CN203783101U - Steel column operating platform for quickly pouring interior poured concrete - Google Patents
Steel column operating platform for quickly pouring interior poured concrete Download PDFInfo
- Publication number
- CN203783101U CN203783101U CN201420055655.4U CN201420055655U CN203783101U CN 203783101 U CN203783101 U CN 203783101U CN 201420055655 U CN201420055655 U CN 201420055655U CN 203783101 U CN203783101 U CN 203783101U
- Authority
- CN
- China
- Prior art keywords
- steel column
- operating platform
- support
- base plate
- column operating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to a steel column operating platform for quickly pouring interior poured concrete and belongs to the technical field of construction equipment. The steel column operating platform comprises a base plate, a bracket and at least two steel column pothooks; the bracket is arranged on the periphery of the base plate; each of the steel column pothooks is fixedly connected with the bracket, so that the platform is fixedly hung on the steel column through the steel column pothooks; the steel column pothooks fixed on the bracket on the same side can be used for conveniently fixing the steel column operating platform in the construction positions of the unevenly erected steel columns with corner posts or girders; lifting lugs arranged on the bracket can be used for further conveniently lifting the platform; the construction efficiency is increased; the construction period is saved; the steel column operating platform for quickly pouring the interior poured concrete has the advantages of simple structure, low cost and wide application scope.
Description
Technical field
The utility model relates to building operations equipment technical field, and particularly building operations platform structure technical field, specifically refers to a kind of steel column operating platform for interior filling concrete fast pouring.
Background technology
In the middle of the casting process of pouring concrete into steel column, tend in the enterprising line operate construction of girder steel, work plane is narrow and small, and danger is larger, and girder steel still has a segment distance apart from steel column node simultaneously, is inconvenient to construct.At present in work progress, conventionally adopt operating platform, existing operating platform is and sets up and be fixed on girder steel, and operating platform can only be once the service of building of a steel column, after having built, need again to lift operating platform, carry out again the work of building of steel column next time, cannot provide safe operating space for corner post or the inhomogeneous steel column of steel girder erection, the safety of operating platform, the demand of stability cannot be guaranteed under these conditions, also the needs of efficiency of construction cannot be when the duration is nervous, met.
Utility model content
The purpose of this utility model is to have overcome above-mentioned shortcoming of the prior art, a kind of safety and stability is provided, be convenient to carry out the pouring construction of the inhomogeneous steel column of corner post or steel girder erection, lifting is convenient simultaneously, improve efficiency of construction, save the duration, and simple in structure, with low cost, range of application is quite widely used in the steel column operating platform of interior filling concrete fast pouring.
In order to realize above-mentioned object, the steel column operating platform for interior filling concrete fast pouring of the present utility model has following formation:
Should comprise base plate, be arranged at base plate support and at least two steel column hooks around for the steel column operating platform of interior filling concrete fast pouring, each described steel column hook is fixedly connected on described support.
Should be for the steel column operating platform of interior filling concrete fast pouring, described base plate is rectangular base plate, and described support is arranged at the surrounding of described rectangular base plate, and each described steel column hook is all fixed on the support of the same side.
Should be for the steel column operating platform of interior filling concrete fast pouring, described support is flange beam stand, described steel column hook is n shape hook, this n shape hook comprises outer metal level and interior matte friction material layer, outer metal level is connected by intermediate adhesive layer with interior matte friction material layer, between described outer metal level and described flange beam stand, by weld layer, is fixedly connected with.
Should be for the steel column operating platform of interior filling concrete fast pouring, described base plate comprises horizontal diagonal brace and is layed in the scaffold floor on horizontal diagonal brace, the support bottom described in described horizontal diagonal brace is fixed on.
Should be for the steel column operating platform of interior filling concrete fast pouring, described cantilever tip is provided with at least two hangers, and described each hanger is uniformly distributed in support both sides.
Should, for the steel column operating platform of interior filling concrete fast pouring, on described support, also be laid with safe purse seine.
Adopted the steel column operating platform for interior filling concrete fast pouring of this utility model, because it comprises base plate, be arranged at base plate support and at least two steel column hooks around, and each steel column hook is fixedly connected on described support, make this platform to be hung on fixing and steel column by each steel column hook, simultaneously, the steel column hook that is fixed on the same side support can make this steel column operating platform be convenient to be fixed on to have the construction location of corner post or the inhomogeneous steel column of steel girder erection, and the hanger arranging on support can facilitate the lifting of platform further, improve efficiency of construction, save the duration, and the steel column operating platform for interior filling concrete fast pouring of the present utility model, it is simple in structure, with low cost, range of application is also quite extensive.
Accompanying drawing explanation
Fig. 1 is the top view of the steel column operating platform for interior filling concrete fast pouring of the present utility model.
Fig. 2 is the front elevation view of the steel column operating platform for interior filling concrete fast pouring of the present utility model.
Fig. 3 is the lateral view of the steel column operating platform for interior filling concrete fast pouring of the present utility model.
Fig. 4 is the steel column hook schematic diagram of the steel column operating platform for interior filling concrete fast pouring of the present utility model.
The specific embodiment
In order more clearly to understand technology contents of the present utility model, especially exemplified by following examples, describe in detail.
In one embodiment, this steel column operating platform for interior filling concrete fast pouring as shown in Figure 1 to Figure 3, comprise base plate 1, be arranged at base plate 1 support 2 and at least two steel column hooks 3 around, each described steel column hook 3 is fixedly connected on described support 2.Described base plate 1 comprises horizontal diagonal brace 11 and is layed in the scaffold floor 12 on horizontal diagonal brace 11, the bottom of the support 2 described in described horizontal diagonal brace 11 is fixed on.Described support 2 tops are provided with at least two hangers 4, and described each hanger 4 is uniformly distributed in the both sides of support 2, so that the lifting of platform.On described support 2, be also laid with safe purse seine 5, to guarantee constructor's safety.
In a preferred embodiment, described base plate 1 is rectangular base plate, and described support 2 is arranged at the surrounding of described rectangular base plate 1, and each described steel column hook 3 is all fixed on the support 2 of the same side.
In preferred embodiment, described support 2 is flange beam stand, described steel column hook 3 is n shape hook as shown in Figure 4, this n shape hook 3 comprises outer metal level 31 and interior matte friction material layer 32, outer metal level 31 is connected by middle seccotine tack coat (not shown) with interior matte friction material layer 32, between described outer metal level 31 and described flange beam stand 2, by weld layer (not shown), is fixedly connected with.
In actual applications, the utility model is comprised of base plate 1, support 2, steel column hook 3, hanger 4, purse seine 5 etc.Support 2 is welded to form by i iron, and weld horizontal diagonal brace 11 is answered in support 2 bottoms, guarantees the globality of platform, and platform operations face completely spreads scaffold floor 12.Described steel column hook 3 can hang over metal hook 31 on steel column 9 sidewalls by one and the friction material layer 32 of metal hook 31 inner sides forms.In operating platform one side, two steel columns hooks 3 are installed, installation site determines according to drawing steel column 9 spacing, and 2, steel column hook 3 and support are by being welded to connect.Hanger 4 adopts round steel through being processed into cat shape and being welded on the both sides of support 2 for the lifting of platform.Purse seine 5 hangs over the surrounding of support 2.The steel column hook 3 that the utility model self has can be fixed on this operating platform on steel column 9.By this paralell is located on girder steel, operating surface can be shortened apart from steel column nodal distance, and 9 escape ways of two steel columns can be served as, convenient construction personnel are current safely and fast 9 of two steel columns.By steel column, linking up with 3 can be fixed on operating platform on steel column 9, has guaranteed that operating platform still can keep stable in corner post or girder steel situation pockety, reduces transverse shakiness.By hanger 4, can realize the quick lifting of operating platform.By hanging close order purse seine 5, can guarantee constructor's safety.
In use, the utility model can be used after should completing making and assembling in conjunction with parameters such as steel column size, steel column spacing, hook dimensions and steel column hook spacing, platform size at the construction field (site).Lifting of the present utility model, fixing operation are simple, and standardization can be widely used in Pre-tensioned Steel Structures, and the utility model is compared with traditional approach, more convenient, quick, safe, general, has improved significantly efficiency of construction.
Adopted the steel column operating platform for interior filling concrete fast pouring of this utility model, because it comprises base plate, be arranged at base plate support and at least two steel column hooks around, and each steel column hook is fixedly connected on described support, make this platform to be hung on fixing and steel column by each steel column hook, simultaneously, the steel column hook that is fixed on the same side support can make this steel column operating platform be convenient to be fixed on to have the construction location of corner post or the inhomogeneous steel column of steel girder erection, and the hanger arranging on support can facilitate the lifting of platform further, improve efficiency of construction, save the duration, and the steel column operating platform for interior filling concrete fast pouring of the present utility model, it is simple in structure, with low cost, range of application is also quite extensive.
In this manual, the utility model is described with reference to its specific embodiment.But, still can make various modifications and conversion obviously and not deviate from spirit and scope of the present utility model.Therefore, manual and accompanying drawing are regarded in an illustrative, rather than a restrictive.
Claims (6)
1. for a steel column operating platform for interior filling concrete fast pouring, it is characterized in that, comprise base plate, be arranged at base plate support and at least two steel column hooks around, each described steel column hook is fixedly connected on described support.
2. the steel column operating platform for interior filling concrete fast pouring according to claim 1, it is characterized in that, described base plate is rectangular base plate, and described support is arranged at the surrounding of described rectangular base plate, and each described steel column hook is all fixed on the support of the same side.
3. the steel column operating platform for interior filling concrete fast pouring according to claim 2, it is characterized in that, described support is flange beam stand, described steel column hook is n shape hook, this n shape hook comprises outer metal level and interior matte friction material layer, outer metal level is connected by intermediate adhesive layer with interior matte friction material layer, between described outer metal level and described flange beam stand, by weld layer, is fixedly connected with.
4. according to the steel column operating platform for interior filling concrete fast pouring described in any one in claims 1 to 3, it is characterized in that, described base plate comprises horizontal diagonal brace and is layed in the scaffold floor on horizontal diagonal brace, the support bottom described in described horizontal diagonal brace is fixed on.
5. according to the steel column operating platform for interior filling concrete fast pouring described in any one in claims 1 to 3, it is characterized in that, described cantilever tip is provided with at least two hangers, and described each hanger is uniformly distributed in support both sides.
6. according to the steel column operating platform for interior filling concrete fast pouring described in any one in claims 1 to 3, it is characterized in that, on described support, be also laid with safe purse seine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420055655.4U CN203783101U (en) | 2014-01-28 | 2014-01-28 | Steel column operating platform for quickly pouring interior poured concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420055655.4U CN203783101U (en) | 2014-01-28 | 2014-01-28 | Steel column operating platform for quickly pouring interior poured concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203783101U true CN203783101U (en) | 2014-08-20 |
Family
ID=51319302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420055655.4U Expired - Fee Related CN203783101U (en) | 2014-01-28 | 2014-01-28 | Steel column operating platform for quickly pouring interior poured concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203783101U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107378520A (en) * | 2017-09-05 | 2017-11-24 | 洛阳霍鑫机电科技有限公司 | A kind of stainless steel welded formula combined platform |
-
2014
- 2014-01-28 CN CN201420055655.4U patent/CN203783101U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107378520A (en) * | 2017-09-05 | 2017-11-24 | 洛阳霍鑫机电科技有限公司 | A kind of stainless steel welded formula combined platform |
CN107378520B (en) * | 2017-09-05 | 2023-11-10 | 洛阳霍鑫机电科技有限公司 | Stainless steel welding type combined platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
CN203878965U (en) | Device for construction of elevator shaft | |
CN102587645A (en) | Climbing supporting mechanism having expansion and automatic meshing functions, and construction method thereof | |
CN211143305U (en) | Steel structure building | |
CN107574826A (en) | A kind of concrete purlin and the general attachment structure and connection construction method gone along with sb. to guard him | |
CN203783105U (en) | Fast construction operating platform used for section steel column interior pouring concrete | |
CN205955160U (en) | Antiskid lattice formula elevartor shaft removes operation platform | |
CN203113793U (en) | Large formwork installation system of oblique structure | |
CN203783101U (en) | Steel column operating platform for quickly pouring interior poured concrete | |
CN204040515U (en) | Cat ladder | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
CN208650506U (en) | A kind of slip-framed reverse mould constructing device | |
CN201794305U (en) | Supporting device for elevator shaft mold | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN207484991U (en) | A kind of glass curtain wall monorail hoisting structure | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN204357138U (en) | Simple steel structure hoisting frame | |
CN203878989U (en) | Integral hoisting operation platform for steel pipe column concrete pouring of super high-rise buildings | |
CN204059909U (en) | With the horizontal truss of avoiding structure | |
CN207176698U (en) | A kind of concrete purlin and the general attachment structure gone along with sb. to guard him | |
CN203452388U (en) | Movable type concrete casting operation platform | |
CN206486988U (en) | A kind of temporary steel structural support | |
CN206971735U (en) | Basic platform for cantilevered structure formwork | |
CN205976431U (en) | Tube -shape structures hydraulic pressure slipform promotes construction platform | |
CN204002511U (en) | A kind of three-dimensional arrangement ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140820 Termination date: 20210128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |