CN204059206U - A kind of bridge construction Support bracket - Google Patents
A kind of bridge construction Support bracket Download PDFInfo
- Publication number
- CN204059206U CN204059206U CN201420542949.XU CN201420542949U CN204059206U CN 204059206 U CN204059206 U CN 204059206U CN 201420542949 U CN201420542949 U CN 201420542949U CN 204059206 U CN204059206 U CN 204059206U
- Authority
- CN
- China
- Prior art keywords
- gripper shoe
- bolt
- bridge
- run
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical group C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 238000004064 recycling Methods 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bridge construction Support bracket, comprise the first gripper shoe being symmetricly set on bridge pier both sides and the second gripper shoe being symmetricly set on bridge pier both sides; Described first gripper shoe two ends are run through and are provided with the first through hole; Run through in described first through hole and be plugged with the first bolt; Described first bolt one end has been threaded connection the first nut; Described second gripper shoe two ends are run through and are provided with the second through hole; Run through in described second through hole and be plugged with the second bolt; Described second bolt one end has been threaded connection the second nut; Be provided with support column between described first gripper shoe and the second gripper shoe, the upper end of support column is fixedly connected with the bottom of the first gripper shoe; The utility model avoids and uses scaffold and shelf bracket to carry out supporting the shortcoming existed, and effectively achieves the support to bridge, has easy installation and removal simultaneously, reliability is high and have the advantages such as recycling.
Description
Technical field
The utility model is specifically related to a kind of bridge construction Support bracket, belongs to bridge construction technical field.
Background technology
Along with the continuous lifting of socioeconomic development and building level, and being on the increase of vehicle, big and small bridge is built; In bridge and upkeep operation, often Support bracket can be used; Traditional bracing frame is many to be built by steel pipe, and such as conventional in construction scaffold, because the pipe fitting of scaffold is more, have when building that to build difficulty large, progress of building is slow, and needs a lot of manpower to build, thus brings great trouble with upkeep operation to building of bridge; Although at present in bridge construction, pre-buried large block plate in bridge pier, and after being completed by shelf bracket assembly welding under bridge, monolithic hoisted in position welds with pre-embedded steel slab; Although the method can overcome the existence that scaffolds erecting build difficulty greatly, progress of building is slow, and the shortcoming needing a lot of manpower to build, but in shelf bracket welding process, there is following problem: high-altitude vertical welding, weldquality is difficult to ensure, there is potential safety hazard; Weld seam is long, overhead welding workload is large, bracket installation period is long; Need during dismounting to use gas welding to be cut off by pre-embedded steel slab by bracket, remove difficulty, and the shelf bracket after gas welding cutting damages serious, should not repeatedly use, revolving difference, bracket input amount is large; After bracket is removed, realize pre-buried large block plate and be difficult to process, affect bridge pier presentation quality.
Summary of the invention
For the problems referred to above, it is simple that the technical problems to be solved in the utility model is to provide a kind of structure, practical, effectively can overcome the shortcoming of building traditional pin hand cradle and adopting shelf bracket to exist; Meanwhile, effectively can realize the support to bridge, and there is easy accessibility and the bridge construction Support bracket of advantage such as can to reuse.
Bridge construction Support bracket of the present utility model, comprises the first gripper shoe being symmetricly set on bridge pier both sides and the second gripper shoe being symmetricly set on bridge pier both sides; Described first gripper shoe two ends are run through and are provided with the first through hole; Run through in described first through hole and be plugged with the first bolt; Described first bolt one end has been threaded connection the first nut; Described second gripper shoe two ends are run through and are provided with the second through hole; Run through in described second through hole and be plugged with the second bolt; Described second bolt one end has been threaded connection the second nut; Be provided with support column between described first gripper shoe and the second gripper shoe, the upper end of support column is fixedly connected with the bottom of the first gripper shoe, and the lower end of support column is fixedly connected with the top of the second gripper shoe; Described first gripper shoe top is fixedly installed hydraulically extensible bar; Described hydraulically extensible masthead portion is fixedly connected with supporting plate.
Further, the first gripper shoe being symmetricly set on bridge pier both sides described in is fixedly connected with the first nut by the first bolt.
Further, the second gripper shoe being symmetricly set on bridge pier both sides described in is fixedly connected with the second nut by the second bolt.
Further, described first gripper shoe and the second gripper shoe medial surface are respectively arranged with first caving in and second to cave in of being connected with bridge pier.
Further, described supporting plate is discoid, and supporting plate upper surface is provided with anti-skidding projection.
The utility model beneficial effect: a kind of structure of the present utility model is simple, practical, effectively can overcome the shortcoming of building traditional pin hand cradle and adopting shelf bracket to exist; Meanwhile, effectively can realize the support to bridge, and there is easy accessibility and the bridge construction Support bracket of advantage such as can to reuse; Because support column and the first gripper shoe and the second gripper shoe are mutually permanently connected, therefore make to be in first gripper shoe of the same side, the second gripper shoe and gripper shoe and form an entirety; When using the utility model, first the entirety that two are made up of the first gripper shoe, the second gripper shoe and gripper shoe being separately positioned on bridge pier both sides, and being fixed by the first bolt, the first nut, the second bolt and the second nut; Then allow hydraulically extensible bar stretch, supporting plate is propped up below bridge, thus achieve the support to bridge; The utility model avoids and uses scaffold and shelf bracket to carry out supporting the shortcoming existed, and effectively achieves the support to bridge, has easy installation and removal simultaneously, reliability is high and have the advantages such as recycling.
Accompanying drawing explanation
For ease of illustrating, the utility model is described in detail by following concrete enforcement and accompanying drawing.
Fig. 1 is main TV structure schematic diagram of the present utility model;
Fig. 2 is the plan structure schematic diagram of the first gripper shoe;
Fig. 3 is the plan structure schematic diagram of the second gripper shoe;
Fig. 4 is the plan structure schematic diagram of supporting plate.
Detailed description of the invention
Bridge construction Support bracket as shown in Figure 1, Figure 2, Figure 3 and Figure 4, comprises the first gripper shoe 2 being symmetricly set on bridge pier 1 both sides and the second gripper shoe 3 being symmetricly set on bridge pier 1 both sides; Described first gripper shoe 2 two ends are run through and are provided with the first through hole 4; Run through in described first through hole 4 and be plugged with the first bolt 5; Described first bolt 5 one end has been threaded connection the first nut 6; Described second gripper shoe 3 two ends are run through and are provided with the second through hole 7; Run through in described second through hole 7 and be plugged with the second bolt 8; Described second bolt 8 one end has been threaded connection the second nut 9; Be provided with support column 10 between described first gripper shoe 2 and the second gripper shoe 3, the upper end of support column 10 is fixedly connected with the bottom of the first gripper shoe 2, and the lower end of support column 10 is fixedly connected with the top of the second gripper shoe 3; Described first gripper shoe 2 top is fixedly installed hydraulically extensible bar 11; Described hydraulically extensible bar 11 top is fixedly connected with supporting plate 12.
Wherein, the first gripper shoe 2 being symmetricly set on bridge pier 1 both sides described in is fixedly connected with the first nut 6 by the first bolt 5; Described the second gripper shoe 3 being symmetricly set on bridge pier 1 both sides is fixedly connected with the second nut 9 by the second bolt 8; Described first gripper shoe 2 and the second gripper shoe 3 medial surface are respectively arranged be connected with bridge pier 1 first cave in and 13 and second cave in 14; Described supporting plate 12 is discoid, and supporting plate 12 upper surface is provided with anti-skidding projection.
Because support column and the first gripper shoe and the second gripper shoe are mutually permanently connected, therefore make to be in first gripper shoe of the same side, the second gripper shoe and gripper shoe and form an entirety; When using the utility model, first the entirety that two are made up of the first gripper shoe, the second gripper shoe and gripper shoe being separately positioned on bridge pier both sides, and being fixed by the first bolt, the first nut, the second bolt and the second nut; Then allow hydraulically extensible bar stretch, supporting plate is propped up below bridge, thus achieve the support to bridge.
Embodiment recited above is only be described preferred embodiment of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept; the various modification that this area ordinary person makes the technical solution of the utility model and improvement; protection domain of the present utility model all should be dropped into; the technology contents of the utility model request protection, all records in detail in the claims.
Claims (5)
1. a bridge construction Support bracket, is characterized in that: comprise the first gripper shoe being symmetricly set on bridge pier both sides and the second gripper shoe being symmetricly set on bridge pier both sides; Described first gripper shoe two ends are run through and are provided with the first through hole; Run through in described first through hole and be plugged with the first bolt; Described first bolt one end has been threaded connection the first nut; Described second gripper shoe two ends are run through and are provided with the second through hole; Run through in described second through hole and be plugged with the second bolt; Described second bolt one end has been threaded connection the second nut; Be provided with support column between described first gripper shoe and the second gripper shoe, the upper end of support column is fixedly connected with the bottom of the first gripper shoe, and the lower end of support column is fixedly connected with the top of the second gripper shoe; Described first gripper shoe top is fixedly installed hydraulically extensible bar; Described hydraulically extensible masthead portion is fixedly connected with supporting plate.
2. bridge construction Support bracket according to claim 1, is characterized in that: described in be symmetricly set on bridge pier both sides the first gripper shoe be fixedly connected with the first nut by the first bolt.
3. bridge construction Support bracket according to claim 1, is characterized in that: described in be symmetricly set on bridge pier both sides the second gripper shoe be fixedly connected with the second nut by the second bolt.
4. bridge construction Support bracket according to claim 1, is characterized in that: described first gripper shoe and the second gripper shoe medial surface are respectively arranged be connected with bridge pier first cave in and second to cave in.
5. bridge construction Support bracket according to claim 1, is characterized in that: described supporting plate is discoid, and supporting plate upper surface is provided with anti-skidding projection.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420542949.XU CN204059206U (en) | 2014-09-07 | 2014-09-07 | A kind of bridge construction Support bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420542949.XU CN204059206U (en) | 2014-09-07 | 2014-09-07 | A kind of bridge construction Support bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204059206U true CN204059206U (en) | 2014-12-31 |
Family
ID=52200750
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420542949.XU Expired - Fee Related CN204059206U (en) | 2014-09-07 | 2014-09-07 | A kind of bridge construction Support bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204059206U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926452A (en) * | 2016-05-17 | 2016-09-07 | 哈尔滨共阳科技咨询有限公司 | Stable supporting device for bridge |
| CN107419664A (en) * | 2017-05-30 | 2017-12-01 | 林再颐 | A kind of Support bracket structure of bridge construction |
| CN110815098A (en) * | 2018-08-08 | 2020-02-21 | 厦门嘉达环保科技有限公司 | Blast cap silencer installation ring platform |
-
2014
- 2014-09-07 CN CN201420542949.XU patent/CN204059206U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926452A (en) * | 2016-05-17 | 2016-09-07 | 哈尔滨共阳科技咨询有限公司 | Stable supporting device for bridge |
| CN107419664A (en) * | 2017-05-30 | 2017-12-01 | 林再颐 | A kind of Support bracket structure of bridge construction |
| CN107419664B (en) * | 2017-05-30 | 2019-06-28 | 倡创(上海)咨询管理事务所 | A kind of Support bracket structure of bridge construction |
| CN110815098A (en) * | 2018-08-08 | 2020-02-21 | 厦门嘉达环保科技有限公司 | Blast cap silencer installation ring platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104070316B (en) | A kind of assembled group of welded H section steel is to device and using method thereof | |
| CN204059206U (en) | A kind of bridge construction Support bracket | |
| CN204876547U (en) | Big template system of APC shell structure | |
| CN103790398B (en) | Non-pre-support dismantling method for large concrete structure | |
| CN206873307U (en) | Movable type bridge justifies pier stud work high above the ground operating platform | |
| CN206457729U (en) | A kind of supporting bracket of bridge construction | |
| CN205576747U (en) | Cast -in -place panel braced system of U type roof beam | |
| CN204081453U (en) | Can have enough to meet need use formula scaffold frame shaped steel fixing device that encorbelments | |
| CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
| CN208963263U (en) | Support frame is used in a kind of carrying of boat segmental | |
| CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
| CN203834370U (en) | Arch ring steel formwork trolley for circular arch culvert | |
| CN207484292U (en) | Bent cap bed die removes device | |
| CN204753390U (en) | Bridge construction support bracket | |
| AU2020254677B2 (en) | Construction system | |
| CN202000268U (en) | Foldable front outrigger for bridge girder erection machine | |
| CN204023421U (en) | A kind of bridge construction Support bracket | |
| CN202644407U (en) | Demoulding device for bottom plate bracket of capping beam constructed by hoop method | |
| CN100560471C (en) | Sliding method of tower when hoisting by hydraulic lifting technology | |
| CN104533071A (en) | Concrete cylinder annular formwork-attached scaffold and construction method thereof | |
| CN204097883U (en) | Auxiliary stand installed by steel bridge | |
| CN204080633U (en) | A kind of Bridge Pier Construction device | |
| CN209723570U (en) | Steel column docking installation operation platform | |
| CN202214967U (en) | Portable column construction hanging frame | |
| CN202299379U (en) | Early-disassembled column head |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20150907 |
|
| EXPY | Termination of patent right or utility model |