CN203361605U - Anchor ring assembly - Google Patents
Anchor ring assembly Download PDFInfo
- Publication number
- CN203361605U CN203361605U CN 201320431746 CN201320431746U CN203361605U CN 203361605 U CN203361605 U CN 203361605U CN 201320431746 CN201320431746 CN 201320431746 CN 201320431746 U CN201320431746 U CN 201320431746U CN 203361605 U CN203361605 U CN 203361605U
- Authority
- CN
- China
- Prior art keywords
- anchor ring
- shaped anchor
- shaped
- floor plates
- ring assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses an anchor ring assembly which comprises a U-shaped anchor ring (1). The end portions of two straight bars of the U-shaped anchor ring (1) are provided with threads (2), a steel angle (3) is arranged between the two straight bars of the U-shaped anchor ring (1), the two straight bars of the U-shaped anchor ring (1) are respectively provided with a plastic pipe (4), a washer (5) and a nut (6), the plastic pipes (4) are placed below the steel angle (3), and the washers (5) and the nuts (6) are placed above the steel angle (3). The anchor ring assembly is suitable for construction of a cantilever rack in a non-water room. The anchor ring assembly achieves recycling and reusing of the U-shaped anchor ring through a simple method, can remove material consumption and can lower construction cost.
Description
Technical field
the utility model relates to a kind of anchor ring assembly, and particularly a kind of anchor ring assembly for outer builder's jack girder steel anchor ring recycling method, belong to the outer builder's jack technical field of construction of building.
Background technology
existing building is normal adopts outer builder's jack to be constructed, and specific practice is when building floor plates, and pre-buried for choosing the U-shaped anchor ring of girder steel outside fixing in floor plates, according to national safety standards for buildings regulation, choosing girder steel outward for every need to be fixed with three U-shaped anchor rings.Current way, the U-shaped anchor ring is disposable use, and the U-shaped anchor ring reinforcing bar that will expose the floor plates surface after finishing using cuts off along the floor plates surface, and the reinforcing bar scaled off can only be worked as the processing of steel scrap muscle, and remaining U-shaped anchor ring can only be stayed in floor plates.The construction of a building needs hundreds and thousands of the outer girder steels of choosing, and chooses girder steel outward for every and uses three U-shaped anchor rings, and the cost of three U-shaped anchor rings is 37.5 yuan, and only the cost of U-shaped anchor ring is just very considerable.
current this job practices, U-shaped anchor ring used is disposable use, the U-shaped anchor ring can not the secondary utilization, has not only caused the waste of material, has also increased construction cost.
Summary of the invention
the purpose of this utility model is, discloses a kind of anchor ring assembly, can save material consumption, reduces construction cost, to overcome the deficiencies in the prior art.
the technical solution of the utility model:
a kind of anchor ring assembly, comprise the U-shaped anchor ring, and two straight muscle ends of U-shaped anchor ring are provided with screw thread; Be provided with angle steel between two straight muscle of U-shaped anchor ring, on two straight muscle of U-shaped anchor ring, be respectively equipped with plastic pipe, packing ring and nut, plastic pipe is positioned at the angle steel below, and packing ring and nut are positioned at the angle steel top.
in aforementioned anchor ring assembly, on two straight muscle of described U-shaped anchor ring, be respectively equipped with two nuts.
compared with prior art, the utility model is applicable to the non-construction that outer builder's jack between boiled water room is arranged, and when pre-buried U-shaped anchor ring, first on two straight tubes of U-shaped anchor ring, puts plastic pipe, and the height of plastic pipe is greater than the height of floor plates; Be wound around adhesive tape in the outside of U-shaped anchor ring in addition, avoid the reinforcing bar of U-shaped anchor ring together with concrete binding, after the U-shaped anchor ring is finished using, can the U-shaped anchor ring be taken out by downward external force to Reusability from the bottom of floor plates.The utility model, by simple method, has been realized the problem of U-shaped anchor ring recycling, can save material consumption, reduces construction cost.
The accompanying drawing explanation
fig. 1 is structural representation of the present utility model;
fig. 2 is the structural representation of anchor ring assembly
fig. 3 is application example figure of the present utility model.
being labeled as in figure: 1-U-shaped anchor ring, 2-screw thread, 3-angle steel, 4-plastic pipe, 5-packing ring, 6-nut, 7-floor plates, 8-choose girder steel, 9-soffit formwork outward.
The specific embodiment
below in conjunction with accompanying drawing, the utility model is described in further detail, but not as to any restriction of the present utility model.
the utility model is the method for following a kind of outer builder's jack girder steel U-shaped anchor ring recycling, as shown in Figure 1, the method is when carrying out the construction of U-shaped anchor ring, overlap respectively the preceding paragraph plastic pipe 4 on two straight vertical muscle of U-shaped anchor ring 1, the length of plastic pipe 4 should be greater than the thickness of floor plates 7, two straight muscle of U-shaped anchor ring 1 are fixed on the soffit formwork 9 of floor plates vertically upward, and then carry out building of floor plates 7; After outer builder's jack is finished using, with flitch, be pressed on the straight vertical muscle that exposes the floor plates concrete surface, with iron hammer, impact downwards, make the U-shaped anchor ring exit from the floor plates bottom purpose that concrete reaches recycling.Plastic pipe 4 is enclosed within on U-shaped anchor ring 1 and with adhesive tape, whole U-shaped anchor ring is wound around and is bundled together together with plastic pipe afterwards, and the thickness on the big or small top of the adhesive tape thickness that while being wound around parcel, bottom reinforcement bars is wound around forms lower large little shape, is convenient to the later stage dismounting.Two straight muscle of U-shaped anchor ring are temporarily fixed at the U-shaped anchor ring on the soffit formwork 9 of floor plates 7 bottoms with iron nail vertically upward.Carry out building of floor plates 7, before the complete initial set of concreting, check pre-buried position and the direction of flooring U-shaped anchor ring and adjusted in time.The U-shaped anchor ring, from concrete is exited in the floor plates bottom, carries out shutoff with cement paste to reinforced hole.
for the structural representation of of the present utility model a kind of anchor ring assembly of said method as shown in Figure 2, this assembly comprises U-shaped anchor ring 1, and two straight muscle ends of U-shaped anchor ring 1 are provided with screw thread 2; Be provided with angle steel 3 between two straight muscle of U-shaped anchor ring 1, on two straight muscle of U-shaped anchor ring 1, be respectively equipped with plastic pipe 4, packing ring 5 and nut 6, plastic pipe 4 is positioned at angle steel 3 belows, and packing ring 5 and nut 6 are positioned at angle steel 3 tops.Be respectively equipped with two nuts 6 on 1 two straight muscle of U-shaped anchor ring.
specific implementation process of the present utility model and principle
1, be that the round steel two ends that φ 16 length are 880mm length (length can according to the actual conditions adjustment) process respectively the long screw thread 2 of 100mm in specification, according to the size of 380mm, 120mm, 380mm, make U-shaped anchor ring 1 on hoop bender.Put separately again the φ 20 plastic pipe 4(PVC pipes that a length is 120~150mm in U-shaped anchor ring 1 bottom, two ends); Finally be wound around and superscribe from outside by whole ironware with adhesive tape again, require during parcel bottom reinforcement bars is wound in to lower large little shape, be convenient to remove.
2, intercepting one section length of side is that 63mm thickness is the angle steel 3 that 6mm length is 250mm, and two ends allow respectively into 65mm, beats between two parties the hole of each φ 18mm.As the crimp of choosing girder steel 8 outward.The hex nut 6 of on two straight muscle of U-shaped anchor ring 1, joining respectively 1 packing ring 5 and two M16.
3, after the reinforcing bar binding of floor plates 7 completes; U-shaped anchor ring 1 is placed at reinforcement topping position in floor plates; U-shaped anchor ring 1 use iron nail is temporarily fixed on template; be shifted for fear of U-shaped anchor ring 1 when building the floor plates concrete, at the end of U-shaped anchor ring 1 muscle or bending position, adopt the reinforcing bar of φ 6.5 U-shaped anchor ring 1 to be reinforced fixing.Before the complete initial set of floor plates concreting, check that whether position and the direction of the embedded part that flooring is pre-buried be correct, and adjusted in time.
4, hit the straight muscle straightening on curved U-shaped anchor ring in constructing after the floor plates concrete setting, then choose girder steel 8 between two straight muscle of U-shaped anchor ring outside placing, then by two borehole jacks on angle steel 3 on two straight muscle of U-shaped anchor ring, then on two straight muscle of U-shaped anchor ring the cover upper gasket 5 with double nut, carry out fastening again.Make the outer girder steel 8 of choosing form a stressed integral body with the floor plates concrete, and guarantee the U-shaped anchor ring uniform stressed in two of ends thereafter.
while 5, needing to remove after outer builder's jack uses, first become flexible the nut 6 on three U-shaped anchor rings, then will choose the inside vibration of girder steel 8 outward, remove again double nut after making outer center of gravity of choosing girder steel 8 move on in building, choose outward after girder steel 8 takes out nut 6 is enclosed within on screw thread 2 again, be pressed on the U-shaped anchor ring that exposes concrete surface with flitch again, with weight, impact flitch, under external force U-shaped anchor ring is exited to the purpose that concrete surface reaches recovery from the bottom of floor plates.
6,, after having removed U-shaped anchor ring, tackle hole and the groove that U-shaped anchor ring causes and adopt the structural strengthening measure to be repaired it.
method of the present utility model is only applicable to non-ly have between boiled water room, and for guaranteeing to have from now on the application function in (as bathroom) between boiled water room, the outer girder steel 8 of choosing of locating between boiled water room still adopts an existing built-in process.
Claims (2)
1. an anchor ring assembly, comprise U-shaped anchor ring (1), and two straight muscle ends of U-shaped anchor ring (1) are provided with screw thread (2); It is characterized in that: between two straight muscle of U-shaped anchor ring (1), be provided with angle steel (3), be respectively equipped with plastic pipe (4), packing ring (5) and nut (6) on two straight muscle of U-shaped anchor ring (1), plastic pipe (4) is positioned at angle steel (3) below, and packing ring (5) and nut (6) are positioned at angle steel (3) top.
2. anchor ring assembly according to claim 1, is characterized in that: on (1) two straight muscle of aforementioned U-shaped anchor ring, be respectively equipped with two nuts (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320431746 CN203361605U (en) | 2013-07-19 | 2013-07-19 | Anchor ring assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320431746 CN203361605U (en) | 2013-07-19 | 2013-07-19 | Anchor ring assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203361605U true CN203361605U (en) | 2013-12-25 |
Family
ID=49809391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320431746 Expired - Fee Related CN203361605U (en) | 2013-07-19 | 2013-07-19 | Anchor ring assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203361605U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104295082A (en) * | 2013-07-19 | 2015-01-21 | 中建四局第一建筑工程有限公司 | Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method |
CN109763571A (en) * | 2018-12-29 | 2019-05-17 | 广西建工集团第五建筑工程有限责任公司 | It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method |
CN111519770A (en) * | 2020-05-06 | 2020-08-11 | 中铁建设集团有限公司 | Improved construction method for manufacturing and positioning U-shaped ring of discharging platform |
-
2013
- 2013-07-19 CN CN 201320431746 patent/CN203361605U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104295082A (en) * | 2013-07-19 | 2015-01-21 | 中建四局第一建筑工程有限公司 | Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method |
CN109763571A (en) * | 2018-12-29 | 2019-05-17 | 广西建工集团第五建筑工程有限责任公司 | It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method |
CN111519770A (en) * | 2020-05-06 | 2020-08-11 | 中铁建设集团有限公司 | Improved construction method for manufacturing and positioning U-shaped ring of discharging platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422B (en) | A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method | |
CN205976410U (en) | Shaped steel is encorbelmented scaffold frame and can be dismantled type of falling U screw vacuum pump | |
CN203856202U (en) | Simple pullable sizing device of reserved holes | |
CN203361605U (en) | Anchor ring assembly | |
CN203904835U (en) | Integrated external prestressing tendon steering saddle | |
CN202766972U (en) | Circular pier column hoop | |
CN206289945U (en) | A kind of assembled Portable safety crosshead | |
CN104295082A (en) | Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method | |
CN215760469U (en) | Building structure movement joint position shear force wall aluminum mould board location reinforcement device | |
CN204960289U (en) | Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly | |
CN102661035A (en) | Tool type wall connecting piece for exterior wall scaffold | |
CN201190408Y (en) | Tool type exterior scaffolding of section steel fastening tube | |
CN205348724U (en) | Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting | |
CN202611223U (en) | Recyclable bolt type scaffold wall connection piece | |
CN202658765U (en) | Keel framework concrete anti-crack filling wall | |
CN102465605A (en) | Method for building bottom plate steel bar support | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN206815804U (en) | A kind of new builder's jack girder steel built-in fitting | |
CN103046743A (en) | High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method | |
CN203640257U (en) | Support of overhanging type scaffold | |
CN201339320Y (en) | High-altitude overhanging hanging reinforced concrete hanging bracket | |
CN105370027A (en) | Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure | |
CN106284997A (en) | The big punching block construction method for lifting whole of reinforced concrete chimney | |
CN206070598U (en) | A kind of poured band of outer wall of basement outboard template and its fixed structure | |
CN205134546U (en) | But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131225 Termination date: 20160719 |
|
CF01 | Termination of patent right due to non-payment of annual fee |