CN205617771U - Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft - Google Patents
Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft Download PDFInfo
- Publication number
- CN205617771U CN205617771U CN201620237145.8U CN201620237145U CN205617771U CN 205617771 U CN205617771 U CN 205617771U CN 201620237145 U CN201620237145 U CN 201620237145U CN 205617771 U CN205617771 U CN 205617771U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- construction operation
- vertical
- cabinet frame
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft, including platform steel skeleton, driving motor, vertical well cabinet frame and platform backup pad, the platform steel skeleton is installed at platform backup pad below constitution construction operation platform, the vertical centre of installing at the well of vertical well cabinet frame to the vertical construction operation platform that runs through, at the vertical concrete feeding pump line that is equipped with in the centre of vertical well cabinet frame, driving motor installs on construction operation platform to the drive construction operation platform remove along the vertical lift of vertical well cabinet frame, it transversely supports the positioning pulley group on four stands of vertical well cabinet frame to be equipped with four difference on construction operation platform. This integrated device construction operation platform can remove in the well in vertical lift to the centre of vertical well cabinet frame sets up all kinds of pipelines, can compromise the transportation of pipeline, also can reciprocate in the well, has improved the efficiency of construction, has reduced construction cost.
Description
Technical field
This utility model relates to a kind of construction of lift well device, especially one and is applicable to construction in high residential building elevator
Operating platform and pipeline transportation integration apparatus.
Background technology
Elevator shaft steel bar template concrete construction, during the construction of usual top-bottom cross, needs subsection setup profile steel bracket, torr
Set up protective scaffold on frame again, as the operation support body of elevator beam in hoistway and track, also serve as protection support body.This way needs
Want substantial amounts of circulation material, heavy profile steel bracket, just closed at crossed construction or after binding because hoistway is suitable for reading, tower crane without
Method is transported material in cylinder and profile steel bracket handling is put in place.These work will rely on a large amount of labour force, and material is transported to
Each layer hoistway, then rely on manpower movement profile steel bracket in place, the most manually transmit steel pipe, fastener, take by height of lift requirement
And if removing support body.So causing problems with:
1, mechanized construction degree is low, a large amount of manual delivery material engineering, landing of easily slipping out of the hand when changing hands, and easily causes weight
The object that thing falls hits injury accident, and bracket is fixing the most with great difficulty to topple, and potential safety hazard is a lot;
2, expending great amount of cost, the material such as shaped steel, steel pipe, fastener and the lumps of wood and related measure cost are used for setting up and tearing open
Remove, and hand haulage's circulation material is to ground, need to expend substantial amounts of cost;
3, meet when needing hole to be provided in structure, its position, size required precision high, take to water the measures such as concrete protection and be stranded
Difficulty, hole secondary plugging work consuming consumptive material, the layering of operator must be relied on when being transformed into another floor to pass in and out;
4, hoistway cradle stationary is motionless, and operator are inconvenient to move up and down, and construction material is also required to manually repeatedly turn
Changing, transmit and just can enter hoistway, in operating process, potential safety hazard is a lot;
5, act on single, model sheetinstallat assistance platform can only be done, it is impossible to take into account other construction requirements, such as concrete conveyance
Pipeline, refuse collection pipeline, fire-fighting, the matching requirements that supplies water and power;
6, on-the-spot high-rise concrete pump typically hole to be provided on floor, needs to set up a large amount of support, and the later stage also to enter
Row closure, and the shelf below material distributing machine need to be reinforced during casting concrete, work consuming consumptive material, also potential safety hazard.
Therefore, necessary this construction operation platform is improved, adapt to mechanization, the wanting of green construction development
Ask.
Utility model content
Utility model purpose: provide a kind of multifunctional integrated device, with the mechanization degree constructed in improving hoistway, increases
Add construction security reliability, and the transport of pipeline can be taken into account, it is possible to move up and down in hoistway, improve efficiency of construction, reduce
Cost.
Technical scheme: construction operation platform and pipeline transportation integration in high residential building elevator described in the utility model
Device, including platform steel skeleton, drives motor, vertical well cabinet frame and platform support panel;Platform steel skeleton is arranged on platform and props up
Construction operation platform is constituted below fagging;Vertical well cabinet frame is vertically installed at the centre of hoistway, and it is flat vertically to run through constructing operation
Platform;Center vertical at vertical well cabinet frame is provided with concrete delivery pump pipe;Drive motor to be arranged on construction operation platform, and drive
Dynamic construction operation platform vertically well cabinet frame vertical lifting moves;Construction operation platform is provided with four difference cross-brace exist
Positioning pulley group on four root posts of vertical well cabinet frame.
Use drive motor drive construction operation platform in hoistway vertically well cabinet frame vertical lifting move, be effectively improved
Efficiency of construction, reduces construction cost;Use the center vertical at vertical well cabinet frame that concrete delivery pump pipe is set, it is possible to right
Concrete delivery pump pipe is supported fixing, and is conveniently delivered up concrete slurry, has preferable stability and safety;Adopt
It is capable of the cross-brace of construction operation platform by positioning pulley group, prevents construction operation platform from going out relative to vertical well cabinet frame
Now rock, improve the stability in use of construction operation platform, enhance the safety of construction.
As further restriction scheme of the present utility model, the most vertically it is provided with cable testing bridge in the centre of vertical well cabinet frame.
Use the center vertical at vertical well cabinet frame that cable testing bridge, convenient installation cable are set, and cable is effectively protected.
As further restriction scheme of the present utility model, the most vertically it is provided with fire extinguisher canvas hose in the centre of vertical well cabinet frame
Road.Use the center vertical at vertical well cabinet frame that fire water pipeline is set, it is simple to the interim fixed installation of fire water pipeline, effectively
Improve the security against fire of job site.
As further restriction scheme of the present utility model, the most vertically it is provided with vertical rubbish in the centre of vertical well cabinet frame and leads to
Road.Using the center vertical at vertical well cabinet frame to arrange vertical garbage shaft, the rubbish produced during convenient construction carries downwards.
As further restriction scheme of the present utility model, construction operation platform tilts to be provided with oblique garbage shaft,
Oblique garbage shaft docks mutually with the upper port of vertical garbage shaft.Use the upper end of oblique garbage shaft and vertical garbage shaft
Mouth docks mutually, it is achieved the indirect closing of the upper port of vertical garbage shaft, improves safety.
As further restriction scheme of the present utility model, the edge entering people's inlet side at construction operation platform is hinged
There is pedal.Use pedal convenient construction personnel can pass in and out construction operation platform.
As further restriction scheme of the present utility model, construction operation platform is inserted with inserted link, stretching out of inserted link
End is plugged in vertical well cabinet frame for level.Inserted link is used to realize being relatively fixed of construction operation platform and vertical well cabinet frame,
Prevent construction operation platform accidental falling.
Compared with prior art, it provides the benefit that this utility model: (1) uses and drives motor to drive construction operation platform
In hoistway, vertically well cabinet frame vertical lifting moves, and is effectively increased efficiency of construction, reduces construction cost;(2) use
The center vertical of vertical well cabinet frame arranges concrete delivery pump pipe, it is possible to be supported fixing to concrete delivery pump pipe, convenient
It is delivered up concrete slurry, there is preferable stability and safety;(3) positioning pulley group is used to be capable of constructing operation
The cross-brace of platform, prevents construction operation platform from occurring rocking relative to vertical well cabinet frame, improves construction operation platform
Stability in use, enhances the safety of construction.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram of the present utility model;
Fig. 2 is side-looking structural representation of the present utility model.
Label in figure: 1, inserted link, 2, hoistway, 3, cable testing bridge, 4, positioning pulley group, 5, vertical garbage shaft, 6, pedal,
7, concrete delivery pump pipe, 8, platform steel skeleton, 9, platform support panel, 10, fire water pipeline, 11, drive motor, 12, vertical
Well cabinet frame, 13, oblique garbage shaft, 14, construction operation platform.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model
It is not limited to described embodiment.
Embodiment 1:
As illustrated in fig. 1 and 2, construction operation platform and pipeline transportation integration in high residential building elevator of the present utility model
Device includes: platform steel skeleton 8, driving motor 11, vertical well cabinet frame 12 and platform support panel 9.
Wherein, platform steel skeleton 8 is arranged on composition construction operation platform 14 below platform support panel 9;Vertical well cabinet frame 12
It is vertically installed at the centre of hoistway 2, and vertically runs through construction operation platform 14;Center vertical at vertical well cabinet frame 12 is provided with mixed
Solidifying soil delivery pump pipe 7, cable testing bridge 3, fire water pipeline 10, vertical garbage shaft 5;Construction operation platform 14 tilts and is provided with
Oblique garbage shaft 13, oblique garbage shaft 13 docks mutually with the upper port of vertical garbage shaft 5;Drive motor 11 to be arranged on to execute
On work operating platform 14, and construction operation platform 14 vertically well cabinet frame 12 vertical lifting is driven to move;At construction operation platform
14 are provided with four cross-brace positioning pulley groups 4 on four root posts of vertical well cabinet frame 12 respectively;Put down in constructing operation
Platform 14 enters the edge of people's inlet side and is hinged with pedal 6;Construction operation platform 14 is inserted with inserted link 1, stretching out of inserted link 1
End is plugged in vertical well cabinet frame 12 for level.
In high residential building elevator of the present utility model, construction operation platform and pipeline transportation integration apparatus are being carried out now
Field makes when building:
(1) vertical well cabinet frame 12 uses conventional high-rise people's goods construction elevator derrick standard knot, the most a size of 70*70*
1500mm, the basis of vertical well cabinet frame 12 imbeds when construction elevator pit foundation plinth with reference to construction elevator basis built-in fitting, and according to
Construction elevator standard arranges sustaining wall connector.
(2) platform steel skeleton 8 uses the square steel of a size of 50*50*3mm to be welded, according to the pre-drilled spiral shell of design drawing
Keyhole;Platform support panel 9 uses the plank sheathing that 15mm is thick, and the spacing between platform support panel 9 and vertical well cabinet frame 12 is 60-
70mm, uses template completely to spread in the middle of the vertical well cabinet frame 12 every layer of index bed position.
(3) in vertical well cabinet frame 12 according to design drawing require install vertical garbage shaft 5(200*500mm), cable bridge
Frame 3, concrete delivery pump pipe 7 and fire water pipeline 10;And use the fixtures such as square steel (50*50*3mm) and bolt to above-mentioned
Pipeline is fixed, and needs to increase yielding rubber pad between pipeline and fixture.
(4) the driving motor 11 on construction operation platform 14 is with power-off brake device, is provided with on vertical well cabinet frame 12
Gear train track, drives the output shaft of motor 11 to be provided with and gear train track meshed gears, thus carries out upper and lower sliding
Drive;Each positioning pulley group 4 includes that two leading blocks, two leading blocks are clamped in the same of vertical well cabinet frame 12 respectively
On column, carry out stable elevating function with driving motor 11 to coordinate.
(5) stop after construction operation platform 14 rises to index bed operating surface, use inserted link 1 to be inserted on vertical well cabinet frame 12
In the square steel of fixing various pipes, inserted link 1 uses the square steel of a size of 40*40*3mm to make, and fixing dead with bolt, prevents from putting down
Platform accidental falling.After construction operation platform 14 rises to the scope of operation every time, when pouring floor concrete, install with derrick standard knot
Supporting concrete spreader, material distributing machine uses tower crane to coordinate and manually installs.
(6) cable testing bridge 3 within construction operation platform 14 is installed and is constructed with reference to on-the-spot temporary electricity specification, carries out
Lightning protection and protection against electric shock work.The cable of installation is delivered in the graduation two electronic box of each floor by lift port, disappears
Watertight conduit 10 to install free expansion joint at each floor, with vibration proof drawing crack.
(7) corner of construction operation platform 14 protective upright rod to be provided with, after construction operation platform 14 rises to last layer, under
One layer uses fixed steel framework job platform as horizontal protective device.
This utility model compared with prior art provides the benefit that: this utility model simple in construction, easy for installation, whole
Job platform can move up and down in hoistway, and security reliability is high, improves efficiency of construction, reduces cost, hence it is evident that improves well
The mechanization degree of construction in road, and solve high-rise water power pipeline and the laying problem of garbage shaft, decrease various pipe
The reserved opening in road.
Although as it has been described above, represented and described this utility model with reference to specific preferred embodiment, but it must not
It is construed to the restriction to this utility model self.In the spirit and scope of the present utility model defined without departing from claims
Under premise, can various changes can be made in the form and details to it.
Claims (7)
1. construction operation platform and pipeline transportation integration apparatus in high residential building elevator, it is characterised in that: include platform steel
Skeleton (8), driving motor (11), vertical well cabinet frame (12) and platform support panel (9);Platform steel skeleton (8) is arranged on platform
Gripper shoe (9) lower section constitutes construction operation platform (14);Vertical well cabinet frame (12) is vertically installed at the centre of hoistway (2), and erects
Directly run through construction operation platform (14);Center vertical vertical well cabinet frame (12) is provided with concrete delivery pump pipe (7);Drive electricity
Machine (11) is arranged on construction operation platform (14), and drives construction operation platform (14) vertically well cabinet frame (12) vertical lifting
Mobile;Construction operation platform (14) is provided with four cross-brace determining on four root posts of vertical well cabinet frame (12) respectively
Position assembly pulley (4).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1, its
It is characterised by: be the most vertically provided with cable testing bridge (3) in the centre of vertical well cabinet frame (12).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2,
It is characterized in that: be the most vertically provided with fire water pipeline (10) in the centre of vertical well cabinet frame (12).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2,
It is characterized in that: be the most vertically provided with vertical garbage shaft (5) in the centre of vertical well cabinet frame (12).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 4, its
It is characterised by: being provided with oblique garbage shaft (13) in the upper inclination of construction operation platform (14), oblique garbage shaft (13) is with vertical
The upper port of garbage shaft (5) is docked mutually.
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2,
It is characterized in that: the edge entering people's inlet side at construction operation platform (14) is hinged with pedal (6).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2,
It is characterized in that: be inserted with inserted link (1) on construction operation platform (14), the external part of inserted link (1) is plugged in perpendicular for level
On well cabinet frame (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620237145.8U CN205617771U (en) | 2016-03-25 | 2016-03-25 | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620237145.8U CN205617771U (en) | 2016-03-25 | 2016-03-25 | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205617771U true CN205617771U (en) | 2016-10-05 |
Family
ID=57031993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620237145.8U Active CN205617771U (en) | 2016-03-25 | 2016-03-25 | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205617771U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107119912A (en) * | 2017-06-26 | 2017-09-01 | 中国建筑第四工程局有限公司 | A kind of construction elevator operating platform structure and preparation method thereof |
CN107989365A (en) * | 2018-01-08 | 2018-05-04 | 北京城建十建设工程有限公司 | Clear water hollow concrete column-form system and its construction method |
-
2016
- 2016-03-25 CN CN201620237145.8U patent/CN205617771U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107119912A (en) * | 2017-06-26 | 2017-09-01 | 中国建筑第四工程局有限公司 | A kind of construction elevator operating platform structure and preparation method thereof |
CN107119912B (en) * | 2017-06-26 | 2023-10-17 | 中国建筑第四工程局有限公司 | Construction elevator operation platform structure and manufacturing method thereof |
CN107989365A (en) * | 2018-01-08 | 2018-05-04 | 北京城建十建设工程有限公司 | Clear water hollow concrete column-form system and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017084210A1 (en) | Inner support wire saw lossless cutting and disassembling structure and construction method therefor | |
CN101619630B (en) | Mounting method of steel chimney and implementary jacking device | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN104975719A (en) | Novel material distribution device and construction method for pouring floor concrete by using same | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN203173644U (en) | Multifunctional lifting shaft working platform system | |
CN207048345U (en) | Construction discharge platform device | |
CN205296803U (en) | Elevator automatic lifting operation panel | |
CN205617771U (en) | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft | |
CN202370234U (en) | Tool type elevator hoistway construction platform | |
CN203143872U (en) | Mobile platform for elevator installation construction | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
CN202401769U (en) | Detachable concrete cloth machine for self-elevating creeping formwork system | |
CN202064281U (en) | Slip form frame | |
CN111576878A (en) | Construction process for quick-release system of aluminum alloy template | |
CN209145305U (en) | A kind of construction device for discharging | |
CN110847289A (en) | Ultra-deep large-span circular water intake pump house roof support and construction method thereof | |
CN113668401B (en) | Hoisting process based on installation and transportation platform on long-span bridge pier | |
CN206722431U (en) | Discharging platform for high-rise building construction | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN204662933U (en) | A kind of hoistway operation frame lift-type steel platform | |
CN203022327U (en) | Elevator shaft high-altitude construction platform device | |
CN106088564A (en) | Track climbing type monolithic architecture construction scaffolding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |