CN106836559A - Reinforced concrete wall structure capable of preventing cracking and construction method thereof - Google Patents
Reinforced concrete wall structure capable of preventing cracking and construction method thereof Download PDFInfo
- Publication number
- CN106836559A CN106836559A CN201710083263.7A CN201710083263A CN106836559A CN 106836559 A CN106836559 A CN 106836559A CN 201710083263 A CN201710083263 A CN 201710083263A CN 106836559 A CN106836559 A CN 106836559A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- wall
- concrete wall
- spacing
- sleeper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 32
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 238000005336 cracking Methods 0.000 title claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 5
- 241001669679 Eleotris Species 0.000 claims description 14
- 239000004567 concrete Substances 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 238000007796 conventional method Methods 0.000 claims description 6
- 238000009413 insulation Methods 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 5
- 238000005266 casting Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
Abstract
A reinforced concrete wall structure for preventing cracking is characterized in that the reinforced concrete wall is of a vertical cantilever structure, double rows of reinforcing mesh sheets are arranged in the reinforced concrete wall, the lower end of the reinforced concrete wall is connected with a foundation, and the upper end of the reinforced concrete wall is connected with a plate or a beam. When the wall body is in a vertical cantilever structure and is only connected with the beam, the top of the wall body is provided with a hidden beam, the hidden beams are vertically arranged at intervals of 1.5-2.5 m, and the hidden columns are longitudinally arranged at intervals of 3.0-5.0 m. When the top of the wall body is connected with the plate, the top of the wall body does not need to be provided with hidden beams, the hidden beams are only arranged at intervals of 1.5-2.5 m along the vertical direction, and the hidden columns are arranged at intervals of 3.0-5.0 m along the longitudinal direction. The structure and the construction method thereof are simple and easy to implement, can effectively reduce the probability of cracks appearing on the reinforced concrete wall, and ensure the structural safety and normal use of the reinforced concrete wall.
Description
Technical field
It is more particularly to a kind of to prevent the reinforced concrete wall structure of cracking and its apply the invention belongs to building engineering field
Work method.
Background technology
In process of construction, cast in situ ferroconcrete wall body cracking is more universal, particularly underground engineering outer wall cracking
It is more, and crack is often Vertical Cracks, along wall length direction than more uniform distribution, serious meeting forms through crack, therefore
The phenomenons such as seepage, steel bar corrosion are often resulted in, so that performance reduction of the structure under long-term use state, serious has an effect on
Use function.
The reason for causing reinforced concrete wall to ftracture, in addition to the deficiency of concrete material itself, mainly external force
The result of effect, is mainly temperature stress and more than the visible active force in the outside of its ability to bear (such as shock, side pressure in external force
Deng).At present, the common practice for preventing wall crazing be by the use of wall double steel bar mesh sheet as prevent cracking temperature
Muscle, but effect of anti-cracking is not often obvious.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, a kind of reinforced concrete wall knot for preventing and ftractureing is developed
Structure and its construction method, the structure and its construction method are simple and easy to apply, can effectively reduce reinforced concrete wall there is crack
Probability, it is ensured that the structure of reinforced concrete wall is safe and normally uses.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of reinforced concrete wall structure for preventing from ftractureing, the double reinforced mesh of configuration in reinforced concrete wall, its
It is characterised by:Wall is vertical cantilever design, and its lower end connects with basis, and upper end connects with plate or beam.
Dark beam together is set at the top of above-mentioned wall, and vertically by spacing 1.5m~dark beam of 2.5m settings, between being pressed along longitudinal direction
Away from 3.0m~5.0m, sleeper is set.
Above-mentioned wall vertically sets dark beam by spacing 1.5m~2.5m, sets dark by spacing 3.0m~5.0m along longitudinal direction
Post.
The construction procedure of the above-mentioned reinforced concrete wall structure for preventing from ftractureing is as follows:
(1) conventional method is first according to wall longitudinal reinforcement and sleeper reinforcing bar insertion basis, and pours base concrete;
(2) sequentially colligation wall horizontal reinforcement and sleeper, dark beam steel;
(3) wall form is installed and is reinforced using pull-tab or Screw arbor with nut at both-ends;When using plank sheathing, template thickness is not small
Heat-insulation layer is set on the outside of template when 15mm, winter construction;When using metal form, in the construction of any season in template
Outside sets heat-insulation layer;
(4) casting concrete according to a conventional method, top exposed parts covering and heat insulating layer;
(5) curing in the mold is no less than 7 days, and then form removal template, plastic sheeting moisture-keeping maintaining is pasted on concrete wall surface.
The advantages of the present invention are:
1st, the reinforced concrete wall structure for originally preventing the reinforced concrete wall structure and construction method of cracking from producing,
Its wall lower end connects with basis, and upper end connects with plate or beam or is vertical cantilever design, and reinforced concrete wall configures double steel
Muscle mesh sheet;When wall is vertical cantilever design or when only connecting with beam, dark beam together is set at the top of wall, and between vertically pressing
Dark beam is set away from 1.5m~2.5m, sleeper is set by spacing 3.0m~5.0m along longitudinal direction;When wall top connects with plate, wall
Top is not required to set dark beam, only vertically sets dark beam by spacing 1.5m~2.5m, is set by spacing 3.0m~5.0m along longitudinal direction
Sleeper.The present invention sets dark beam, sleeper, improves concrete lateral rigidity and cracking resistance, and double layer bar can improve reinforcing bar and mix
Solidifying soil surface crack resistance.
2nd, originally prevent the construction method of the reinforced concrete wall structure of cracking from providing concrete mix premature coagulation
Required constant environment temperature and humidity, it is to avoid the generation of curing temperature change drastically, reinforced concrete shear wall is poured
Build rate of rise steady growth with the extension of suitable curing temperature of rear intensity, early strength is high, can compensation temperature should
Adverse effect of the power to structure, it is to avoid the generation in crack.Simultaneously because early strength is high, it is particularly suitable for periphery and produces vibration lotus
The operation of load, also can carry out the operations such as foundation ditch backfill ahead of time.
3rd, the reinforced concrete wall structure and construction method of cracking is originally prevented to be applied to four seasons spring, summer, autumn and winter, and various temperature
Spend the environment of acute variation, convenient and quick construction.
Brief description of the drawings
Fig. 1 is the reinforced concrete wall structural representation for preventing and ftractureing of the invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the side view of Fig. 1.
Specific embodiment
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not limit
Qualitatively, it is impossible to which protection scope of the present invention is limited with this.
A kind of reinforced concrete wall structure for preventing from ftractureing, reinforced concrete wall is vertical cantilever design, inside it
Double reinforced mesh 5 is configured, wall lower end connects with basis, and upper end connects with plate or beam 1.
When wall only connects for vertical cantilever design with beam 1, dark beam 2 together is set at the top of wall, and vertically presses
Spacing 1.5m~2.5m sets dark beam, and sleeper 4 is set by spacing 3.0m~5.0m along longitudinal direction.When wall top connects with plate,
Wall top is not required to set dark beam 2, only vertically sets dark beam 3 by spacing 1.5m~2.5m, along longitudinal direction by spacing 3.0m~
5.0m sets sleeper 4.
The construction procedure of the above-mentioned reinforced concrete wall structure for preventing from ftractureing is as follows:
(1) conventional method is first according to wall longitudinal reinforcement and sleeper reinforcing bar insertion basis, and pours base concrete;
(2) sequentially colligation wall horizontal reinforcement and sleeper, dark beam steel;
(3) wall form is installed and is reinforced using pull-tab or Screw arbor with nut at both-ends.When using plank sheathing, template thickness is not small
Heat-insulation layer is set on the outside of template when 15mm, winter construction;When using metal form, in the construction of any season in template
Outside sets heat-insulation layer;
(4) casting concrete, top exposed parts covering and heat insulating according to a conventional method;
(5) curing in the mold is no less than 7 days, and then form removal template, plastic sheeting moisture-keeping maintaining is pasted on concrete wall surface.
The present invention in order to resist the influence of external force, on the premise of concrete material ensures quality, significantly wall crazing
Probability.
Claims (4)
1. a kind of reinforced concrete wall structure for preventing from ftractureing, configures double reinforced mesh in reinforced concrete wall, and it is special
Levy and be:Wall is vertical cantilever design, and its lower end connects with basis, and upper end connects with plate or beam.
2. it is according to claim 1 prevent cracking reinforced concrete wall structure, it is characterised in that:Above-mentioned wall top
Dark beam together is set, and sleeper vertically is set by spacing 3.0m~5.0m along longitudinal direction by spacing 1.5m~dark beam of 2.5m settings.
3. it is according to claim 1 prevent cracking reinforced concrete wall structure, it is characterised in that:Above-mentioned wall is along perpendicular
Dark beam is set to by spacing 1.5m~2.5m, sleeper is set by spacing 3.0m~5.0m along longitudinal direction.
4. a kind of construction procedure of the reinforced concrete wall structure for preventing cracking according to claim 1, its feature exists
In:Carried out according to the following steps:
(1) conventional method is first according to wall longitudinal reinforcement and sleeper reinforcing bar insertion basis, and pours base concrete;
(2) sequentially colligation wall horizontal reinforcement and sleeper, dark beam steel;
(3) wall form is installed and is reinforced using pull-tab or Screw arbor with nut at both-ends;When using plank sheathing, template thickness is not less than
15mm, sets heat-insulation layer on the outside of template during winter construction;When using metal form, in the construction of any season outside template
Side sets heat-insulation layer;
(4) casting concrete according to a conventional method, top exposed parts covering and heat insulating layer;
(5) curing in the mold is no less than 7 days, and then form removal template, plastic sheeting moisture-keeping maintaining is pasted on concrete wall surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710083263.7A CN106836559A (en) | 2017-02-16 | 2017-02-16 | Reinforced concrete wall structure capable of preventing cracking and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710083263.7A CN106836559A (en) | 2017-02-16 | 2017-02-16 | Reinforced concrete wall structure capable of preventing cracking and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836559A true CN106836559A (en) | 2017-06-13 |
Family
ID=59127569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710083263.7A Pending CN106836559A (en) | 2017-02-16 | 2017-02-16 | Reinforced concrete wall structure capable of preventing cracking and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836559A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227404A (en) * | 2020-10-12 | 2021-01-15 | 山东大学 | Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall |
CN112227403A (en) * | 2020-10-12 | 2021-01-15 | 山东大学 | Connecting system and connecting method for prefabricated superposed foundation and full-prefabricated shear wall |
CN112240033A (en) * | 2019-07-18 | 2021-01-19 | 重庆建工第七建筑工程有限责任公司 | Construction method of unconventional reverse construction outer wall structure in high slope area |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030233808A1 (en) * | 2002-06-25 | 2003-12-25 | David Zuppan | Foundation wall system |
CN102373714A (en) * | 2011-11-22 | 2012-03-14 | 苏州市建筑设计研究院有限责任公司 | Reinforcing bar structure for reducing cracks of basement outer wall |
CN102720215A (en) * | 2012-06-21 | 2012-10-10 | 杭州南联土木工程科技有限公司 | Permanent-joint-free overlength reinforced concrete underground engineering design and building method utilizing restraining bodies |
-
2017
- 2017-02-16 CN CN201710083263.7A patent/CN106836559A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030233808A1 (en) * | 2002-06-25 | 2003-12-25 | David Zuppan | Foundation wall system |
CN102373714A (en) * | 2011-11-22 | 2012-03-14 | 苏州市建筑设计研究院有限责任公司 | Reinforcing bar structure for reducing cracks of basement outer wall |
CN102720215A (en) * | 2012-06-21 | 2012-10-10 | 杭州南联土木工程科技有限公司 | Permanent-joint-free overlength reinforced concrete underground engineering design and building method utilizing restraining bodies |
Non-Patent Citations (3)
Title |
---|
李爱国: "地下室外墙设计若干问题探讨", 《中国建材科技》 * |
蒋凤昌等: "某地下室外墙混凝土裂缝防治技术措施", 《建筑技术开发》 * |
钱艺柏等: "高层建筑地下室外墙混凝土裂缝防治与工程实践", 《建筑施工》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112240033A (en) * | 2019-07-18 | 2021-01-19 | 重庆建工第七建筑工程有限责任公司 | Construction method of unconventional reverse construction outer wall structure in high slope area |
CN112227404A (en) * | 2020-10-12 | 2021-01-15 | 山东大学 | Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall |
CN112227403A (en) * | 2020-10-12 | 2021-01-15 | 山东大学 | Connecting system and connecting method for prefabricated superposed foundation and full-prefabricated shear wall |
CN112227404B (en) * | 2020-10-12 | 2021-07-30 | 山东大学 | Connecting system and connecting method for prefabricated superposed foundation and prefabricated superposed shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887702B (en) | A kind of method of pre-stressed carbon fiber plate and steel concrete reinforced concrete beam | |
CN104631706B (en) | One kind exempts from form removal concrete column and its construction method | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine | |
CN105507462B (en) | Have both the combined wall and its construction method of load-bearing and heat insulation function | |
CN105421810B (en) | Prefabricated wallboard reinforced masonry structure and construction method thereof | |
CN106836559A (en) | Reinforced concrete wall structure capable of preventing cracking and construction method thereof | |
CN111663681A (en) | Assembled wall body connecting structure and construction method thereof | |
CN206233579U (en) | Shear wall template is to drawing connecting piece and template reinforced structure thereof | |
CN208534081U (en) | A kind of reconstruction structure of old building constructional column | |
CN204728528U (en) | The I-shaped encased steel plate shear wall of Multicarity | |
CN204456428U (en) | A kind of entirety being installed on composite wallboard is waftd window | |
CN212317544U (en) | A post connection structure about newly-built basis for expanding underground space | |
CN110318463A (en) | A kind of connection structure and construction method of prefabricated post and beam based on phosphorus magnesium material | |
CN206091288U (en) | Concrete post -cast strip is propped up and is established device | |
CN212715663U (en) | Water stop screw for controlling wall steel bar protection layer | |
CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
CN105888282B (en) | A kind of seismic reinforcing structure and method that big hole is opened for transformer station's masonry wall | |
CN209874074U (en) | Porous inclined plane slip casting embedded pipe | |
CN210439720U (en) | Reinforced structure for increasing cross section of concrete beam side | |
CN107035045A (en) | A kind of precast concrete bidirectional hollow plate and preparation method thereof | |
CN209779951U (en) | steel plate-ultrahigh-strength concrete combined shear wall structure | |
CN207392752U (en) | For preventing the constructing device of grout leakage of formwork root | |
CN206752789U (en) | A kind of precast concrete bidirectional hollow plate and its prepare mould therefor | |
CN215671031U (en) | Post-cast strip PVC pipe plain concrete support system | |
CN206144186U (en) | Structure of bamboo reinforcement recycled concrete increase method of section reinforcing concrete post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |