CN206448272U - Roadbed side slope arched framework one-time-shaped mould - Google Patents

Roadbed side slope arched framework one-time-shaped mould Download PDF

Info

Publication number
CN206448272U
CN206448272U CN201621442034.7U CN201621442034U CN206448272U CN 206448272 U CN206448272 U CN 206448272U CN 201621442034 U CN201621442034 U CN 201621442034U CN 206448272 U CN206448272 U CN 206448272U
Authority
CN
China
Prior art keywords
template
rib
steel plate
main framing
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621442034.7U
Other languages
Chinese (zh)
Inventor
张渠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201621442034.7U priority Critical patent/CN206448272U/en
Application granted granted Critical
Publication of CN206448272U publication Critical patent/CN206448272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to roadbed side slope arched framework slope protection prevention technical field, in order to solve mould of the roadbed side slope arched framework with the technical problem such as rib primary concreting and guarantee side slope skeleton concrete quality that intercepts water, there is provided a kind of roadbed side slope arched framework one-time-shaped mould, including main framing template, intercept water rib template, concrete overflows steel plate and arc formwork, main framing template is connected smoothly with arc formwork, on the inside of main framing template two pieces of rib templates that intercept water being parallel to each other are provided with along longitudinally asymmetric, the two ends of main framing template pass through junction steel plate, bolt is connected as one with the rib template that intercepts water, the rib template bottom of intercepting water is connected with concrete along vertical equity and overflows steel plate, concrete overflows is provided with some holes of vibrating on steel plate.Using the utility model can quickly, it is efficient and can make to intercept water rib and main framing vibrates while pouring, not only ensure that the total quality of concrete but also saved reinforcing bar and labo r usage, it is time saving, laborsaving, it is convenient and swift.

Description

Roadbed side slope arched framework one-time-shaped mould
Technical field
The utility model belongs to roadbed side slope arched framework slope protection prevention technical field, and in particular to a kind of roadbed side slope arch Shape skeleton one-shot forming mould.
Background technology
Roadbed appurtenant work quality directly affects railway operation safety in current railway bed work progress, is this pin It is attached to roadbed that a variety of side slope protection engineerings, such as roadbed arched framework, pile plate wall, gravity are provided with according to side slope strata condition Some row protection forms such as formula retaining wall, Anchored frame beam, hollow brick, purpose is provided to Slope Stability and reinforced, and prevents Only slope failure, considerable safety quality accident, influence passenger and national wealth safety are caused to railway operation, and this technology invention is In a kind of roadbed arched framework template ancillary technique field, current high-speed railway and common railway arched framework work progress due to Intercept water rib and template of template is not main framing uncovered pressure device in a complete linked system, template casting process, causes existing Concrete in stage concrete casting process middle skeleton can not vibrate, intercept water rib can not with main framing simultaneously primary concreting, Later concrete skeleton severe crack is caused, voids and pits is serious, concrete structure shortcake locally occurs and dissipated, and no state of strength rises Essence less than side slope protection is acted on.Later stage repairs extremely difficult to skeleton, time-consuming to take a lot of work, and there is serious quality peace Full hidden danger, therefore exclusively carried out research for this problem.
The content of the invention
The utility model rib primary concreting and ensures that side slope skeleton is mixed to solve roadbed side slope arched framework with intercepting water There is provided a kind of roadbed side slope arched framework one-time-shaped mould for the mould of the technical problems such as solidifying soil property amount.
The utility model is adopted the following technical scheme that:
A kind of roadbed side slope arched framework one-shot forming mould, including main framing template, the rib template that intercepts water, concrete overflow steel Plate and arc formwork, main framing template are connected smoothly with arc formwork, are provided with the inside of main framing template along longitudinally asymmetric Two pieces of rib templates that intercept water for being parallel to each other, the two ends of main framing template are connected as by junction steel plate, bolt and the rib template that intercepts water One, the rib template bottom of intercepting water is connected with concrete along vertical equity and overflows steel plate, is provided with if concrete overflows on steel plate Dry hole of vibrating.
The main framing template is concordant with rib template top of intercepting water, and junction steel plate is vertically connected at main framing template and intercepted water The top of rib template.
The hole of vibrating is, not less than 10x10cm, at least provided with two, to be equally spaced between hole of vibrating.
The junction steel plate of hole two that vibrates(2)Inner side.
The utility model has the advantages that:
1st, compared with existing construction technology, using the utility model can quickly, it is efficient and intercept water rib and master can be made Skeleton is poured simultaneously to vibrate, and the working time has saved 2/3rds;
2nd, it is convenient, flexible using the utility model mould, it is to avoid because the rib template that intercepts water with main framing can not connect into one Individual entirety causes to pour in two times, causes side slope concrete factor and the tradition such as can not vibrate without cover plate above main framing template Construction technology relatively ensure that the total quality of concrete, effectively avoid because intercept water rib and main framing pour by several times need it is pre-buried The processes such as batch reinforcing bar and dabbing are connect, the total quality of concrete has not only been ensure that but also has saved reinforcing bar and labo r usage, time saving, province Power, it is convenient and swift.
Brief description of the drawings
Fig. 1 is structural front view of the present utility model;
Fig. 2 is structure top view of the present utility model;
In figure:1- bolts, 2- junction steel plates, 3- main framings template, 4- intercept water rib template, 5- concrete overflow steel plate, 6- Vibrate hole, 7- arc formworks.
Embodiment
With reference to accompanying drawing, embodiment of the present utility model is described further:
Roadbed side slope arched framework one-shot forming mould as shown in Figure 1, 2, including main framing template 2, the rib template 4 that intercepts water, Concrete overflows steel plate 5 and arc formwork 7, and main framing template 3 is connected smoothly with arc formwork 7, the inner side of main framing template 3 Two pieces of rib templates 4 that intercept water being parallel to each other are provided with along longitudinally asymmetric, the two ends of main framing template 3 pass through junction steel plate 2, bolt 1 connects as one with the rib template 4 that intercepts water, and the bottom of rib template 4 of intercepting water is connected with concrete along vertical equity and overflows steel plate 5, Concrete overflows is provided with some holes 6 of vibrating on steel plate 5.
The main framing template 3 is concordant with the top of rib template 4 of intercepting water, and junction steel plate 2 is vertically connected at the He of main framing template 3 The top for the rib template 4 that intercepts water.
Junction steel plate uses steel plate after 1cm to be made, junction steel plate be connection intercept water rib template and main framing template into Set by an entirety;Fastening bolt turns into set by an entirety for the fixed rib template that intercepts water with main framing template;Anti- concrete Overflow steel plate to form using 5mm steel plate processing and fabricatings, be welded into an entirety with the skeleton rib that intercepts water, be effectively prevented concrete Overflowed above from main framing;Concrete vibrating mouthful 4 is continued to employ by vibrated concrete, it is ensured that the quality of skeleton concrete.
The utility model is traditional skeleton template to be optimized repacking, after roadbed arched framework supporting is finished, and is used To intercept water rib template and main framing template of steel plate connects into an entirety, is fixed, is then intercepted water two under rib using fastening bolt Side's anti-concrete of welding overflows steel plate, and two 10x10cm holes of indwelling on steel plate, facilitates after casting concrete under vibrating spear Put and vibrate.
The utility model device ensure that the shaping of roadbed skeleton concrete energy one-time-concreting and energy large area will according to design Ask and vibrated, total quality that is efficient, time saving, laborsaving, ensure that roadbed concrete has reached the work of roadbed side slope protection With.Solve and poured by several times because side slope intercepts water caused by rib mould and main framing mould are not an entirety, above main framing template Without anti-concrete lower skateboard cause can not large area effectively vibrate, because gradation pour caused by connect the technologies such as batch dabbing embedded bar Problem.

Claims (4)

1. a kind of roadbed side slope arched framework one-shot forming mould, it is characterised in that:Including main framing template(3), intercept water rib template (4), concrete overflow steel plate(5)And arc formwork(7), main framing template(3)With arc formwork(7)It is connected smoothly, it is main Skeleton template(3)Inner side is provided with two pieces of rib templates that intercept water being parallel to each other along longitudinally asymmetric(4), main framing template(3)Two End passes through junction steel plate(2), bolt(1)With the rib template that intercepts water(4)Connect as one, the rib template that intercepts water(4)Bottom is along vertical There is concrete to overflow steel plate to level connection joint(5), concrete spilling steel plate(5)On be provided with some holes of vibrating(6).
2. roadbed side slope arched framework one-shot forming mould according to claim 1, it is characterised in that:The main framing template (3)With the rib template that intercepts water(4)Top is concordant, junction steel plate(2)It is vertically connected at main framing template(3)With the rib template that intercepts water(4) Top.
3. roadbed side slope arched framework one-shot forming mould according to claim 2, it is characterised in that:The hole of vibrating(6) For not less than 10x10cm, at least provided with two, hole of vibrating(6)Between be equally spaced.
4. roadbed side slope arched framework one-shot forming mould according to claim 3, it is characterised in that:The hole of vibrating(6) Two junction steel plates(2)Inner side.
CN201621442034.7U 2016-12-27 2016-12-27 Roadbed side slope arched framework one-time-shaped mould Active CN206448272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621442034.7U CN206448272U (en) 2016-12-27 2016-12-27 Roadbed side slope arched framework one-time-shaped mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621442034.7U CN206448272U (en) 2016-12-27 2016-12-27 Roadbed side slope arched framework one-time-shaped mould

Publications (1)

Publication Number Publication Date
CN206448272U true CN206448272U (en) 2017-08-29

Family

ID=59674509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621442034.7U Active CN206448272U (en) 2016-12-27 2016-12-27 Roadbed side slope arched framework one-time-shaped mould

Country Status (1)

Country Link
CN (1) CN206448272U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487266A (en) * 2018-06-01 2018-09-04 宁夏力丰农机制造有限公司 A kind of cutting arched framework beam forms
CN111119204A (en) * 2019-12-25 2020-05-08 中国路桥集团西安实业发展有限公司 Construction method of concrete arch framework revetment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487266A (en) * 2018-06-01 2018-09-04 宁夏力丰农机制造有限公司 A kind of cutting arched framework beam forms
CN111119204A (en) * 2019-12-25 2020-05-08 中国路桥集团西安实业发展有限公司 Construction method of concrete arch framework revetment

Similar Documents

Publication Publication Date Title
CN104631706B (en) One kind exempts from form removal concrete column and its construction method
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN105839850A (en) Basement reverse-construction scape post-casting pre-stressed construction method
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN203712840U (en) Small box girder concrete pouring mold
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN107053440A (en) A kind of precast plate girder pedestal preparation method
CN104328717B (en) CRTS III plate-type non-fragment orbit self-compacting concrete builds frock and method
CN207988490U (en) A kind of easy device that deformation joint shear wall formwork installs
CN109469349A (en) A kind of floor strengthening reconstruction method for adding reinforced concrete secondary beam
CN105484403A (en) Assembly type concrete bidirectional ribbed floor and construction method therefor
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN202401398U (en) Construction steel pipe bailey beam support in soft foundation
CN102425110A (en) Cast-in-situ concrete construction method for full section of urban overpass box girder
CN110344844A (en) A kind of track engineering section of track well construction method
CN206942138U (en) Cast template splices bridge plate
CN106149877A (en) Docking structure at concrete frame structure prefabricated post and beam slab node and method
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN207672389U (en) Roadbed concrete curb cast-in-place mould
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN215052265U (en) Reinforced concrete thin wall body reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant