CN205000656U - From over -and -under type material cycling platform - Google Patents

From over -and -under type material cycling platform Download PDF

Info

Publication number
CN205000656U
CN205000656U CN201520485972.4U CN201520485972U CN205000656U CN 205000656 U CN205000656 U CN 205000656U CN 201520485972 U CN201520485972 U CN 201520485972U CN 205000656 U CN205000656 U CN 205000656U
Authority
CN
China
Prior art keywords
platform
guide rail
turnoverplatform
wall
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520485972.4U
Other languages
Chinese (zh)
Inventor
张永前
刘建国
刘太峰
石丛林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Original Assignee
XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING filed Critical XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Priority to CN201520485972.4U priority Critical patent/CN205000656U/en
Application granted granted Critical
Publication of CN205000656U publication Critical patent/CN205000656U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a from over -and -under type material cycling platform specifically is an all -steel structure who is arranged in the construction the to use platform of unloading. A from over -and -under type material cycling platform, turnover platform installation is on the building outer wall, the turnover platform includes guide rail, windrow platform and installs the promotion string seat on the building outer wall, the windrow platform is fixed on the guide rail, the guide rail attaches the wall base through the direction and installs on the building outer wall, promote and hang the seat through electric block connection guide rail. The beneficial effect of the utility model: the utility model provides a from over -and -under type material cycling platform simple to operate, once assemble on ground, and every layer of installation of material conventional relatively platform is practiced thrift artifically, reduces the operation danger source that high altitude ann tore open, and the easy operation that climbs has anti -falling device safe and reliable, can return the turnover and use, has fine social and economic benefits.

Description

From lifting material Turnoverplatform
Technical field
The utility model relates to a kind of from lifting material Turnoverplatform, specifically a kind of full steel structure discharging platform for using in building operations.
Background technology
At present, exterior wall discharging platform many employings steel wood mixed form in Tall Reinforced Concrete Buildings construction, but all there are some shortcomings in current used discharge platform device, owing to adopting steel wood mixed form, it is not firm to connect, piece is not rigorous, material platform platform bad sealing, material platform platform carries out off-load by wire rope, material platform platform is directly shelved on the floor inside balcony or window opening, and safety factor is low, and material platform platform has from climbing function, every layer of construction completes needs tower crane to coordinate to be lifted in superstructure and reinstall, and labour intensity is large.
Utility model content
In order to effectively solve the problem, the utility model provides a kind of full steel structure from lifting material Turnoverplatform, all with bolts, disposablely on ground to set up, discharging platform is realized from climbing function by electric block after lifting, scaffold floor and protective screening all adopt full steel structure, create the high working environment of a safety factor to workman.
A kind of from lifting material Turnoverplatform, described Turnoverplatform is arranged on external wall, the lifting hanging seat that described Turnoverplatform comprises guide rail, windrow platform and is arranged on external wall, described windrow platform is fixed on guide rail, described guide rail is arranged on external wall by attached wall guide holder, and described lifting hanging seat is by electric block connection guide rail.
Further, described electric block is mounted on the suspension ring of lifting hanging seat, and the hook connecting of described electric block bottom is connected on the hoisting ring in the middle part of guide rail.
Further, described guide rail is connected with described attached wall guide holder by off-load mounting blocks.
Further, described guide rail is connected an oblique-pulling truss with described windrow platform.
Further, described windrow platform is provided with guardrail board.
Further, described guide rail quantity is two, and is connected and fixed by truss frame for connecting between described two guide rails, and three attached wall guide holders installed by described every root guide rail.
Further, described lifting hanging seat installation site is in attached wall guide holder side.
Further, described attached wall guide holder is fixed on external wall by through-wall bolt.
Further, described guide rail is also provided with an operating platform, described operating platform is on the downside of described windrow platform.
The beneficial effects of the utility model: it is easy for installation from lifting material Turnoverplatform that the utility model provides, ground is once assembled, relatively conventional material platform every layer is installed and is saved manually, reduce high-altitude and pacify the operation dangerous matter sources of tearing open, climb simple to operate, there is falling proof device safe and reliable, turnover can be returned and use, there is good Social benefit and economic benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is lifting schematic diagram of the present utility model;
Fig. 3 is attached wall guide holder of the present utility model and promotes hanging seat structural representation;
Fig. 4 is lateral view of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is explained in further detail.Should be appreciated that specific embodiment described herein only for explaining the utility model, and be not used in restriction the utility model.
On the contrary, the utility model is contained any by the substituting of making on marrow of the present utility model and scope of defining of claim, amendment, equivalent method and scheme.Further, in order to make the public have a better understanding to the present invention, in hereafter details of the present utility model being described, detailedly describe some specific detail sections.Do not have the description of these detail sections can understand the utility model completely for a person skilled in the art yet.
As shown in Figure 1, the utility model comprises guide rail 1, truss frame for connecting 2, attached wall guide holder 3, promotes hanging seat 4, electric block 5, off-load mounting blocks 6, oblique-pulling truss 7, guardrail board 8, windrow platform 9, operating platform 10, building structure 11, through-wall bolt 12, insurance steel cable 13.On ground by guide rail 1, truss frame for connecting 2, attached wall guide holder 3, off-load mounting blocks 6, oblique-pulling truss 7, guardrail board 8, windrow platform 9, operating platform 10 connects into entirety as shown in Figure 2, at windrow platform 9 extension suspension ring place and guide rail 1 suspension ring place wire rope snapping, four wire rope are merged into a suspension centre, building structure 11 extension is lifted into by building site tower crane, the relative position of adjustment attached wall guide holder 3 and guide rail 1, through-wall bolt 12 is used by attached wall guide holder 3 to be fixed in building structure 11, and by the bolton on off-load mounting blocks 6, this device is locked onto in building structure, then installed by through-wall bolt 12 and promote hanging seat 4, electric block 5 is mounted on the suspension ring of lifting hanging seat 4, electric block 5 lower end hook connecting is received in the hoisting ring in the middle part of guide rail 1.Then use insurance steel cable 13 to be connected with the attached wall guide holder 3 on upper strata by two suspension ring outside windrow platform 9, after installing, do site tests, be supplied to operating personnel after meeting the demands and use, as accompanying drawing 4.
When climbing, article all in windrow platform 9 are removed clean, start electric block 5 and shrink chain, after driving whole system upwards to climb 10cm along attached wall guide holder 3, remove off-load mounting blocks 6, then continue to climb, after being raised to superstructure plate face height, off-load mounting blocks 6 is installed and whole system is locked in superstructure structural edge, electric block 5 is loosened and pulls down, have enough to meet the need to superstructure, remove and promote hanging seat 4 and through-wall bolt 12, be installed to superstructure structure.After superstructure discharging completes, repeat above-mentioned flow process, repeatedly promote.
Top building construction discharging completes, and during by installing, whole system is hung and torn ground open by hanging method, disintegrates, encapsulation warehouse-in.

Claims (9)

1. one kind from lifting material Turnoverplatform, it is characterized in that, described Turnoverplatform is arranged on external wall, the lifting hanging seat (4) that described Turnoverplatform comprises guide rail (1), windrow platform (9) and is arranged on external wall, described windrow platform (9) is fixed on guide rail (1), described guide rail (1) is arranged on external wall by attached wall guide holder (3), and described lifting hanging seat (4) is by electric block (5) connection guide rail (1).
2. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described electric block (5) is mounted on the suspension ring of lifting hanging seat (4), and the hook connecting of described electric block (5) bottom is connected on the hoisting ring at guide rail (1) middle part.
3. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described guide rail (1) is connected with described attached wall guide holder (3) by off-load mounting blocks (6).
4. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described guide rail (1) is connected an oblique-pulling truss (7) with described windrow platform (9).
5. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described windrow platform (9) is provided with guardrail board (8).
6. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described guide rail (1) quantity is two, and being connected and fixed by truss frame for connecting (2) between described two guide rails (1), and upper installation three attached wall guide holders (3) of described every root guide rail (1).
7. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described lifting hanging seat (4) installation site is in attached wall guide holder (3) side.
8. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described attached wall guide holder (3) is fixed on external wall by through-wall bolt (12).
9. one according to claim 1 is from lifting material Turnoverplatform, it is characterized in that, described guide rail (1) is also provided with an operating platform (10), described operating platform (10) is in described windrow platform (9) downside.
CN201520485972.4U 2015-07-07 2015-07-07 From over -and -under type material cycling platform Expired - Fee Related CN205000656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520485972.4U CN205000656U (en) 2015-07-07 2015-07-07 From over -and -under type material cycling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520485972.4U CN205000656U (en) 2015-07-07 2015-07-07 From over -and -under type material cycling platform

Publications (1)

Publication Number Publication Date
CN205000656U true CN205000656U (en) 2016-01-27

Family

ID=55157552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520485972.4U Expired - Fee Related CN205000656U (en) 2015-07-07 2015-07-07 From over -and -under type material cycling platform

Country Status (1)

Country Link
CN (1) CN205000656U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106006305A (en) * 2016-06-07 2016-10-12 中国十七冶集团有限公司 Automatic lifting type material platform
CN111502302A (en) * 2020-05-08 2020-08-07 中国十七冶集团有限公司 Hydraulic lifting unloading platform and construction method thereof
CN112302326A (en) * 2020-10-29 2021-02-02 中国建筑第八工程局有限公司 Self-climbing safety hard protection and hoisting integrated platform and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106006305A (en) * 2016-06-07 2016-10-12 中国十七冶集团有限公司 Automatic lifting type material platform
CN111502302A (en) * 2020-05-08 2020-08-07 中国十七冶集团有限公司 Hydraulic lifting unloading platform and construction method thereof
CN112302326A (en) * 2020-10-29 2021-02-02 中国建筑第八工程局有限公司 Self-climbing safety hard protection and hoisting integrated platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN101787792B (en) Building protection screen system
CN205077885U (en) Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs
CN205000656U (en) From over -and -under type material cycling platform
CN201826542U (en) Self-climbing protective screening
CN206753012U (en) A kind of attachment type raise scaffold just hangs hanging apparatus
CN206341631U (en) One kind suspension vertical greening device
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN206971760U (en) A kind of full steel structure assembled climbs material platform
CN205743040U (en) A kind of integrated form material hoisting platform
CN205259628U (en) Pipe truss structure anchor clamps formula safety protective guard pole
CN205442496U (en) High -rise building roof curtain lifting device
CN202441045U (en) Rail-type electric attached lifting scaffold
CN204024104U (en) Fast-assembling modularization winding staircase
CN203437842U (en) Pipeline welding platform
JP3950800B2 (en) Suspension scaffold
CN204876521U (en) Novel lift scaffold device
CN210655915U (en) Connecting device for climbing frame and tower crane
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204098465U (en) Lifting false work falls in a kind of frame guide rail formula
CN110616909B (en) Construction method of suspension track system at bottom of connecting bridge of super high-rise building
CN211596994U (en) Protection device for repairing inspection well for traffic
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN218028869U (en) Novel prefabricated bay window outer hanger
CN205000632U (en) From masterplate work platform that climbs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20190707

CF01 Termination of patent right due to non-payment of annual fee