CN205617732U - Job site pipeline formula floor rubbish clearance system - Google Patents

Job site pipeline formula floor rubbish clearance system Download PDF

Info

Publication number
CN205617732U
CN205617732U CN201620303558.1U CN201620303558U CN205617732U CN 205617732 U CN205617732 U CN 205617732U CN 201620303558 U CN201620303558 U CN 201620303558U CN 205617732 U CN205617732 U CN 205617732U
Authority
CN
China
Prior art keywords
pipeline
frame
conveyance conduit
floor
rubbish
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620303558.1U
Other languages
Chinese (zh)
Inventor
梅理
全有维
刘亚松
姚庆雨
王鹏
李新安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201620303558.1U priority Critical patent/CN205617732U/en
Application granted granted Critical
Publication of CN205617732U publication Critical patent/CN205617732U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a job site pipeline formula floor rubbish clearance system, concentrate the pond including pipeline support frame, pipeline and rubbish, the pipeline support frame includes U -shaped buried bolt, u -shaped frame and pipeline iron hoop in advance, the U -shaped in advance buried bolt be used for with u -shaped frame horizontal installation at the cast -in -place board of each floor, and u -shaped frame's bending segment stretches out outside the cast -in -place board of floor, the fixed cover of pipeline iron hoop is established on pipeline, and pipeline is vertical to pass each u -shaped frame, and the pipeline iron hoop supports on u -shaped frame, the corresponding position department of the cast -in -place board of every floor all is equipped with one and the communicating rubbish pouring opening of pipeline on pipeline, pipeline rectifies down to the concentrated pond of rubbish. This pipeline formula floor rubbish clearance system processes, installs, demolishs very conveniently, and the material in the work progress can used repeatedly.

Description

A kind of job site duct type floor garbage-cleaning system
Technical field
This utility model relates to a kind of floor garbage-cleaning system, the floor garbage-cleaning system of a kind of duct type.
Background technology
At present, in building construction process, common cleaning way is rubbish to be beaten heap shovel into handbarrow, is transported to ground by people's Cargo Lift, clears speed too slow, takies people's Cargo Lift and uses the time, and efficiency is low, takes artificial.It is therefore necessary to design a set of cleaning system, thus improve the efficiency of garbage-cleaning.
Utility model content
Utility model purpose: the floor garbage-cleaning system that a kind of garbage-cleaning efficiency is high and time saving and energy saving is provided.
Technical scheme: job site described in the utility model duct type floor garbage-cleaning system, including pipeline support frame, conveyance conduit and rubbish centralized pool;Pipeline support frame includes U-shaped pre-embedded bolt, U-frame frame and pipeline iron hoop;U-shaped pre-embedded bolt for being horizontally arranged at each floor Bars In Poured Concrete Slab by U-frame frame, and the bending segment of U-frame frame stretches out outside floor Bars In Poured Concrete Slab;Pipeline iron hoop fixed cover is located on conveyance conduit, and conveyance conduit passes vertically through each U-frame frame, and pipeline iron hoop is supported on U-frame frame;On conveyance conduit, the corresponding position of each floor Bars In Poured Concrete Slab is equipped with a rubbish pour spout communicated with conveyance conduit;Conveyance conduit lower end is right against rubbish centralized pool.
The combination using U-frame frame and pipeline iron hoop is capable of the most fixing of conveyance conduit so that rubbish in conveyance conduit by action of gravity free-falling, substantially increase rubbish in work progress clears efficiency;Using U-shaped pre-embedded bolt to be fixed U-frame frame, after construction, convenient dismounting turnover uses, and effectively saves construction material, reduces construction cost.
As further restriction scheme of the present utility model, the edge at floor Bars In Poured Concrete Slab is fitted with T-shaped embedded iron parts;It is provided with set square between T-shaped embedded iron parts and U-frame frame.Use T-shaped embedded iron parts and the effect of set square, it is possible to U-frame frame is fixed further, enhances the structural strength of system.
As further restriction scheme of the present utility model, the internal diameter of conveyance conduit is 25cm ~ 30cm.The conveyance conduit using 25cm ~ 30cm internal diameter can be easy to the conveying of Bulky Waste.
This utility model is compared with prior art, it provides the benefit that: (1) uses the combination of U-frame frame and pipeline iron hoop to be capable of the most fixing of conveyance conduit, so that rubbish in conveyance conduit by action of gravity free-falling, substantially increase rubbish in work progress clears efficiency;(2) using U-shaped pre-embedded bolt to be fixed U-frame frame, after construction, convenient dismounting turnover uses, and effectively saves construction material, reduces construction cost.
Accompanying drawing explanation
Fig. 1 is system structure schematic diagram of the present utility model;
Fig. 2 is U-frame frame installing structure schematic diagram of the present utility model;
Fig. 3 is conveyance conduit mounting structure schematic diagram of the present utility model;
Fig. 4 is rubbish pour spout structural representation of the present utility model.
In figure: 1, floor Bars In Poured Concrete Slab, 2, rubbish pour spout, 3, pipeline support frame, 4, conveyance conduit, 5, rubbish centralized pool, 6, U-frame frame, 7, T-shaped embedded iron parts, 8, U-shaped pre-embedded bolt, 9, set square, 10, pipeline iron hoop.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
Embodiment 1:
As Figure 1-4, job site of the present utility model duct type floor garbage-cleaning system includes: pipeline support frame 3, conveyance conduit 4 and rubbish centralized pool 5.
Wherein, pipeline support frame 3 includes U-shaped pre-embedded bolt 8, U-frame frame 6 and pipeline iron hoop 10;U-shaped pre-embedded bolt 8 for being horizontally arranged at each floor Bars In Poured Concrete Slab 1 by U-frame frame 6, and the bending segment of U-frame frame 6 stretches out outside floor Bars In Poured Concrete Slab 1;Pipeline iron hoop 10 fixed cover is located on conveyance conduit 4, and conveyance conduit 4 passes vertically through each U-frame frame 6, and pipeline iron hoop 10 is supported on U-frame frame 6;On conveyance conduit 4, the corresponding position of each floor Bars In Poured Concrete Slab 1 is equipped with a rubbish pour spout 2 communicated with conveyance conduit 4;Conveyance conduit 4 lower end is right against rubbish centralized pool 5;Edge at floor Bars In Poured Concrete Slab 1 is fitted with T-shaped embedded iron parts 7;Set square 9 it is provided with between T-shaped embedded iron parts 7 and U-frame frame 6;The internal diameter of conveyance conduit 4 is 25cm ~ 30cm.
Job site of the present utility model duct type floor garbage-cleaning system, when making, comprises the steps:
(1) according to line setting, first T-shaped embedded iron parts 7 and U-shaped pre-embedded bolt 8 are embedded on floor Bars In Poured Concrete Slab 1;
(2) selecting, according to accurately calculating, the channel-section steel meeting force request, be welded into U-frame frame 6, size is determined according to the size of conveyance conduit 4;
(3) the U-frame frame 6 welded is placed on pre-buried good U-shaped pre-embedded bolt 8, tightens;
(4) process small-sized set square 9 according to on-site actual situations, set square 9 is welded on T-shaped embedded iron parts 7, plays reinforcement effect;
(5) customize pipeline iron hoop 10 according to the size of conveyance conduit 4, after pipeline iron hoop 10 is clamped conveyance conduit 4, utilize truck crane or on-the-spot tower crane to be hung in by conveyance conduit 4 in the space of U-frame frame 6, make U-frame frame 6 just be stuck in below pipeline iron hoop 10;
(6), according to on-site actual situations, after selecting suitable height, process rubbish pour spout 2, be soldered on conveyance conduit 4;
(7) it is actually needed finally according to scene, rubbish centralized pool 5 of constructing below conveyance conduit 4, and security protection is set around.
Job site of the present utility model duct type floor garbage-cleaning system processes, install, remove very convenient, and the material in work progress can be reused, and can effectively solve the defects such as the lost labor of usual way, efficiency is low.Feature is: (1) is easy and simple to handle, convenient to assemble and disassemble;(2) material can utilize with repetitive cycling;(3) be greatly improved rubbish in work progress clears efficiency.
Although as it has been described above, represented and described this utility model with reference to specific preferred embodiment, but it shall not be construed as the restriction to this utility model self.Under the spirit and scope premise of the present utility model defined without departing from claims, can various changes can be made in the form and details to it.

Claims (3)

1. a job site duct type floor garbage-cleaning system, it is characterised in that: include pipeline support frame (3), conveyance conduit (4) and rubbish centralized pool (5);Pipeline support frame (3) includes U-shaped pre-embedded bolt (8), U-frame frame (6) and pipeline iron hoop (10);U-shaped pre-embedded bolt (8) for being horizontally arranged at each floor Bars In Poured Concrete Slab (1) by U-frame frame (6), and the bending segment of U-frame frame (6) stretches out floor Bars In Poured Concrete Slab (1) outward;Pipeline iron hoop (10) fixed cover is located on conveyance conduit (4), and conveyance conduit (4) passes vertically through each U-frame frame (6), and pipeline iron hoop (10) is supported on U-frame frame (6);It is equipped with a rubbish pour spout (2) communicated with conveyance conduit (4) in the corresponding position of the upper each floor Bars In Poured Concrete Slab (1) of conveyance conduit (4);Conveyance conduit (4) lower end is right against rubbish centralized pool (5).
Job site the most according to claim 1 duct type floor garbage-cleaning system, it is characterised in that: the edge at floor Bars In Poured Concrete Slab (1) is fitted with T-shaped embedded iron parts (7);Set square (9) it is provided with between T-shaped embedded iron parts (7) and U-frame frame (6).
Job site the most according to claim 1 and 2 duct type floor garbage-cleaning system, it is characterised in that: the internal diameter of conveyance conduit (4) is 25cm ~ 30cm.
CN201620303558.1U 2016-04-12 2016-04-12 Job site pipeline formula floor rubbish clearance system Active CN205617732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620303558.1U CN205617732U (en) 2016-04-12 2016-04-12 Job site pipeline formula floor rubbish clearance system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620303558.1U CN205617732U (en) 2016-04-12 2016-04-12 Job site pipeline formula floor rubbish clearance system

Publications (1)

Publication Number Publication Date
CN205617732U true CN205617732U (en) 2016-10-05

Family

ID=57030259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620303558.1U Active CN205617732U (en) 2016-04-12 2016-04-12 Job site pipeline formula floor rubbish clearance system

Country Status (1)

Country Link
CN (1) CN205617732U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661335A (en) * 2017-03-29 2018-10-16 五冶集团上海有限公司 A kind of collection device for clearing up high floor concrete placings pump line remaining slurry
CN110700517A (en) * 2019-10-22 2020-01-17 邳州市蓝天节能建材有限公司 Be applied to job site's rubbish pipeline
CN113565326A (en) * 2021-08-04 2021-10-29 刁金龙 Garbage recycling channel for building construction and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661335A (en) * 2017-03-29 2018-10-16 五冶集团上海有限公司 A kind of collection device for clearing up high floor concrete placings pump line remaining slurry
CN110700517A (en) * 2019-10-22 2020-01-17 邳州市蓝天节能建材有限公司 Be applied to job site's rubbish pipeline
CN113565326A (en) * 2021-08-04 2021-10-29 刁金龙 Garbage recycling channel for building construction and using method thereof

Similar Documents

Publication Publication Date Title
CN205617732U (en) Job site pipeline formula floor rubbish clearance system
CN206784951U (en) Concrete placement floor thickness control device
CN204163115U (en) Template construction device is hung in a kind of ater-casting
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN206625428U (en) Pipe shaft post-cast floor slab closed system
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN108222066A (en) A kind of combined steel formwork support system and its construction method
CN110761191A (en) Concrete guardrail construction device and method thereof
CN102505839A (en) Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate
CN208830444U (en) Inspection shaft steel combined template
CN209686857U (en) Deep basal pit outer wall of basement shape steel bracket diagonal brace single side formwork system
CN205443834U (en) Novel reinforced concrete prefabricated section
CN203462754U (en) Free-disassembly suspension template
CN209469875U (en) A kind of concrete pump pipe bending place support device
CN105951599B (en) High column mould bases integrated construction technique
CN205636498U (en) Wet seam construction equipment
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN201620602U (en) Preburied sleeve
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN207957611U (en) A kind of small members are mobile and install equipment
CN207295478U (en) Steel pipe column bracket seat connection apparatus
CN202214967U (en) Portable column construction hanging frame
CN207048314U (en) A kind of shaping type stair wooden model board component
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN105421780B (en) A kind of construction method of prefabricated concrete structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant