pull bar
steel form
silo
tower
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203035740U
Other languages
Chinese (zh)
Inventor
赵善德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN2009203035740U priority Critical patent/CN201411899Y/en
Application granted granted Critical
Publication of CN201411899Y publication Critical patent/CN201411899Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a template structure for concrete placement, especially a template structure for tower-silo reinforcement construction, which aims at the prior deficiency. The template structure for tower-silo reinforcement construction with convenient construction, comprises a steel template (1) arranged along the cycle direction of a primary silo wall (3), a casting cavity formed bythe steel template (1) and the primary silo wall (3) and a tie rod (8) with one end fixed on the primary silo wall (3), wherein the steel template (1) is fixed by another end of the tie rod. The construction is convenient and the steel template is prevented from turn over outwards and the connection between the primary silo wall and a reinforcement layer is reinforced and the template structure issuitable for reinforcement construction of the columnar structure walls such as tower-silo.

Description

The formwork structure that is used for the tower silo strengthening construction
Technical field
The utility model relates to a kind of formwork structure of concrete pouring, especially a kind of formwork structure that is used for the tower silo strengthening construction.
Background technology
In the industrial construction work progress, usually adopt the reinforced concrete cylinder storehouse as the place of depositing ore or coal material temporarily, but owing to be temporary building, the design of tower silo, construction are not very perfect, situations such as bulkhead cracking in use often occur, just need carry out strengthening construction tower silo in order to keep the safety in production.
At present, the common employing of reinforcing increases one deck steel bar concrete reinforcement layer and finishes outside former bulkhead, the formwork structure of strengthening construction adopts usually to be installed steel form and steel form is fixed the formation stable structure with steel pipe scaffold and iron wire outside the reinforcing cage of back-up coat.But this formwork structure, the steel pipe reinforcement means is loaded down with trivial details, and labor strength is big, and when fluid concrete, steel form is outwards rollover easily.
The utility model content
In order to overcome existing deficiency, technical problem to be solved in the utility model provides a kind of formwork structure that is used for the tower silo strengthening construction of easy construction.
The technical scheme that its technical problem that solves the utility model adopts is: the formwork structure that is used for the tower silo strengthening construction, comprise the steel form that circumferentially is provided with along former bulkhead, surround formation cast chamber by steel form and former bulkhead, comprise that an end is fixed on the pull bar on the former bulkhead, steel form is fixing by the pull bar other end.
The beneficial effects of the utility model are: pour into a mould chamber, easy construction by pull bar tension and formation between steel form and the former bulkhead.And after when cast and cast, outwards turn on one's side because the pulling force of pull bar has prevented steel form, the existence of pull bar has simultaneously also strengthened being connected of former bulkhead and back-up coat.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
As shown in Figure 1, the formwork structure that is used for the tower silo strengthening construction of the present utility model comprises the steel form 1 that circumferentially is provided with along former bulkhead 3, surrounds with former bulkhead 3 by steel form 1 and forms the cast chamber, comprise that an end is fixed on the pull bar 8 on the former bulkhead 3, steel form 1 is fixing by pull bar 8 other ends.
Concrete, the stirrup 5 of described pull bar 8 by being arranged on steel form 1 outside be steel form 1 fixedly, is fixed with butterfly card 6 on the pull bar 8, and described stirrup 5 is stuck between steel form 1 and the butterfly card 6.Install for convenience, the end that described pull bar 8 is provided with butterfly card 6 is provided with screw thread, and described butterfly card 6 is fixed on the pull bar 8 by clamp nut 7.
Certainly, described pull bar 8 also can be directly by the fixing steel form 1 of the stirrup 5 that is arranged on steel form 1 outside on it, and be fixed by welding on the pull bar 8, perhaps by the butterfly card 6 that is arranged on steel form 1 outside on it fixedly steel form 1, perhaps other structures such as barb, block.
In order to strengthen the fastening force of butterfly card 6, described butterfly card 6 is fixed on the pull bar 8 by the solid nut 7 of two-restriction.
Construction for convenience, and make things convenient for the recovery of pull bar 8 to use, described pull bar 8 is fixed on the former bulkhead 3 by the bar planting 4 of implanting former bulkhead 3.Pull bar 8 is connected with bar planting 4 by welding, because the existence of pull bar 8 and bar planting 4 mainly is in order to prevent to pour into a mould and cast back steel form 1 is outwards turned on one's side, and after the back-up coat moulding reinforcement by connection layer and former bulkhead 3, mainly bear pulling force, described pull bar 8 also can adopt form such as hook to form to be connected with bar planting 4.
For convenience carry out strengthening construction in real time, promptly need not empty tower silo and just carry out strengthening construction, described bar planting 4 is implanted by chemical adhesive fixed, and certain described bar planting 4 also can be adopted expansion bolt etc.After tower silo empties, also can adopt the form of through hole pull bar.
The reinforced concrete cylinder storehouse position of barrel crackle occurs generally in the middle part that is subjected to the horizontal force maximum, middle part section to stressed maximum carries out strength checking, requirement is equivalent to tower silo height 2/3rds at the former bulkhead 3 outsourcing one decks of tower silo, and thick is the thick back-up coat of former bulkhead 1/3rd two.
During construction,, determine bar planting 4 density by the pulling force checking computations that produce between new and old silo, by boring on former bulkhead 3, with chemical adhesive bar planting 4 is implanted in the former bulkhead 3, welding thread 8 in bar planting 4 outer ends is by reasonable disposition steel form 1, steel form 1 is placed along back-up coat, steel form 1 usefulness reinforcing bar is pushed down butterfly card 6 to stirrup 5 by pull bar 8 as stirrup 5, by clamp nut 7 bandings, compress steel form 1, form formwork structure.
Steel form 1 is finalized the design by stirrup 5 bandings, and surrounds formation cast chambeies with former bulkhead 3, and the reinforcing cage 2 of back-up coat is arranged in the cast chamber, and former bulkhead 3 and steel form 1 pass through stirrup 5 and pull bar 8 and bar planting 4 tensions, easy construction.And after when cast and cast, outwards turn on one's side because the pulling force of pull bar 8 and bar planting 4 has prevented steel form 1, the existence of while pull bar 8 and bar planting 4 has also strengthened being connected of former bulkhead 3 and back-up coat.Formwork structure carries out concrete pouring by inspecting for acceptance.

Claims (8)

1. the formwork structure that is used for the tower silo strengthening construction, comprise the steel form (1) that circumferentially is provided with along former bulkhead (3), surround formation cast chamber by steel form (1) and former bulkhead (3), it is characterized in that: comprise that an end is fixed on the pull bar (8) on the former bulkhead (3), steel form (1) is fixing by pull bar (8) other end.
2. the formwork structure that is used for the tower silo strengthening construction as claimed in claim 1 is characterized in that: described pull bar (8) is by the fixing steel form (1) of the stirrup (5) that is arranged on steel form (1) outside on it.
3. the formwork structure that is used for the tower silo strengthening construction as claimed in claim 1 is characterized in that: described pull bar (8) is by the fixing steel form (1) of the butterfly card (6) that is arranged on steel form (1) outside on it.
4. the formwork structure that is used for the tower silo strengthening construction as claimed in claim 1, it is characterized in that: the stirrup (5) of described pull bar (8) by being arranged on steel form (1) outside be steel form (1) fixedly, be fixed with butterfly card (6) on the pull bar (8), described stirrup (5) is stuck between steel form (1) and the butterfly card (6).
5. as claim 3 or the 4 described formwork structures that are used for the tower silo strengthening construction, it is characterized in that: the end that described pull bar (8) is provided with butterfly card (6) is provided with screw thread, and described butterfly card (6) is fixed on the pull bar (8) by clamp nut (7).
6. the formwork structure that is used for the tower silo strengthening construction as claimed in claim 5 is characterized in that: described butterfly card (6) is fixed on the pull bar (8) by the solid nut (7) of two-restriction.
7. as claim 1,2, the 3 or 4 described formwork structures that are used for the tower silo strengthening construction, it is characterized in that: described pull bar (8) is fixed on the former bulkhead (3) by the bar planting (4) of implanting former bulkhead (3).
8. the formwork structure that is used for the tower silo strengthening construction as claimed in claim 7 is characterized in that: described bar planting (4) is implanted by chemical adhesive fixed.
CN2009203035740U 2009-05-25 2009-05-25 Template structure for tower-silo reinforcement construction Expired - Lifetime CN201411899Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203035740U CN201411899Y (en) 2009-05-25 2009-05-25 Template structure for tower-silo reinforcement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203035740U CN201411899Y (en) 2009-05-25 2009-05-25 Template structure for tower-silo reinforcement construction

Publications (1)

Publication Number Publication Date
CN201411899Y true CN201411899Y (en) 2010-02-24

Family

ID=41713786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203035740U Expired - Lifetime CN201411899Y (en) 2009-05-25 2009-05-25 Template structure for tower-silo reinforcement construction

Country Status (1)

Country Link
CN (1) CN201411899Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824908A (en) * 2010-04-27 2010-09-08 中建七局第二建筑有限公司 Shear wall large template and shear wall large template system
CN103669894A (en) * 2012-09-14 2014-03-26 贵阳铝镁设计研究院有限公司 Reinforcement method for reinforced concrete silo inner wall and structure
CN104746870A (en) * 2015-01-23 2015-07-01 中国建筑第八工程局有限公司 Construction method for arc decorating part on building body external facade
CN105464401A (en) * 2016-01-06 2016-04-06 中国建筑第八工程局有限公司 One-side support formwork structure for enlarging section and strengthening construction and construction method
CN105715064A (en) * 2016-01-31 2016-06-29 太原钢铁(集团)有限公司 Repairing and reinforcing method for reinforced concrete stock bin
CN107201845A (en) * 2017-06-13 2017-09-26 江苏建筑职业技术学院 A kind of low strong ultralight big porosity obturator construction method
CN113481884A (en) * 2021-07-18 2021-10-08 陕西省建筑科学研究院有限公司 Formwork erecting method for arched concrete beam

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824908A (en) * 2010-04-27 2010-09-08 中建七局第二建筑有限公司 Shear wall large template and shear wall large template system
CN103669894A (en) * 2012-09-14 2014-03-26 贵阳铝镁设计研究院有限公司 Reinforcement method for reinforced concrete silo inner wall and structure
CN104746870A (en) * 2015-01-23 2015-07-01 中国建筑第八工程局有限公司 Construction method for arc decorating part on building body external facade
CN105464401A (en) * 2016-01-06 2016-04-06 中国建筑第八工程局有限公司 One-side support formwork structure for enlarging section and strengthening construction and construction method
CN105715064A (en) * 2016-01-31 2016-06-29 太原钢铁(集团)有限公司 Repairing and reinforcing method for reinforced concrete stock bin
CN105715064B (en) * 2016-01-31 2017-10-17 太原钢铁(集团)有限公司 A kind of repairing and reinforcing method of armored concrete feed bin
CN107201845A (en) * 2017-06-13 2017-09-26 江苏建筑职业技术学院 A kind of low strong ultralight big porosity obturator construction method
CN113481884A (en) * 2021-07-18 2021-10-08 陕西省建筑科学研究院有限公司 Formwork erecting method for arched concrete beam

Similar Documents

Publication Publication Date Title
CN201411899Y (en) Template structure for tower-silo reinforcement construction
CN203097017U (en) Connecting structure between prefabricated infilled wall and prefabricated column or prefabricated shear wall
KR20170075753A (en) Prefabricated pier column member with steel-concrete composite structure
CN201661009U (en) Concrete-filled square steel tubular column
CN106182364A (en) A kind of detachable steel core and the method making pre-stressed concrete hollow beam
CN103216030A (en) Method for splicing and connecting precast reinforced concrete floor slabs within span
CN204960289U (en) Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly
CN113217059A (en) Combined anchor rod with prestressed rod core
CN106836559A (en) A kind of reinforced concrete wall structure and its construction method for preventing from ftractureing
CN100532736C (en) Concrete anchor stock and construction technique thereof
CN202644525U (en) Variable cross-section prestress reinforced concrete tubular pile
CN202969414U (en) Bridge-culvert foundation
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN112012195B (en) Construction method of precast pile anticorrosion hoisting structure
CN211080767U (en) Superposed beam, superposed beam and cast-in-place column connecting node
CN211899791U (en) Prefabricated floor preformed hole adopts and wears steel pull rod to consolidate masonry structure
CN208563359U (en) A kind of prefabricated PHC tubular pole and its connection structure with cushion cap flange
CN207131088U (en) A kind of shear wall support component
CN204225360U (en) A kind of prefabricated post and the syndeton with precast beam
CN209293202U (en) A kind of concrete column is converted into the connection structure of steel pipe column
CN203022018U (en) Plant column foundation in reclamation areas
CN206299120U (en) A kind of arch formwork for placing
CN201103246Y (en) Node structure for connecting steel silo wall and concrete barrel wall
CN202117390U (en) Segmentally spliced water tank tower
CN205618307U (en) Connection structure between a concrete tower section of thick bamboo and head tower section of thick bamboo

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110317

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617000 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110317

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: China 19th Metallurgical Corporation

Address before: 617000 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC Shijiu Construction Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100224