CN201620602U - Preburied sleeve - Google Patents

Preburied sleeve Download PDF

Info

Publication number
CN201620602U
CN201620602U CN2010201339034U CN201020133903U CN201620602U CN 201620602 U CN201620602 U CN 201620602U CN 2010201339034 U CN2010201339034 U CN 2010201339034U CN 201020133903 U CN201020133903 U CN 201020133903U CN 201620602 U CN201620602 U CN 201620602U
Authority
CN
China
Prior art keywords
sleeve
sleeve body
steel flat
construction
band steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201339034U
Other languages
Chinese (zh)
Inventor
师永生
肖凤
秦宏伟
郭同波
陈�峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN2010201339034U priority Critical patent/CN201620602U/en
Application granted granted Critical
Publication of CN201620602U publication Critical patent/CN201620602U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a preburied sleeve in the field of building construction. The purpose of the utility model is to solve the problems of the conventional sleeve, i.e. difficult positioning and easy positional deviation. The preburied sleeve comprises a sleeve body, a steel flat which traverses the port of the sleeve is welded on the lower part of the sleeve body, preferably in the cavity of the sleeve body, the middle of the steel flat is provided with a round hole and connected with a hook bolt, which consists of an upper screw part and a lower curved hook part, and the upper screw part passes through the round hole of the steel flat, and is hung on the upper plane of the steel flat through a nut. During construction, a sleeve outline is first drawn on a formwork, a hole is made on the formwork in the middle of the outline, the sleeve body is placed at a needed position, the hook bolt passes through the holes on the formwork and the steel flat, the lower hook part hooks the formwork or a member, and the upper screw part is fixed on the steel flat through the nut. The preburied sleeve can ensure that the position of a reserved hole is accurate, construction is quick and convenient, moreover, the construction period is short, and the construction efficiency is high.

Description

A kind of service sleeve
Technical field
The utility model relates to a kind of construction appliance in the building operations, especially relates to a kind of service sleeve in concrete and the reinforced concrete member.
Background technology
In the prior art, the floor of industry and civilian construction stays when establishing the hole, and method is more, and relatively Tong Hang way is pre-buried steel sleeve pipe.In the construction,, generally the outer wall of service sleeve and the reinforcing bar in the member are welded, build concrete then for guaranteeing the correct position of service sleeve.This job practices, the location trouble of service sleeve and existence are than mistake, and local reinforcement displacement also may cause service sleeve to produce skew when vibrating concrete, and construction effect is poor.
The utility model content
For overcoming in the prior art, the service sleeve location bothers, the problem of the easy deviation in position, and the utility model provides a kind of service sleeve, is easy to lay, and makes that the reservation openings position is accurate.
For solving above technical problem, a kind of service sleeve provided by the utility model, comprise sleeve body, the bottom of described sleeve body is welded with the band steel that traverses its port, the middle part of band steel is provided with circular hole and is connected with HOOK BOLTS, described HOOK BOLTS comprises the hook portion of upper screw part and bottom circular arc, and upper screw is passed the circular hole of band steel, and is suspended on the last plane of band steel by nut.
With respect to prior art, the utility model has been obtained following beneficial effect: during construction, on template, mark earlier the sleeve pipe outline line, and perforate on the template of middle part in outline line, the upper screw of pore size and HOOK BOLTS partly adapts, then sleeve body is placed on the desired location, HOOK BOLTS is passed hole on template and the band steel, the hook portion of bottom colludes on template or member, the screw rod on top is fastened on the band steel by nut, service sleeve of the present utility model makes that the reservation openings position is accurate, and quick construction is convenient, and the duration is short, the work efficiency height.
As improvement of the present utility model, described band steel is welded on the inner chamber of sleeve body.Band steel is welded in the sleeve body, not only can improve bonding strength, and the port of sleeve body can be lain on the template, and when preventing that concrete from building, slurry leaks in people's sleeve pipe from sleeve bottom.
As of the present utility model preferred, the height of described sleeve body with the thickness of pre-buried floor equate.
Description of drawings
Fig. 1 is the structural representation of service sleeve of the present utility model in construction.
Fig. 2 is the stereogram of the utility model service sleeve.
Among the figure: 1 flooring concrete, 2 sleeve body, 3 loose fillers, 4 templates, 5 HOOK BOLTSs, 6 nuts, 7 band steels.
The specific embodiment
As shown in Figures 1 and 2, service sleeve of the present utility model comprises sleeve body 2, the height of sleeve body 2 with the thickness of pre-buried floor equate or exceed certain size that the bottom of sleeve body 2 is welded with the band steel 7 that traverses its port, preferably is welded on the inner chamber of sleeve body 2 by the requirement of construction.The middle part of band steel 7 is provided with circular hole and is connected with HOOK BOLTS 5, and HOOK BOLTS 5 comprises the hook portion of upper screw part and bottom circular arc, and upper screw is passed the circular hole of band steel, and is suspended on the last plane of band steel 7 by nut 6.
During construction, on template 4, emit earlier the hole to be provided position, and mark the sleeve pipe outline line, perforate on the template of middle part in outline line, the upper screw of pore size and HOOK BOLTS 5 partly adapts, then sleeve body 2 is placed on the desired location, HOOK BOLTS is passed circular hole on template 4 and the band steel 7, the hook portion of bottom colludes on template or member, the screw rod on top is fastened on the band steel 7 by nut, after fixing, in sleeve body 2, adorn loose filler 3 again and do not wait as sand, saw, and with the plastic sheeting capping mouth of pipe.Build the outline that reexamines sleeve pipe before the concrete and whether overlap accurate rear pouring concrete with the bullet sideline.Unclamp HOOK BOLTS 5 during form removal earlier, back stripping 4, HOOK BOLTS 5 is used with nut 6 recyclable huge profits.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop in the protection domain of the utility model requirement.

Claims (3)

1. service sleeve, comprise sleeve body, it is characterized in that, the bottom of described sleeve body is welded with the band steel that traverses its port, the middle part of band steel is provided with circular hole and is connected with HOOK BOLTS, described HOOK BOLTS comprises the hook portion of upper screw part and bottom circular arc, and upper screw is passed the circular hole of band steel, and is suspended on the last plane of band steel by nut.
2. a kind of service sleeve according to claim 1 is characterized in that described band steel is welded on the inner chamber of sleeve body.
3. a kind of service sleeve according to claim 1 and 2 is characterized in that, the height of described sleeve body with the thickness of pre-buried floor equate.
CN2010201339034U 2010-03-18 2010-03-18 Preburied sleeve Expired - Fee Related CN201620602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201339034U CN201620602U (en) 2010-03-18 2010-03-18 Preburied sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201339034U CN201620602U (en) 2010-03-18 2010-03-18 Preburied sleeve

Publications (1)

Publication Number Publication Date
CN201620602U true CN201620602U (en) 2010-11-03

Family

ID=43024058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201339034U Expired - Fee Related CN201620602U (en) 2010-03-18 2010-03-18 Preburied sleeve

Country Status (1)

Country Link
CN (1) CN201620602U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556819A (en) * 2013-11-23 2014-02-05 中建四局第六建筑工程有限公司 Construction method for reserving constructional column holes in beam plate
CN107476332A (en) * 2017-09-21 2017-12-15 高士雄 A kind of anchor bolt box sectional die box
CN109732770A (en) * 2019-02-27 2019-05-10 中交第二航务工程局有限公司 Arc service sleeve auxiliary locator and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556819A (en) * 2013-11-23 2014-02-05 中建四局第六建筑工程有限公司 Construction method for reserving constructional column holes in beam plate
CN103556819B (en) * 2013-11-23 2015-12-09 中建四局第六建筑工程有限公司 A kind of construction method of reserved constructional column hole on beam slab
CN107476332A (en) * 2017-09-21 2017-12-15 高士雄 A kind of anchor bolt box sectional die box
CN109732770A (en) * 2019-02-27 2019-05-10 中交第二航务工程局有限公司 Arc service sleeve auxiliary locator and method

Similar Documents

Publication Publication Date Title
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN203856202U (en) Simple pullable sizing device of reserved holes
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN201620602U (en) Preburied sleeve
CN107476588A (en) A kind of pinpoint beam device of prefabricated components built-in fitting and its application method
CN202012356U (en) Concrete pouring and head sealing device through pump pipes
CN205617732U (en) Job site pipeline formula floor rubbish clearance system
CN203050108U (en) Concrete slab pipe installation reserved hole construction mold
CN208792746U (en) A kind of expansion joint regularization same tool steel plate template
CN209533777U (en) A kind of lateral reserved steel bar positioning plugging device of precast shear wall
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN207110505U (en) A kind of pinpoint beam device of prefabricated components built-in fitting
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN203361605U (en) Anchor ring assembly
CN109098456A (en) A kind of aluminum alloy pattern plate Transfer pipe molding machine and construction method
CN104153464A (en) Steel pipe concrete jacking inserting plate type control device and method for connecting steel pipe concrete jacking inserting plate type control device to steel pipe column
CN208650519U (en) The flooring de-molding device of concrete surface is pried away from for internal corner formwork
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN207582934U (en) A kind of pre-buried hook for being used to fix builder's jack I-steel
CN201874304U (en) Positioning clamp for installing handrail
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure
CN102744784B (en) Heavy-load railway pre-cast T beam overall binding carcass and construction method thereof
CN106499180A (en) A kind of new exterior sheathing is reinforced and external scaffolding drawknot device and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103

Termination date: 20120318