CN205617732U - Job site pipeline formula floor rubbish clearance system - Google Patents
Job site pipeline formula floor rubbish clearance system Download PDFInfo
- Publication number
- CN205617732U CN205617732U CN201620303558.1U CN201620303558U CN205617732U CN 205617732 U CN205617732 U CN 205617732U CN 201620303558 U CN201620303558 U CN 201620303558U CN 205617732 U CN205617732 U CN 205617732U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- frame
- conveyance conduit
- floor
- rubbish
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a job site pipeline formula floor rubbish clearance system, concentrate the pond including pipeline support frame, pipeline and rubbish, the pipeline support frame includes U -shaped buried bolt, u -shaped frame and pipeline iron hoop in advance, the U -shaped in advance buried bolt be used for with u -shaped frame horizontal installation at the cast -in -place board of each floor, and u -shaped frame's bending segment stretches out outside the cast -in -place board of floor, the fixed cover of pipeline iron hoop is established on pipeline, and pipeline is vertical to pass each u -shaped frame, and the pipeline iron hoop supports on u -shaped frame, the corresponding position department of the cast -in -place board of every floor all is equipped with one and the communicating rubbish pouring opening of pipeline on pipeline, pipeline rectifies down to the concentrated pond of rubbish. This pipeline formula floor rubbish clearance system processes, installs, demolishs very conveniently, and the material in the work progress can used repeatedly.
Description
Technical field
This utility model relates to a kind of floor garbage-cleaning system, the floor garbage-cleaning system of a kind of duct type.
Background technology
At present, in building construction process, common cleaning way is rubbish to be beaten heap shovel into handbarrow, is transported to ground by people's Cargo Lift, clears speed too slow, takies people's Cargo Lift and uses the time, and efficiency is low, takes artificial.It is therefore necessary to design a set of cleaning system, thus improve the efficiency of garbage-cleaning.
Utility model content
Utility model purpose: the floor garbage-cleaning system that a kind of garbage-cleaning efficiency is high and time saving and energy saving is provided.
Technical scheme: job site described in the utility model duct type floor garbage-cleaning system, including pipeline support frame, conveyance conduit and rubbish centralized pool;Pipeline support frame includes U-shaped pre-embedded bolt, U-frame frame and pipeline iron hoop;U-shaped pre-embedded bolt for being horizontally arranged at each floor Bars In Poured Concrete Slab by U-frame frame, and the bending segment of U-frame frame stretches out outside floor Bars In Poured Concrete Slab;Pipeline iron hoop fixed cover is located on conveyance conduit, and conveyance conduit passes vertically through each U-frame frame, and pipeline iron hoop is supported on U-frame frame;On conveyance conduit, the corresponding position of each floor Bars In Poured Concrete Slab is equipped with a rubbish pour spout communicated with conveyance conduit;Conveyance conduit lower end is right against rubbish centralized pool.
The combination using U-frame frame and pipeline iron hoop is capable of the most fixing of conveyance conduit so that rubbish in conveyance conduit by action of gravity free-falling, substantially increase rubbish in work progress clears efficiency;Using U-shaped pre-embedded bolt to be fixed U-frame frame, after construction, convenient dismounting turnover uses, and effectively saves construction material, reduces construction cost.
As further restriction scheme of the present utility model, the edge at floor Bars In Poured Concrete Slab is fitted with T-shaped embedded iron parts;It is provided with set square between T-shaped embedded iron parts and U-frame frame.Use T-shaped embedded iron parts and the effect of set square, it is possible to U-frame frame is fixed further, enhances the structural strength of system.
As further restriction scheme of the present utility model, the internal diameter of conveyance conduit is 25cm ~ 30cm.The conveyance conduit using 25cm ~ 30cm internal diameter can be easy to the conveying of Bulky Waste.
This utility model is compared with prior art, it provides the benefit that: (1) uses the combination of U-frame frame and pipeline iron hoop to be capable of the most fixing of conveyance conduit, so that rubbish in conveyance conduit by action of gravity free-falling, substantially increase rubbish in work progress clears efficiency;(2) using U-shaped pre-embedded bolt to be fixed U-frame frame, after construction, convenient dismounting turnover uses, and effectively saves construction material, reduces construction cost.
Accompanying drawing explanation
Fig. 1 is system structure schematic diagram of the present utility model;
Fig. 2 is U-frame frame installing structure schematic diagram of the present utility model;
Fig. 3 is conveyance conduit mounting structure schematic diagram of the present utility model;
Fig. 4 is rubbish pour spout structural representation of the present utility model.
In figure: 1, floor Bars In Poured Concrete Slab, 2, rubbish pour spout, 3, pipeline support frame, 4, conveyance conduit, 5, rubbish centralized pool, 6, U-frame frame, 7, T-shaped embedded iron parts, 8, U-shaped pre-embedded bolt, 9, set square, 10, pipeline iron hoop.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
Embodiment 1:
As Figure 1-4, job site of the present utility model duct type floor garbage-cleaning system includes: pipeline support frame 3, conveyance conduit 4 and rubbish centralized pool 5.
Wherein, pipeline support frame 3 includes U-shaped pre-embedded bolt 8, U-frame frame 6 and pipeline iron hoop 10;U-shaped pre-embedded bolt 8 for being horizontally arranged at each floor Bars In Poured Concrete Slab 1 by U-frame frame 6, and the bending segment of U-frame frame 6 stretches out outside floor Bars In Poured Concrete Slab 1;Pipeline iron hoop 10 fixed cover is located on conveyance conduit 4, and conveyance conduit 4 passes vertically through each U-frame frame 6, and pipeline iron hoop 10 is supported on U-frame frame 6;On conveyance conduit 4, the corresponding position of each floor Bars In Poured Concrete Slab 1 is equipped with a rubbish pour spout 2 communicated with conveyance conduit 4;Conveyance conduit 4 lower end is right against rubbish centralized pool 5;Edge at floor Bars In Poured Concrete Slab 1 is fitted with T-shaped embedded iron parts 7;Set square 9 it is provided with between T-shaped embedded iron parts 7 and U-frame frame 6;The internal diameter of conveyance conduit 4 is 25cm ~ 30cm.
Job site of the present utility model duct type floor garbage-cleaning system, when making, comprises the steps:
(1) according to line setting, first T-shaped embedded iron parts 7 and U-shaped pre-embedded bolt 8 are embedded on floor Bars In Poured Concrete Slab 1;
(2) selecting, according to accurately calculating, the channel-section steel meeting force request, be welded into U-frame frame 6, size is determined according to the size of conveyance conduit 4;
(3) the U-frame frame 6 welded is placed on pre-buried good U-shaped pre-embedded bolt 8, tightens;
(4) process small-sized set square 9 according to on-site actual situations, set square 9 is welded on T-shaped embedded iron parts 7, plays reinforcement effect;
(5) customize pipeline iron hoop 10 according to the size of conveyance conduit 4, after pipeline iron hoop 10 is clamped conveyance conduit 4, utilize truck crane or on-the-spot tower crane to be hung in by conveyance conduit 4 in the space of U-frame frame 6, make U-frame frame 6 just be stuck in below pipeline iron hoop 10;
(6), according to on-site actual situations, after selecting suitable height, process rubbish pour spout 2, be soldered on conveyance conduit 4;
(7) it is actually needed finally according to scene, rubbish centralized pool 5 of constructing below conveyance conduit 4, and security protection is set around.
Job site of the present utility model duct type floor garbage-cleaning system processes, install, remove very convenient, and the material in work progress can be reused, and can effectively solve the defects such as the lost labor of usual way, efficiency is low.Feature is: (1) is easy and simple to handle, convenient to assemble and disassemble;(2) material can utilize with repetitive cycling;(3) be greatly improved rubbish in work progress clears efficiency.
Although as it has been described above, represented and described this utility model with reference to specific preferred embodiment, but it shall not be construed as the restriction to this utility model self.Under the spirit and scope premise of the present utility model defined without departing from claims, can various changes can be made in the form and details to it.
Claims (3)
1. a job site duct type floor garbage-cleaning system, it is characterised in that: include pipeline support frame (3), conveyance conduit (4) and rubbish centralized pool (5);Pipeline support frame (3) includes U-shaped pre-embedded bolt (8), U-frame frame (6) and pipeline iron hoop (10);U-shaped pre-embedded bolt (8) for being horizontally arranged at each floor Bars In Poured Concrete Slab (1) by U-frame frame (6), and the bending segment of U-frame frame (6) stretches out floor Bars In Poured Concrete Slab (1) outward;Pipeline iron hoop (10) fixed cover is located on conveyance conduit (4), and conveyance conduit (4) passes vertically through each U-frame frame (6), and pipeline iron hoop (10) is supported on U-frame frame (6);It is equipped with a rubbish pour spout (2) communicated with conveyance conduit (4) in the corresponding position of the upper each floor Bars In Poured Concrete Slab (1) of conveyance conduit (4);Conveyance conduit (4) lower end is right against rubbish centralized pool (5).
Job site the most according to claim 1 duct type floor garbage-cleaning system, it is characterised in that: the edge at floor Bars In Poured Concrete Slab (1) is fitted with T-shaped embedded iron parts (7);Set square (9) it is provided with between T-shaped embedded iron parts (7) and U-frame frame (6).
Job site the most according to claim 1 and 2 duct type floor garbage-cleaning system, it is characterised in that: the internal diameter of conveyance conduit (4) is 25cm ~ 30cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620303558.1U CN205617732U (en) | 2016-04-12 | 2016-04-12 | Job site pipeline formula floor rubbish clearance system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620303558.1U CN205617732U (en) | 2016-04-12 | 2016-04-12 | Job site pipeline formula floor rubbish clearance system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205617732U true CN205617732U (en) | 2016-10-05 |
Family
ID=57030259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620303558.1U Active CN205617732U (en) | 2016-04-12 | 2016-04-12 | Job site pipeline formula floor rubbish clearance system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205617732U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661335A (en) * | 2017-03-29 | 2018-10-16 | 五冶集团上海有限公司 | A kind of collection device for clearing up high floor concrete placings pump line remaining slurry |
CN110700517A (en) * | 2019-10-22 | 2020-01-17 | 邳州市蓝天节能建材有限公司 | Be applied to job site's rubbish pipeline |
CN113565326A (en) * | 2021-08-04 | 2021-10-29 | 刁金龙 | Garbage recycling channel for building construction and using method thereof |
-
2016
- 2016-04-12 CN CN201620303558.1U patent/CN205617732U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661335A (en) * | 2017-03-29 | 2018-10-16 | 五冶集团上海有限公司 | A kind of collection device for clearing up high floor concrete placings pump line remaining slurry |
CN110700517A (en) * | 2019-10-22 | 2020-01-17 | 邳州市蓝天节能建材有限公司 | Be applied to job site's rubbish pipeline |
CN113565326A (en) * | 2021-08-04 | 2021-10-29 | 刁金龙 | Garbage recycling channel for building construction and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205617732U (en) | Job site pipeline formula floor rubbish clearance system | |
CN206784951U (en) | Concrete placement floor thickness control device | |
CN204163115U (en) | Template construction device is hung in a kind of ater-casting | |
CN105603843A (en) | Assembled reinforced concrete prefabricated pavement slab and construction method thereof | |
CN206625428U (en) | Pipe shaft post-cast floor slab closed system | |
CN102518300B (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
CN108222066A (en) | A kind of combined steel formwork support system and its construction method | |
CN110761191A (en) | Concrete guardrail construction device and method thereof | |
CN102505839A (en) | Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate | |
CN208830444U (en) | Inspection shaft steel combined template | |
CN209686857U (en) | Deep basal pit outer wall of basement shape steel bracket diagonal brace single side formwork system | |
CN205443834U (en) | Novel reinforced concrete prefabricated section | |
CN203462754U (en) | Free-disassembly suspension template | |
CN209469875U (en) | A kind of concrete pump pipe bending place support device | |
CN105951599B (en) | High column mould bases integrated construction technique | |
CN205636498U (en) | Wet seam construction equipment | |
CN105275198B (en) | A kind of shear-wall strengthening formwork structure and its construction method | |
CN201620602U (en) | Preburied sleeve | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN207957611U (en) | A kind of small members are mobile and install equipment | |
CN207295478U (en) | Steel pipe column bracket seat connection apparatus | |
CN202214967U (en) | Portable column construction hanging frame | |
CN207048314U (en) | A kind of shaping type stair wooden model board component | |
CN205224420U (en) | Anticorrosive industry factory building precast concrete stand | |
CN105421780B (en) | A kind of construction method of prefabricated concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |