CN205617771U - Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft - Google Patents

Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft Download PDF

Info

Publication number
CN205617771U
CN205617771U CN201620237145.8U CN201620237145U CN205617771U CN 205617771 U CN205617771 U CN 205617771U CN 201620237145 U CN201620237145 U CN 201620237145U CN 205617771 U CN205617771 U CN 205617771U
Authority
CN
China
Prior art keywords
operation platform
construction operation
vertical
cabinet frame
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620237145.8U
Other languages
Chinese (zh)
Inventor
李佳鹏
顾志峰
程建军
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201620237145.8U priority Critical patent/CN205617771U/en
Application granted granted Critical
Publication of CN205617771U publication Critical patent/CN205617771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft, including platform steel skeleton, driving motor, vertical well cabinet frame and platform backup pad, the platform steel skeleton is installed at platform backup pad below constitution construction operation platform, the vertical centre of installing at the well of vertical well cabinet frame to the vertical construction operation platform that runs through, at the vertical concrete feeding pump line that is equipped with in the centre of vertical well cabinet frame, driving motor installs on construction operation platform to the drive construction operation platform remove along the vertical lift of vertical well cabinet frame, it transversely supports the positioning pulley group on four stands of vertical well cabinet frame to be equipped with four difference on construction operation platform. This integrated device construction operation platform can remove in the well in vertical lift to the centre of vertical well cabinet frame sets up all kinds of pipelines, can compromise the transportation of pipeline, also can reciprocate in the well, has improved the efficiency of construction, has reduced construction cost.

Description

Construction operation platform and pipeline transportation integration apparatus in high residential building elevator
Technical field
This utility model relates to a kind of construction of lift well device, especially one and is applicable to construction in high residential building elevator Operating platform and pipeline transportation integration apparatus.
Background technology
Elevator shaft steel bar template concrete construction, during the construction of usual top-bottom cross, needs subsection setup profile steel bracket, torr Set up protective scaffold on frame again, as the operation support body of elevator beam in hoistway and track, also serve as protection support body.This way needs Want substantial amounts of circulation material, heavy profile steel bracket, just closed at crossed construction or after binding because hoistway is suitable for reading, tower crane without Method is transported material in cylinder and profile steel bracket handling is put in place.These work will rely on a large amount of labour force, and material is transported to Each layer hoistway, then rely on manpower movement profile steel bracket in place, the most manually transmit steel pipe, fastener, take by height of lift requirement And if removing support body.So causing problems with:
1, mechanized construction degree is low, a large amount of manual delivery material engineering, landing of easily slipping out of the hand when changing hands, and easily causes weight The object that thing falls hits injury accident, and bracket is fixing the most with great difficulty to topple, and potential safety hazard is a lot;
2, expending great amount of cost, the material such as shaped steel, steel pipe, fastener and the lumps of wood and related measure cost are used for setting up and tearing open Remove, and hand haulage's circulation material is to ground, need to expend substantial amounts of cost;
3, meet when needing hole to be provided in structure, its position, size required precision high, take to water the measures such as concrete protection and be stranded Difficulty, hole secondary plugging work consuming consumptive material, the layering of operator must be relied on when being transformed into another floor to pass in and out;
4, hoistway cradle stationary is motionless, and operator are inconvenient to move up and down, and construction material is also required to manually repeatedly turn Changing, transmit and just can enter hoistway, in operating process, potential safety hazard is a lot;
5, act on single, model sheetinstallat assistance platform can only be done, it is impossible to take into account other construction requirements, such as concrete conveyance Pipeline, refuse collection pipeline, fire-fighting, the matching requirements that supplies water and power;
6, on-the-spot high-rise concrete pump typically hole to be provided on floor, needs to set up a large amount of support, and the later stage also to enter Row closure, and the shelf below material distributing machine need to be reinforced during casting concrete, work consuming consumptive material, also potential safety hazard.
Therefore, necessary this construction operation platform is improved, adapt to mechanization, the wanting of green construction development Ask.
Utility model content
Utility model purpose: provide a kind of multifunctional integrated device, with the mechanization degree constructed in improving hoistway, increases Add construction security reliability, and the transport of pipeline can be taken into account, it is possible to move up and down in hoistway, improve efficiency of construction, reduce Cost.
Technical scheme: construction operation platform and pipeline transportation integration in high residential building elevator described in the utility model Device, including platform steel skeleton, drives motor, vertical well cabinet frame and platform support panel;Platform steel skeleton is arranged on platform and props up Construction operation platform is constituted below fagging;Vertical well cabinet frame is vertically installed at the centre of hoistway, and it is flat vertically to run through constructing operation Platform;Center vertical at vertical well cabinet frame is provided with concrete delivery pump pipe;Drive motor to be arranged on construction operation platform, and drive Dynamic construction operation platform vertically well cabinet frame vertical lifting moves;Construction operation platform is provided with four difference cross-brace exist Positioning pulley group on four root posts of vertical well cabinet frame.
Use drive motor drive construction operation platform in hoistway vertically well cabinet frame vertical lifting move, be effectively improved Efficiency of construction, reduces construction cost;Use the center vertical at vertical well cabinet frame that concrete delivery pump pipe is set, it is possible to right Concrete delivery pump pipe is supported fixing, and is conveniently delivered up concrete slurry, has preferable stability and safety;Adopt It is capable of the cross-brace of construction operation platform by positioning pulley group, prevents construction operation platform from going out relative to vertical well cabinet frame Now rock, improve the stability in use of construction operation platform, enhance the safety of construction.
As further restriction scheme of the present utility model, the most vertically it is provided with cable testing bridge in the centre of vertical well cabinet frame. Use the center vertical at vertical well cabinet frame that cable testing bridge, convenient installation cable are set, and cable is effectively protected.
As further restriction scheme of the present utility model, the most vertically it is provided with fire extinguisher canvas hose in the centre of vertical well cabinet frame Road.Use the center vertical at vertical well cabinet frame that fire water pipeline is set, it is simple to the interim fixed installation of fire water pipeline, effectively Improve the security against fire of job site.
As further restriction scheme of the present utility model, the most vertically it is provided with vertical rubbish in the centre of vertical well cabinet frame and leads to Road.Using the center vertical at vertical well cabinet frame to arrange vertical garbage shaft, the rubbish produced during convenient construction carries downwards.
As further restriction scheme of the present utility model, construction operation platform tilts to be provided with oblique garbage shaft, Oblique garbage shaft docks mutually with the upper port of vertical garbage shaft.Use the upper end of oblique garbage shaft and vertical garbage shaft Mouth docks mutually, it is achieved the indirect closing of the upper port of vertical garbage shaft, improves safety.
As further restriction scheme of the present utility model, the edge entering people's inlet side at construction operation platform is hinged There is pedal.Use pedal convenient construction personnel can pass in and out construction operation platform.
As further restriction scheme of the present utility model, construction operation platform is inserted with inserted link, stretching out of inserted link End is plugged in vertical well cabinet frame for level.Inserted link is used to realize being relatively fixed of construction operation platform and vertical well cabinet frame, Prevent construction operation platform accidental falling.
Compared with prior art, it provides the benefit that this utility model: (1) uses and drives motor to drive construction operation platform In hoistway, vertically well cabinet frame vertical lifting moves, and is effectively increased efficiency of construction, reduces construction cost;(2) use The center vertical of vertical well cabinet frame arranges concrete delivery pump pipe, it is possible to be supported fixing to concrete delivery pump pipe, convenient It is delivered up concrete slurry, there is preferable stability and safety;(3) positioning pulley group is used to be capable of constructing operation The cross-brace of platform, prevents construction operation platform from occurring rocking relative to vertical well cabinet frame, improves construction operation platform Stability in use, enhances the safety of construction.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram of the present utility model;
Fig. 2 is side-looking structural representation of the present utility model.
Label in figure: 1, inserted link, 2, hoistway, 3, cable testing bridge, 4, positioning pulley group, 5, vertical garbage shaft, 6, pedal, 7, concrete delivery pump pipe, 8, platform steel skeleton, 9, platform support panel, 10, fire water pipeline, 11, drive motor, 12, vertical Well cabinet frame, 13, oblique garbage shaft, 14, construction operation platform.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model It is not limited to described embodiment.
Embodiment 1:
As illustrated in fig. 1 and 2, construction operation platform and pipeline transportation integration in high residential building elevator of the present utility model Device includes: platform steel skeleton 8, driving motor 11, vertical well cabinet frame 12 and platform support panel 9.
Wherein, platform steel skeleton 8 is arranged on composition construction operation platform 14 below platform support panel 9;Vertical well cabinet frame 12 It is vertically installed at the centre of hoistway 2, and vertically runs through construction operation platform 14;Center vertical at vertical well cabinet frame 12 is provided with mixed Solidifying soil delivery pump pipe 7, cable testing bridge 3, fire water pipeline 10, vertical garbage shaft 5;Construction operation platform 14 tilts and is provided with Oblique garbage shaft 13, oblique garbage shaft 13 docks mutually with the upper port of vertical garbage shaft 5;Drive motor 11 to be arranged on to execute On work operating platform 14, and construction operation platform 14 vertically well cabinet frame 12 vertical lifting is driven to move;At construction operation platform 14 are provided with four cross-brace positioning pulley groups 4 on four root posts of vertical well cabinet frame 12 respectively;Put down in constructing operation Platform 14 enters the edge of people's inlet side and is hinged with pedal 6;Construction operation platform 14 is inserted with inserted link 1, stretching out of inserted link 1 End is plugged in vertical well cabinet frame 12 for level.
In high residential building elevator of the present utility model, construction operation platform and pipeline transportation integration apparatus are being carried out now Field makes when building:
(1) vertical well cabinet frame 12 uses conventional high-rise people's goods construction elevator derrick standard knot, the most a size of 70*70* 1500mm, the basis of vertical well cabinet frame 12 imbeds when construction elevator pit foundation plinth with reference to construction elevator basis built-in fitting, and according to Construction elevator standard arranges sustaining wall connector.
(2) platform steel skeleton 8 uses the square steel of a size of 50*50*3mm to be welded, according to the pre-drilled spiral shell of design drawing Keyhole;Platform support panel 9 uses the plank sheathing that 15mm is thick, and the spacing between platform support panel 9 and vertical well cabinet frame 12 is 60- 70mm, uses template completely to spread in the middle of the vertical well cabinet frame 12 every layer of index bed position.
(3) in vertical well cabinet frame 12 according to design drawing require install vertical garbage shaft 5(200*500mm), cable bridge Frame 3, concrete delivery pump pipe 7 and fire water pipeline 10;And use the fixtures such as square steel (50*50*3mm) and bolt to above-mentioned Pipeline is fixed, and needs to increase yielding rubber pad between pipeline and fixture.
(4) the driving motor 11 on construction operation platform 14 is with power-off brake device, is provided with on vertical well cabinet frame 12 Gear train track, drives the output shaft of motor 11 to be provided with and gear train track meshed gears, thus carries out upper and lower sliding Drive;Each positioning pulley group 4 includes that two leading blocks, two leading blocks are clamped in the same of vertical well cabinet frame 12 respectively On column, carry out stable elevating function with driving motor 11 to coordinate.
(5) stop after construction operation platform 14 rises to index bed operating surface, use inserted link 1 to be inserted on vertical well cabinet frame 12 In the square steel of fixing various pipes, inserted link 1 uses the square steel of a size of 40*40*3mm to make, and fixing dead with bolt, prevents from putting down Platform accidental falling.After construction operation platform 14 rises to the scope of operation every time, when pouring floor concrete, install with derrick standard knot Supporting concrete spreader, material distributing machine uses tower crane to coordinate and manually installs.
(6) cable testing bridge 3 within construction operation platform 14 is installed and is constructed with reference to on-the-spot temporary electricity specification, carries out Lightning protection and protection against electric shock work.The cable of installation is delivered in the graduation two electronic box of each floor by lift port, disappears Watertight conduit 10 to install free expansion joint at each floor, with vibration proof drawing crack.
(7) corner of construction operation platform 14 protective upright rod to be provided with, after construction operation platform 14 rises to last layer, under One layer uses fixed steel framework job platform as horizontal protective device.
This utility model compared with prior art provides the benefit that: this utility model simple in construction, easy for installation, whole Job platform can move up and down in hoistway, and security reliability is high, improves efficiency of construction, reduces cost, hence it is evident that improves well The mechanization degree of construction in road, and solve high-rise water power pipeline and the laying problem of garbage shaft, decrease various pipe The reserved opening in road.
Although as it has been described above, represented and described this utility model with reference to specific preferred embodiment, but it must not It is construed to the restriction to this utility model self.In the spirit and scope of the present utility model defined without departing from claims Under premise, can various changes can be made in the form and details to it.

Claims (7)

1. construction operation platform and pipeline transportation integration apparatus in high residential building elevator, it is characterised in that: include platform steel Skeleton (8), driving motor (11), vertical well cabinet frame (12) and platform support panel (9);Platform steel skeleton (8) is arranged on platform Gripper shoe (9) lower section constitutes construction operation platform (14);Vertical well cabinet frame (12) is vertically installed at the centre of hoistway (2), and erects Directly run through construction operation platform (14);Center vertical vertical well cabinet frame (12) is provided with concrete delivery pump pipe (7);Drive electricity Machine (11) is arranged on construction operation platform (14), and drives construction operation platform (14) vertically well cabinet frame (12) vertical lifting Mobile;Construction operation platform (14) is provided with four cross-brace determining on four root posts of vertical well cabinet frame (12) respectively Position assembly pulley (4).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1, its It is characterised by: be the most vertically provided with cable testing bridge (3) in the centre of vertical well cabinet frame (12).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2, It is characterized in that: be the most vertically provided with fire water pipeline (10) in the centre of vertical well cabinet frame (12).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2, It is characterized in that: be the most vertically provided with vertical garbage shaft (5) in the centre of vertical well cabinet frame (12).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 4, its It is characterised by: being provided with oblique garbage shaft (13) in the upper inclination of construction operation platform (14), oblique garbage shaft (13) is with vertical The upper port of garbage shaft (5) is docked mutually.
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2, It is characterized in that: the edge entering people's inlet side at construction operation platform (14) is hinged with pedal (6).
Construction operation platform and pipeline transportation integration apparatus in high residential building elevator the most according to claim 1 and 2, It is characterized in that: be inserted with inserted link (1) on construction operation platform (14), the external part of inserted link (1) is plugged in perpendicular for level On well cabinet frame (12).
CN201620237145.8U 2016-03-25 2016-03-25 Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft Active CN205617771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620237145.8U CN205617771U (en) 2016-03-25 2016-03-25 Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620237145.8U CN205617771U (en) 2016-03-25 2016-03-25 Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft

Publications (1)

Publication Number Publication Date
CN205617771U true CN205617771U (en) 2016-10-05

Family

ID=57031993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620237145.8U Active CN205617771U (en) 2016-03-25 2016-03-25 Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft

Country Status (1)

Country Link
CN (1) CN205617771U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119912A (en) * 2017-06-26 2017-09-01 中国建筑第四工程局有限公司 A kind of construction elevator operating platform structure and preparation method thereof
CN107989365A (en) * 2018-01-08 2018-05-04 北京城建十建设工程有限公司 Clear water hollow concrete column-form system and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119912A (en) * 2017-06-26 2017-09-01 中国建筑第四工程局有限公司 A kind of construction elevator operating platform structure and preparation method thereof
CN107119912B (en) * 2017-06-26 2023-10-17 中国建筑第四工程局有限公司 Construction elevator operation platform structure and manufacturing method thereof
CN107989365A (en) * 2018-01-08 2018-05-04 北京城建十建设工程有限公司 Clear water hollow concrete column-form system and its construction method

Similar Documents

Publication Publication Date Title
WO2017084210A1 (en) Inner support wire saw lossless cutting and disassembling structure and construction method therefor
CN101619630B (en) Mounting method of steel chimney and implementary jacking device
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN104975719A (en) Novel material distribution device and construction method for pouring floor concrete by using same
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN203173644U (en) Multifunctional lifting shaft working platform system
CN207048345U (en) Construction discharge platform device
CN205296803U (en) Elevator automatic lifting operation panel
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN202370234U (en) Tool type elevator hoistway construction platform
CN203143872U (en) Mobile platform for elevator installation construction
CN206233546U (en) A kind of elevator hoistways workbench
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN202401769U (en) Detachable concrete cloth machine for self-elevating creeping formwork system
CN202064281U (en) Slip form frame
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN209145305U (en) A kind of construction device for discharging
CN110847289A (en) Ultra-deep large-span circular water intake pump house roof support and construction method thereof
CN113668401B (en) Hoisting process based on installation and transportation platform on long-span bridge pier
CN206722431U (en) Discharging platform for high-rise building construction
CN203320922U (en) Supporting device for forming of elevator shaft template
CN204662933U (en) A kind of hoistway operation frame lift-type steel platform
CN203022327U (en) Elevator shaft high-altitude construction platform device
CN106088564A (en) Track climbing type monolithic architecture construction scaffolding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant