CN202012356U - Concrete pouring and head sealing device through pump pipes - Google Patents
Concrete pouring and head sealing device through pump pipes Download PDFInfo
- Publication number
- CN202012356U CN202012356U CN2011201109272U CN201120110927U CN202012356U CN 202012356 U CN202012356 U CN 202012356U CN 2011201109272 U CN2011201109272 U CN 2011201109272U CN 201120110927 U CN201120110927 U CN 201120110927U CN 202012356 U CN202012356 U CN 202012356U
- Authority
- CN
- China
- Prior art keywords
- pump line
- steel plate
- pump pipe
- jumbo
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a concrete pouring and head sealing device through pump pipes, which comprises a steel mould jumbo formwork surface, a first pump pipe and a second pump pipe, wherein the steel mould jumbo formwork surface is provided with the first pump pipe and the second pump pipe; the first pump pipe and the second pump pipe are respectively positioned inside and outside the steel mould jumbo formwork surface; a reinforcing steel plate is arranged inside the steel mould jumbo formwork surface; a separation steel plate is arranged between the first pump pipe and the outside of the steel mould jumbo formwork surface; a long bolt passes through the first pump pipe, the separation steel plate, the steel mould jumbo formwork surface, the reinforcing steel plate and the second pump pipe to ensure that the first pump pipe, the separation steel plate, the steel mould jumbo formwork surface, the reinforcing steel plate and the second pump pipe are fixedly connected; and the second pump pipe is fixedly connected with the reinforcing steel plate through a bolt. After the concrete pouring and head sealing device provided by the utility model completes pouring, the pump pipe outside the steel mould jumbo formwork surface is removed. The concrete pouring and head sealing device is very suitable for pouring a top arch in the tunnel lining concrete construction.
Description
Technical field
The utility model relates to a kind of power station construction work concrete pump line and builds the end socket device, is applicable to steel form carrier crown sealing of hole.
Background technology
In underground engineering construction, tunnel adopts steel form carrier to carry out the formwork erection construction, and not stratified full section is built, and the conventional casting method of employing can not be closely knit with crown position concrete filling.
Summary of the invention
The utility model provides a kind of concrete pump line to build the end socket device, satisfies tunnel crown lining concrete and builds closely knit needs.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: the concrete pump line is built the end socket device, comprise steel form carrier template face, first pump line, second pump line that steel form carrier template face is provided with, first pump line, second pump line lay respectively at the outside in the steel form carrier template face, steel form carrier template face inboard is provided with the reinforcement steel plate, first pump line and steel form carrier template face are provided with isolate steel plate between the outside, and stay bolt passes first pump line, isolate steel plate, steel form carrier template face, strengthens steel plate, second pump line is fixedly connected with them.Described second pump line is bolted to connection with the reinforcement steel plate.
Described second pump line is provided with plugging hole, and plugging hole is provided with bolt.
Described isolate steel plate is circular-arc, the both sides chamfering.
The beneficial effect that a kind of concrete pump line of the utility model is built the end socket device is as follows: isolate steel plate is circular-arc, is convenient to be adjacent to the steel form carrier panel, and both sides band chamfering makes things convenient for the later stage to remove.Employing connects into firm integral body with second pump line with strengthening steel plate than lag bolt, to avoid the distortion of steel form carrier form surfacing.The concrete pump line that the utility model provides is built the end socket device, finishes and builds back dismounting steel form carrier template face pump line in addition, is fit to very much tunnel lining concrete construction crown and builds.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is the utility model structure drawing of device;
Fig. 2 strengthens steel plate structure figure for the utility model;
Fig. 3 is the utility model isolate steel plate structure chart;
Fig. 4 is the utility model first pump line structure chart.
The specific embodiment
The concrete pump line is built the end socket device, comprise steel form carrier template face, first pump line 1, second pump line 2 that steel form carrier template face is provided with, first pump line 1, second pump line 2 lay respectively at the outside in the steel form carrier template face, steel form carrier template face inboard is provided with strengthens steel plate 4, be provided with isolate steel plate 3 between first pump line 1 and the steel form carrier template face outside, stay bolt passes first pump line 1, isolate steel plate 3, steel form carrier template face, strengthens steel plate 4, second pump line 2 is fixedly connected with them, described second pump line 2 with strengthen steel plate 4 and be bolted to connection.
On first pump line, 1 flange internal thread is set, passes reinforcement steel plate 4 by bolt and be connected with second pump line 2 with isolate steel plate 3.6 M20 internal thread bolts hole are set on first pump line, 1 flange, adopt 2~3mm steel plate to cover bolt hole.
12 φ 21mm through holes are set on second pump line, 2 flange, and pump line one side has 3 φ 28mm holes.
When building crown, pump line stops feed after being fed to constant voltage, with the bolt taking-up of 3 φ 28mm hole shutoff in advance on second pump line 2, in 3 Φ 25mm reinforcing bar patchholes, to prevent the concrete tenesmus in second pump line 2.Remove second pump line 2 then with pump line, remove second pump line 2 when waiting concrete and strengthen the bolt that the steel plate 4 and first pump line 1 are connected, second pump line 2 is removed near initial set down to the pump machine.Steel form carrier is removed isolate steel plate 3 after moving back mould, repairs the concrete aperture that the hole sealing device position stays.Isolate steel plate 3 is reusable.Being fit to very much tunnel lining concrete construction crown builds.
Claims (4)
1. the concrete pump line is built the end socket device, comprise steel form carrier template face, first pump line (1) that steel form carrier template face is provided with, second pump line (2), it is characterized in that: first pump line (1), second pump line (2) lays respectively at the outside in the steel form carrier template face, steel form carrier template face inboard is provided with strengthens steel plate (4), be provided with isolate steel plate (3) between first pump line (1) and the steel form carrier template face outside, stay bolt passes first pump line (1), isolate steel plate (3), steel form carrier template face, strengthen steel plate (4), second pump line (2) is fixedly connected with them.
2. build the end socket device according to the described concrete pump line of claim 1, it is characterized in that: second pump line (2) is bolted to connection with reinforcement steel plate (4).
3. build the end socket device according to claim 1 or 2 described concrete pump lines, it is characterized in that: described second pump line (2) is provided with plugging hole, and plugging hole is provided with bolt.
4. build the end socket device according to the described concrete pump line of claim 1, it is characterized in that: described isolate steel plate (3) is circular-arc, the both sides chamfering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201109272U CN202012356U (en) | 2011-04-15 | 2011-04-15 | Concrete pouring and head sealing device through pump pipes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201109272U CN202012356U (en) | 2011-04-15 | 2011-04-15 | Concrete pouring and head sealing device through pump pipes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202012356U true CN202012356U (en) | 2011-10-19 |
Family
ID=44782968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201109272U Expired - Fee Related CN202012356U (en) | 2011-04-15 | 2011-04-15 | Concrete pouring and head sealing device through pump pipes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202012356U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047232A (en) * | 2014-07-03 | 2014-09-17 | 中铁二十一局集团第三工程有限公司 | Automatic mould fixing and demoulding device for road and bridge concrete pouring preformed hole or embedded part |
CN105041340A (en) * | 2015-08-12 | 2015-11-11 | 天津矿山工程有限公司 | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering |
CN105781578A (en) * | 2016-03-08 | 2016-07-20 | 中铁隧道集团三处有限公司 | Rapid blocking formwork trolley and blocking method for water and mud burst of tunnel |
CN105888694A (en) * | 2016-06-08 | 2016-08-24 | 张济宏 | Tunnel integral steel mould lining trolley capping device and seamless capping process |
CN109595009A (en) * | 2018-12-17 | 2019-04-09 | 中国葛洲坝集团第工程有限公司 | Pump concrete entrance hole sealing device and its method for sealing |
CN109882208A (en) * | 2019-02-28 | 2019-06-14 | 广东水电二局股份有限公司 | A kind of tunnel lined steel pipe structure and the concrete warehousing method using the structure |
-
2011
- 2011-04-15 CN CN2011201109272U patent/CN202012356U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104047232A (en) * | 2014-07-03 | 2014-09-17 | 中铁二十一局集团第三工程有限公司 | Automatic mould fixing and demoulding device for road and bridge concrete pouring preformed hole or embedded part |
CN104047232B (en) * | 2014-07-03 | 2015-12-02 | 中铁二十一局集团第三工程有限公司 | Road and bridge concreting preformed hole or built-in fitting are from active and inactive mold stripper apparatus |
CN105041340A (en) * | 2015-08-12 | 2015-11-11 | 天津矿山工程有限公司 | Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering |
CN105781578A (en) * | 2016-03-08 | 2016-07-20 | 中铁隧道集团三处有限公司 | Rapid blocking formwork trolley and blocking method for water and mud burst of tunnel |
CN105781578B (en) * | 2016-03-08 | 2018-02-06 | 中铁隧道集团三处有限公司 | The quick blocking formwork jumbo and method for blocking of a kind of tunnel water bursting factor |
CN105888694A (en) * | 2016-06-08 | 2016-08-24 | 张济宏 | Tunnel integral steel mould lining trolley capping device and seamless capping process |
CN109595009A (en) * | 2018-12-17 | 2019-04-09 | 中国葛洲坝集团第工程有限公司 | Pump concrete entrance hole sealing device and its method for sealing |
CN109595009B (en) * | 2018-12-17 | 2023-12-26 | 中国葛洲坝集团第一工程有限公司 | Hole sealing device and hole sealing method for pumped concrete inlet |
CN109882208A (en) * | 2019-02-28 | 2019-06-14 | 广东水电二局股份有限公司 | A kind of tunnel lined steel pipe structure and the concrete warehousing method using the structure |
CN109882208B (en) * | 2019-02-28 | 2024-02-13 | 广东水电二局股份有限公司 | Tunnel lining steel pipe structure and concrete warehousing method applying same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202012356U (en) | Concrete pouring and head sealing device through pump pipes | |
CN203022024U (en) | Integrally-movable formwork for pipe gallery cast-in-situ construction | |
CN102345461B (en) | Subsequent project and shield driving parallel construction method for long-distance railway tunnel | |
CN202039341U (en) | Soil body reinforcing device for tunnel portal ring of underwater shield tunnel holing process | |
CN104564102B (en) | A kind of tunnel lining concrete grouting device | |
CN104533450B (en) | One-time-concreting construction method of inverted arch low wall of single-track tunnel | |
CN109184189A (en) | A kind of diameter Silo conical shell silo roof construction method | |
CN201411899Y (en) | Template structure for tower-silo reinforcement construction | |
CN107191006B (en) | Dismantling and repairing method for refractory concrete layer of diversion trench | |
CN105736012A (en) | Concrete grouting device for tunnel lining | |
CN204267046U (en) | A kind of tunnel lining concrete grouting device | |
CN204282225U (en) | For the length of side rapid adjustment template of unidirectional closing slope rectangular pier construction | |
CN203462754U (en) | Free-disassembly suspension template | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN204401377U (en) | Adjustable ballastless track self-compacting concrete perfusion gang form | |
CN104790353A (en) | Sluice pier construction method for small and medium size sluices | |
CN204024068U (en) | A kind of hoisting steel pipe pillar concrete connection control device | |
CN103882840B (en) | A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof | |
CN202213043U (en) | Reinforced concrete inverted arch block die | |
CN202628120U (en) | Tunnel two-lining concrete construction trolley based material distributing device | |
CN201620602U (en) | Preburied sleeve | |
CN201778822U (en) | Hydraulic formwork trolley | |
CN104153464A (en) | Steel pipe concrete jacking inserting plate type control device and method for connecting steel pipe concrete jacking inserting plate type control device to steel pipe column | |
CN111271085B (en) | Construction method of tunnel portal oblique-cutting hat brim type combined template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111019 Termination date: 20180415 |
|
CF01 | Termination of patent right due to non-payment of annual fee |