CN205443834U - Novel reinforced concrete prefabricated section - Google Patents

Novel reinforced concrete prefabricated section Download PDF

Info

Publication number
CN205443834U
CN205443834U CN201521119557.3U CN201521119557U CN205443834U CN 205443834 U CN205443834 U CN 205443834U CN 201521119557 U CN201521119557 U CN 201521119557U CN 205443834 U CN205443834 U CN 205443834U
Authority
CN
China
Prior art keywords
plate body
reinforcement
prefabricated section
reinforced concrete
novel reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521119557.3U
Other languages
Chinese (zh)
Inventor
王立国
桑兆龙
安凤杰
刘辛田
张静涛
� 赵
赵一
齐景昀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201521119557.3U priority Critical patent/CN205443834U/en
Application granted granted Critical
Publication of CN205443834U publication Critical patent/CN205443834U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a novel reinforced concrete prefabricated section prefabricates the road deck and includes the concrete slab body, for the rectangular plate, has all wrapped the metal safe edge on the arris of the upper and lower bottom surface of rectangular plate, concrete slab is internal to be equipped with double -deck two -way arrangement of reinforcement, and in four bights of upper surface, two bight positions on a diagonal are inlayed respectively and are established one section vertical nozzle stub at least. Be equipped with the lifting hook in the vertical nozzle stub, the bottom mounting of lifting hook is on the arrangement of reinforcement, the top of vertical nozzle stub and lifting hook and the upper surface parallel and level of the concrete slab body. The mesh of fast, the convenient maintenance of construction that industrial area ground road surface was executed in the realization, low input, environmental protection. The utility model discloses prefabricated road deck is applicable to the job site temporary road of mating formation fast, the 90 tons of reconditioning that can pass through, and intensity is high, makes and repairs the convenience, and is with low costs, and the use can be had enough to meet the need many times to the local convenience of changing, and is energy -concerving and environment -protective, the effectual drawback of having solved traditional engineering construction place road surface.

Description

A kind of Novel reinforced concrete prefabricated section
Technical field
This utility model relates to building yard temporary road construction field, particularly to a kind of Novel reinforced concrete prefabricated section.
Background technology
China's engineering construction place road base conventional concrete to be used pours road surface way at present, and this kind of conventional art pavement maintenance time is long, and wastes time and energy, and affects field material transport, and then affects duration progress;Various engineering materials, vehicle all need through entrance construction site, road surface, and permanent load action certainly will cause the phenomenons such as road surface fracture, depression to occur;Moreover, after treating engineering construction, also needing to abolish road surface, place, not only fund input is big, and causes waste of material and environmental pollution, does not meets the requirement of green construction and sustainable development.Additionally, existing pavement concrete precast construction intensity is little, edge is fragile, specificity is poor, mobile or dismounting is wasted time and energy, local replacing maintenance complexity, and turnover inconvenience is not suitable for building yard temporary pavement and lays.
Utility model content
This utility model purpose is to provide a kind of Novel reinforced concrete prefabricated section, pavement construction progress is slow, maintenance is wasted time and energy, it is high to put into and not environmentally technical problem to overcome conventional concrete to pour, and existing pavement concrete precast construction intensity is little, edge is fragile, specificity is poor, mobile or dismounting is wasted time and energy, be difficult to carry out local replacing, turnover inconvenience, be not suitable for the technical barrier of building yard road surfacing.
For achieving the above object, this utility model patent includes herein below:
A kind of Novel reinforced concrete prefabricated section, including concrete plate body, is provided with arrangement of reinforcement in described concrete slab body, it is characterised in that: described concrete plate body is rectangular slab, and described rectangular slab is all surrounded by the arris of bottom surface metal safe edge;On the upper surface of described concrete plate body, at least two corner positions on a diagonal are embedded one section of vertical short tube respectively;Being provided with suspension hook in described vertical short tube, the bottom of described suspension hook is fixed on arrangement of reinforcement;Described vertical short tube is concordant with the upper surface of concrete plate body with the top of suspension hook.
As optimal technical scheme of the present utility model, described metal safe edge is angle steel, and its two limb is adjacent to bottom surface and the side of concrete plate body respectively.
Preferably, the inner side of described angle steel is welded with the drag hook for drawknot concrete plate body Yu metal safe edge.
Preferably, described vertical short tube is pvc pipe, its a diameter of 100mm, length 40~60mm.
Preferably, described arrangement of reinforcement is double-layer double-direction muscle, upper ferrum and spacing is concrete slab body thickness 1/4~the 5/6 of lower ferrum.
Preferably, the upper ferrum of described arrangement of reinforcement and lower ferrum all use grade III steel, and reinforcement manner can be 12200,8120,10160 or 14250;The perpendicular muscle of arrangement of reinforcement uses grade III steel 10200, utilizes the reinforcing bar of different size, makes full use of building site clout.
Preferably, described concrete plate body is the plate body that C20 concreting becomes, and its size is the most adjustable, staggered joint erection is carried out for ease of site road when constructing, using two kinds of sizes, one is long 400mm × wide 600mm × thickness 200mm, and another kind is long 800mm × wide 600mm × thickness 200mm.
Preferably, the horizontal range in the distance concrete plate body corner, axis of described vertical short tube is 100~300mm.
Additionally, this utility model also provides for the preparation method of a kind of above-mentioned Novel reinforced concrete prefabricated section, comprise the steps:
Step one, install prefabricated road deck template according to design size;
Step 2, bottom template, arrange the metal safe edge of bottom surface: metal safe edge uses angle steel, and angle steel is close to template bottom surface and side, and connects at corner welding;
Step 3, welding drag hook: welding drag hook inside at two 100mm of angle steel inner distance angle steel limit, drag hook is L-type, and drag hook one is welded on inside angle steel, strengthens the connection of angle steel and concrete;
Step 4, arrangement of reinforcement: arrangement of reinforcement uses the two-way muscle in upper strata, upper ferrum and lower ferrum all to use grade III steel, and reinforcement manner is 12200,8120,10160 or 14250, and perpendicular muscle uses grade III steel 10200;
Step 5, suspension hook is set: inserting vertical vertical short tube in relevant position, template cornerwise two, set suspension hook in vertical short tube, the lower end of suspension hook is welded and fixed with arrangement of reinforcement, it is ensured that do not fall off;
Step 6, concreting: in template, pour C20 concrete;
Step 7, the metal safe edge of layout upper bottom surface: treating that concrete curing intensity reaches the metal safe edge of 100% layout upper bottom surface, metal safe edge uses angle steel, and angle steel is close to upper bottom surface and side;
Step 8, concrete curing, so far, prepared by Novel reinforced concrete prefabricated section.
Compared with prior art, of the present utility model it is a technical advantage that:
1, prefabricated road deck can directly be assembled into building yard temporary pavement in scene, lays speed soon, does not affect site operation;
2, separate between plate and plate, local replacing is convenient, can repeatedly have enough to meet the need use, lifting or conveniently moving;
3, make simply, draw materials conveniently, may utilize scrap material at the construction field (site) and make, reduce garbage emission, energy-conserving and environment-protective, fast and easy, low cost;
4, prefabricated road deck surrounding angle steel cornerite, it is ensured that prefabricated road deck is at the integrity used and in circular flow, and slab strength is high, and pavement quality is guaranteed;
To sum up, Novel reinforced concrete prefabricated section is applicable to fast spreading job site temporary road, and can pass through 90 tons of loaded vehicle, and intensity is high, makes and repairs conveniently, and low cost can have enough to meet the need use, energy-conserving and environment-protective, effectively solves Traditional project and builds the drawback on road surface, place.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of the Novel reinforced concrete prefabricated section that this utility model relates to;
Fig. 2 is the cross-sectional view of the A-A section of Fig. 1.
Reference: 1-concrete plate body, 2-metal safe edge, 3-arrangement of reinforcement, 4-suspension hook, the vertical short tube of 5-, 6-drag hook.
Detailed description of the invention
Being described principle of the present utility model and feature below in conjunction with accompanying drawing, example is served only for explaining this utility model, is not intended to limit scope of the present utility model.
This utility model relates to a kind of Novel reinforced concrete prefabricated section, such as Fig. 1 and Fig. 2, including concrete plate body 1, the plate body that described concrete plate body 1 becomes for C20 concreting, arrangement of reinforcement 3 it is provided with in it, described arrangement of reinforcement 3 is double-layer double-direction muscle, the spacing of upper ferrum and lower ferrum is the 1/4~5/6 of concrete plate body 1 thickness, wherein the upper ferrum of arrangement of reinforcement and lower ferrum all use grade III steel, reinforcement manner can be 12200,8120,10160 or 14250, the perpendicular muscle of arrangement of reinforcement uses grade III steel 10200, it is simple to utilizes the reinforcing bar of different size, makes full use of building site clout;Described concrete plate body 1 is rectangular slab, the most frayed for edge during guarantee prefabricated road deck lifting, there is stronger durability, can repeatedly use, all carrying out cornerite with metal safe edge 2 on the arris of bottom surface on prefabricated road deck, in embodiment, metal safe edge 2 uses angle steel, angle steel a size of 40 × 40mm, thickness is 4mm, welds the drag hook 6 of twice reinforcing bar inside every corner angle at distance angle steel two 100mm;For convenience of lifting, on concrete plate body 1 diagonal away from end points 150~250mm, vertical short tube 5 is set, described vertical short tube 5 is pvc pipe, its a diameter of 100mm, length can be with 40~60mm, and the present embodiment uses a length of 50mm of pvc pipe, if arrangement of reinforcement 3 runs into vertical short tube 5 when arranging, walk around from both sides, place in PVC vertical ductThe suspension hook 4 of 16 reinforcement fabrications, the bottom of suspension hook 4 is with iron wire colligation on arrangement of reinforcement 3, and described vertical short tube 5 is concordant with the upper surface of concrete plate body 1 with the top of suspension hook 4.
The size of the prefabricated road deck of this utility model can be the most adjustable, staggered joint erection is carried out for ease of site road when constructing, this enforcement profit preferably employs two kinds of sizes, and one is long 400mm × wide 600mm × thickness 200mm, and another kind is long 800mm × wide 600mm × thickness 200mm.
This utility model also provides for the preparation method of a kind of above-mentioned Novel reinforced concrete prefabricated section, comprises the steps:
Step one, install prefabricated road deck template according to design size;
Step 2, bottom template, arrange the metal safe edge 2 of bottom surface: metal safe edge 2 uses angle steel, angle steel to be close to template bottom surface and side, and connects at corner welding;
Step 3, welding drag hook: inside angle steel at two 10cm of elongation steel limit, weld drag hook;
Step 4, arrangement of reinforcement: arrangement of reinforcement 3 uses the two-way muscle in upper strata, upper ferrum and lower ferrum all to use grade III steel, and reinforcement manner is 12200,8120,10160 or 14250, and perpendicular muscle uses grade III steel 10200;
Step 5, suspension hook 4 is set: inserting vertical vertical short tube 5 in relevant position, template cornerwise two, set suspension hook 4 in vertical short tube 5, the lower end of suspension hook 4 is welded and fixed with arrangement of reinforcement 3, it is ensured that do not fall off;
Step 6, concreting: in template, pour C20 concrete;
Step 7, concrete curing,
Step 8, the metal safe edge 2 of layout upper bottom surface: treating that concrete curing intensity reaches 100% and can arrange metal safe edge 2, use angle steel, angle steel is close to upper bottom surface and side.So far, prepared by Novel reinforced concrete prefabricated section.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (9)

1. a Novel reinforced concrete prefabricated section, including concrete plate body (1), it is provided with arrangement of reinforcement (3) in described concrete plate body (1), it is characterised in that: described concrete plate body (1) is rectangular slab, and described rectangular slab is all surrounded by the arris of bottom surface metal safe edge (2);On the upper surface of described concrete plate body (1), at least two corner positions on a diagonal are embedded one section of vertical short tube (5) respectively;Being provided with suspension hook (4) in described vertical short tube (5), the bottom of described suspension hook (4) is fixed on arrangement of reinforcement (3);Described vertical short tube (5) is concordant with the upper surface of concrete plate body (1) with the top of suspension hook (4).
A kind of Novel reinforced concrete prefabricated section the most according to claim 1, it is characterised in that: described metal safe edge (2) is angle steel, and its two limb is adjacent to bottom surface and the side of concrete plate body (1) respectively.
A kind of Novel reinforced concrete prefabricated section the most according to claim 2, it is characterised in that: the inner side of described angle steel is welded with the drag hook (6) for drawknot concrete plate body (1) Yu metal safe edge (2).
A kind of Novel reinforced concrete prefabricated section the most according to claim 1, it is characterised in that: described vertical short tube (5) is pvc pipe, its a diameter of 100mm, length 40~60mm.
A kind of Novel reinforced concrete prefabricated section the most according to claim 1, it is characterised in that: described arrangement of reinforcement (3) is double-layer double-direction muscle, and the spacing of upper ferrum and lower ferrum is the 1/4~5/6 of concrete plate body (1) thickness.
A kind of Novel reinforced concrete prefabricated section the most according to claim 5, it is characterised in that: the upper ferrum of described arrangement of reinforcement (3) and lower ferrum all use grade III steel, and reinforcement manner is 12200,8120,10160 or 14250;The perpendicular muscle of arrangement of reinforcement (3) uses grade III steel 10200.
A kind of Novel reinforced concrete prefabricated section the most according to claim 1, it is characterised in that: described concrete plate body (1) is the plate body that C20 concreting becomes.
A kind of Novel reinforced concrete prefabricated section the most according to claim 1, it is characterised in that: the size of described concrete plate body (1) has two kinds, and one is 400*600*200mm, and another kind is 800*600*200mm.
9. according to a kind of Novel reinforced concrete prefabricated section described in claim 1~8 any one, it is characterised in that: the horizontal range in distance concrete plate body (1) corner, axis of described vertical short tube (5) is 100~300mm.
CN201521119557.3U 2015-12-30 2015-12-30 Novel reinforced concrete prefabricated section Expired - Fee Related CN205443834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521119557.3U CN205443834U (en) 2015-12-30 2015-12-30 Novel reinforced concrete prefabricated section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521119557.3U CN205443834U (en) 2015-12-30 2015-12-30 Novel reinforced concrete prefabricated section

Publications (1)

Publication Number Publication Date
CN205443834U true CN205443834U (en) 2016-08-10

Family

ID=56572477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521119557.3U Expired - Fee Related CN205443834U (en) 2015-12-30 2015-12-30 Novel reinforced concrete prefabricated section

Country Status (1)

Country Link
CN (1) CN205443834U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603843A (en) * 2015-12-30 2016-05-25 中国建筑第二工程局有限公司 Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN106677476A (en) * 2017-01-03 2017-05-17 南丹县住房和城乡建设局 Movable type ground rebar concrete plate block
CN106758658A (en) * 2017-01-20 2017-05-31 天津住总建筑集团有限公司 A kind of construction method of precast rc slab block and the heavily loaded temporary road of laying
CN114411473A (en) * 2022-01-29 2022-04-29 中铁二十局集团房地产开发有限公司 Assembled repeatedly usable haydite concrete yard floor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603843A (en) * 2015-12-30 2016-05-25 中国建筑第二工程局有限公司 Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN106677476A (en) * 2017-01-03 2017-05-17 南丹县住房和城乡建设局 Movable type ground rebar concrete plate block
CN106758658A (en) * 2017-01-20 2017-05-31 天津住总建筑集团有限公司 A kind of construction method of precast rc slab block and the heavily loaded temporary road of laying
CN114411473A (en) * 2022-01-29 2022-04-29 中铁二十局集团房地产开发有限公司 Assembled repeatedly usable haydite concrete yard floor

Similar Documents

Publication Publication Date Title
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN205443834U (en) Novel reinforced concrete prefabricated section
CN102619152A (en) Split mounting type prefabricated reinforced concrete construction temporary road
CN206428551U (en) A kind of repeatable assembled engagement temporary pavement plate utilized of monoblock type
CN108130837A (en) A kind of prefabricated road plate and its construction method
CN208586722U (en) Precast concrete assembled piping shaft
CN103334359B (en) Prefabricated reinforced concrete pavement plate and pavement construction method
CN204455749U (en) Prefabricated road surface block
CN203383121U (en) Prefabricated temporary pavement concrete slab convenient to assemble and disassemble
CN105239482A (en) Single-bar, single-mesh and anti-crack type precast concrete pavement slab convenient to carry, disassemble and assemble and using method of precast concrete pavement slab
CN107740522A (en) The attachment structure and its construction method of prefabricated regeneration monolith plate and composite beam
CN205576662U (en) Interlocking -type concrete road base plate
CN207109477U (en) Prefabricated assembled regeneration concrete heavy load builder's road plate can be recycled in one kind
CN205417623U (en) Machine is transported to long step material
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN101885208A (en) Method for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN210288002U (en) But reuse is construction way temporarily
CN204212023U (en) A kind of spliced steel concrete temporary pavement
CN203034808U (en) Amphibious pipe for floor garbage transportation and pump pipe cleaning
CN109811613A (en) A kind of interim ground installation and its integral construction method
CN210418434U (en) Frock is laid fast to metallic steel tank bottom plate in restricted space
CN204825556U (en) Hollow road deck of precast reinforced concrete
CN209293356U (en) A kind of energy-saving prefabricated floor plate
CN210657851U (en) Precast concrete pavement slab capable of being hoisted quickly
KR101705313B1 (en) Precast concrete panels and paving method using an embedded nut and asymmetric pocket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20161230