CN203783105U - Fast construction operating platform used for section steel column interior pouring concrete - Google Patents

Fast construction operating platform used for section steel column interior pouring concrete Download PDF

Info

Publication number
CN203783105U
CN203783105U CN201420054880.6U CN201420054880U CN203783105U CN 203783105 U CN203783105 U CN 203783105U CN 201420054880 U CN201420054880 U CN 201420054880U CN 203783105 U CN203783105 U CN 203783105U
Authority
CN
China
Prior art keywords
steel column
operating platform
platform
base plate
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420054880.6U
Other languages
Chinese (zh)
Inventor
王磊
李鑫洋
黄贵
郭鹏
汪廷勇
刘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201420054880.6U priority Critical patent/CN203783105U/en
Application granted granted Critical
Publication of CN203783105U publication Critical patent/CN203783105U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a fast construction operating platform used for section steel column interior pouring concrete. The platform comprises a platform support structure which is arranged on a steel beam in a supporting mode and at least two fixing suspension structures which enable the platform support structure and a section steel column to form a fixing structure and are fixedly connected onto the platform support structure, the platform support structure comprises a baseboard which is provided with an installing surface, a horizontal support unit and a fence protecting unit, the horizontal support unit is fixedly connected onto the installing surface and is used for supporting the baseboard, the fence protecting unit is vertically arranged along the periphery of the installing surface of the baseboard, the fence protecting unit comprises a platform protecting support and a safety net which is arranged on the platform protecting support in a hanging mode to form a protecting fence, and each fixing suspension structure comprises a suspension body, a connecting end which is connected with the baseboard and the fence protecting unit, and a suspension end which is opposite to the connecting end and is used for suspending on the section steel column. The fast construction operating platform has the beneficial effect of improving the safety, the stability and the convenience of the operating platform.

Description

For filling with concrete rapid construction operating platform in steel column
Technical field
The utility model belongs to field of engineering technology, is specifically related to a kind of for filling with concrete rapid construction operating platform in steel column.
Background technology
In super high steel structure steel column, fill with in the middle of concrete casting process, tend in the enterprising line operate construction of girder steel, work plane is narrow and small, danger is larger, safety of workers can not get ensureing, between steel column node, girder steel still has a segment distance simultaneously, be inconvenient to construct, in work progress, tend to adopt operating platform, operating platform is in the past and sets up and be fixed on girder steel, and operating platform in the past can only be once the service of building of a steel column, after having operated, need again to lift arrangement operating platform, build again work next time, therefore, cannot provide safe operating space for corner post or the inhomogeneous steel column of steel girder erection, the safety of this operating platform is low under these conditions, poor stability, convenient not.
Utility model content
For overcoming the existing defect of prior art, now provide a kind of for filling with concrete fast and safe construction operating platform in steel column, the safety that solved operating platform is low, poor stability, the problem such as convenient not.
Technical problem to be solved in the utility model realizes by the following technical solutions:
A kind of for filling with concrete rapid construction operating platform in steel column, comprise: be set up in the platform support structure on girder steel, be fixedly connected on described platform support structure so that form at least two fixing and hanging structures of fixed structure between described platform support structure and steel column; Described platform support structure comprises: have a base plate of installed surface, be fixedly connected on described installed surface, for supporting the horizontal support unit of described base plate and erectting the fence protective unit arranging along the installed surface periphery of described base plate; Described fixing and hanging structure comprises: suspension body, the link that connects described base plate or fence protective unit and suspended end relative with described link, that supply to hang on steel column; Wherein, described fence protective unit comprises: Terrace prevention support and being hung on Terrace prevention support for the safety net that forms protective guard.
Preferably, be positioned at the relative both sides of described base plate and be fixedly connected with the longitudinal carrier of base plate described in lateral support.
Preferably, described base plate is the double i iron that electric welding connects, and described double i iron forms a rectangular structure.
Preferably, described Terrace prevention support comprises four rectangular frame structure, and described four rectangular frame structure are stood on respectively the surrounding of described base plate to form four stifled safety wall supports.
Preferably, described rectangular frame structure comprises multiple support posts, and described multiple support posts are connected across the relative both sides of described rectangular frame structure.
Preferably, the walking surface of described base plate completely spreads scaffold floor to form the operating surface passage for people's walking.
Preferably, the support post of described operating surface passage both sides is provided with the corresponding hanger connecting of suspended end for fixing and hanging structure.
Preferably, the dual-side of described operating surface passage is provided with the corresponding hanger connecting of suspended end for fixing and hanging structure simultaneously.
Preferably, the link of described fixing and hanging structure is connected via bolt with described hanger.
Preferably, described fixing and hanging structure is that wire rope regulates erecting by overhang, described wire rope regulates erecting by overhang to comprise wire rope body, is located at the connection annulus of link and is located at the adjusting hook of suspended end, and described wire rope body is connected via high-strength bolt with described adjusting hook.
Operating platform for pouring concrete into steel column pouring construction provided by the utility model, one end by fixing and hanging structure is effectively connected with operating platform, the other end of fixing and hanging structure is arranged near steel column one side, and the structure of double i iron base plate is fixed on girder steel operating platform, thereby ensure the stability of operating platform; Fence protection is welded on operating platform surrounding, ensures the safety of high-altitude application, and hanger is welded on operating platform both sides, the quick lifting of handled easily platform.In addition, because operating platform is erected on girder steel, shorten the distance of operating surface and steel column, constructability and convenient current safely and fast between two steel columns.
Brief description of the drawings
Fig. 1 is that the utility model is for filling with the top view of concrete rapid construction operating platform in steel column;
Fig. 2 is that the utility model is for filling with the elevation of concrete rapid construction operating platform in steel column;
Fig. 3 is that the utility model is for filling with the lateral view of concrete rapid construction operating platform in steel column; And
Fig. 4 is that the utility model is for filling with the structural representation of concrete rapid construction operating platform fixing and hanging structure in steel column.
Detailed description of the invention
For the benefit of the understanding to structure of the present utility model, describes below in conjunction with drawings and Examples.
Fig. 1 be the utility model for filling with the top view of concrete rapid construction operating platform in steel column, Fig. 2 is that the utility model is for filling with the elevation of concrete rapid construction operating platform in steel column.
In conjunction with shown in Fig. 1 to Fig. 2, a kind of for filling with concrete rapid construction operating platform in steel column, comprising: be set up in platform support structure 10 and fixing and hanging structure 20 on girder steel.
Platform support structure 10, comprising: have installed surface a base plate 11, establish the horizontal support unit 12 that is fixedly connected with on described installed surface and erect along the installed surface periphery of described base plate the fence protective unit 13 arranging.
In the present embodiment, base plate 11 is the double i iron being fixedly connected with, and be electric welding connection, and multiple i iron is a rectangular configuration jointly between adjacent i iron; Horizontal support unit 12 is preferably two steel columns, and welding is located on the corresponding diagonal of base plate 11 installed surfaces respectively.
Bending resistance and bearing capacity that horizontal support unit 12 meanings are to strengthen base plate are set herein, make the long service life of base plate 11, reduce the generation of security incident.
The walking surface of this base plate 11 is the reverse side of installed surface, completely spreads scaffold floor to form the operating surface passage for people's walking, so that constructor can steadily stand on scaffold floor at the walking surface of base plate 11.
Be provided with the corresponding hanger 14 connecting of suspended end for fixing and hanging structure 20 at operating surface passage dual-side, in the present embodiment, the number that this hanger 14 is positioned on base plate 11 is four, be separately positioned between two the both sides of the edge of base plate 11, the corner of closing on associated floor 11 arranges, this hanger 14 adopts round steel to be welded on base plate 11 through being processed into cat shape.When hanger 14 is during for the lifting of paralell, can settle fast lifting operating platform to arrive new position, build work for high efficiency next time.In the time that hanger 14 connects for same fixing and hanging structure 20 correspondences, on the hanger 14 that is positioned at base plate the same side, connect respectively a fixing and hanging structure 20, be fixedly connected with the steel column of this side for platform support structure 10.
Be positioned at the relative both sides of described base plate 11 and be fixedly connected with longitudinal carrier 15, longitudinal carrier 15 is taking base plate 11 side i iron diagonal as connecting track, a wave broken line connects, further, this longitudinal carrier 15 is steel column, the two ends of each steel column are welded on the corresponding diagonal summit of i iron, make whole platform support structure more solid, firm.
Fig. 3 is that the utility model is for filling with the lateral view of concrete rapid construction operating platform in steel column.
As shown in Figures 2 and 3, erect along the installed surface periphery of described base plate 11 the fence protective unit 13 arranging; This fence protective unit 13 comprises: Terrace prevention support 131 and safety net 132.
In the present embodiment, Terrace prevention support 131 is four rectangular frame structure, and described four rectangular frame structure are stood on respectively the surrounding of described base plate 11 to form four stifled safety walls.
Rectangular frame structure comprises multiple support posts, and described multiple support posts are connected across the relative both sides of described rectangular frame structure.In the present embodiment, the plurality of support post comprises multiple the first support posts 133 and second support post 134, particularly, in rectangular frame structure, be provided with multiple the first support posts 133 that are connected across ground parallel edges in described rectangular frame structure, spaced set between perpendicular and described multiple the first support post 133 of described multiple the first support posts 133 and described ground parallel edges.Further, be also provided with the second support post 134 that is connected across ground perpendicular edge in described rectangular frame structure in rectangular frame structure, the two ends of this second support post 134 are separately positioned on the point midway of ground perpendicular edge in rectangular frame structure.
On the support post of the operating surface passage both sides of base plate 11, be provided with the corresponding hanger 16 connecting of suspended end for fixing and hanging structure 20 simultaneously.In the present embodiment, the number of this hanger 16 is four, is symmetricly set on respectively between two on the support post of both sides of base plate 11; Wherein, two hangers 16 that are positioned at base plate 11 the same sides are separately positioned on this side near rectangular frame structure ground perpendicular edge and are positioned on the crossover node of the second support post 134 and the first support force post 133.
In the present embodiment, on the hanger 16 that is positioned at base plate 11 the same sides, connect respectively a fixing and hanging structure 20, be fixedly connected with the steel column of this side for platform support structure 10.Arranging is like this to consider the suspension tie point of this hanger 16 as operating platform, can make the fixed structure balance that is connected to form via fixing and hanging structure 20 between operating platform and steel column good and more stable.
Safety net 132 is hung on Terrace prevention support.In the present embodiment, safety net 132 opens setting taking four angles of each rectangular frame structure as summit respectively, and it has the features such as intensity is high, easy for installation, anti-aging, shock-resistant, corrosion-resistant, is used for preventing that people, thing from falling.
Fig. 4 is that the utility model is for filling with the structural representation of concrete rapid construction operating platform fixing and hanging structure in steel column.
As shown in Figure 4, fixing and hanging structure 20 comprises: suspension body, the link that connects described base plate 11 or fence protective unit 13 and suspended end relative with described link, that supply to hang on supporter.
Fixing and hanging structure 20 is fixedly connected on platform support structure 10 so that form fixed structure between platform support structure 10 and steel column.
In the present embodiment, fixing and hanging structure 20 is wire rope adjusting erecting by overhang, described wire rope regulates erecting by overhang to comprise wire rope body, connects the link 21 of described base plate and be provided with to regulate and link up with for the suspended end 22 on suspension strut thing, and wire rope body is connected via high-strength bolt with regulating to link up with, further, the link of fixing and hanging structure 20 via bolt with hanger 14 on the same side base plate 11 or be connected with the hanger 16 on the support force post of the same side.
In the time providing operation to corner post or the inhomogeneous steel column of steel girder erection, regulate the suspended end 22 of erecting by overhang to be articulated on your plate of steel column sidewall wire rope, and link up with position by adjusting, make platform support structure 10 more stable.
This operating platform in use, should be in conjunction with steel column size, and steel column spacing, hook dimensions and steel column wire rope adjustable fixing device spacing and platform size, this operating platform is made in engineering, assembling, after completing, can use at the construction field (site), in the work progress of engineering high-altitude, need to make two operating platforms and use simultaneously and just can reach ideal effect.
Operating platform for pouring concrete into steel column pouring construction provided by the utility model, one end by fixing and hanging structure is effectively connected with operating platform, the other end of fixing and hanging structure is arranged near steel column one side, and the structure of double i iron base plate is fixed on girder steel operating platform, thereby ensure the stability of operating platform; Fence protection is welded on operating platform surrounding, ensures the safety of high-altitude application, and hanger is welded on operating platform both sides, the quick lifting of handled easily platform.In addition, because operating platform is erected on girder steel, shorten the distance of operating surface and steel column, constructability and convenient current safely and fast between two steel columns.The utility model lifting, fixing operation are simple, and easily standardization, can in Pre-tensioned Steel Structures, be widely used, and the utility model is compared with traditional approach, more convenient, quick, safe, general, larger raising efficiency of construction.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thereby some details in embodiment should not form restriction of the present utility model, the utility model by the scope defining using appended claims as protection domain.

Claims (10)

1. one kind for filling with concrete rapid construction operating platform in steel column, it is characterized in that, comprise: be set up in the platform support structure on girder steel, be fixedly connected on described platform support structure so that form at least two fixing and hanging structures of fixed structure between described platform support structure and steel column;
Described platform support structure comprises: have a base plate of installed surface, be fixedly connected on described installed surface, for supporting the horizontal support unit of described base plate and erectting the fence protective unit arranging along the installed surface periphery of described base plate; Described fence protective unit comprises: Terrace prevention support and being hung on Terrace prevention support for the safety net that forms protective guard;
Described fixing and hanging structure comprises: suspension body, the link that connects described base plate or described fence protective unit and suspended end relative with described link, that supply to hang on steel column.
2. according to claim 1ly it is characterized in that for filling with concrete rapid construction operating platform in steel column, be positioned at the relative both sides of described base plate and be fixedly connected with the longitudinal carrier of base plate described in lateral support.
3. according to claim 1ly it is characterized in that for filling with concrete rapid construction operating platform in steel column, described base plate is the double i iron that electric welding connects, and described double i iron forms a rectangular structure.
4. according to claim 3ly it is characterized in that for filling with concrete rapid construction operating platform in steel column, described Terrace prevention support comprises four rectangular frame structure, and described four rectangular frame structure are stood on respectively the surrounding of described base plate.
5. according to claim 4ly it is characterized in that for filling with concrete rapid construction operating platform in steel column, described rectangular frame structure comprises multiple support posts, and described multiple support posts are connected across the relative both sides of described rectangular frame structure.
6. according to claim 5ly it is characterized in that for filling with concrete rapid construction operating platform in steel column, the walking surface of described base plate completely spreads scaffold floor to form the operating surface passage for people's walking.
7. one according to claim 6, for filling with concrete rapid construction operating platform in steel column, is characterized in that, the support post of described operating surface passage both sides is provided with the corresponding hanger connecting of suspended end for fixing and hanging structure.
8. one according to claim 7, for filling with concrete rapid construction operating platform in steel column, is characterized in that, the dual-side of described operating surface passage is provided with the corresponding hanger connecting of suspended end for fixing and hanging structure simultaneously.
9. fill with concrete rapid construction operating platform according to the one described in claim 7 or 8 in steel column, it is characterized in that, the link of described fixing and hanging structure is connected via bolt with described hanger.
10. one according to claim 1 is for filling with concrete rapid construction operating platform in steel column, it is characterized in that, described fixing and hanging structure is that wire rope regulates erecting by overhang, described wire rope regulates erecting by overhang to comprise wire rope body, is located at the connection annulus of link and is located at the adjusting hook of suspended end, and described wire rope body is connected via high-strength bolt with described adjusting hook.
CN201420054880.6U 2014-01-28 2014-01-28 Fast construction operating platform used for section steel column interior pouring concrete Expired - Fee Related CN203783105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420054880.6U CN203783105U (en) 2014-01-28 2014-01-28 Fast construction operating platform used for section steel column interior pouring concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420054880.6U CN203783105U (en) 2014-01-28 2014-01-28 Fast construction operating platform used for section steel column interior pouring concrete

Publications (1)

Publication Number Publication Date
CN203783105U true CN203783105U (en) 2014-08-20

Family

ID=51319306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420054880.6U Expired - Fee Related CN203783105U (en) 2014-01-28 2014-01-28 Fast construction operating platform used for section steel column interior pouring concrete

Country Status (1)

Country Link
CN (1) CN203783105U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049848A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Adjustable anti-shaking moving platform and mounting method
CN106049846A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Anti-tilt construction platform and using method thereof
CN106049843A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Hanging type anti-shaking construction platform and mounting method thereof
CN108118884A (en) * 2018-02-24 2018-06-05 上海宝钢工程咨询有限公司 A kind of Super High grid operations platform and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049848A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Adjustable anti-shaking moving platform and mounting method
CN106049846A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Anti-tilt construction platform and using method thereof
CN106049843A (en) * 2016-07-15 2016-10-26 上海市安装工程集团有限公司 Hanging type anti-shaking construction platform and mounting method thereof
CN108118884A (en) * 2018-02-24 2018-06-05 上海宝钢工程咨询有限公司 A kind of Super High grid operations platform and preparation method thereof

Similar Documents

Publication Publication Date Title
TWI506190B (en) A?high-rise safety construction lifting platform
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN103982040B (en) A kind of construction of super highrise building vertical multi-transportation device
CN203700971U (en) Bridge wet joint construction formwork
CN207048345U (en) Construction discharge platform device
CN104291222B (en) The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN205955160U (en) Antiskid lattice formula elevartor shaft removes operation platform
CN103291116A (en) Grid-type formwork supporting and operating platform for construction of water tank on top of inverted-cone water tower
CN203487767U (en) Cross plate scaffold
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
CN213115585U (en) Stable form bearing structure that building engineering used
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN203846841U (en) Power transmission line iron tower and rest platform thereof
CN203878989U (en) Integral hoisting operation platform for steel pipe column concrete pouring of super high-rise buildings
CN203783101U (en) Steel column operating platform for quickly pouring interior poured concrete
CN205558447U (en) Found pole appurtenance
CN206971735U (en) Basic platform for cantilevered structure formwork
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN104947925A (en) Elevator shaft protection operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820

Termination date: 20210128