CN202214967U - Portable column construction hanging frame - Google Patents

Portable column construction hanging frame Download PDF

Info

Publication number
CN202214967U
CN202214967U CN 201120293245 CN201120293245U CN202214967U CN 202214967 U CN202214967 U CN 202214967U CN 201120293245 CN201120293245 CN 201120293245 CN 201120293245 U CN201120293245 U CN 201120293245U CN 202214967 U CN202214967 U CN 202214967U
Authority
CN
China
Prior art keywords
frame
portable
hanging frame
construction
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120293245
Other languages
Chinese (zh)
Inventor
郭长春
李爽
蒲拥军
陈晓明
杨春兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN 201120293245 priority Critical patent/CN202214967U/en
Application granted granted Critical
Publication of CN202214967U publication Critical patent/CN202214967U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a building construction operating platform, in particular to a portable column construction hanging frame. The hanging frame comprises a triangular bracket of which the vertical side is arranged on a column, and a construction platform arranged on the triangular bracket, wherein the construction platform comprises a base plate arranged on the horizontal side of the triangular bracket, and a rail arranged at the periphery of the base plate. Through the technical scheme, the portable column construction hanging frame is convenient to assemble and disassemble, occupies a small space and is convenient to transport.

Description

Portable post construction hanger
Technical field
The utility model relates to a kind of CONSTRUCTION OPERATIONS platform, is specifically related to a kind of portable post construction hanger.
Background technology
In steel work or reinforced concrete member lifting construction, it is higher often to run into the structure cylinder, and the situation that operation planar can not be in time; Traditional practice is earlier with behind the cylinder hoisted in position; Scaffolding erecting arrives the operation plane, and then takes out construction operation platform, supplies personnel operation to use; Build and dismantle such construction operation platform and not only waste great amount of manpower and material resources, and transport process bothers very much.
The utility model content
It is convenient that the technical problem that the utility model will solve provides a kind of installation and removal, the portable easily post construction of the little transhipment that takes up space simultaneously hanger.
In order to solve the problems of the technologies described above; The utility model provides a kind of portable post construction hanger; Include vertical edge and be installed to the A-frame on the post and be installed in the operation platform on the A-frame, described operation platform comprises the chassis that is installed on the A-frame horizontal edge, the railing that is installed in the chassis periphery.
Adopt the portable post construction hanger of technique scheme to have following advantage: 1; Want that the mode that combines directly is fixed on the post owing to adopt A-frame and operation platform; Needn't as traditional scaffold, build up, so the installation and removal operation is fewer, very convenient always from ground; 2, because operation platform and A-frame all can dismantle, so it is little to take up space in the transport process, convenient transportation.
For the tightness that guarantees that A-frame is connected with post, described A-frame is provided with bolt hole, and A-frame passes through bolt to post.
As preferred version, in order further to dismantle railing, reduce the volume that it takies, the periphery on said chassis is provided with jack, and said railing comprises the vertical rod that cooperates with jack and is plugged on the cross bar at vertical rod top.
As preferred version, in order to reduce cost, guarantee the intensity of A-frame simultaneously, described A-frame is made up of the angle steel welding.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation:
Fig. 1 is the structural representation of the portable post construction of the utility model hanger.
The specific embodiment
As shown in Figure 1; The utility model provides a kind of portable post construction hanger; Include A-frame 1 and the operation platform that is installed on it; Wherein, operation platform comprises chassis 21, is welded on the jack 22 on the chassis 21, the steel pipe 23 that cooperates with jack 22, and the top of steel pipe 23 has the reinforcing steel bar frame 25 of cutting head through four jiaos and connects fixing.A-frame 1 is made up of the angle steel welding, and its vertical edge is provided with bolt hole, is installed on the post 3 through bolt, and the horizontal edge of A-frame 1 is fixedly connected with chassis 21 through bolt.
Above-described only is the preferred implementation of the utility model, should be understood that for a person skilled in the art, under the prerequisite that does not break away from the utility model structure; Can also make some distortion and improvement; Such as changing bolt hole into bar hole, thereby spacing changes angle steel into the steel of other shapes; The simple structure that changes jack, these can not influence effect and practical applicability that the utility model is implemented.

Claims (4)

1. portable post construction hanger; Include vertical edge and be installed to the A-frame on the post and be installed in the operation platform on the A-frame, it is characterized in that: described operation platform comprises the chassis that is installed on the A-frame horizontal edge, the railing that is installed in the chassis periphery.
2. portable post construction hanger according to claim 1, it is characterized in that: described A-frame is provided with bolt hole, and A-frame passes through bolt to post.
3. portable post construction hanger according to claim 1, it is characterized in that: the periphery on said chassis is provided with jack, and said railing comprises the vertical rod that cooperates with jack and is plugged on the cross bar at vertical rod top.
4. portable post construction hanger according to claim 1, it is characterized in that: described A-frame is made up of the angle steel welding.
CN 201120293245 2011-08-12 2011-08-12 Portable column construction hanging frame Expired - Fee Related CN202214967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120293245 CN202214967U (en) 2011-08-12 2011-08-12 Portable column construction hanging frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120293245 CN202214967U (en) 2011-08-12 2011-08-12 Portable column construction hanging frame

Publications (1)

Publication Number Publication Date
CN202214967U true CN202214967U (en) 2012-05-09

Family

ID=46014227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120293245 Expired - Fee Related CN202214967U (en) 2011-08-12 2011-08-12 Portable column construction hanging frame

Country Status (1)

Country Link
CN (1) CN202214967U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558382A (en) * 2017-10-16 2018-01-09 中交路桥建设有限公司 A kind of heavy type truss pipe support system
CN109629812A (en) * 2017-10-09 2019-04-16 上海宝冶集团有限公司 The fast assembling-disassembling method of super high-rise steel pipe column operating platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629812A (en) * 2017-10-09 2019-04-16 上海宝冶集团有限公司 The fast assembling-disassembling method of super high-rise steel pipe column operating platform
CN107558382A (en) * 2017-10-16 2018-01-09 中交路桥建设有限公司 A kind of heavy type truss pipe support system

Similar Documents

Publication Publication Date Title
CN202248876U (en) Shear wall door/window opening formwork composite device
CN103334379A (en) Construction method for hanging part of anti-collision guardrail on expressway
CN205576747U (en) Cast -in -place panel braced system of U type roof beam
CN211143305U (en) Steel structure building
CN102080384A (en) Construction method for mounting lifter on top plate of underground parking garage
CN202214967U (en) Portable column construction hanging frame
CN202831643U (en) Combined type concrete chute
CN205617732U (en) Job site pipeline formula floor rubbish clearance system
CN103352570B (en) Assembled construction gateway
CN203271096U (en) Operating platform
CN205348963U (en) A security fence for building site
CN102720347A (en) Scaffold tool type wall connecting piece and construction method thereof
CN201915638U (en) Hyperbolic steel funnel construction equipment
CN203947754U (en) Elevator shaft tool-type operating platform
CN204059206U (en) A kind of bridge construction Support bracket
CN203213137U (en) Steel raft foundation for installing steel structure roof
CN203638063U (en) Guardrail stand column device for erecting ship hatch coaming guardrail
CN104948004B (en) A kind of site safety manages revolving enclosure wall
CN213710353U (en) Early-dismantling supporting device for beam slab
CN105275198A (en) A shear wall formwork reinforcing construction method
CN201377163Y (en) Mobile platform being established by traveling crane
CN201722937U (en) Sliding platform for installation of net rack
CN203699828U (en) Simple tool-type lifting frame for mounting of steel reinforcement cages
CN202913716U (en) Temporary support structure for truss integral lifting
CN201261947Y (en) Assembly type escape way

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20190812

CF01 Termination of patent right due to non-payment of annual fee