Steel Structure regularization

Country Status (1)

Country Link
CN (1) CN204703542U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592751A (en) * 2016-11-10 2017-04-26 中衡设计集团股份有限公司 Large-span steel corridor with railings
CN112726979A (en) * 2020-12-25 2021-04-30 武汉神华军建筑工程有限公司 Net frame type ramp module

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592751A (en) * 2016-11-10 2017-04-26 中衡设计集团股份有限公司 Large-span steel corridor with railings
CN112726979A (en) * 2020-12-25 2021-04-30 武汉神华军建筑工程有限公司 Net frame type ramp module

Similar Documents

Publication Publication Date Title
CN204252285U (en) Assembling energy-dissipating type bean column node
CN205421538U (en) Novel steel construction
CN205242647U (en) Connected node of girder steel and steel column
CN204703542U (en) The assembled passage of a kind of Construction of Steel Structure regularization
CN104213707B (en) All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure
CN203271096U (en) Operating platform
CN204826714U (en) Novel steel constructs a tire supporting frame
CN205257792U (en) Bridge crane with triangular support girder
CN204212390U (en) A kind of Construction of Steel Structure Worker carrying basket
CN208415977U (en) Face side hole Protecting clamping apparatus
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet
CN204001887U (en) Dismantled and assembled dedicated platform for underground workshop vault lighting installation and repairing
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN201274392Y (en) Operating platform on portable adjustable bar
CN203569909U (en) Tower crane integral type steel frame aisle
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN204112739U (en) A kind of tower crane high-altitude mounting or dismounting operation caisson type operating platform
CN210918489U (en) Protective guard device of supporting platform
CN103669889A (en) High-altitude safety fence for steel structure assembling and manufacturing method of high-altitude safety fence
CN203755641U (en) Cantilever beam upright positioning card of cantilever scaffold
CN204609345U (en) A kind of full dismounting bean column node temporary support lattice column device
CN210848979U (en) Special bracket for high-altitude on-site welding of bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151014

Termination date: 20160602