CN207048345U - Construction discharge platform device - Google Patents

Construction discharge platform device Download PDF

Info

Publication number
CN207048345U
CN207048345U CN201720691014.1U CN201720691014U CN207048345U CN 207048345 U CN207048345 U CN 207048345U CN 201720691014 U CN201720691014 U CN 201720691014U CN 207048345 U CN207048345 U CN 207048345U
Authority
CN
China
Prior art keywords
positioning component
floor
tie
outside
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720691014.1U
Other languages
Chinese (zh)
Inventor
胡二永
王艳民
王艳华
翟文超
苏永超
董小涛
马凯
邢付强
王世春
徐创柯
周成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720691014.1U priority Critical patent/CN207048345U/en
Application granted granted Critical
Publication of CN207048345U publication Critical patent/CN207048345U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

Construction discharge platform device, including platform body, upper installation positioning component and lower installation positioning component, upper installation positioning component is identical with the construction of lower installation positioning component, upper positioning component is located by connecting on the reinforced concrete upright column and floor of lower floor, upper positioning component is located by connecting on the reinforced concrete upright column and floor of floor, the outer end of upper positioning component and the outer end of lower positioning component are respectively positioned on the edge of floor, hoist engine is fixedly installed on the outside of upper positioning component, the outside of lower positioning component passes through be hinged on the inside of bearing pin and platform body, hoist engine is by steel wire rope with being connected on the outside of platform body.The utility model successively uses from bottom to top, and installation and removal are convenient, can repeatedly use, security reliability is strong, and labor intensity is low, minimum to building destruction, practical, application easy to spread.

Description

Construction discharge platform device
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of construction discharge platform device.
Background technology
In Building Construction, the discharging constructing operation of building materials is most important, it be not only related to construction into This, the time of construction, and labor cost, and it is related to the security performance of construction.In order to improve efficiency of construction, reduction is applied Work difficulty, ensure construction safety, it is necessary to ensure the fully safe and reliable operability of discharging platform.Existing discharging platform is most It is overhanging type structure, existing discharging platform is generally horizontal structure, and there is cumbersome for installation, reliability is poor, it is impossible to weight It is used for multiple times again, workmen again moves the material on platform in floor plates at station on platform, and not only labor intensity is big for this, And larger potential safety hazard be present.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided one kind is easily installed, can repeatedly made With, mitigate the strong construction discharge platform device of workmen labor intensity, security reliability.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Construction discharge platform device, bag Include the structure of platform body, upper installation positioning component and lower installation positioning component, upper installation positioning component and lower installation positioning component Make identical, upper positioning component is located by connecting on the reinforced concrete upright column and floor of lower floor, and upper positioning component is located by connecting On the reinforced concrete upright column and floor of upper floor, the outer end of the outer end of upper positioning component and lower positioning component is respectively positioned on floor Edge, be fixedly installed hoist engine on the outside of upper positioning component, the outside of lower positioning component passes through bearing pin and platform body Inner side is hinged, and hoist engine is by steel wire rope with being connected on the outside of platform body.
Lower installation positioning component includes horizontally disposed positioning beam and two tie-beams, and positioning beam is in left-right direction Horizontally disposed, two tie-beams are horizontally disposed with along inward-outward direction, and two tie-beams are located in same level, and the two of positioning beam End is anchored at the left side of adjacent two root posts by one group of jack bolt assembly along inward-outward direction respectively, and two tie-beams are located at Between two root posts and below positioning beam, two the inner of tie-beam install spiral shell by one group of double end vertically The left and right ends of bolt assembly and positioning beam connect, and positioning beam lower surface contacts with tie-beam inside upper surface, two tie-beams Outer end bottom is provided with a support beam vertically, and support beam lower end is supported on the floor of lower floor, two companies Connect and be provided with buttress brace between the outside of beam, buttress brace left and right ends are connected with tie-beam by connecting bolt respectively.
Platform body includes lower variable section and the flat board that is laid on lower variable section, lower variable section it is outer Side, front side and rear side are respectively arranged with enclosing, and the front and rear of the inner side of lower rectangular frame passes through described bearing pin and company Beam is connect to be hinged.
Using above-mentioned technical proposal, base of the utility model using the reinforced concrete upright column on each floor as positioning connection Plinth, highly reliable, positioning beam and support beam play the effect for limiting tie-beam keep level state and being hinged with platform body, by Power is reasonable, and safety coefficient is high.Jack bolt assembly is anchored at adjacent two reinforced concrete upright columns, and building is destroyed less, also not With being cut again after built-in connection use.In addition, using tie-beam, positioning beam, support beam and various bolts, can repeat Utilize.When needing to carry out discharging to the floor of last layer, can by the platform body on next layer, tie-beam, support beam and Positioning beam is dismantled, and the hoist engine dismounting of last layer, the hoist engine, tie-beam, support beam and the positioning beam that disassemble is installed to The floor of upper last layer, pulling down the platform body to get off is not had using hinge to last layer on two tie-beams of dismounting, The steel wire rope connecting platform outer body of hoist engine can carry out discharge operation to last layer.
When carrying out discharging, after tower crane hangs onto material on flat board, start hoist engine, hoist engine is upward by steel wire rope Platform body is drawn, platform body is rotated up by the center of circle of bearing pin, is gradually risen on the outside of platform body, material is just automatically to introversion On the floor of the floor of lower landing, thus eliminate workmen and stand again to being carried on platform body, lighten one's labor Intensity, and reduce potential safety hazard.
In summary, the utility model successively uses from bottom to top, and installation and removal are convenient, can repeatedly use, Security reliability is strong, and labor intensity is low, minimum to building destruction, practical, application easy to spread.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the left view of lower installation positioning component in Fig. 1.
Embodiment
As depicted in figs. 1 and 2, construction discharge platform device of the present utility model, including platform body, upper installation are determined Hyte part and lower installation positioning component, upper installation positioning component is identical with the construction of lower installation positioning component, and upper positioning component is determined Position is connected on the reinforced concrete upright column 1 and floor 2 of lower floor, and upper positioning component is located by connecting on the reinforced concrete of floor On native column 1 and floor 2, the outer end of the outer end of upper positioning component and lower positioning component is respectively positioned on the edge of floor, upper positioning Hoist engine 3 is fixedly installed on the outside of component, the outside of lower positioning component passes through be hinged, elevator on the inside of bearing pin 4 and platform body Machine 3 is by steel wire rope 5 with being connected on the outside of platform body.
Lower installation positioning component includes horizontally disposed positioning beam 6 and two tie-beams 7, and positioning beam 6 is along left and right Direction is horizontally disposed with, and two tie-beams 7 are horizontally disposed with along inward-outward direction, and two tie-beams 7 are located in same level, positioning The both ends of beam 6 are anchored at the left side of adjacent two root posts 1 by one group of component of bolt 8 along inward-outward direction respectively, two Tie-beam 7 between two root posts 1 and positioned at the lower section of positioning beam 6, two tie-beams 7 it is inner by one group along Vertical Square To double end installation bolt group 9 be connected with the left and right ends of positioning beam 6, the lower surface of positioning beam 6 and the inside upper surface of tie-beam 7 Contact, the outer end bottom of two tie-beams 7 are provided with a support beam 10 vertically, and the lower end of support beam 10 is supported on On the floor 2 of lower floor, buttress brace 11 is provided between the outside of two tie-beams 7, the left and right ends of buttress brace 11 are respectively with connecting Beam 7 is connect to connect by connecting bolt 12.
Platform body includes lower variable section 13 and the flat board 14 being laid on lower variable section 13, lower rectangular frame Outside, front side and the rear side of beam 13 are respectively arranged with enclosing 15, and the front and rear of the inner side of lower rectangular frame is by described Bearing pin 4 and tie-beam 7 it is be hinged.
Basis of the utility model with the reinforced concrete upright column 1 on each floor for positioning connection, highly reliable, positioning Beam 6 and support beam 10 play the effect for limiting the keep level state of tie-beam 7 and being hinged with platform body, reasonable stress, safety Coefficient is high.The component of bolt 8 is anchored at adjacent two reinforced concrete upright columns 1, and building is destroyed less, without pre-buried connection Cut again after part use.In addition, using tie-beam 7, positioning beam 6, support beam 10 and various bolts, can reuse. When needing the floor to last layer to carry out discharging, by the platform body on next layer, tie-beam 7, support beam 10 and can determine Position beam 6 is dismantled, and the hoist engine 3 of last layer is dismantled, and the hoist engine 3, tie-beam 7, support beam 10 and the positioning beam 6 that disassemble are pacified The floor of last layer is attached to, pulling down the platform body that gets off and being hinged to last layer using bearing pin 4 does not have two connections dismantled On beam 7, the connecting platform outer body of steel wire rope 5 of hoist engine 3 can carry out discharge operation to last layer.
When carrying out discharging, after tower crane hangs onto material on flat board 14, start hoist engine 3, hoist engine 3 passes through steel wire rope 5 pull up platform body, and platform body is rotated up with bearing pin 4 for the center of circle, are gradually risen on the outside of platform body, material is with regard to automatic On the floor 2 of the floor slid inwardly downward, thus eliminate workmen and stand again to being carried on platform body, subtract Light work intensity, and reduce potential safety hazard.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc. Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality With the protection domain of new technique scheme.

Claims (3)

1. construction discharge platform device, it is characterised in that:Including platform body, upper installation positioning component and lower installation positioning Component, upper installation positioning component is identical with the construction of lower installation positioning component, and upper positioning component is located by connecting on the steel of lower floor On reinforced concrete column and floor, upper positioning component is located by connecting on the reinforced concrete upright column and floor of floor, upper fixed The outer end of hyte part and the outer end of lower positioning component are respectively positioned on the edge of floor, and volume is fixedly installed on the outside of upper positioning component Raise machine, the outside of lower positioning component by be hinged on the inside of bearing pin and platform body, hoist engine by steel wire rope and platform body outside Side connects.
2. construction discharge platform device according to claim 1, it is characterised in that:Lower installation positioning component includes equal Horizontally disposed a positioning beam and two tie-beams, positioning beam are horizontally disposed with left-right direction, and two tie-beams are along inside and outside Direction is horizontally disposed with, and two tie-beams are located in same level, and the both ends of positioning beam are respectively by one group along inward-outward direction Jack bolt assembly is anchored at the left side of adjacent two root posts, and two tie-beams are between two root posts and under positioning beam Side, two the inner of tie-beam are connected by the left and right ends of one group of double end installation bolt component and positioning beam vertically Connect, positioning beam lower surface contacts with tie-beam inside upper surface, and the outer end bottoms of two tie-beams is provided with one along vertical The support beam in direction, support beam lower end are supported on the floor of lower floor, and buttress brace is provided between the outside of two tie-beams, Buttress brace left and right ends are connected with tie-beam by connecting bolt respectively.
3. construction discharge platform device according to claim 2, it is characterised in that:Platform body includes lower rectangle frame The flat board on lower variable section is set a roof beam in place and is laid on, outside, front side and the rear side of lower variable section are respectively arranged with enclosing, The front and rear of the inner side of lower rectangular frame is hinged by described bearing pin with tie-beam.
CN201720691014.1U 2017-06-14 2017-06-14 Construction discharge platform device Expired - Fee Related CN207048345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720691014.1U CN207048345U (en) 2017-06-14 2017-06-14 Construction discharge platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720691014.1U CN207048345U (en) 2017-06-14 2017-06-14 Construction discharge platform device

Publications (1)

Publication Number Publication Date
CN207048345U true CN207048345U (en) 2018-02-27

Family

ID=61492754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720691014.1U Expired - Fee Related CN207048345U (en) 2017-06-14 2017-06-14 Construction discharge platform device

Country Status (1)

Country Link
CN (1) CN207048345U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130656A (en) * 2019-05-20 2019-08-16 温州中顺建筑工程有限公司 The compound anchoring discharging platform of turnover type and construction method
CN110185263A (en) * 2019-04-16 2019-08-30 中国建筑第二工程局有限公司 Construction platform of unloading
CN112299203A (en) * 2020-10-23 2021-02-02 窦进新 Building construction material carries uses lifting machine
CN112900887A (en) * 2021-01-18 2021-06-04 于彬 A assembled platform of unloading safely for construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185263A (en) * 2019-04-16 2019-08-30 中国建筑第二工程局有限公司 Construction platform of unloading
CN110130656A (en) * 2019-05-20 2019-08-16 温州中顺建筑工程有限公司 The compound anchoring discharging platform of turnover type and construction method
CN110130656B (en) * 2019-05-20 2021-03-09 温州中顺建筑工程有限公司 Turnover type composite anchoring unloading platform and construction method
CN112299203A (en) * 2020-10-23 2021-02-02 窦进新 Building construction material carries uses lifting machine
CN112900887A (en) * 2021-01-18 2021-06-04 于彬 A assembled platform of unloading safely for construction
CN112900887B (en) * 2021-01-18 2022-07-15 于彬 A assembled platform of unloading safely for construction

Similar Documents

Publication Publication Date Title
CN207048345U (en) Construction discharge platform device
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
TWI506190B (en) A?high-rise safety construction lifting platform
CN206513052U (en) A kind of spring layer support and hydraulic pressure spring layer climbing system
CN106348189A (en) Hoisting type rack device special for distribution area
CN203097316U (en) Foldable hydraulic lifting support secure channel for high altitude construction
CN209210319U (en) It drives a vehicle dedicated maintenance hanging basket
CN202450762U (en) Construction lifting platform
CN204126240U (en) Moving lift type is encorbelmented operating platform
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN207484935U (en) Shear wall elevator adjustable operating platform
CN107696005B (en) lifting operation platform for building construction
CN204224064U (en) The unlatching of escalator floor plate and supporting construction
CN207227957U (en) Pier construction security protection platform
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN203669328U (en) Quick-disassembly high-altitude working hanging basket
CN208686053U (en) A kind of elevator well sizing climbing platforms device
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN207295501U (en) The operating platform of bearing is reinforced for bridge Single column pier
CN204038917U (en) Detachable external hanging type operating platform
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN213951973U (en) Adjustable construction platform
CN211666622U (en) Test device capable of climbing up and down and turning plate to stand in counter-force well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

CF01 Termination of patent right due to non-payment of annual fee