CN203924659U - Hanging frame type construction platform device - Google Patents
Hanging frame type construction platform device Download PDFInfo
- Publication number
- CN203924659U CN203924659U CN201420335788.7U CN201420335788U CN203924659U CN 203924659 U CN203924659 U CN 203924659U CN 201420335788 U CN201420335788 U CN 201420335788U CN 203924659 U CN203924659 U CN 203924659U
- Authority
- CN
- China
- Prior art keywords
- type
- angle steel
- hanger
- hanger jig
- jig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 47
- 239000010959 steel Substances 0.000 claims abstract description 47
- 238000009434 installation Methods 0.000 claims abstract description 9
- 238000003466 welding Methods 0.000 claims abstract description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000000137 annealing Methods 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 241000282326 Felis catus Species 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000005272 metallurgy Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a kind of hanging frame type construction platform device, comprise arc steel structure body, security guardrail and shank, angle steel cross bar, angle steel vertical rod, angle steel brace, A type hanger jig, Type B hanger jig welded and installed are set on arc steel structure body, angle steel cross bar, angle steel vertical rod are to an angle of 90 degrees welds, again angle steel brace, shank, A type hanger jig, Type B hanger jig and security guardrail are worn to level rope position through hole is set, carry out safety rope and run through, security guardrail and security guardrail welding assembly are integrated.The utility model is simple in structure, reasonable in design, and safety and stability fully meets job execution requirement, can in the construction of manufacturability Steel Structure Installation, can widely popularize application.
Description
Technical field
The utility model is mainly used in industrial cylindrical shell, Shell-Class Steel Structure Installation engineering, during to the assembly operation of such steel work, uses.
Background technology
For the installations such as small-sized steel stack in metallurgy industry blast furnace, hot-blast stove and power plant, adopt big machinery can not meet integral hoisting, and while needing segmental hoisting operation, a requisite procedure while being assembly operation.
Utility model content
The utility model object is to provide a kind of hanging frame type construction platform device.
In order to realize the utility model object, by the following technical solutions: hanging frame type construction platform device, comprise arc steel structure body, security guardrail and shank are set on arc steel structure body, angle steel cross bar, angle steel vertical rod, angle steel brace, A type hanger jig, Type B hanger jig welded and installed, by angle steel cross bar, angle steel vertical rod is an angle of 90 degrees and welds, again by angle steel brace, shank, A type hanger jig, Type B hanger jig and security guardrail are worn level rope position through hole are set, carrying out safety rope runs through, security guardrail and security guardrail welding assembly are integrated, fixedly hanger is also installed on arc steel structure body, and welding position and A type hanger jig, Type B hanger jig match, A type hanger jig, Type B hanger jig are plugged on fixedly and are fixed on hanger, on above device, lay scaffolding board, and it is reliable by the fixation of annealing iron wire that at least three scaffolding boards are installed.
Above-mentioned hanging frame type construction platform device, 1.2m place below assembled docking port, vertical installation site on the wallboard of steel work body, horizontal level is arranged along the circumferential direction hoop of tubular construction, span >=3m.
The utility model is simple in structure, reasonable in design, and safety and stability fully meets job execution requirement, can in the construction of manufacturability Steel Structure Installation, can widely popularize application.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model hanger facade structures schematic diagram;
Fig. 3 is the utility model A type hanging point cross-sectional view;
Fig. 4 is Fig. 3 A type hanging point plan structure schematic diagram;
Fig. 5 is the utility model Type B hanging point cross-sectional view;
Fig. 6 is Fig. 5 Type B hanging point plan structure schematic diagram;
In figure, be labeled as: 1, security guardrail; 2, safety rope; 3, fixing hanger; 4, A type hanger jig; 5, scaffolding board; 6, angle steel brace; 7, steel work body; 8, steel work piece, 9, Type B hanger jig, 10, shank, 11, angle steel cross bar, 12, angle steel vertical rod.
The specific embodiment
Below in conjunction with practical application schematic diagram, the utility model is done to further detailed description.
Hanging frame type construction platform device of the present utility model, comprise arc steel structure body, security guardrail 1 and shank 10 are set on arc steel structure body 7, angle steel cross bar 11, angle steel vertical rod 12, angle steel brace 6, A type hanger jig 4, Type B hanger jig 9 welded and installed, by angle steel cross bar 11, angle steel vertical rod 12 is an angle of 90 degrees and welds, again by angle steel brace 6, shank 10, A type hanger jig 4, Type B hanger jig 9 and security guardrail 1 are worn level rope position through hole are set, carrying out safety rope runs through, security guardrail 1 and security guardrail 1 welding assembly are integrated, as shown in Figure 2, hanger 3 is also installed fixedly on arc steel structure body 7, is required hanger full weld, and firm welding, welding position and A type hanger jig 4, Type B hanger jig 9 match, as shown in Fig. 2 position by the device of installing, A type hanger jig 4, Type B hanger jig 9 are plugged on fixedly and are fixed on hanger 3, more than several, on device, lay scaffolding board 5, and at least three scaffolding boards 5 are installed, the scaffolding board of laying after stablizing is reliable by the fixation of annealing iron wire.
Described security guardrail 1 also arranges the serial connection that safety rope 2 is carried out in string rope hole, and link plate can be reinforced into certain radian, meets the fixedly requirement of hanger jig, is welded in advance installation in along with structure installation process.1.2m place below assembled docking port, vertical installation site on wallboard, horizontal level is arranged along the circumferential direction hoop of tubular construction, span >=3m.When structural segmented lifting, the outside that lifts in advance cylindrical shell or housing installs hanger in advance, and completes frame plate, has hung safety net, drawn safety rope etc., until all installation measures arrange qualified after, with structure, lift, be connected when with each structural sections assembling.Structure hoisting is to setting height(from bottom), and operating personnel can reach already installed job platform by cat ladder, carries out assembling operation.Using rear platform removes: operating personnel are by last layer platform, by coir rope, removes one by one safety rope, net, frame plate, hanger etc. completely, thereby completes the dismounting of whole layer platform, and time saving and energy saving, efficiency significantly improves.The utility model does not describe part in detail and is known technology, and the common variation that those skilled in the art carries out within the scope of technical solutions of the utility model or replacement all should be included in protection domain of the present utility model.
Claims (2)
1. hanging frame type construction platform device, comprise arc steel structure body, it is characterized in that: security guardrail and shank, angle steel cross bar, angle steel vertical rod, angle steel brace, A type hanger jig, Type B hanger jig welded and installed are set on arc steel structure body, angle steel cross bar, angle steel vertical rod are to an angle of 90 degrees welds, again angle steel brace, shank, A type hanger jig, Type B hanger jig and security guardrail are worn to level rope position through hole is set, carry out safety rope and run through, security guardrail and security guardrail welding assembly are integrated; Fixedly hanger is also installed on arc steel structure body, and welding position and A type hanger jig, Type B hanger jig match; A type hanger jig, Type B hanger jig are plugged on fixedly and are fixed on hanger, on above device, lay scaffolding board, and it is reliable by the fixation of annealing iron wire that at least three scaffolding boards are installed.
2. hanging frame type construction platform device according to claim 1, is characterized in that: 1.2m place below assembled docking port, vertical installation site on the wallboard of steel work body, horizontal level is arranged along the circumferential direction hoop of tubular construction, span >=3m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420335788.7U CN203924659U (en) | 2014-06-23 | 2014-06-23 | Hanging frame type construction platform device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420335788.7U CN203924659U (en) | 2014-06-23 | 2014-06-23 | Hanging frame type construction platform device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203924659U true CN203924659U (en) | 2014-11-05 |
Family
ID=51820509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420335788.7U Expired - Lifetime CN203924659U (en) | 2014-06-23 | 2014-06-23 | Hanging frame type construction platform device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203924659U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032944A (en) * | 2014-06-23 | 2014-09-10 | 山东电力建设第一工程公司 | Suspension frame construction platform device |
CN107227839A (en) * | 2017-07-10 | 2017-10-03 | 中冶建筑研究总院有限公司 | A kind of integrated Construction of Supporting security platform and installation method |
-
2014
- 2014-06-23 CN CN201420335788.7U patent/CN203924659U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104032944A (en) * | 2014-06-23 | 2014-09-10 | 山东电力建设第一工程公司 | Suspension frame construction platform device |
CN107227839A (en) * | 2017-07-10 | 2017-10-03 | 中冶建筑研究总院有限公司 | A kind of integrated Construction of Supporting security platform and installation method |
CN107227839B (en) * | 2017-07-10 | 2024-02-06 | 中冶建筑研究总院有限公司 | Integrated support construction safety platform and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204960269U (en) | Integral pylon | |
CN203499229U (en) | Operating platform for construction of elevator shaft | |
CN203845689U (en) | Indoor assembled large-scale equipment hoisting device | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN104032944A (en) | Suspension frame construction platform device | |
CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
CN204626930U (en) | Integrated lifting frame operating platform | |
CN203474231U (en) | Steel bar tower safety hoisting device | |
CN203297765U (en) | Integrated support and hanger capable of being assembled and connecting pieces thereof | |
CN202864675U (en) | Shaft-type part hoisting tool | |
CN103193148A (en) | Railway locomotive roof lifting component and lifting frame | |
CN102817467B (en) | Operating platform for high-altitude installation of steel structure | |
CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
CN204238443U (en) | A kind of detachable suspension column fastening devices | |
CN203820360U (en) | Lifting appliance for installing existing railway sound barrier plate | |
CN204224123U (en) | A kind of suspension hoisting device installing base husband Saite stove | |
CN203795824U (en) | Suspension type fastener scaffold erecting device | |
CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
CN203855324U (en) | Lifting device for installing and removing underground coal mine working face | |
CN204702404U (en) | Portable suspender | |
CN104612166A (en) | Combined supporting device and method for hole wall supporting | |
CN206550561U (en) | By root vertical lifting formula large-scale pipeline soldering mounting structure in closed shaft | |
CN206188260U (en) | Hoist top ping lift prevents kinking device and hoist | |
CN103552905A (en) | Pipe fitting hoisting box | |
CN203514753U (en) | Mobile elevator shaft operation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20141105 |