CN209651673U - A kind of construction elevator attaching structure of lifting platform - Google Patents

A kind of construction elevator attaching structure of lifting platform Download PDF

Info

Publication number
CN209651673U
CN209651673U CN201920165038.2U CN201920165038U CN209651673U CN 209651673 U CN209651673 U CN 209651673U CN 201920165038 U CN201920165038 U CN 201920165038U CN 209651673 U CN209651673 U CN 209651673U
Authority
CN
China
Prior art keywords
platform
lifting platform
attached
construction elevator
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920165038.2U
Other languages
Chinese (zh)
Inventor
管聪聪
苏国活
周子璐
张伊菡
郭奇
程昌宏
黄硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201920165038.2U priority Critical patent/CN209651673U/en
Application granted granted Critical
Publication of CN209651673U publication Critical patent/CN209651673U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction elevator attaching structure of lifting platform, can solve traditional way first is that, construction elevator overall height by the way of double standard knots, the disadvantage is that, high hundreds of meters of distance needs to increase a set of standard knots more;Traditional way second is that, construction elevator can only arrive lifting platform hanger bottom, additionally need the hydraulic climbing formwork platform that design connects construction elevator, then from climb formwork platform in hanger, at high cost and trouble problem.Including construction elevator, steel platform, wall-attached frame and lifting platform, the steel platform is located in lifting platform top sidewall, wall-attached frame is provided on the lifting platform side wall, it is connected at the top of the wall-attached frame with steel platform, and the wall-attached frame bottom is fixed on Core Walls Structure wall by gooseneck, it is fixedly connected between the wall-attached frame bottom and gooseneck by connection frame, connects elevator standard section by three sets of sliding attached walls on the wall-attached frame side wall.

Description

A kind of construction elevator attaching structure of lifting platform
Technical field
The utility model relates to super high-rise building Core Walls Structure lifting platform fields, are a kind of lifting platforms specifically Construction elevator attaching structure.
Background technique
Lifting platform system is a kind of mechanical equipment suitable for the vertical wall construction of super high-rise building Core Walls Structure, is one A integrated constructing operation place, material stockyard, the safety of the facilities such as material distributing machine, tower crane, hands-off operation platform.Serve jacking The construction elevator of platform needs directly to reach the steel platform at the top of lifting platform, transports constructing operation personnel lifting platform system up and down System.
When in order to facilitate lifting platform construction, lifting platform system above and below constructing operation personnel, highly desired construction elevator The steel platform face of lifting platform can directly be reached.It realizes the function, then has to solve from the formal attached wall of construction elevator highest Attached wall method of the position to this section of steel platform top distance.The attached wall needs to carry generated level when construction elevator operation Power guarantees safety, it is also necessary to be rapidly separated when meeting platform jacking, quickly connection after the completion of jacking restores construction elevator operation Demand.
Traditional way first is that, construction elevator overall height by the way of double standard knots, the disadvantage is that, it is hundreds of meters high away from From need increases a set of standard knots.
Traditional way second is that, construction elevator can only arrive lifting platform hanger bottom, additionally need design and connect construction elevator Hydraulic climbing formwork platform, then from climb formwork platform in hanger, at high cost and trouble.
Utility model content
The purpose of this utility model is to provide a kind of construction elevator attaching structures of lifting platform, can solve traditional Way first is that, construction elevator overall height by the way of double standard knots, the disadvantage is that, high hundreds of meters of distance, need increase it is a set of Standard knot;Traditional way second is that, construction elevator can only arrive lifting platform hanger bottom, additionally need design and connect construction elevator Hydraulic climbing formwork platform, then from climb formwork platform in hanger, at high cost and trouble problem.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of construction elevator attaching structure of lifting platform, including construction elevator, steel platform, wall-attached frame and jacking are flat Platform, the steel platform are located in lifting platform top sidewall, and wall-attached frame, the wall-attached frame are provided on the lifting platform side wall Top is connected with steel platform, and the wall-attached frame bottom is fixed on Core Walls Structure wall by gooseneck, the wall-attached frame bottom It is fixedly connected between portion and gooseneck by connection frame, connects elevator standard by three sets of sliding attached walls on the wall-attached frame side wall It saves, construction elevator is installed on the elevator standard section, and if being connected between elevator standard section lower part and lifting platform Dry elevator attached wall.
Preferably, the strut being obliquely installed is connected between the connection frame and wall-attached frame.
Preferably, the lifting platform is from steel platform top to the formal attached wall distance being arranged between bottom more than 20m.
Preferably, the wall-attached frame lower part that the lifting platform provides is connected by quickly assembled and disassembled gooseneck and main structure It connects.
Preferably, the wall-attached frame top that the lifting platform provides directly is welded with the steel platform of lifting platform, and attached wall Frame top jacks together with steel platform.
The utility model has the following beneficial effects:
There is biggish rigidity using lifting platform itself, the horizontal force that construction elevator operation generates can be born, thus can To add the wall-attached frame of construction elevator, certainly construction elevator attachment issue is solved, construction elevator is enable directly to reach lifting platform Table top.
The wall-attached frame lower part that lifting platform provides is connect by quickly assembled and disassembled gooseneck with main structure, lifting platform The wall-attached frame top of offer is directly welded with the steel platform on lifting platform, can be jacked together with steel platform, construction elevator passes through Elevator standard section and three sets of sliding attached walls realize being rapidly separated and connecting when attached wall and platform jacking when elevator operation.
Construction elevator is passed to the horizontal force that elevator is run by three sets of sliding attached walls using elevator standard section attached Horizontal force is passed to lifting platform by gooseneck, directly passes to horizontal force at the top of wall-attached frame by wall stand, wall-attached frame lower part Steel platform, lifting platform rigidity itself is larger, can bear the load that construction elevator operation generates, keep construction elevator direct It rises in the steel platform of lifting platform.The wall-attached frame can carry generated horizontal force when construction elevator operation, guarantee peace Entirely, additionally it is possible to be rapidly separated when meeting platform jacking, quickly connection, restores the operation of construction elevator after the completion of jacking.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model wall-attached frame structural schematic diagram;
In figure: 1, construction elevator;2, steel platform;3, wall-attached frame;4, gooseneck;5, elevator standard section;6, elevator attached wall;7, Lifting platform;8, connection frame;9, strut;10, attached wall is slided.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with embodiment, it is clear that described Embodiment be only the utility model a part of the embodiment, instead of all the embodiments.Based on the reality in the utility model Example is applied, all other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to In the range of the utility model protection.
Please refer to shown in Fig. 1-2, a kind of construction elevator attaching structure of lifting platform, including construction elevator 1, steel platform 2, Wall-attached frame 3 and lifting platform 7, steel platform 2 are located in 7 top sidewall of lifting platform, are provided with attached wall on 7 side wall of lifting platform Frame 3,3 top of wall-attached frame is connected with steel platform 2, and 3 bottom of wall-attached frame is fixed on Core Walls Structure wall by gooseneck 4, attached It is fixedly connected between 3 bottom of wall stand and gooseneck 4 by connection frame 8, passes through three sets of sliding attached wall 10 connections on 3 side wall of wall-attached frame Elevator standard section 5 is equipped with construction elevator 1 on elevator standard section 5, and connects between 5 lower part of elevator standard section and lifting platform 7 There are several elevator attached walls 6.
The strut 9 being obliquely installed is connected between connection frame 8 and wall-attached frame 3, so that between wall-attached frame 3 and gooseneck 4 Connection is more firm.
Lifting platform 7, more than 20m, is applied from 2 top of steel platform to the formal attached wall distance being arranged between bottom to meet The standard knot jib-length of work elevator 1 at most no more than 7.5m, will enable construction elevator reach steel platform top, then must be herein The condition of 1 attached wall structure of construction elevator is added in the range of 20m.
3 lower part of wall-attached frame that lifting platform 7 provides is connect by quickly assembled and disassembled gooseneck 4 with main structure.
3 top of wall-attached frame that lifting platform 7 provides directly is welded with the steel platform 2 of lifting platform 7, and 3 top of wall-attached frame It is jacked together with steel platform 2.
Construction elevator 1, is first mounted on elevator standard section 5, elevator standard by the construction elevator adherence method of lifting platform Section 5 is mounted on 3 side wall of wall-attached frame by three sets of sliding attached walls 10, and 3 lower part of wall-attached frame is fixed on lifting platform by gooseneck 4 On 7 side walls, 3 top of wall-attached frame is directly connected with steel platform 2, and gooseneck 4 needs to prepare two sets, before lifting platform 7 jacks, first Upper beam is installed, horizontal force is passed to lifting platform 7 by gooseneck 4 by 3 lower part of wall-attached frame, and 3 top of wall-attached frame is straight It connecing and horizontal force is passed into steel platform 2, the rigidity of lifting platform 7 itself is larger, the load that construction elevator operation generates can be born, Construction elevator 1 is set directly to rise in the steel platform 2 of lifting platform 7.When the wall-attached frame 3 can carry construction elevator operation Generated horizontal force guarantees safety, additionally it is possible to be rapidly separated when meeting platform jacking, quickly connection, restores after the completion of jacking The operation of construction elevator 1.
The utility model has the following beneficial effects: having biggish rigidity in itself using lifting platform 7, construction elevator can be born The horizontal force generated is run, thus the wall-attached frame 3 of construction elevator 1 can be added, certainly construction elevator attachment issue has been solved, has made to apply Work elevator 1 can directly reach 7 table top of lifting platform.
3 lower part of wall-attached frame that lifting platform 7 provides is connect by quickly assembled and disassembled gooseneck 4 with main structure, is jacked 3 top of wall-attached frame that platform 7 provides directly is welded with the steel platform 2 on lifting platform 7, can be jacked together with steel platform 2, is constructed It is quick de- when attached wall and platform when elevator 1 realizes that elevator is run by elevator standard section 5 and three sets of sliding attached walls 10 jack From and connection.
Construction elevator is passed to the horizontal force that elevator is run by three sets of sliding attached walls 10 using elevator standard section 5 Horizontal force is passed to lifting platform 7 by gooseneck 4 by wall-attached frame 3,3 lower part of wall-attached frame, and 3 top of wall-attached frame is directly by horizontal force Steel platform 2 is passed to, the rigidity of lifting platform 7 itself is larger, can bear the load that construction elevator operation generates, make construction elevator 1 can directly rise in the steel platform 2 of lifting platform 7.The wall-attached frame 3 can carry generated water when construction elevator operation Flat power guarantees safety, additionally it is possible to be rapidly separated when meeting platform jacking, quickly connection, restores construction elevator 1 after the completion of jacking Operation.
When the utility model is used, a kind of construction elevator adherence method of lifting platform described in the utility model, Principle is that have biggish rigidity in itself using lifting platform 7, can bear the horizontal force that construction elevator operation generates, thus can To add the wall-attached frame 3 of construction elevator 1, it is a kind of solution construction elevator attachment issue, construction elevator 1 is enable directly to reach top The construction method of peaceful 7 table tops.When construction elevator 1 realizes elevator operation by elevator standard section 5 and three sets of sliding attached walls 10 Attached wall and platform jack when be rapidly separated and connect.Construction elevator 1 is run on elevator standard section 5 to 10 sections of attached wall of sliding When, the safe operation speed that the speed of service to elevator producer requires need to be reduced.3 lower part of wall-attached frame that lifting platform 7 provides passes through Quickly assembled and disassembled gooseneck 4 is connect with main structure, and 3 top of wall-attached frame that lifting platform 7 provides is directly and on lifting platform 7 Steel platform 2 weld, can be jacked together with steel platform 2.Construction elevator passes through three sets of sliding attached walls using elevator standard section 5 The horizontal force of elevator operation is passed to wall-attached frame 3 by 10, and horizontal force is passed to jacking by gooseneck 4 and put down by 3 lower part of wall-attached frame Horizontal force is directly passed to steel platform 2 by platform 7,3 top of wall-attached frame, the rigidity of lifting platform 7 itself is larger, can bear construction electricity The load that ladder operation generates, enables construction elevator 1 directly to rise in the steel platform 2 of lifting platform 7.Gooseneck 4 needs standard It is 2 sets standby, it is conveniently used in turn, before lifting platform 7 jacks, first installs upper beam.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this Utility model.The utility model is limited only by the claims and their full scope and equivalents.

Claims (5)

1. a kind of construction elevator attaching structure of lifting platform, including construction elevator (1), steel platform (2), wall-attached frame (3) and Lifting platform (7), which is characterized in that the steel platform (2) is located in lifting platform (7) top sidewall, the lifting platform (7) It is provided with wall-attached frame (3), is connected at the top of the wall-attached frame (3) with steel platform (2), and the wall-attached frame (3) bottom on side wall It is fixed on Core Walls Structure wall by gooseneck (4), passes through connection frame (8) between wall-attached frame (3) bottom and gooseneck (4) It is fixedly connected, connects elevator standard section (5) by three sets of sliding attached walls (10) on wall-attached frame (3) side wall, the elevator mark It is equipped with construction elevator (1), and is connected between elevator standard section (5) lower part and lifting platform (7) several on quasi- section (5) A elevator attached wall (6).
2. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the connection frame (8) strut (9) being obliquely installed is connected between wall-attached frame (3).
3. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the jacking is flat Platform (7) is at the top of steel platform (2) to the formal attached wall distance being arranged between bottom more than 20m.
4. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the jacking is flat Wall-attached frame (3) lower part that platform (7) provides is connect by quickly assembled and disassembled gooseneck (4) with main structure.
5. a kind of construction elevator attaching structure of lifting platform according to claim 1, which is characterized in that the jacking is flat Wall-attached frame (3) top that platform (7) provides directly is welded with the steel platform (2) of lifting platform (7), and wall-attached frame (3) top is with steel Platform (2) jacks together.
CN201920165038.2U 2019-01-30 2019-01-30 A kind of construction elevator attaching structure of lifting platform Expired - Fee Related CN209651673U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920165038.2U CN209651673U (en) 2019-01-30 2019-01-30 A kind of construction elevator attaching structure of lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920165038.2U CN209651673U (en) 2019-01-30 2019-01-30 A kind of construction elevator attaching structure of lifting platform

Publications (1)

Publication Number Publication Date
CN209651673U true CN209651673U (en) 2019-11-19

Family

ID=68523415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920165038.2U Expired - Fee Related CN209651673U (en) 2019-01-30 2019-01-30 A kind of construction elevator attaching structure of lifting platform

Country Status (1)

Country Link
CN (1) CN209651673U (en)

Similar Documents

Publication Publication Date Title
CN103993728B (en) A kind of assembling shaped steel is encorbelmented protection canopy
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN207048345U (en) Construction discharge platform device
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN204781881U (en) Elevartor shaft structure construction handling frame
CN202689495U (en) Self-elevating chimney and water tower construction tower frame
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN203891441U (en) Assembly type section steel overhung protective shed
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN208152583U (en) A kind of high-building construction ancillary equipment
CN209651673U (en) A kind of construction elevator attaching structure of lifting platform
CN102168484B (en) External hanging scaffold and application method thereof
CN202401769U (en) Detachable concrete cloth machine for self-elevating creeping formwork system
CN205444975U (en) Large -scale room lid steel construction construction braced system with view platform
CN205116883U (en) Mast hoisting device of superelevation layer steel construction launching tower
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN211057829U (en) Fixed maintenance platform of formula relief well is encorbelmented to counter weight antitorque type
CN109775511A (en) A kind of the construction elevator attaching structure and adherence method of lifting platform
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN206397107U (en) Armored concrete construction of lift well operating platform bracket
CN203097281U (en) Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119

Termination date: 20210130

CF01 Termination of patent right due to non-payment of annual fee