CN206174437U - Be applied to gallows of super high overlength cantilevered member construction - Google Patents

Be applied to gallows of super high overlength cantilevered member construction Download PDF

Info

Publication number
CN206174437U
CN206174437U CN201621153920.8U CN201621153920U CN206174437U CN 206174437 U CN206174437 U CN 206174437U CN 201621153920 U CN201621153920 U CN 201621153920U CN 206174437 U CN206174437 U CN 206174437U
Authority
CN
China
Prior art keywords
scaffolding
ladder
fixed
order
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621153920.8U
Other languages
Chinese (zh)
Inventor
王希河
王立方
韦佑鑫
姚继鑫
董玉坤
牛亚良
唐太
杨清鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Xiamen Construction Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201621153920.8U priority Critical patent/CN206174437U/en
Application granted granted Critical
Publication of CN206174437U publication Critical patent/CN206174437U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

本实用新型提供一种应用于超高超长悬挑构件施工的吊架,属于建筑工程技术领域,其结构包括楼体顶层楼板上方固定构筑有悬架楼层框架,楼体顶层楼板边缘部构筑有女儿墙;悬架楼层框架的边缘部向外延伸固定设置有水平的外探主梁,女儿墙和外探主梁之间斜向架设有斜撑悬架梁,女儿墙和悬架楼层框架的框架梁之间架设有加固支撑梁;斜撑悬架梁的下部设置有支撑构件;支撑构件的下方设置有阶梯脚手架。该应用于超高超长悬挑构件施工的吊架施工影响面少,施工灵活,安全系数高。与吊篮相比安全系数高很多。架体稳定性能好,吊架安装完成后整体性能好,稳定性强。

The utility model provides a hanger used in the construction of super high and super long cantilevered components, which belongs to the technical field of construction engineering. Wall; the edge of the suspended floor frame extends outwards and is fixedly provided with a horizontal main beam for external exploration, and a diagonally braced suspension beam is installed between the parapet and the main beam for external exploration, and the frame of the parapet and the suspended floor frame A reinforced support beam is erected between the beams; a support member is provided at the lower part of the diagonally braced suspension beam; and a ladder scaffold is provided below the support member. The hanger applied to the construction of ultra-high and ultra-long overhanging components has less construction influence surface, flexible construction and high safety factor. Compared with the hanging basket, the safety factor is much higher. The stability of the frame is good. After the hanger is installed, the overall performance is good and the stability is strong.

Description

一种应用于超高超长悬挑构件施工的吊架A hanger applied to the construction of super high and super long cantilevered components

技术领域technical field

本实用新型涉及建筑工程技术领域,具体地说是一种应用于超高超长悬挑构件施工的吊架。The utility model relates to the technical field of construction engineering, in particular to a hanger used in the construction of superhigh and superlong cantilever components.

背景技术Background technique

一般的,随着现场建筑的蓬勃发展,建筑物造型日新月异,施工难度逐渐增大。部分建筑物为了突显建筑气场、彰显建筑地位,在屋顶设计“屋帽”造型。Generally, with the vigorous development of on-site construction, the shape of the building changes with each passing day, and the difficulty of construction gradually increases. In order to highlight the architectural aura and highlight the status of the building, some buildings design a "roof hat" shape on the roof.

采用普通钢管落地/悬挑式脚手架可以解决部分悬挑构件的施工,当悬挑构件悬挑较长且标高较高时,普通钢管脚手架则存在较大局限性。The use of ordinary steel pipe floor/cantilever scaffolding can solve the construction of some cantilevered components. When the cantilevered components are long and the elevation is high, ordinary steel pipe scaffolding has great limitations.

本工程悬挑构件结构悬挑长度为3.8米,装饰悬挑长度为4.8米,悬挑饰面顶标高距室外地面标高为42.95米。The length of the cantilever structure of the cantilevered components of this project is 3.8 meters, the length of the decorative cantilever is 4.8 meters, and the elevation of the top of the cantilevered finish is 42.95 meters from the outdoor ground.

现有的落地式脚手架,增加立杆数量,同时需组织专家论证,材料数量巨大。Existing floor-mounted scaffolding increases the number of poles, and at the same time needs to organize expert demonstrations, and the amount of materials is huge.

现有的悬挑式脚手架,经过专项计算,悬挑工字钢型号较大,存在较大安全隐患。The existing cantilevered scaffolding, after special calculation, has a larger model of cantilevered I-beam, which has a greater potential safety hazard.

现有采用登高车进行构件安装,但是登高车受场地、构件荷载、人员数量影响较大。At present, the climbing car is used for component installation, but the climbing car is greatly affected by the site, component load, and the number of personnel.

发明内容Contents of the invention

本实用新型的技术任务是解决现有技术的不足,提供一种应用于超高超长悬挑构件施工的吊架。The technical task of the utility model is to solve the deficiencies of the prior art and provide a hanger applied to the construction of superhigh and superlong cantilever components.

本实用新型的技术方案是按以下方式实现的,该应用于超高超长悬挑构件施工的吊架,其结构包括楼体顶层楼板上方固定构筑有悬架楼层框架,The technical scheme of the utility model is realized in the following manner. The hanger applied to the construction of super high and super long cantilevered components has a structure including a suspended floor frame fixed above the top floor of the building,

楼体顶层楼板边缘部构筑有女儿墙;A parapet is built on the edge of the top floor of the building;

悬架楼层框架的边缘部向外延伸固定设置有水平的外探主梁,The edge of the suspended floor frame extends outward and is fixedly provided with a horizontal main girder for external exploration.

女儿墙和外探主梁之间斜向架设有斜撑悬架梁,Diagonal bracing suspension beams are installed obliquely between the parapet wall and the main girder of the external exploration.

女儿墙和悬架楼层框架的框架梁之间架设有加固支撑梁;Reinforcement support beams are erected between the parapet and the frame beams of the suspended floor frame;

斜撑悬架梁和加固支撑梁在女儿墙上的端部相互通过钢筋栓接浇铸连接固定;The ends of the diagonally braced suspension beams and the reinforced support beams on the parapet are connected and fixed by bolting and casting with steel bars;

斜撑悬架梁的下部设置有支撑构件;The lower part of the diagonally braced suspension beam is provided with a support member;

支撑构件的下方设置有阶梯脚手架;Ladder scaffolding is provided under the support member;

阶梯脚手架的下平面的内探端固定构筑在女儿墙根部,阶梯脚手架的下平面向女儿墙外侧外展探出,阶梯脚手架的下端架面向上连体架设有一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架;The inner probe end of the lower plane of the ladder scaffold is fixed at the root of the parapet, the lower plane of the ladder scaffold protrudes out to the outside of the parapet wall, and the lower end of the ladder scaffold faces upwards. Scaffolding, four-step scaffolding;

一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架顺次连体延伸向外架设;The first-order scaffolding, second-order scaffolding, third-order scaffolding, and fourth-order scaffolding are extended and erected in sequence;

阶梯脚手架的下平面间隔矩阵式分布的固定设置有铰接座,铰接座上铰接有立杆,立杆向上延伸,立杆的顶端并通过螺栓拉结固定在外探主梁上;立杆固定悬吊阶梯脚手架;The lower plane of the ladder scaffolding is fixed in a matrix-like distribution with hinged seats, on which a vertical rod is hinged, the vertical rod extends upward, and the top of the vertical rod is fixed on the main beam of the external inspection by bolts; the vertical rod is fixed and suspended ladder scaffolding;

阶梯脚手架的外沿固定连接有防护栏杆,防护栏杆向上延伸并通过螺栓拉结固定在外探主梁上;The outer edge of the ladder scaffolding is fixedly connected with a protective railing, and the protective railing extends upwards and is fixed on the main beam of the external inspection by bolts;

防护栏杆外侧界面挂设有密目网,密目网绑接在防护栏杆上;A dense mesh is hung on the outer interface of the protective railing, and the dense mesh is bound to the protective railing;

女儿墙和一阶脚手架之间斜向固定搭设有爬梯,爬梯的底端与一阶脚手架之间通过脚手架扣件固定连接,爬梯的顶端向上探出女儿墙,并与女儿墙部的斜撑悬架梁通过栓接固定;A climbing ladder is fixed obliquely between the parapet and the first-order scaffolding. The bottom end of the ladder is fixedly connected with the first-order scaffolding through scaffold fasteners. The frame beam is fixed by bolting;

一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架的上架面上沿阶梯脚手架跨度方向均铺设有脚踏板,脚踏板的边角部与所在阶梯脚手架绑扎固定;The upper surface of the first-order scaffolding, second-order scaffolding, third-order scaffolding, and fourth-order scaffolding are all laid with pedals along the span direction of the ladder scaffolding, and the corners of the pedals are bound and fixed to the ladder scaffolding where they are located;

一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架之间依次相邻的立面铺设立板,立板与所靠近的阶梯脚手架绑扎固定。The adjacent facades of the first-level scaffolding, second-level scaffolding, third-level scaffolding, and fourth-level scaffolding are laid with vertical boards, and the vertical boards are bound and fixed to the adjacent ladder scaffolding.

脚踏板采用穿孔钢脚踏板。Footrests are perforated steel footrests.

立板采用竹胶板。The vertical board is made of bamboo plywood.

本实用新型与现有技术相比所产生的有益效果是:Compared with the prior art, the utility model has the following beneficial effects:

该应用于超高超长悬挑构件施工的吊架节约成本,和钢管架相比较能节省将近三分之二措施费。The hanger used in the construction of ultra-high and ultra-long cantilever components saves costs, and can save nearly two-thirds of the construction cost compared with the steel pipe frame.

施工影响面少,和钢管架比较,对其他施工作业影响少,几乎不影响其他施工工种。The construction influence area is less, compared with the steel pipe frame, it has less impact on other construction operations, and hardly affects other construction types.

施工灵活,安全系数高。平台经过对每个受力点计算,对达不到或者接近危险值的都加固处理。工人在这一平台上施工,换位思考可以说是地平面上移,工人施工灵活,方便施工。与吊篮相比安全系数高很多。Flexible construction and high safety factor. The platform is calculated for each stress point, and those that do not reach or approach the dangerous value are reinforced. When workers work on this platform, empathy can be said to be that the ground level is moved up, and the workers are flexible and convenient for construction. Compared with the hanging basket, the safety factor is much higher.

架体稳定性能好,吊架安装完成后整体性能好,稳定性强。The stability of the frame is good, and the overall performance of the hanger is good after the installation is completed, and the stability is strong.

该应用于超高超长悬挑构件施工的吊架设计合理、结构简单、安全可靠、使用方便、易于维护,具有很好的推广使用价值。The hanger applied to the construction of ultra-high and ultra-long overhanging components has reasonable design, simple structure, safety and reliability, convenient use and easy maintenance, and has good popularization and use value.

附图说明Description of drawings

附图1是本实用新型的结构示意图;Accompanying drawing 1 is the structural representation of the utility model;

附图2是本实用新型的阶梯脚手架的俯视结构示意图;Accompanying drawing 2 is the top view structure schematic diagram of the ladder scaffold of the present utility model;

附图3是本实用新型的阶梯脚手架的主视结构示意图;Accompanying drawing 3 is the main view structure schematic diagram of the ladder scaffold of the present utility model;

附图4是本实用新型的阶梯脚手架的脚踏板的结构示意图。Accompanying drawing 4 is the structural representation of the pedal of the stepped scaffold of the present invention.

附图中的标记分别表示:The marks in the accompanying drawings indicate respectively:

1、楼体顶层楼板,2、悬架楼层框架,3、女儿墙,1. The top floor slab of the building, 2. The suspended floor frame, 3. The parapet,

4、外探主梁,5、斜撑悬架梁,6、框架梁,7、加固支撑梁,4. Main beam for external exploration, 5. Diagonal bracing suspension beam, 6. Frame beam, 7. Reinforced support beam,

8、支撑构件,9、阶梯脚手架,10、内探端,8. Support member, 9. Ladder scaffolding, 10. Inner probe end,

11、一阶脚手架,12、二阶脚手架,13、三阶脚手架,14、四阶脚手架,11. First-order scaffolding, 12. Second-order scaffolding, 13. Third-order scaffolding, 14. Fourth-order scaffolding,

15、铰接座,16、立杆,17、螺栓拉结,15, hinged seat, 16, vertical rod, 17, bolt tie,

18、防护栏杆,19、密目网,18, protective railing, 19, dense mesh,

20、爬梯,21、脚手架扣件,20. Ladder, 21. Scaffolding fasteners,

22、脚踏板,23、立板。22, pedals, 23, vertical board.

具体实施方式detailed description

下面结合附图对本实用新型的一种应用于超高超长悬挑构件施工的吊架作以下详细说明。A kind of hanger of the present utility model applied to the construction of superhigh and superlong cantilever components will be described in detail below in conjunction with the accompanying drawings.

如附图所示,本实用新型的一种应用于超高超长悬挑构件施工的吊架,其结构包括楼体顶层楼板1上方固定构筑有悬架楼层框架2,As shown in the accompanying drawings, a hanger of the utility model applied to the construction of super high and super long cantilevered components, its structure includes a suspended floor frame 2 fixed above the top floor slab 1 of the building,

楼体顶层楼板1边缘部构筑有女儿墙3;A parapet 3 is constructed at the edge of the top floor slab 1 of the building;

悬架楼层框架2的边缘部向外延伸固定设置有水平的外探主梁4,The edge of the suspended floor frame 2 extends outward and is fixedly provided with a horizontal main girder 4 for external exploration,

女儿墙和外探主梁之间斜向架设有斜撑悬架梁5,Diagonal bracing suspension beams 5 are arranged obliquely between the parapet wall and the main girder of the external exploration.

女儿墙和悬架楼层框架的框架梁6之间架设有加固支撑梁7;A reinforced support beam 7 is erected between the parapet and the frame beam 6 of the suspended floor frame;

斜撑悬架梁和加固支撑梁在女儿墙上的端部相互通过钢筋栓接浇铸连接固定;The ends of the diagonally braced suspension beams and the reinforced support beams on the parapet are connected and fixed by bolting and casting with steel bars;

斜撑悬架梁5的下部设置有支撑构件8;The lower part of the diagonally braced suspension beam 5 is provided with a support member 8;

支撑构件8的下方设置有阶梯脚手架9;A stepped scaffolding 9 is provided below the supporting member 8;

阶梯脚手架的下平面的内探端10固定构筑在女儿墙根部,阶梯脚手架的下平面向女儿墙外侧外展探出,阶梯脚手架的下端架面向上连体架设有一阶脚手架11、二阶脚手架12、三阶脚手架13、四阶脚手架14;The inner probe end 10 of the lower plane of the ladder scaffolding is fixedly constructed at the root of the parapet, the lower plane of the ladder scaffolding protrudes out to the outside of the parapet wall, and the lower end of the ladder scaffolding faces upwards and is connected with a first-order scaffolding 11 and a second-order scaffolding 12 , Three-stage scaffolding 13, four-stage scaffolding 14;

一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架顺次连体延伸向外架设;The first-order scaffolding, second-order scaffolding, third-order scaffolding, and fourth-order scaffolding are extended and erected in sequence;

阶梯脚手架9的下平面间隔矩阵式分布的固定设置有铰接座15,铰接座上铰接有立杆16,立杆向上延伸,立杆16的顶端并通过螺栓拉结17固定在外探主梁4上;立杆固定悬吊阶梯脚手架;The lower plane of the ladder scaffold 9 is fixedly arranged in a matrix-like distribution with hinged seats 15, on which a vertical rod 16 is hinged, and the vertical rod extends upwards, and the top of the vertical rod 16 is fixed on the main girder 4 of the outer probe through a bolt tie 17 ;Pole fixed suspension ladder scaffolding;

阶梯脚手架9的外沿固定连接有防护栏杆18,防护栏杆向上延伸并通过螺栓拉结固定在外探主梁上;The outer edge of the ladder scaffold 9 is fixedly connected with a protective railing 18, and the protective railing extends upwards and is fixed on the main girder of the external exploration by bolts;

防护栏杆18外侧界面挂设有密目网19,密目网绑接在防护栏杆上;A dense mesh 19 is hung on the outer interface of the protective railing 18, and the dense mesh is bound on the protective railing;

女儿墙和一阶脚手架之间斜向固定搭设有爬梯20,爬梯的底端与一阶脚手架之间通过脚手架扣件21固定连接,爬梯的顶端向上探出女儿墙,并与女儿墙部的斜撑悬架梁通过栓接固定;A climbing ladder 20 is fixed obliquely between the parapet and the first-order scaffolding, and the bottom end of the climbing ladder is fixedly connected with the first-order scaffolding through a scaffold fastener 21. The supporting suspension beam is fixed by bolting;

一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架的上架面上沿阶梯脚手架跨度方向均铺设有脚踏板22,脚踏板的边角部与所在阶梯脚手架绑扎固定;Step 22 is laid on the upper surface of the first-order scaffold, second-order scaffold, third-order scaffold, and fourth-order scaffold along the span direction of the ladder scaffold, and the corners of the foot pedal are bound and fixed to the ladder scaffold where it is located;

一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架之间依次相邻的立面铺设立板23,立板与所靠近的阶梯脚手架绑扎固定。The vertical panels 23 are laid on the adjacent facades of the first-level scaffolding, second-level scaffolding, third-level scaffolding, and fourth-level scaffolding, and the vertical panels are bound and fixed to the adjacent ladder scaffolding.

脚踏板22采用穿孔钢脚踏板。Pedal board 22 adopts perforated steel pedal board.

立板23采用竹胶板。Riser 23 adopts bamboo plywood.

现场施工:Site construction:

1、施工顺序1. Construction sequence

加固→处理预埋→主支撑梁安装→吊杆安装→横向支撑梁安装→阶梯脚手架安装→脚踏板安装→护栏安装→挂安全网→铝板龙骨安装→底面铝板安装→注胶→护栏拆除→脚踏板拆除→横向支撑拆除→竖向支撑拆除→拉杆部位铝板安装→顶面铝板安装。Reinforcement→Pre-embedding→Installation of main support beam→Installation of suspenders→Installation of lateral support beams→Installation of ladder scaffolding→Installation of pedals→Installation of guardrails→Hanging safety nets→Installation of aluminum keels→Installation of aluminum plates on the bottom surface→Glue injection→Removal of guardrails→ Removal of the pedal → removal of the horizontal support → removal of the vertical support → installation of the aluminum plate at the tie rod → installation of the top aluminum plate.

2、施工方法2. Construction method

1)加固处理1) Reinforcement treatment

根据计算,原建筑结构不能满足安装施工平台后的荷载,在安装前需要对建筑结构进行加固。根据设计图纸进行加固,加固时严格按图施工,保证所用材料符合设计要求,安装正确,受力方向正确。According to calculations, the original building structure cannot meet the load after the construction platform is installed, and the building structure needs to be reinforced before installation. Reinforcement is carried out according to the design drawings, and the construction is strictly carried out according to the drawings during reinforcement to ensure that the materials used meet the design requirements, the installation is correct, and the force direction is correct.

2)预埋安装2) Embedded installation

预埋间距对应原钢结构支撑梁下方统一偏移100mm,在标高36.2m处设置固定预埋件。在土建结构上使用水平仪在36.2m处抄平,按照预埋钢板穿孔位置在土建结构上打孔,孔径14mm,孔深不小于110mm,用气筒和毛刷清理干净孔内灰尘,植入m12x160化学锚栓,充分搅拌均匀。待化学螺栓固定30分钟后安装250x200x8预埋钢板。在预埋上焊接8mm连接钢板。The pre-embedded spacing corresponds to a uniform offset of 100mm below the original steel structure support beam, and fixed embedded parts are set at an elevation of 36.2m. Use a spirit level to level the civil structure at 36.2m, and drill holes in the civil structure according to the perforation position of the embedded steel plate. The hole diameter is 14mm and the hole depth is not less than 110mm. Anchor, fully stir evenly. Install the 250x200x8 pre-embedded steel plate after the chemical bolts are fixed for 30 minutes. Weld 8mm connecting steel plates on the pre-embedded.

3)悬挑主支撑梁安装3) Cantilever main support beam installation

主支撑梁在地面焊接加工完成,并把两根10#槽钢拉结杆使用m25x40高强螺栓固定在支撑梁的连接耳板上。采用固定在原钢结构上的小型卷扬机吊装,吊装到位后,一端采用m16x40的高强螺栓固定在预埋上的连接钢板上,调节支撑梁水平,把拉结杆预固定在原钢结构上,调节拉结杆的垂直度,固定拉结杆。The main support beam is welded and processed on the ground, and two 10# channel steel tie rods are fixed to the connecting ear plates of the support beam with m25x40 high-strength bolts. Use a small hoist fixed on the original steel structure for hoisting. After hoisting in place, one end is fixed to the pre-buried connecting steel plate with m16x40 high-strength bolts, adjust the level of the support beam, pre-fix the tie rods on the original steel structure, and adjust the tie. The verticality of the rod, fixed tie rod.

4)横向支撑梁安装4) Lateral support beam installation

横向支撑梁采用从内而外的安装顺序。每根梁的两端均留有20mm的安装可调间隙,防止悬挑梁间距不均。Lateral support beams are installed in an inside-out order. There is a 20mm installation adjustable gap at both ends of each beam to prevent uneven spacing of the cantilever beams.

5)阶梯脚手架安装、脚踏板铺设5) Ladder scaffolding installation, pedal laying

横向支撑梁安装完毕后,挂水平安全网,要求网绳不破坏,绷紧圈牢,拼接严密,用铁丝固定牢靠。After the horizontal support beam is installed, the horizontal safety net is hung, and the net rope is required not to be damaged, tightly tightened, spliced tightly, and fixed firmly with iron wires.

开始安装阶梯脚手架。阶梯脚手架分四个阶梯,每个阶梯高差600mm,宽度1200mm。横向支撑梁上预先焊接有长150mm直径60mm的套筒,间距1400mm。脚手架立杆放在套筒内,并通过旋紧套筒上的螺栓固定立杆,横竖杆连接采用90°铸铁扣件。Start installing the ladder scaffolding. The ladder scaffolding is divided into four steps, each step has a height difference of 600mm and a width of 1200mm. A sleeve with a length of 150mm and a diameter of 60mm is pre-welded on the transverse support beam, with a spacing of 1400mm. The scaffold pole is placed in the sleeve, and the pole is fixed by tightening the bolts on the sleeve. The horizontal and vertical poles are connected by 90° cast iron fasteners.

与横梁成水平方向满铺250x3000mm穿孔钢踏板,脚踏板采用3mm铁丝捆绑,每块脚踏板不少于四个绑扎点。阶梯脚手架的立面铺设12mm竹胶板,竹胶板与钢管之间采用铁丝绑扎。250x3000mm perforated steel pedals are laid horizontally with the beam, and the pedals are bound with 3mm iron wire, and each pedal has no less than four binding points. 12mm bamboo plywood is laid on the facade of the ladder scaffolding, and the bamboo plywood and steel pipes are bound with iron wires.

6)防护栏杆安装6) Installation of protective railings

在平台的外沿搭设防护栏杆,防护栏杆采用直径48mm的圆钢管搭设。在横梁上间距1400mm焊接长150mm直径60mm的圆管,安装护栏时,竖向护栏钢管插进60mm圆管内固定,横向栏杆通过90°钢管扣件与竖向栏杆连接,间距1200mm。并与阶梯脚手架连接。护栏顶部使用横向拉结杆与原钢结构连接,间距1400mm。Set up protective railings on the outer edge of the platform, and the protective railings are built with round steel pipes with a diameter of 48mm. Weld round pipes with a length of 150mm and a diameter of 60mm on the beam at a distance of 1400mm. When installing the guardrail, the vertical guardrail steel pipe is inserted into the 60mm round pipe to fix it. The horizontal railing is connected to the vertical railing through a 90° steel pipe fastener with a spacing of 1200mm. And connected with ladder scaffolding. The top of the guardrail is connected to the original steel structure with horizontal tie rods at a distance of 1400mm.

护栏安装完毕,在外侧挂密目网。要求绷紧圈牢,拼接严密,用铁丝固定牢靠。After the guardrail is installed, a dense mesh is hung on the outside. It is required to tighten the ring firmly, to splice tightly, and to fix it firmly with iron wire.

7)安全绳安装7) Safety rope installation

施工平台设立一道独立的安全绳,施工人员均把安全带固定在安全绳上。安全绳采用16mm锦纶绳,固定在建筑楼顶的结构柱上,固定点间距8.4m,标高在女儿墙以上,伸展到铝板装饰面下方供挂安全带用。An independent safety rope is set up on the construction platform, and the construction personnel fix the safety belt on the safety rope. The safety rope is made of 16mm nylon rope, fixed on the structural column on the roof of the building, the distance between the fixed points is 8.4m, the elevation is above the parapet wall, and it extends below the decorative surface of the aluminum plate for hanging the safety belt.

3、通道3. Channel

为了施工人员上下方便,本工程施工平台设置上人爬梯。具体搭设要求如下:For the convenience of construction workers, the construction platform of this project is equipped with climbing ladders. The specific set-up requirements are as follows:

1)建筑屋面女儿墙顶与施工平台的高差为2.3米。采用直径48mm圆钢管搭设爬梯供工人上下,不得用于材料运输。爬梯高度3m,宽度1m,踏步横杆间距400mm,采用架扣连接。1) The height difference between the parapet top of the building roof and the construction platform is 2.3 meters. Use round steel pipes with a diameter of 48mm to set up ladders for workers to go up and down, and shall not be used for material transportation. The height of the climbing ladder is 3m, the width is 1m, and the distance between the step bars is 400mm, which are connected by frame buckles.

2)爬梯16.8m设置一个,统一漆红白相间色。2) Set up a climbing ladder at 16.8m, uniformly painted in red and white colors.

3)验收合格后方可投入使用。3) It can be put into use only after passing the acceptance test.

施工平台搭设技术要求Technical requirements for construction platform erection

1、安装完成的平台上严禁打孔。1. It is strictly forbidden to drill holes on the installed platform.

2、钢结构使用前应进行质量检查,有裂缝,变形的严禁使用,出现滑丝的螺栓必须更换。2. The quality inspection of the steel structure should be carried out before use. If there are cracks or deformation, it is strictly forbidden to use it. The bolts with slippage must be replaced.

3、脚手片纵向对接平铺时,接头处必须设一根横向水平杆,脚手片有外伸,两块脚手片外伸长度的和不大于200mm。3. When the scaffolding pieces are vertically butt-jointed and tiled, a horizontal horizontal bar must be installed at the joint, the scaffolding pieces have overhangs, and the sum of the overhanging lengths of the two pieces of scaffolding pieces is not more than 200mm.

4、钢结构连接螺栓采用高强螺栓,螺栓扭力值按计算采用。4. High-strength bolts are used for the connecting bolts of the steel structure, and the torque value of the bolts is adopted according to the calculation.

5、施工平台搭设前,结构计算书要通过土建设计单位和原钢结构设计单位的认可。5. Before the construction platform is erected, the structural calculation must be approved by the civil engineering design unit and the original steel structure design unit.

6、护栏的拉结点因施工需要需除去原拉结点时,采取移位临时拉结加固,一跨内的拉结点不得同时拆除,以确保外架的安全可靠。6. When the original tie points of the guardrail need to be removed due to construction needs, the temporary tie knots shall be shifted and reinforced. The tie points within a span shall not be removed at the same time to ensure the safety and reliability of the outer frame.

7、安全绳必须独立设置,不得与原钢结构或者施工平台有任何连接。在建筑结构上固定时,避开易变形或易破坏位置。7. The safety rope must be set independently and must not have any connection with the original steel structure or construction platform. When fixing on the building structure, avoid places that are easily deformed or easily damaged.

施工平台的验收与检查Acceptance and inspection of construction platforms

1、平台按需要进行分段搭设,搭设后要经过验收,合格后挂验收合格牌才能投入使用。验收时监理、项目经理、架子班长、安全部门有关人员要参加并签字。1. The platform shall be erected in sections according to the needs. After erection, it shall be inspected and accepted. Only after passing the inspection and acceptance can it be put into use. During the acceptance inspection, supervisors, project managers, shelf monitors, and relevant personnel from the safety department must participate and sign.

2、平台投入使用后,安全员在定期安全检查时要对平台进行检查。2. After the platform is put into use, security officers should check the platform during regular security inspections.

3、平台上的施工荷载应符合设计要求,不得超载。不得在平台上吊装任何材料或构件。3. The construction load on the platform shall meet the design requirements and shall not be overloaded. No material or structure shall be hoisted on the platform.

4、平台的验收和日常使用按以下规定执行,检查合格后方允许投入使用或继续使用。4. The acceptance and daily use of the platform shall be carried out in accordance with the following regulations, and it shall be put into use or continue to be used only after passing the inspection.

1)搭设完毕后;1) After setting up;

2)连续使用达到六个月2) Continuous use for six months

3)在遭受暴风、大雨、大雪、地震等强力因素作用之后;3) After being subjected to strong factors such as storms, heavy rain, heavy snow, and earthquakes;

4)施工中途停止作用超过15天,在重新使用前;4) Stop working for more than 15 days during construction, before re-use;

5)在使用过程中发现有显著变形、沉降拆除杠件和拉结以及安全隐患存在的情况时。5) When it is found that there is significant deformation, settlement, removal of bars and knots, and potential safety hazards during use.

5、在装饰开始后,要重点检查架子的拉接与脚手板的铺设情况。5. After the decoration starts, it is necessary to focus on checking the connection of the shelf and the laying of the scaffolding.

6、脚手架在使用期间,严禁随意拆除或剪断各种设施。6. During the use of scaffolding, it is strictly forbidden to dismantle or cut various facilities at will.

平台拆除方案Platform dismantling scheme

本工程因为是高层建筑比较高,平台拆除时采用间隔一跨拆除,先拆除建筑转角部位的平台,然后间隔一跨,拆除一跨,使用小型卷扬机运输踏板、钢管和槽钢挑梁。剩余的平台整体一跨用4台卷扬机下落到地面。扣件及小型配件从施工电梯往下运输。Because this project is a relatively tall high-rise building, the platform is dismantled at intervals. The platform at the corner of the building is removed first, and then intervals are removed, and a small winch is used to transport the pedals, steel pipes and channel steel beams. The rest of the platform is lowered to the ground with 4 winches as a whole. Fasteners and small accessories are transported down from the construction elevator.

拆除建筑物施工脚手架必须遵守JGJ80-91高处作业安全技术规范的有关规定,及JGJ130-2001的规定,特别是按关于强风区同处作业、雪天、雨天高处作业的有关规定进行。本工程属高空钢结构施工平台,拆除时应注意以下事项:The dismantling of building construction scaffolding must comply with the relevant provisions of JGJ80-91 Safety Technical Specifications for Working at Heights and the provisions of JGJ130-2001, especially the relevant provisions for working at the same place in strong wind areas, and working at heights in snowy and rainy days. This project is a high-altitude steel structure construction platform, and the following items should be paid attention to when dismantling:

1、拆除前对参与拆除的操作人员、管理人员和检查、监护人员进行施工方案、安全、质量和外装饰保护等措施交底。1. Before the demolition, the operators, management personnel, inspectors and guardians who participated in the demolition shall be fully informed about the construction plan, safety, quality and exterior decoration protection measures.

2、拆除前对平台进行安全检查,确认平台不存在隐患。如存在影响拆除安全的隐患,应先对平台进行整修和加固,以保证在拆除中不发生危险。2. Before dismantling, conduct a safety inspection on the platform to confirm that there are no hidden dangers in the platform. If there are hidden dangers affecting the safety of demolition, the platform should be repaired and reinforced first to ensure that no danger occurs during the demolition.

3、划出工作区标志,禁止行人进入,交有专人监护。3. Delineate the sign of the work area, prohibit pedestrians from entering, and hand it over to special personnel for guardianship.

4、统一指挥,上下呼应,动作协调,当解开与另一人有关的结扣时,应告知对方,以防坠落。4. Unify command, echo up and down, and coordinate movements. When untying the knot related to another person, you should inform the other party to prevent falling.

5、材料工具要用滑轮和绳索运送,不得乱扔。5. Materials and tools should be transported with pulleys and ropes, and should not be thrown around.

6、拆下的脚手架钢管、扣件及其他材料运送地面后,应及时清理,归类堆放。6. After the removed scaffold steel pipes, fasteners and other materials are transported to the ground, they should be cleaned up in time and classified and stacked.

7、每日拆除平台告一段落时,都要对尚未拆除部分的安全进行检查,还要对周围环境进行检查,如有异常情况及时处理,确认一切安全后方可离岗,不可疏忽大意,留有隐患。7. When the daily dismantling of the platform comes to an end, it is necessary to check the safety of the part that has not been dismantled, and also check the surrounding environment. Hidden danger.

安全环保措施Safety and Environmental Protection Measures

1、避雷接地装置:1. Lightning protection grounding device:

因为该工程的高度比较高,需要设置避雷接地装置。平台的钢结构采用Ф12镀锌圆钢与原钢结构焊接,并与建筑物的避雷接地装置连成系统的避雷接地装置,其接地电阻不得大于10欧姆。Because the height of the project is relatively high, a lightning protection grounding device needs to be installed. The steel structure of the platform is welded with Ф12 galvanized round steel and the original steel structure, and connected with the lightning protection grounding device of the building to form a systematic lightning protection grounding device, and its grounding resistance shall not exceed 10 ohms.

2、安全操作要求:2. Safety operation requirements:

1)工人作业时必须按安全要求戴好安全帽,系好安全带,穿软底防滑鞋,衣着灵便;1) Workers must wear safety helmets, fasten safety belts, wear soft-soled non-slip shoes, and wear comfortable clothes according to safety requirements;

2)设工人作业时必须按安全要求戴好安全帽,系好安全带,穿软底防滑鞋,衣着灵便;上架子操作人员必须具有登高作业操作证;2) Workers must wear safety helmets, fasten seat belts, wear soft-soled non-slip shoes, and wear comfortable clothes according to safety requirements; operators on shelves must have operating certificates for climbing;

3)应严格遵守高处作业有关安全规定,患有不宜高处作业病症的人员及其它不适合高处作业人员不得从事脚手架拆除工作;3) Strictly abide by the relevant safety regulations for high-altitude operations, and those who suffer from diseases that are not suitable for high-altitude operations and other personnel who are not suitable for high-altitude operations are not allowed to dismantle scaffolding;

4)有操作人员必须熟知遵守国家安全法规和本岗位安全技术规程,正确使用个人防护用品,严禁酒后上班;4) Operators must be familiar with and abide by national safety regulations and safety technical regulations of their posts, use personal protective equipment correctly, and are strictly prohibited from going to work after drinking;

5)禁攀爬外架上下,不得在工作面上嘻笑、打闹;5) It is forbidden to climb up and down the outer frame, and it is not allowed to laugh or fight on the working surface;

6)搭设、拆除过程中,中途不得换人,如遇中途换人,应及时对更换人员作详细交底;6) In the process of erection and dismantling, no replacement is allowed in the middle. In case of a replacement in the middle, a detailed disclosure should be made to the replacement personnel in time;

7)遇六级大风和雨、雪天气及夜间,应停止搭设、拆除作业;7) In case of six-level strong wind, rain, snow and night, the erection and dismantling operations should be stopped;

8)拆除时,外侧应有防止坠物伤人的防护措施,并悬挂安全警牌,设置安全警戒区,并派专人看护,严禁非操作人员入内;8) When dismantling, there should be protective measures to prevent falling objects from hurting people on the outside, and a safety warning sign should be hung, a safety alert area should be set up, and special personnel should be assigned to guard, and non-operating personnel are strictly prohibited from entering;

9)操作时不得向下抛掷物件,不得在未固定的杆件上行走;9) Do not throw objects downward during operation, and do not walk on unfixed rods;

10)下班时收集好工具和材料,清除不安全因素;10) Collect tools and materials when off work, and remove unsafe factors;

3、消防安全3. Fire safety

1)所有重型设备不允许放到施工平台上,电焊机放置在楼面上;1) All heavy equipment is not allowed to be placed on the construction platform, and electric welding machines are placed on the floor;

2)平台上不能私拉电线,必须有专业电工布线到位;2) Wires cannot be pulled privately on the platform, and professional electricians must have wiring in place;

3)间隔8.4m距离不能少于两个灭火器,需要电焊部位加倍。3) There should be no less than two fire extinguishers at a distance of 8.4m, and the welding parts need to be doubled.

电焊部位下方不得放置易燃材料,并设置接火斗。No flammable materials shall be placed under the welding part, and a fire bucket shall be set.

Claims (3)

1.一种应用于超高超长悬挑构件施工的吊架,其特征在于包括楼体顶层楼板上方固定构筑有悬架楼层框架,1. A hanger applied to superhigh and superlong cantilever member construction, characterized in that it comprises a suspended floor frame fixedly constructed above the top floor of the building, 楼体顶层楼板边缘部构筑有女儿墙;A parapet is built on the edge of the top floor of the building; 悬架楼层框架的边缘部向外延伸固定设置有水平的外探主梁,The edge of the suspended floor frame extends outward and is fixedly provided with a horizontal main girder for external exploration. 女儿墙和外探主梁之间斜向架设有斜撑悬架梁,Diagonal bracing suspension beams are installed obliquely between the parapet wall and the main girder of the external exploration. 女儿墙和悬架楼层框架的框架梁之间架设有加固支撑梁;Reinforcement support beams are erected between the parapet and the frame beams of the suspended floor frame; 斜撑悬架梁和加固支撑梁在女儿墙上的端部相互通过钢筋栓接浇铸连接固定;The ends of the diagonally braced suspension beams and the reinforced support beams on the parapet are connected and fixed by bolting and casting with steel bars; 斜撑悬架梁的下部设置有支撑构件;The lower part of the diagonally braced suspension beam is provided with a support member; 支撑构件的下方设置有阶梯脚手架;Ladder scaffolding is provided under the support member; 阶梯脚手架的下平面的内探端固定构筑在女儿墙根部,阶梯脚手架的下平面向女儿墙外侧外展探出,阶梯脚手架的下端架面向上连体架设有一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架;The inner probe end of the lower plane of the ladder scaffold is fixed at the root of the parapet, the lower plane of the ladder scaffold protrudes out to the outside of the parapet wall, and the lower end of the ladder scaffold faces upwards. Scaffolding, four-step scaffolding; 一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架顺次连体延伸向外架设;The first-order scaffolding, second-order scaffolding, third-order scaffolding, and fourth-order scaffolding are extended and erected in sequence; 阶梯脚手架的下平面间隔矩阵式分布的固定设置有铰接座,铰接座上铰接有立杆,立杆向上延伸,立杆的顶端并通过螺栓拉结固定在外探主梁上;立杆固定悬吊阶梯脚手架;The lower plane of the ladder scaffolding is fixed in a matrix-like distribution with hinged seats, on which a vertical rod is hinged, the vertical rod extends upward, and the top of the vertical rod is fixed on the main beam of the external inspection by bolts; the vertical rod is fixed and suspended ladder scaffolding; 阶梯脚手架的外沿固定连接有防护栏杆,防护栏杆向上延伸并通过螺栓拉结固定在外探主梁上;The outer edge of the ladder scaffolding is fixedly connected with a protective railing, and the protective railing extends upwards and is fixed on the main beam of the external inspection by bolts; 防护栏杆外侧界面挂设有密目网,密目网绑接在防护栏杆上;A dense mesh is hung on the outer interface of the protective railing, and the dense mesh is bound to the protective railing; 女儿墙和一阶脚手架之间斜向固定搭设有爬梯,爬梯的底端与一阶脚手架之间通过脚手架扣件固定连接,爬梯的顶端向上探出女儿墙,并与女儿墙部的斜撑悬架梁通过栓接固定;A climbing ladder is fixed obliquely between the parapet and the first-order scaffolding. The bottom end of the ladder is fixedly connected with the first-order scaffolding through scaffold fasteners. The frame beam is fixed by bolting; 一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架的上架面上沿阶梯脚手架跨度方向均铺设有脚踏板,脚踏板的边角部与所在阶梯脚手架绑扎固定;The upper surface of the first-order scaffolding, second-order scaffolding, third-order scaffolding, and fourth-order scaffolding are all laid with pedals along the span direction of the ladder scaffolding, and the corners of the pedals are bound and fixed to the ladder scaffolding where they are located; 一阶脚手架、二阶脚手架、三阶脚手架、四阶脚手架之间依次相邻的立面铺设立板,立板与所靠近的阶梯脚手架绑扎固定。The adjacent facades of the first-level scaffolding, second-level scaffolding, third-level scaffolding, and fourth-level scaffolding are laid with vertical boards, and the vertical boards are bound and fixed to the adjacent ladder scaffolding. 2.根据权利要求1所述的一种应用于超高超长悬挑构件施工的吊架,其特征在于:脚踏板采用穿孔钢脚踏板。2. A hanger applied to the construction of super-high and super-long cantilever members according to claim 1, characterized in that the pedals are perforated steel pedals. 3.根据权利要求1所述的一种应用于超高超长悬挑构件施工的吊架,其特征在于:立板采用竹胶板。3. A hanger for construction of super-high and super-long overhanging components according to claim 1, characterized in that: the vertical board is made of bamboo plywood.
CN201621153920.8U 2016-10-31 2016-10-31 Be applied to gallows of super high overlength cantilevered member construction Expired - Fee Related CN206174437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621153920.8U CN206174437U (en) 2016-10-31 2016-10-31 Be applied to gallows of super high overlength cantilevered member construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621153920.8U CN206174437U (en) 2016-10-31 2016-10-31 Be applied to gallows of super high overlength cantilevered member construction

Publications (1)

Publication Number Publication Date
CN206174437U true CN206174437U (en) 2017-05-17

Family

ID=58680239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621153920.8U Expired - Fee Related CN206174437U (en) 2016-10-31 2016-10-31 Be applied to gallows of super high overlength cantilevered member construction

Country Status (1)

Country Link
CN (1) CN206174437U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643545A (en) * 2018-07-19 2018-10-12 上海宝冶集团有限公司 Outer protective frame sets up tooling and outer protective frame system
CN109138398A (en) * 2018-09-28 2019-01-04 上海建工四建集团有限公司 A kind of pin-connected panel suspention steel platform and its construction method
CN109577632A (en) * 2019-01-16 2019-04-05 中建八局第建设有限公司 A kind of swinging scaffold and its construction method
CN109653502A (en) * 2019-02-20 2019-04-19 中国建筑第八工程局有限公司 Staged moves back the big Glass Curtain Wall Construction method of platform
CN111321883A (en) * 2020-03-27 2020-06-23 中国建筑一局(集团)有限公司 A fixture-type parapet wall hanging basket device and parapet wall hanging basket system
CN115613798A (en) * 2022-10-27 2023-01-17 北京房地集团有限公司 Mounting structure and mounting method for cantilever beam of cantilever scaffold
CN115897978A (en) * 2022-10-18 2023-04-04 五冶集团上海有限公司 Cantilevered steel platform and erection method of inner ring corridor between high-rise floors of spherical building

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643545A (en) * 2018-07-19 2018-10-12 上海宝冶集团有限公司 Outer protective frame sets up tooling and outer protective frame system
CN109138398A (en) * 2018-09-28 2019-01-04 上海建工四建集团有限公司 A kind of pin-connected panel suspention steel platform and its construction method
CN109138398B (en) * 2018-09-28 2024-03-26 上海建工四建集团有限公司 Assembled suspension steel platform and construction method thereof
CN109577632A (en) * 2019-01-16 2019-04-05 中建八局第建设有限公司 A kind of swinging scaffold and its construction method
CN109577632B (en) * 2019-01-16 2023-10-27 中建八局第一建设有限公司 Suspended scaffolding and construction method thereof
CN109653502A (en) * 2019-02-20 2019-04-19 中国建筑第八工程局有限公司 Staged moves back the big Glass Curtain Wall Construction method of platform
CN111321883A (en) * 2020-03-27 2020-06-23 中国建筑一局(集团)有限公司 A fixture-type parapet wall hanging basket device and parapet wall hanging basket system
CN115897978A (en) * 2022-10-18 2023-04-04 五冶集团上海有限公司 Cantilevered steel platform and erection method of inner ring corridor between high-rise floors of spherical building
CN115613798A (en) * 2022-10-27 2023-01-17 北京房地集团有限公司 Mounting structure and mounting method for cantilever beam of cantilever scaffold
CN115613798B (en) * 2022-10-27 2023-10-03 北京房地集团有限公司 Mounting structure and mounting method of cantilever beam of cantilever scaffold

Similar Documents

Publication Publication Date Title
CN206174437U (en) Be applied to gallows of super high overlength cantilevered member construction
CN107055347B (en) A kind of Tower crane disassembly structures and methods of high-rise installation
US20090120718A1 (en) Multi-level safety net support system for high-rise construction
CN104947926B (en) Hard protection device for upper formwork system of inner barrel of core barrel and construction method of hard protection device
CN112144854A (en) Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN104261232B (en) Lifting device attached to special-shaped section and installation method thereof
CN102864936A (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
US7896132B2 (en) Multi-level fall protection system for high-rise construction
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN106013750A (en) Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN214459670U (en) Ultrahigh cast-in-situ box girder combined formwork
CN106193568A (en) Mobile steel truss operating platform
CN110259090A (en) A kind of construction method of novel pull-up builder's jack
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN104278828B (en) A kind of concrete chimney dismantling operation platform
CN114704064A (en) Flow combination construction method for disk-buckle type self-overhanging operation frame and rope net operation frame
WO2009044405A2 (en) Anchor plate for use with fall protection and maintenance equipment.
CN104989092B (en) A kind of construction method of high-altitude overhanging superposed type steel truss bearing platform
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN213268816U (en) Assembled shaped steel horizontal protection platform of encorbelmenting
CN111764623B (en) Hanging construction platform module and construction method of high altitude large cantilever steel roof frame
CN111608376B (en) Comprehensive construction method for shaping component
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN118564040A (en) Scaffold erection construction method
CN115012660A (en) Construction method of basket pull rod type overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210401

Address after: Unit 01 and 04, 11th floor, No.2 Guanyinshan international business operation center, Siming District, Xiamen City, Fujian Province 361000

Patentee after: China Construction Eighth Bureau (Xiamen) Construction Co.,Ltd.

Address before: No. 89, Gongye South Road, Lixia District, Jinan City, Shandong Province

Patentee before: THE FIRST COMPANY OF CHINA EIGHTH ENGINEERING BUREAU Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

CF01 Termination of patent right due to non-payment of annual fee