CN202467221U CN2011204449666U CN201120444966U CN202467221U CN 202467221 U CN202467221 U CN 202467221U CN 2011204449666 U CN2011204449666 U CN 2011204449666U CN 201120444966 U CN201120444966 U CN 201120444966U CN 202467221 U CN202467221 U CN 202467221U
Authority
CN
China
Prior art keywords
hoisting
steel roof
roof truss
power plant
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204449666U
Other languages
Chinese (zh)
Inventor
唐跃俊
周高峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN ELECTRIC POWER ENGINEERING SUPERVISION Co Ltd
State Grid Corp of China SGCC
Original Assignee
TIANJIN ELECTRIC POWER ENGINEERING SUPERVISION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN ELECTRIC POWER ENGINEERING SUPERVISION Co Ltd filed Critical TIANJIN ELECTRIC POWER ENGINEERING SUPERVISION Co Ltd
Priority to CN2011204449666U priority Critical patent/CN202467221U/en
Application granted granted Critical
Publication of CN202467221U publication Critical patent/CN202467221U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种发电厂主厂房钢屋架吊装起重装置,包括横梁、竖梁以及支撑梁,竖梁竖直安装在横梁上,支撑梁倾斜设置且支撑梁的两端分别安装在横梁和竖梁上形成三角架结构。本实用新型是一种结构简单、设计科学、实用性强的用于发电厂主厂房钢屋架吊装的起重装置,本装置借助主厂房已经安装完成的桥吊,利用桥吊的稳定性及来回的灵活性进行钢屋架吊装,采用本装置可以减少大型吊装设备的再次投入及频繁转移、确保在钢屋架就位过程的安全、缩短吊装工期、降低施工成本。

Figure 201120444966

The utility model relates to a hoisting and lifting device for the steel roof truss of the main factory building of a power plant, which comprises a beam, a vertical beam and a supporting beam. A tripod structure is formed on the vertical beams. The utility model is a lifting device with simple structure, scientific design and strong practicability for hoisting the steel roof truss of the main factory building of a power plant. The flexibility of steel roof truss hoisting, the use of this device can reduce the re-investment and frequent transfer of large hoisting equipment, ensure the safety of the steel roof truss in place process, shorten the hoisting period, and reduce construction costs.

Figure 201120444966

Description

发电厂主厂房钢屋架吊装起重装置Lifting device for steel roof truss hoisting of power plant main building

技术领域 technical field

本实用新型涉及火电工程施工领域中的吊装装置,尤其是一种发电厂主厂房钢屋架吊装起重装置。The utility model relates to a hoisting device in the field of thermal power engineering construction, in particular to a lifting device for hoisting a steel roof truss of a main factory building of a power plant.

背景技术 Background technique

在以往的火电项目施工中,由于主厂房钢屋架的安装高度一般在20多米,因此吊装钢屋架时必须全部采用大型起重设备进行,在吊装过程中大型设备需要频繁转移,从而导致整个吊装过程存在成本高、工期长以及安全可靠度低等诸多问题。In the past construction of thermal power projects, since the installation height of the steel roof truss of the main factory building is generally more than 20 meters, large-scale lifting equipment must be used to hoist the steel roof truss. During the hoisting process, large-scale equipment needs to be frequently transferred, which leads to the There are many problems such as high cost, long construction period and low safety and reliability.

发明内容 Contents of the invention

本实用新型的目的是克服现有技术的不足,提供一种设计合理、结构简单、使用方便、能够降低成本、缩短工期、保证施工安全的发电厂主厂房钢屋架吊装起重装置。The purpose of the utility model is to overcome the deficiencies of the prior art and provide a steel roof truss hoisting device for the main building of a power plant with reasonable design, simple structure, convenient use, reduced cost, shortened construction period, and guaranteed construction safety.

本实用新型的目的是通过以下技术手段实现的:The purpose of this utility model is achieved by the following technical means:

一种发电厂主厂房钢屋架吊装起重装置,其特征在于:包括横梁、竖梁以及支撑梁,竖梁竖直安装在横梁上,支撑梁倾斜设置且支撑梁的两端分别安装在横梁和竖梁上形成三角架结构。A lifting device for hoisting the steel roof truss of the main building of a power plant, characterized in that it includes a beam, a vertical beam and a support beam, the vertical beam is vertically installed on the beam, the support beam is arranged obliquely, and the two ends of the support beam are respectively installed on the beam and the beam. A tripod structure is formed on the vertical beams.

而且,竖梁上端水平安装一连接梁,该连接梁上安装一吊钩。Moreover, a connecting beam is installed horizontally on the upper end of the vertical beam, and a suspension hook is installed on the connecting beam.

而且,所述的横梁、竖梁以及支撑梁均为型钢。Moreover, the cross beams, vertical beams and support beams are all shaped steel.

而且,所述的连接梁为型钢。Moreover, the connecting beam is shaped steel.

而且,所述的横梁、竖梁、支撑梁以及连接梁采用焊接或者螺栓连接方式安装在一起。Moreover, the beams, vertical beams, supporting beams and connecting beams are installed together by welding or bolting.

本实用新型的优点和积极效果是:Advantage and positive effect of the present utility model are:

1、本吊装起重装置的三角形架体采用型钢相互焊接或者螺栓连接,因此本装置组装方便、使用简单,可在现场进行安装。1. The triangular frame body of the hoisting device is welded or bolted to each other by section steel, so the device is easy to assemble and use, and can be installed on site.

2、本吊装起重装置的架体可以在现场进行组装,也可在主厂房桥吊上进行组装,然后将组装完成的吊装起重装置安装在主厂房的桥吊上,最后借助锅炉的大型吊装设备对地面上的钢屋架进行吊装,挂在已经安装完成的起吊设备的倒链上。由于主厂房钢屋架的吊装就位过程全部在施工人员的视野中,因此使用本装置的安全性能比使用以往的大型吊装设备更有保障,不但提高了吊装设备的利用率,而且还为工程节约了大量的人力、物力和资金。2. The frame body of the hoisting device can be assembled on site or on the bridge crane of the main workshop, and then the assembled hoisting device can be installed on the bridge crane of the main workshop, and finally with the help of the large boiler The hoisting equipment hoists the steel roof truss on the ground and hangs it on the inverted chain of the hoisting equipment that has been installed. Since the hoisting process of the steel roof truss of the main factory building is all in the field of vision of the construction personnel, the safety performance of using this device is more guaranteed than that of the previous large-scale hoisting equipment, which not only improves the utilization rate of the hoisting equipment, but also saves the project A lot of manpower, material resources and funds.

3、本吊装起重装置中的架体是采用型钢加工而成的三角架体系,该结构可确保起重装置的稳定性。本吊装起重装置中的横梁、竖梁、支撑梁以及连接梁均为型钢,该型钢选择灵活多样,可根据工程的特点采用不同的型钢结构。在三角架的上部安装可以满足吊装使用的吊钩,其强度需满足起吊设备需要。以上结构均可确保本装置具有足够的吊装强度以及吊装的安全稳定性,保障吊装过程顺利完成。3. The frame body in this hoisting lifting device is a tripod system processed by section steel, which can ensure the stability of the lifting device. The beams, vertical beams, supporting beams and connecting beams in the hoisting and lifting device are all section steels. The selection of the section steels is flexible and diverse, and different section steel structures can be adopted according to the characteristics of the project. Install hooks on the upper part of the tripod that can meet the requirements of hoisting, and its strength must meet the needs of lifting equipment. The above structures can ensure that the device has sufficient hoisting strength and hoisting safety and stability, ensuring the smooth completion of the hoisting process.

4、本实用新型是一种结构简单、设计科学、实用性强的用于发电厂主厂房钢屋架吊装的起重装置,本装置借助主厂房已经安装完成的桥吊,利用桥吊的稳定性及来回的灵活性进行钢屋架吊装,采用本装置可以减少施工机械设备的再次投入及频繁转移、确保在钢屋架就位过程的安全、缩短吊装工期以及降低施工成本。4. The utility model is a lifting device with simple structure, scientific design and strong practicability for hoisting the steel roof truss of the main building of the power plant. And back and forth flexibility for hoisting steel roof trusses, using this device can reduce the re-investment and frequent transfer of construction machinery and equipment, ensure the safety of steel roof trusses in place, shorten the hoisting period and reduce construction costs.

附图说明 Description of drawings

图1是本实用新型的主视图;Fig. 1 is the front view of the utility model;

图2是本实用新型的使用示意图;Fig. 2 is the use schematic diagram of the utility model;

图3是图2的俯视图。FIG. 3 is a top view of FIG. 2 .

具体实施方式 Detailed ways

下面结合附图详细叙述本实用新型的实施例;需要说明的是,本实施例是叙述性的,不是限定性的,不能以此限定本实用新型的保护范围。The embodiments of the present utility model are described in detail below in conjunction with the accompanying drawings; it should be noted that the present embodiments are descriptive, not restrictive, and cannot limit the protection scope of the present utility model with this.

一种发电厂主厂房钢屋架吊装起重装置,包括横梁5、竖梁4以及支撑梁3,竖梁竖直安装在横梁上,横梁安装在桥吊6上,支撑梁倾斜设置,且支撑梁的两端分别安装在横梁和竖梁上,横梁、竖梁以及支撑梁形成一个三角架结构。A hoisting device for hoisting the steel roof truss of the main factory building of a power plant, including a beam 5, a vertical beam 4 and a support beam 3, the vertical beam is installed vertically on the beam, the beam is installed on the bridge crane 6, the support beam is installed obliquely, and the support beam The two ends of the frame are installed on the beam and the vertical beam respectively, and the beam, the vertical beam and the supporting beam form a tripod structure.

竖梁上端水平安装一个连接梁1,该连接梁上安装一个吊钩2,该吊钩用于挂装倒链。本实施例中的横梁、竖梁、支撑梁以及连接梁均为型钢,其采用焊接方式或者螺栓连接方式安装在一起。A connection beam 1 is installed horizontally on the vertical beam upper end, and a suspension hook 2 is installed on the connection beam, and the suspension hook is used for hanging and installing an inverted chain. The beams, vertical beams, supporting beams and connecting beams in this embodiment are all shaped steel, which are installed together by welding or bolting.

本实用新型的使用过程是:The use process of the present utility model is:

本吊装起重装置可根据发电厂主厂房钢屋架的具体尺寸进行组装。在组装过程中,借助吊装锅炉的吊装机械将加工好的配置件在主厂房桥吊梁上组装,所有的连接部位采用焊接或螺栓连接,桥吊与此吊装设备连接采用卡具进行;组装完成后借助锅炉大型吊装设备将已经组装完成的单榀钢屋架7吊装到桥吊梁上,用已经组装完成的吊装设备上的倒链将单榀钢屋架固定在吊装设备上,然后开动桥吊至就位处将钢屋架就位,其它钢屋架按照上述方式进行。The hoisting lifting device can be assembled according to the specific size of the steel roof truss of the main factory building of the power plant. During the assembly process, with the help of hoisting machinery for hoisting the boiler, the processed configuration parts are assembled on the bridge suspension beam of the main factory building. All the connection parts are connected by welding or bolts, and the bridge crane is connected with the hoisting equipment by clamps; the assembly is completed Finally, hoist the assembled single steel roof truss 7 on the bridge suspension beam with the help of large-scale boiler hoisting equipment, fix the single steel roof truss on the hoisting equipment with the inverted chain on the assembled hoisting equipment, and then start the bridge hoist to Put the steel roof truss in place at the position, and carry out the other steel roof trusses in the above-mentioned manner.

Claims (5)

1.一种发电厂主厂房钢屋架吊装起重装置,其特征在于:包括横梁、竖梁以及支撑梁,竖梁竖直安装在横梁上,支撑梁倾斜设置且支撑梁的两端分别安装在横梁和竖梁上形成三角架结构。1. A hoisting device for hoisting the steel roof truss of the main factory building of a power plant, characterized in that: it comprises a crossbeam, a vertical beam and a support beam, the vertical beam is vertically installed on the crossbeam, the support beam is inclined and the two ends of the support beam are respectively installed on the A tripod structure is formed on the beams and vertical beams. 2.根据权利要求1所述的发电厂主厂房钢屋架吊装起重装置,其特征在于:所述的竖梁上端水平安装一连接梁,该连接梁上安装吊钩。2. The hoisting device for hoisting the steel roof truss of the main building of the power plant according to claim 1, wherein a connecting beam is installed horizontally on the upper end of the vertical beam, and a hook is installed on the connecting beam. 3.根据权利要求1所述的发电厂主厂房钢屋架吊装起重装置,其特征在于:所述的横梁、竖梁以及支撑梁均为型钢。3. The hoisting device for hoisting steel roof trusses of the main building of a power plant according to claim 1, wherein the beams, vertical beams and support beams are all shaped steel. 4.根据权利要求2所述的发电厂主厂房钢屋架吊装起重装置,其特征在于:所述的连接梁为型钢。4. The hoisting device for hoisting the steel roof truss of the main workshop building of a power plant according to claim 2, wherein the connecting beam is shaped steel. 5.根据权利要求2所述的发电厂主厂房钢屋架吊装起重装置,其特征在于:所述的横梁、竖梁、支撑梁以及连接梁采用焊接或者螺栓连接方式安装在一起。5. The hoisting device for hoisting steel roof trusses of the main building of a power plant according to claim 2, wherein the beams, vertical beams, supporting beams and connecting beams are installed together by welding or bolting.
CN2011204449666U 2011-11-11 2011-11-11 Power plant main workshop steel roof truss hoisting lifting device Expired - Fee Related CN202467221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204449666U CN202467221U (en) 2011-11-11 2011-11-11 Power plant main workshop steel roof truss hoisting lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204449666U CN202467221U (en) 2011-11-11 2011-11-11 Power plant main workshop steel roof truss hoisting lifting device

Publications (1)

Publication Number Publication Date
CN202467221U true CN202467221U (en) 2012-10-03

Family

ID=46915387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204449666U Expired - Fee Related CN202467221U (en) 2011-11-11 2011-11-11 Power plant main workshop steel roof truss hoisting lifting device

Country Status (1)

Country Link
CN (1) CN202467221U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383613A (en) * 2011-11-11 2012-03-21 天津电力工程监理有限公司 Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN109250641A (en) * 2018-11-09 2019-01-22 山东华兴纺织集团有限公司 A kind of hoisting apparatus for main licker-in

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383613A (en) * 2011-11-11 2012-03-21 天津电力工程监理有限公司 Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN102383613B (en) * 2011-11-11 2014-09-17 天津电力工程监理有限公司 Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN109250641A (en) * 2018-11-09 2019-01-22 山东华兴纺织集团有限公司 A kind of hoisting apparatus for main licker-in

Similar Documents

Publication Publication Date Title
CN102079489A (en) Suspended-rising support system of tower crane
CN203255914U (en) Unit-typed curtain wall lifting device
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN206308702U (en) A kind of portable basis of derrick crane
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN204662458U (en) Detachable pretightning force combined support frame system brace summer transition Connection Block
CN106276630A (en) A kind of internal-climbing tower crane supporting construction of band shearing frame
CN206345617U (en) Building tower crane attachment device is received in a kind of
CN201857209U (en) Special lifting tool provided with wheel hub of diversion cover
CN205975635U (en) Foundation pit support structure
CN201746222U (en) Installation lifting device of cooling wall of furnace shell
CN203066491U (en) Locator for installing round tube type connection member
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN202729660U (en) Support strengthening device for tower crane attached frame
CN204681017U (en) A kind of joist steel upright base
CN204418203U (en) The connecting installation structure of a kind of offshore wind farm jacket basis and support platform
CN204198227U (en) A kind of for the compound type hoisting disk device during maintenance of the equipment such as blast furnace, heat generator
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN203571219U (en) Novel cable tray for bridge
CN204265249U (en) A kind of transfer crane and portal frame thereof
CN208137970U (en) Longitudinally connected attachment device between a kind of grillage for Tunnel Engineering
CN103437368B (en) One encloses purlin parts
CN215716656U (en) Simple overhanging gutter aluminum plate mounting bracket
CN202829430U (en) Movable type lifting appliance for comb plate expansion joint installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: TIANJIN ELECTRIC POWER ENGINEERING SUPERVISION CO., LTD.

Effective date: 20130527

Owner name: TIANJIN ELECTRIC POWER ENGINEERING SUPERVISION CO.

Effective date: 20130527

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300143 HEBEI, TIANJIN TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130527

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Tianjin Electric Power Engineering Supervision Co., Ltd.

Address before: 300143 No. 153 Xiang Xiang Road, Hebei District, Tianjin

Patentee before: Tianjin Electric Power Engineering Supervision Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20191111