CN206636153U - Indoor individual layer scaffold - Google Patents
Indoor individual layer scaffold Download PDFInfo
- Publication number
- CN206636153U CN206636153U CN201720276337.4U CN201720276337U CN206636153U CN 206636153 U CN206636153 U CN 206636153U CN 201720276337 U CN201720276337 U CN 201720276337U CN 206636153 U CN206636153 U CN 206636153U
- Authority
- CN
- China
- Prior art keywords
- straight
- pedal
- entrance
- support frame
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a kind of indoor individual layer scaffold, including scaffold body, the scaffold body both sides are provided with fence support frame, transverse horizontal is provided with pedal in fragment position among the fence support frame, the pedal both sides are provided with folding ladder device on side end face, the pedal center is further opened with rising up into mouth always, it is described go straight up to access cover and close be connected with and renovate out plate, it is described renovate out plate one end and be articulated with described go straight up to inlet edge, the plate other end of renovating out covers described go straight up on entrance, detachable is gone back in the side frame body of fence support frame one, and one small-sized hydraulic lifting platform is installed.By the above-mentioned means, the utility model can climb up pedal in several ways and on scaffold construction working, improve security, protect constructor.
Description
Technical field
Scaffold field is the utility model is related to, more particularly to a kind of indoor individual layer scaffold.
Background technology
Scaffold refers to job site for operation and solves vertically and horizontally to transport the various supports set up.Pin hand
Frame can be with being used in exterior wall, inside fitting or the higher place that can not directly construct of floor height on building sites.Mainly for construction
Personnel up and down go along with sb. to guard him and high-altitude installation component etc. by operation or perimeter security net, and scaffold making material generally has:Bamboo and wood, steel pipe
Or synthetic material etc..Some engineerings are also with scaffold when template use, in addition in portions such as advertising, municipal administration, traffic road and bridge, mines
Door is also used extensively.But traditional scaffold can only be climbed up on treadle of false work by traditional climb type mode, typically all
It is that constructor helps scaffold both sides fix bar directly to set foot on pedal, but traditional climbing mode easily causes scaffold rollover etc.
Dangerous situation occurs, and allows constructor to come to harm.
Utility model content
The utility model, can be in several ways mainly solving the technical problems that provide a kind of indoor individual layer scaffold
Climb up pedal and on scaffold construction working, improve security, protect constructor.
In order to solve the above technical problems, the technical scheme that the utility model uses is:A kind of indoor single layer foot is provided
Hand cradle, including scaffold body, the scaffold body both sides are provided with fence support frame, and the fence support frame is provided with more
Level rail bar, transverse horizontal is provided with pedal in fragment position among the fence support frame, the pedal both ends with it is described
It is connected between fence support frame, folding ladder device, the folding ladder device is installed on the side end face of the pedal both sides
Including more piece ladder plate, be hinged between ladder plate, the pedal center is further opened with rising up into mouth always, it is described go straight up into
Cover to be connected with and renovate out plate on mouthful, it is described renovate out plate one end be articulated with it is described go straight up to inlet edge, it is described that to renovate out plate another
One end is gone straight up on entrance described in covering, and detachable is gone back in the side frame body of fence support frame one and is provided with small-sized hydraulic lifting
Platform.
In one preferred embodiment of the utility model, the entrance of going straight up to is through being opened in pedal center, institute
It is round hole or square opening to state and go straight up to entrance, and described go straight up to is provided with a ring on inlet inside end face to inner bulge
Shape flange, it is described renovate Kai Bangai enter it is described go straight up to entrance after propped up by annular flange.
In one preferred embodiment of the utility model, the small-sized hydraulic lifting platform pendulum is gone straight up to immediately below entrance described
After constructor can be sent into described in go straight up to entrance and climb up on the pedal.
In one preferred embodiment of the utility model, the ladder device that folds is arranged on the institute for going straight up to entrance both sides
State on pedal side end face.
The beneficial effects of the utility model are:The utility model can climb up pedal in several ways and in scaffold
Upper construction working, constructor both can climb up pedal by the folding ladder device on the side end face of pedal both sides, can lead to again
Cross the lifting of small-sized hydraulic elevator platform and directly climb up pedal from going straight up to entrance, be different from traditional climb type login mode, improve
Security, protects constructor.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model
Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings
Other accompanying drawings are obtained, wherein:
Fig. 1 is the structural representation of the preferred embodiment of individual layer scaffold one in the utility model room;
The mark of each part is as follows in accompanying drawing:1st, scaffold body;2nd, fence support frame;3rd, rail bar;4th, trample
Plate;5th, folding ladder fills;6th, entrance is gone straight up to;7th, plate is renovated out;8th, small-sized hydraulic lifting platform.
Embodiment
The technical scheme in the embodiment of the utility model will be clearly and completely described below, it is clear that described
Embodiment is only part of the embodiment of the present utility model, rather than whole embodiments.Based on the implementation in the utility model
Example, all other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, is belonged to
The scope of the utility model protection.
Referring to Fig. 1, the utility model embodiment includes:
A kind of indoor individual layer scaffold, including scaffold body 1, the both sides of scaffold body 1 are provided with fence support
Frame 2, the fence support frame 2 are provided with multistage rail bar 3, and transverse horizontal is installed in the 2 middle fragment position of fence support frame
There is pedal 4, be connected between the both ends of pedal 4 and the fence support frame 2, the both sides side end face of pedal 4
On be provided with fold ladder device 5, it is described folding ladder device 5 include more piece ladder plate, be hinged between ladder plate, it is described to trample
The center of plate 4 is further opened with rising up into mouth 6 always, it is described go straight up to cover to be connected with entrance 6 renovate out plate 7, it is described to renovate out plate 7 one
End be articulated with it is described go straight up to the edge of entrance 6, it is described renovate out the other end of plate 7 cover it is described go straight up on entrance 6, the fence branch
Detachable is gone back in the side frame body of support 2 one one small-sized hydraulic lifting platform 8 is installed.
In addition, the entrance 6 of going straight up to is through being opened in the center of the pedal 4, it is described go straight up to entrance 6 for round hole or
Person's square opening, described go straight up to is provided with a circle annular flange on the inner side end of entrance 6 to inner bulge, described to renovate out plate 7
Propped up after going straight up to entrance 6 described in covering by annular flange.
In addition, the small-sized hydraulic lifting platform 8 put constructor can be sent into after described go straight up to immediately below entrance 6 it is described straight
Mouth 6 is risen up into climb up on the pedal 4.
In addition, the folding ladder device 5 is arranged on described go straight up on the side end face of the pedal 4 of the both sides of entrance 6.
Of the present utility model to be operated in the both sides of scaffold body 1 installation fence support frame 2, fence support frame 2 is provided with more
Level rail bar 3, transverse horizontal is provided with pedal 4 in 2 middle fragment position of fence support frame, and the both ends of pedal 4 support with fence
It is connected between frame 2, is provided with the both sides side end face of pedal 4 and folds ladder device 5, folding ladder device 5 includes more piece ladder
Plate, it is hinged between ladder plate, folds ladder device 5 and be arranged on and goes straight up on the side end face of pedal 4 of the both sides of entrance 6, folding ladder
Device 5 can be folded to put down and allowed in constructor's climbing on pedal 4 from the both sides of pedal 4.
The center of pedal 4 is further opened with rising up into mouth 6 always, goes straight up to cover to be connected with entrance 6 and renovates out plate 7, renovates out
The one end of plate 7, which is articulated with, goes straight up to the edge of entrance 6, renovates out the other end of plate 7 and covers and goes straight up on entrance 6, goes straight up to entrance 6 through opening up
In the center of pedal 4, it is round hole or square opening to go straight up to entrance 6, goes straight up to and is set on the inner side end of entrance 6 to inner bulge
Be equipped with a circle annular flange, renovate out plate 7 cover go straight up to entrance 6 after propped up by annular flange, the side frame body of fence support frame 2 one
On go back detachable one small-sized hydraulic lifting platform 8 be installed, small-sized hydraulic lifting platform 8 is put will can apply after going straight up to immediately below entrance 6
Work person's feeding is gone straight up to entrance 6 and climbed up on pedal 4, and the folding ladder that constructor can both pass through on the both sides side end face of pedal 4 fills
Put 5 and climb up pedal 4, can be lifted again by small-sized hydraulic lifting platform 8 and directly climb up pedal 4 from going straight up to entrance 6, be different from
Traditional climb type login mode, improves security, protects constructor.
Embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, it is every
The equivalent structure or equivalent flow conversion made using the utility model description, or directly or indirectly it is used in other phases
The technical field of pass, similarly it is included in scope of patent protection of the present utility model.
Claims (4)
1. a kind of indoor individual layer scaffold, including scaffold body, it is characterised in that the scaffold body both sides, which are provided with, encloses
Column support frame, the fence support frame are provided with multistage rail bar, and transverse horizontal is pacified in the fragment position of the fence support frame centre
Equipped with pedal, it is connected between the pedal both ends and the fence support frame, on the side end face of the pedal both sides
Folding ladder device is installed, the folding ladder device includes more piece ladder plate, is hinged between ladder plate, in the pedal
Centre is further opened with rising up into mouth always, it is described go straight up to access cover and close be connected with and renovate out plate, described plate one end of renovating out is articulated with
It is described to go straight up to inlet edge, it is described renovate out the plate other end cover it is described go straight up on entrance, the side frame of fence support frame one
Detachable is gone back on body one small-sized hydraulic lifting platform is installed.
2. indoor individual layer scaffold according to claim 1, it is characterised in that described to go straight up to entrance described through being opened in
Pedal center, the entrance of going straight up to is round hole or square opening, it is described go straight up to it is convex to inner side on inlet inside end face
Rise and be provided with a circle annular flange, it is described renovate Kai Bangai enter it is described go straight up to entrance after propped up by annular flange.
3. indoor individual layer scaffold according to claim 1, it is characterised in that the small-sized hydraulic lifting platform pendulum is described
Entrance is gone straight up to described in constructor can be sent into after going straight up to immediately below entrance to climb up on the pedal.
4. indoor individual layer scaffold according to claim 1, it is characterised in that the folding ladder device is arranged on described straight
Rise up on the pedal side end face of mouthful both sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720276337.4U CN206636153U (en) | 2017-03-21 | 2017-03-21 | Indoor individual layer scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720276337.4U CN206636153U (en) | 2017-03-21 | 2017-03-21 | Indoor individual layer scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206636153U true CN206636153U (en) | 2017-11-14 |
Family
ID=60249949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720276337.4U Expired - Fee Related CN206636153U (en) | 2017-03-21 | 2017-03-21 | Indoor individual layer scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206636153U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869471A (en) * | 2017-03-21 | 2017-06-20 | 无锡市龙海杰机械制造有限公司 | Indoor individual layer scaffold |
-
2017
- 2017-03-21 CN CN201720276337.4U patent/CN206636153U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869471A (en) * | 2017-03-21 | 2017-06-20 | 无锡市龙海杰机械制造有限公司 | Indoor individual layer scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206408920U (en) | A kind of collapsible operating platform for narrow space | |
CN210236926U (en) | Folding type tower crane pedestrian safety passage | |
CN206174437U (en) | Be applied to gallows of super high overlength cantilevered member construction | |
CN205088933U (en) | Tower crane inserted lift scaffold's operation protection platform | |
CN206636153U (en) | Indoor individual layer scaffold | |
CN106869471A (en) | Indoor individual layer scaffold | |
CN206928624U (en) | A kind of heavy ladder cage for high-altitude building | |
CN206737376U (en) | Possesses the multi-layer scaffold of simple to install railing defencive function | |
CN205000656U (en) | From over -and -under type material cycling platform | |
CN106836785A (en) | Possesses the scaffold of rotary work ability | |
CN202913679U (en) | Double-function construction operation protection derrick in elevator shaft way | |
CN106869423A (en) | Possesses the outdoor fire-fighting rack that multichannel climbs escaping function | |
CN214885269U (en) | Scaffold with automatic upset apron structure | |
CN206053272U (en) | A kind of traveling centering | |
CN108046183A (en) | A kind of safe construction platform | |
CN206655650U (en) | Vertical steel cat ladder | |
CN201649607U (en) | Overhung-type outer wall scaffold | |
CN210313252U (en) | Tower crane | |
CN208182431U (en) | Building construction elevator passageway and layer door integral structure | |
CN207658909U (en) | A kind of construction elevator cage door | |
CN206636190U (en) | Possesses the scaffold of rotary work ability | |
CN205998903U (en) | Possesses the derrick crane that safety enters passage | |
CN202832180U (en) | Crawling ladder protective structure at top of wind driven generator tower | |
CN206636188U (en) | The reinforcement type building for possessing illumination and drain function builds frame pedal | |
CN206830036U (en) | A kind of roofing cat ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171114 Termination date: 20180321 |