CN202214967U - Portable column construction hanging frame - Google Patents
Portable column construction hanging frame Download PDFInfo
- Publication number
- CN202214967U CN202214967U CN 201120293245 CN201120293245U CN202214967U CN 202214967 U CN202214967 U CN 202214967U CN 201120293245 CN201120293245 CN 201120293245 CN 201120293245 U CN201120293245 U CN 201120293245U CN 202214967 U CN202214967 U CN 202214967U
- Authority
- CN
- China
- Prior art keywords
- frame
- portable
- hanging frame
- construction
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a building construction operating platform, in particular to a portable column construction hanging frame. The hanging frame comprises a triangular bracket of which the vertical side is arranged on a column, and a construction platform arranged on the triangular bracket, wherein the construction platform comprises a base plate arranged on the horizontal side of the triangular bracket, and a rail arranged at the periphery of the base plate. Through the technical scheme, the portable column construction hanging frame is convenient to assemble and disassemble, occupies a small space and is convenient to transport.
Description
Technical field
The utility model relates to a kind of CONSTRUCTION OPERATIONS platform, is specifically related to a kind of portable post construction hanger.
Background technology
In steel work or reinforced concrete member lifting construction, it is higher often to run into the structure cylinder, and the situation that operation planar can not be in time; Traditional practice is earlier with behind the cylinder hoisted in position; Scaffolding erecting arrives the operation plane, and then takes out construction operation platform, supplies personnel operation to use; Build and dismantle such construction operation platform and not only waste great amount of manpower and material resources, and transport process bothers very much.
The utility model content
It is convenient that the technical problem that the utility model will solve provides a kind of installation and removal, the portable easily post construction of the little transhipment that takes up space simultaneously hanger.
In order to solve the problems of the technologies described above; The utility model provides a kind of portable post construction hanger; Include vertical edge and be installed to the A-frame on the post and be installed in the operation platform on the A-frame, described operation platform comprises the chassis that is installed on the A-frame horizontal edge, the railing that is installed in the chassis periphery.
Adopt the portable post construction hanger of technique scheme to have following advantage: 1; Want that the mode that combines directly is fixed on the post owing to adopt A-frame and operation platform; Needn't as traditional scaffold, build up, so the installation and removal operation is fewer, very convenient always from ground; 2, because operation platform and A-frame all can dismantle, so it is little to take up space in the transport process, convenient transportation.
For the tightness that guarantees that A-frame is connected with post, described A-frame is provided with bolt hole, and A-frame passes through bolt to post.
As preferred version, in order further to dismantle railing, reduce the volume that it takies, the periphery on said chassis is provided with jack, and said railing comprises the vertical rod that cooperates with jack and is plugged on the cross bar at vertical rod top.
As preferred version, in order to reduce cost, guarantee the intensity of A-frame simultaneously, described A-frame is made up of the angle steel welding.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation:
Fig. 1 is the structural representation of the portable post construction of the utility model hanger.
The specific embodiment
As shown in Figure 1; The utility model provides a kind of portable post construction hanger; Include A-frame 1 and the operation platform that is installed on it; Wherein, operation platform comprises chassis 21, is welded on the jack 22 on the chassis 21, the steel pipe 23 that cooperates with jack 22, and the top of steel pipe 23 has the reinforcing steel bar frame 25 of cutting head through four jiaos and connects fixing.A-frame 1 is made up of the angle steel welding, and its vertical edge is provided with bolt hole, is installed on the post 3 through bolt, and the horizontal edge of A-frame 1 is fixedly connected with chassis 21 through bolt.
Above-described only is the preferred implementation of the utility model, should be understood that for a person skilled in the art, under the prerequisite that does not break away from the utility model structure; Can also make some distortion and improvement; Such as changing bolt hole into bar hole, thereby spacing changes angle steel into the steel of other shapes; The simple structure that changes jack, these can not influence effect and practical applicability that the utility model is implemented.
Claims (4)
1. portable post construction hanger; Include vertical edge and be installed to the A-frame on the post and be installed in the operation platform on the A-frame, it is characterized in that: described operation platform comprises the chassis that is installed on the A-frame horizontal edge, the railing that is installed in the chassis periphery.
2. portable post construction hanger according to claim 1, it is characterized in that: described A-frame is provided with bolt hole, and A-frame passes through bolt to post.
3. portable post construction hanger according to claim 1, it is characterized in that: the periphery on said chassis is provided with jack, and said railing comprises the vertical rod that cooperates with jack and is plugged on the cross bar at vertical rod top.
4. portable post construction hanger according to claim 1, it is characterized in that: described A-frame is made up of the angle steel welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120293245 CN202214967U (en) | 2011-08-12 | 2011-08-12 | Portable column construction hanging frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120293245 CN202214967U (en) | 2011-08-12 | 2011-08-12 | Portable column construction hanging frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202214967U true CN202214967U (en) | 2012-05-09 |
Family
ID=46014227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120293245 Expired - Fee Related CN202214967U (en) | 2011-08-12 | 2011-08-12 | Portable column construction hanging frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202214967U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107558382A (en) * | 2017-10-16 | 2018-01-09 | 中交路桥建设有限公司 | A kind of heavy type truss pipe support system |
CN109629812A (en) * | 2017-10-09 | 2019-04-16 | 上海宝冶集团有限公司 | The fast assembling-disassembling method of super high-rise steel pipe column operating platform |
-
2011
- 2011-08-12 CN CN 201120293245 patent/CN202214967U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629812A (en) * | 2017-10-09 | 2019-04-16 | 上海宝冶集团有限公司 | The fast assembling-disassembling method of super high-rise steel pipe column operating platform |
CN107558382A (en) * | 2017-10-16 | 2018-01-09 | 中交路桥建设有限公司 | A kind of heavy type truss pipe support system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202248876U (en) | Shear wall door/window opening formwork composite device | |
CN103334379A (en) | Construction method for hanging part of anti-collision guardrail on expressway | |
CN205576747U (en) | Cast -in -place panel braced system of U type roof beam | |
CN211143305U (en) | Steel structure building | |
CN102080384A (en) | Construction method for mounting lifter on top plate of underground parking garage | |
CN202214967U (en) | Portable column construction hanging frame | |
CN202831643U (en) | Combined type concrete chute | |
CN205617732U (en) | Job site pipeline formula floor rubbish clearance system | |
CN103352570B (en) | Assembled construction gateway | |
CN203271096U (en) | Operating platform | |
CN205348963U (en) | A security fence for building site | |
CN102720347A (en) | Scaffold tool type wall connecting piece and construction method thereof | |
CN201915638U (en) | Hyperbolic steel funnel construction equipment | |
CN203947754U (en) | Elevator shaft tool-type operating platform | |
CN204059206U (en) | A kind of bridge construction Support bracket | |
CN203213137U (en) | Steel raft foundation for installing steel structure roof | |
CN203638063U (en) | Guardrail stand column device for erecting ship hatch coaming guardrail | |
CN104948004B (en) | A kind of site safety manages revolving enclosure wall | |
CN213710353U (en) | Early-dismantling supporting device for beam slab | |
CN105275198A (en) | A shear wall formwork reinforcing construction method | |
CN201377163Y (en) | Mobile platform being established by traveling crane | |
CN201722937U (en) | Sliding platform for installation of net rack | |
CN203699828U (en) | Simple tool-type lifting frame for mounting of steel reinforcement cages | |
CN202913716U (en) | Temporary support structure for truss integral lifting | |
CN201261947Y (en) | Assembly type escape way |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120509 Termination date: 20190812 |
|
CF01 | Termination of patent right due to non-payment of annual fee |