CN204626930U - A kind of integrated form crane operating platform - Google Patents
A kind of integrated form crane operating platform Download PDFInfo
- Publication number
- CN204626930U CN204626930U CN201520137295.7U CN201520137295U CN204626930U CN 204626930 U CN204626930 U CN 204626930U CN 201520137295 U CN201520137295 U CN 201520137295U CN 204626930 U CN204626930 U CN 204626930U
- Authority
- CN
- China
- Prior art keywords
- wall
- guide rail
- fixed
- operating platform
- integrated form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
- Ladders (AREA)
Abstract
The utility model proposes a kind of integrated form crane operating platform, the folded scaffold unit comprise the attachment support system be fixed on body of wall, being arranged on the Hoisting System in described attachment support system and being fixed in described Hoisting System, described attachment support system comprises the outrigger be fixed on body of wall and the wall-attached supporting seat be fixed on described outrigger; Described Hoisting System comprises and being arranged on described wall-attached supporting seat and the guide rail that can slide along described wall-attached supporting seat and the guide rail truss being connected described guide rail.This integrated form crane operating platform, can climb separately, and structure is simple, and to construction site strong adaptability, each parts can adopt batch production Prefabrication, modularization assemble, and installing/dismounting is rapid, can also repeat practicality, not only economy but also efficient.
Description
Technical field
The utility model relates to technical field of building construction, particularly a kind of operating platform of high-building construction.
Background technology
In recent years, along with the fast development of China's economy, high-rise, super highrise building gets more and more, and in traditional high-building construction, the steel pipe that use is a large amount of usually, fastener set up scaffold aloft, are arranged on scaffold by operating platform.The construction method of this structure, operating environment is dangerous, and scaffold consumable quantity is large, and cost is high, long construction period, and dismounting is inconvenient.Therefore need a kind of safer, flexibly, the erection method of operating platform easily.
Utility model content
The utility model proposes a kind of integrated form crane operating platform, solve in prior art and pass through scaffold building operating platform, cause the problems such as poor stability in construction, consumptive material are large, cost is high, dismounting is inconvenient.
The technical solution of the utility model is achieved in that a kind of integrated form crane operating platform, the folded scaffold unit comprise the attachment support system be fixed on body of wall, being arranged on the Hoisting System in described attachment support system and being fixed in described Hoisting System, described attachment support system comprises the outrigger be fixed on body of wall and the wall-attached supporting seat be fixed on described outrigger; Described Hoisting System comprises and being arranged on described wall-attached supporting seat and the guide rail that can slide along described wall-attached supporting seat and the guide rail truss being connected described guide rail.
Described folded scaffold unit comprises two brace summers be fixed on described guide rail of encorbelmenting, be vertically fixed on Terrace prevention truss on described brace summer and level is laid on base plate between described brace summer.
Oblique pull wire rope is provided with between described brace summer and described guide rail.
Described wall-attached supporting seat is provided with anti-drop device.
In order to further improve safety, described Terrace prevention truss is provided with safety net.
The utility model adopts integrated form crane operating platform to replace console mode external scaffolding operating platform, and tower crane can be utilized directly to promote whole operating platform along guide rail, and this operating platform has following features:
1, the parts such as wall-attached supporting seat, outrigger, guide rail, guide rail truss, brace summer, platform truss and base plate, because structure is simple, to construction site strong adaptability, therefore all batch production Prefabrication can be adopted, modularization assemble, installing/dismounting is rapid, can also repeat practicality, not only economy but also efficient;
2, whole operating platform realizes climbing separately by tower crane, can stop the position being fixed on and being convenient to materials hauling, convenient, flexible;
3, there is fall arrest mechanical device, safe and reliable.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of integrated form crane of the utility model operating platform structural representation;
Fig. 2 is the utility model attachment support system schematic diagram;
Fig. 3 is the utility model folded scaffold unit schematic diagram.
Mark in figure, 1, body of wall; 2, support system is adhered to; 3, guide rail; 4, guide rail truss; 5, brace summer; 6, Terrace prevention truss; 7, oblique pull wire rope; 8, outrigger; 9, wall-attached supporting seat; 10, anti-drop device; 11, base plate; 12, bolt.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
In figure, outrigger 8 is fixed on body of wall 1 by bolt 12, and jointly forms attachment support system 2 with the wall-attached supporting seat 9 of anti-drop device 10.Hoisting System comprises guide rail 3 and guide rail truss 4, and guide rail 3 is arranged on wall-attached supporting seat 9, and can slide along wall-attached supporting seat 9, and each group of guide rail 3 is installed between joint and connected by guide rail truss 4.Folded scaffold unit comprise on two fixing brace summer 5, vertically fixed support beams on guides 3 of encorbelmenting 5 Terrace prevention truss 6 and level be laid on base plate 11 between brace summer 5.Being provided with safety net around Terrace prevention truss 6, in order to improve the safety of operating platform further, between brace summer 5 and guide rail 3, being provided with oblique pull wire rope 7, the angle between oblique pull wire rope 7 and brace summer 5 should >=45 °.
During descending operation, with tower crane by folded scaffold unit and guide rail 3 along wall-attached supporting seat 9 integral elevating to correct position, by anti-drop device 10, guide rail 3 is fixed, very flexibly and easily.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (5)
1. an integrated form crane operating platform, it is characterized in that: the folded scaffold unit comprising the attachment support system (2) be fixed on body of wall (1), be arranged on the Hoisting System on described attachment support system (2) and be fixed in described Hoisting System, described attachment support system (2) comprises the outrigger (8) be fixed on body of wall (1) and the wall-attached supporting seat (9) be fixed on described outrigger (8); Described Hoisting System comprises and is arranged on described wall-attached supporting seat (9) upper and the guide rail (3) that can slide along described wall-attached supporting seat (9) and the guide rail truss (4) being connected described guide rail (3).
2. a kind of integrated form crane operating platform according to claim 1, it is characterized in that, described folded scaffold unit comprises two brace summers (5) be fixed on described guide rail (3) of encorbelmenting, be vertically fixed on Terrace prevention truss (6) on described brace summer (5) and level and be laid on base plate (11) between described brace summer (5).
3. a kind of integrated form crane operating platform according to claim 2, is characterized in that, be provided with oblique pull wire rope (7) between described brace summer (5) and described guide rail (3).
4. a kind of integrated form crane operating platform according to any one of claims 1 to 3 claim, it is characterized in that, described wall-attached supporting seat (9) is provided with anti-drop device (10).
5. a kind of integrated form crane operating platform according to claim 4, is characterized in that, described Terrace prevention truss (6) is provided with safety net.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520137295.7U CN204626930U (en) | 2015-03-11 | 2015-03-11 | A kind of integrated form crane operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520137295.7U CN204626930U (en) | 2015-03-11 | 2015-03-11 | A kind of integrated form crane operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204626930U true CN204626930U (en) | 2015-09-09 |
Family
ID=54045970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520137295.7U Expired - Fee Related CN204626930U (en) | 2015-03-11 | 2015-03-11 | A kind of integrated form crane operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204626930U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105245168A (en) * | 2015-10-28 | 2016-01-13 | 安徽恒坤地基基础工程有限公司 | Photovoltaic installation device |
CN106639294A (en) * | 2017-01-16 | 2017-05-10 | 深圳前海特辰科技有限公司 | Universal wall attaching connecting piece |
CN110629997A (en) * | 2019-09-06 | 2019-12-31 | 浙江华铁建筑安全科技股份有限公司 | Integrated form climbs frame |
CN113250434A (en) * | 2021-06-24 | 2021-08-13 | 安徽长青建筑制品有限公司 | Multifunctional composite scaffold system |
-
2015
- 2015-03-11 CN CN201520137295.7U patent/CN204626930U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105245168A (en) * | 2015-10-28 | 2016-01-13 | 安徽恒坤地基基础工程有限公司 | Photovoltaic installation device |
CN105245168B (en) * | 2015-10-28 | 2018-04-20 | 安徽恒坤地基基础工程有限公司 | A kind of photovoltaic installs equipment |
CN106639294A (en) * | 2017-01-16 | 2017-05-10 | 深圳前海特辰科技有限公司 | Universal wall attaching connecting piece |
CN110629997A (en) * | 2019-09-06 | 2019-12-31 | 浙江华铁建筑安全科技股份有限公司 | Integrated form climbs frame |
CN113250434A (en) * | 2021-06-24 | 2021-08-13 | 安徽长青建筑制品有限公司 | Multifunctional composite scaffold system |
CN113250434B (en) * | 2021-06-24 | 2022-09-09 | 安徽长青建筑制品有限公司 | Multifunctional composite scaffold system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN204626930U (en) | A kind of integrated form crane operating platform | |
CN106193618A (en) | A kind of Long span aerial steel structure truss construction | |
CN202509754U (en) | High-altitude steel structure node construction working platform | |
CN102392532B (en) | Construction method for built-in hanging scaffold of high-rise building | |
CN204418629U (en) | A kind of integrated form climbing frame | |
CN202882377U (en) | Hanging scaffold for integral hanging construction of truss | |
CN211689948U (en) | Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge | |
CN205654127U (en) | Portable operation protective platform of assembly type structure stairwell | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN201826438U (en) | Steel column convenient for constructing temporary operating platform | |
CN205558308U (en) | Integrated form platform of unloading | |
CN201722937U (en) | Sliding platform for installation of net rack | |
CN202745356U (en) | Hydraulic climb material platform | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
CN202990386U (en) | Externally-suspended scaffold | |
CN203563158U (en) | Portable hand-operated monitor tester | |
CN205975362U (en) | Steel sleeve auxiliary positioning device | |
CN212406019U (en) | Adjustable regularization safety operation platform construction equipment | |
CN204626931U (en) | In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform | |
CN204510797U (en) | A kind of hydraulic climbing formwork structure | |
CN204435859U (en) | Be exclusively used in the moveable platform of high-rise concrete construction of lift well | |
CN203430007U (en) | Aerial work platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20160311 |