CN204267046U - A kind of tunnel lining concrete grouting device - Google Patents

A kind of tunnel lining concrete grouting device Download PDF

Info

Publication number
CN204267046U
CN204267046U CN201420705490.0U CN201420705490U CN204267046U CN 204267046 U CN204267046 U CN 204267046U CN 201420705490 U CN201420705490 U CN 201420705490U CN 204267046 U CN204267046 U CN 204267046U
Authority
CN
China
Prior art keywords
junction block
grouting device
equipment slots
tunnel
flow arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420705490.0U
Other languages
Chinese (zh)
Inventor
史法战
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420705490.0U priority Critical patent/CN204267046U/en
Application granted granted Critical
Publication of CN204267046U publication Critical patent/CN204267046U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of tunnel lining concrete grouting device, comprises lining trolley, it is characterized in that, be provided with equipment slots above described lining trolley, on the uniform cell wall being arranged on equipment slots both sides of junction block, be provided with track in described equipment slots; Part flow arrangement is installed in orbit, its inside is provided with the multiple way union being communicated with main slurry pipe, and described multiple way union is identical with junction block diameter, and when both connect, interface adopts clip sealing, also be connected with many logical filling adaptors outside described junction block, valve installation is on many logical filling adaptors.This grouting device adopts Modular Structure Design, can shunting, driving main slurry pipe to move ahead to only needing mobile part flow arrangement during different station slip casting to the concrete of Grouting Pipe, construction more accurately, is efficiently built, effective shortening construction period, cut the waste, save construction cost.

Description

A kind of tunnel lining concrete grouting device
Technical field
The utility model belongs to construction of tunnel technical field, is specifically related to a kind of tunnel lining concrete grouting device.
Background technology
Concrete lining trolley is the nonstandard product that in constructing tunnel process, secondary lining is indispensable, mainly contains simple and easy lining trolley, all-hydraulic automatic walking lining trolley and netted lining trolley.
Tunnel lining is divided into (1), and monolithic mould builds concrete-liner; (2) precast lining; (3) shotcrete lining cutting; (4) composite lining; (5) open cut tunnel lining cutting.
Full-hydraulic lining trolley can be divided into again side and roof arch formula, whole-circle needle beam type, bed die needle beam type, wholecircle traveling type etc.Also generally use in Hydraulic Tunnel and bridge construction and promote sliding formwork, jacking sliding formwork and turn over mould etc.Whole-round lining trolley is usually used in Hydraulic Tunnel construction, does not allow tunnel to have concrete construction longitudinal seam, generally uses wholecircle traveling type when Hydraulic Tunnel span is larger; The application of side and roof arch formula lining trolley is the most general, is usually used in the concrete Second Lining Construction of highway, railway tunnel and underground chamber.
1. simple and easy lining trolley
Simple and easy lining trolley is generally designed to steel arch posture, and use standard combination steel form, can not establish automatic walking, adopt outer power to drag, de-shuttering is all manual operation, and labour intensity is large.Such lining trolley is generally used for short tunnel construction, and particularly change frequent, that technological requirement is strict tunnel concrete lining construction for plane and spatial geometric shape complexity, operation, its superiority is more obvious.As wide (state) favour (state) speedway little Jin mouth double-arched tunnel, long 200m, plane is in the circular curve change section of R=300m, in hole, horizontal wall inscription changes to+5% from i=± 2%, this tunnel is also on the vertical curve of R=3000m simultaneously, make Tunnel shape in " hyperbolic " state, and middle wall is stalk design, outlet 15m is faded to the horn structure of R=7.5m by R=5.5m, tunnel steel bar concrete two serves as a contrast and adopts the design of plain type bow member chassis, solve these problems well, engineering cost is lower simultaneously.During simple and easy chassis uses, major part adopts artificial concrete, and the simple and easy lining trolley of little Jin mouth adopts the perfusion of concrete transfer pump car, and therefore the rigidity of chassis should be strengthened especially.The simple and easy lining trolley had also adopts Overall Steel Formwork, but de-formwork erection still adopts screw mandrel very heavy, and without automatically walking, such chassis generally adopts concrete transfer pump car to pour into.Simple and easy lining trolley generally adopts combined steel formwork, and combined steel formwork is generally thin plate and makes, and should consider the rigidity of steel form in the design process, so the Pin spacing of steel arch-shelf is unsuitable excessive.If steel form length is 1.5m, then the Pin spacing of steel arch-shelf on average should be not more than 0.75m, and the landing edge of steel form should be located between Pin and Pin, so that installation form fastener and template hook.If use delivery pump perfusion, then rate of flooding is unsuitable too fast, otherwise combined steel formwork will be caused to be out of shape, and especially more should slow down rate of flooding when lining thickness is greater than more than 500mm.Should be doubly cautious when binding perfusion, noting the perfusion situation of concrete at any time, pour into concrete by force after preventing from filling, otherwise burst-mode or chassis deformed damaged will be caused.
2. all-hydraulic automatic walking lining trolley
Be mainly used in medium tunnel construction, higher to construction speed, concrete surface quality requirements.This type of design of tunnel lining trolley is Overall Steel Formwork, hydraulic jack takes off formwork erection, and by the very heavy support of screw mandrel in construction, electric reducer is walked automatically or oil cylinder step-by-step movement is walked automatically, all adopts the perfusion of concrete transfer pump car.Major part lining trolley is such chassis.When designing such lining trolley, when meeting by Clearance requirement, installation site, bearing diagonal bottom inside door frame should be considered, as far as possible near column bottom, make it stressed best.Door frame crossbeam should be enough high, and conventional railway tunnel is not less than 400mm, and highway tunnel is not less than 5500mm.Adjustment minimum range between template end face and door frame is not less than 250mm, otherwise lining cutting section in front and back will be caused to overlap difficulty.
With noticing during such lining trolley that the laying discrepancy in elevation of both sides rail is not more than 1%, otherwise the distortion of screw mandrel very heavy and jacking cylinder will be caused.When the tunnel inside lining having ramp, in order to adjust lining cutting absolute altitude, the discrepancy in elevation of chassis front and back end, template end face and door frame end face can be caused not parallel, very large horizontal component is formed between template and door frame by making, cause the very heavy dislocation of the support screw between template and door frame, cause very heavy, oil cylinder damage.Therefore, when designing, should take into full account that the front and back discrepancy in elevation causes restraining structure or the adjustment System of horizontal component.Rail meter must be installed when locating formwork erection, screw that basic screw mandrel is very heavy, ground, door frame top is very heavy and ground, template top is very heavy, other measure also can be adopted if necessary to reinforce counterdie arch springing position, make door frame stressed little as far as possible, prevent from running mould and door frame distortion.
3. netted lining trolley
Netted lining trolley has structurally been compared to larger change mutually with traditional lining trolley.Tradition lining trolley chassis door frame in construction is stressed member, the lateral pressure that it is subject to is comparatively large, and the rigidity size with door frame produces and do not wait distortion, and should not on-line operation in the tunnel having larger horizontal wall inscription and longitudinal gradient, higher to operating environment requirements, otherwise chassis bulk deformation and damage will be caused.And netted lining trolley door frame in construction for not stressing part, the support member of its template is that ground, the top screw mandrel of limit mould arch springing is very heavy, door frame is only just stressed in de-formwork erection, walking process, and suffered power vertically downward, there is no lateral pressure, only would not need be out of shape by the rigidity that chassis deadweight design door frame is enough.In the tunnel having ramp when construction or walking, no matter be horizontal wall inscription or longitudinal gradient, height can be carried out by the jacking cylinder of door frame bottom and regulate, make chassis entirety be in level, go all out and roll force before chassis global non-existence, ensure that the overall stationarity of chassis.The screw mandrel having fully phased out support because of chassis is very heavy, and chassis location is simple, can adjust to lining cutting geometric position very fast, save a large amount of manpower and materials, improve work efficiency, shorten dust cycle, correspondingly saved engineering cost.
For ensureing the Rigidity and strength of crown template, top gantry designs becomes netted member structure, makes it stressed best, and template can not be out of shape displacement in lining cutting process.In whole chassis, the weakest link is lower bolster and counterdie knighthead, therefore the stressed size of counterdie fully should be calculated when designing lower bolster, widen arc plate width and thickness as far as possible, knighthead must pass through Calculation on Stability of Compressed Bar, ensure that brace has enough Rigidity and strengths, be unlikely in use to deform bending, cause running mould.The lining thickness of concrete, the slump, rate of flooding, aggregate size should be taken into full account and be whether the impact of the factors such as steel bar concrete in computational process.Ground, counterdie arch springing top screw mandrel is very heavy is main stressed member, when whole template is below the center line of the lining cutting center of circle, supporting by it completely, therefore should consider its form of structure and rigidity size when designing.In use, this is very heavy must firmly hold out against in ground, and do not allowed loosening phenomenon, if necessary, other part available is reinforced, and as supplemental support, prevents from running mould and chassis is shifted downwards.It should be noted, very heavyly must to tighten as the rail meter of chassis longitudinal register and basic screw mandrel, to block jail and push up firm rail, particularly more should note during lining cutting on ramp.Such lining trolley is mainly used in longspan tunnel and Cavity Construction.If adopt traditional type full-hydraulic lining trolley, then gantry design is difficult to meet instructions for use, causes door frame deformed damaged, is first door frame crossbeam torsional deformation, finally causes running mould.If increase crossbeam, strengthen vertical to lean on, lower longeron, end face bearing diagonal cross section, then cause unnecessary waste, and adopt netted lining trolley can overcome above difficulty.Because such lining trolley is large span construction, should consider its operability during design, its working stand and gangway should be able to conveniently arrive each operating position.
A kind of construction method of railway tunnel lining side wall concrete is disclosed in Chinese utility model patent application as a publication number CN 101586464A; it is characterized in that: first construct inverted arch and inverted arch inner concrete; then settle sleeper and lay lining trolley walking rail; then lining trolley is moved to and treat lining cutting place; template is connected on a termination of portal frame top and both sides hydraulic jack and jack; lining trolley two cheek board is adjusted to design attitude by the side hydraulic oil cylinder starting both sides; lock all side direction jack, fixation side is to template; Install both sides, tunnel short sidewall templates respectively, short sidewall template upper end and both sides arc formwork lower end being linked together with bolt forms template assembly, is contained in jack one termination on the abutment wall of ditch and short sidewall template one side is fitted together; Then build lining concrete, reach form removal after strength of mould stripping wait the lining concrete of building.
Above-mentioned patent has related to lining side wall concrete construction method, and this construction method decreases operation and reduction of erection time, saves construction cost, enhances tunnel lining abutment wall structure and presentation quality.Existing tunnel grouting device is all more single, and often just a Grouting Pipe carries out slip casting to lining side wall, when carrying out next station slip casting, needs Grouting Pipe to be towed forward or rearrange, and such speed of application is very slow, and efficiency is low.
Summary of the invention
The utility model is for above shortcoming, single based on solution existing tunnel lining cutting coagulation figure grouting device structure, the problem that speed of application is slow.Propose a kind of tunnel lining concrete grouting device, this grouting device adopts Modular Structure Design, can shunt the concrete of Grouting Pipe, main slurry pipe is driven to move ahead to only needing mobile part flow arrangement during different station slip casting, construction more accurately, is efficiently built, effective shortening construction period, cut the waste, save construction cost.
For realizing the purpose of this utility model, the technical solution adopted in the utility model is:
A kind of tunnel lining concrete grouting device, comprises lining trolley, it is characterized in that, be provided with equipment slots above described lining trolley, on the uniform cell wall being arranged on equipment slots both sides of junction block, be provided with track in described equipment slots; Part flow arrangement is installed in orbit, its inside is provided with the multiple way union being communicated with main slurry pipe, and described multiple way union is identical with junction block diameter, and when both connect, interface adopts clip sealing, also be connected with many logical filling adaptors outside described junction block, valve installation is on many logical filling adaptors.
Preferentially, be also provided with the threaded guide rod driving part flow arrangement to move around in orbit in described equipment slots, described threaded guide rod is by being arranged on the motor belt motor action rotating campaign of equipment slots end.Described motor is that PLC controls motor.
Preferentially, described equipment slots is arranged in the middle of lining trolley.
Preferentially, also comprise infrared transmitter and infrared remote receiver, described infrared transmitter is arranged on part flow arrangement, and infrared remote receiver is arranged on junction block side, and described infrared transmitter is identical with infrared remote receiver horizontal level.Described infrared transmitter quantity is 2, is arranged on part flow arrangement both sides, and infrared remote receiver quantity is equal to junction block quantity, is connected with signal transmission line between described infrared remote receiver and motor.
Compared with prior art, the utility model has the advantages that: tunnel can be divided into multiple slip casting unit by the utility model, drive main slurry pipe to move ahead by part flow arrangement and connect the junction block connection slip casting being in different slip casting unit, do not need to rearrange grouting pipeline, constructor can also control uninterrupted and the switch time of distribution pipe simultaneously, improve construction precision, shorten the engineering time, greatly reduce labour's work.
Accompanying drawing explanation
The following accompanying drawing by means of embodiment carries out brief description to the utility model now.In accompanying drawing:
Fig. 1 shows the schematic diagram of the utility model tunnel lining concrete grouting device;
Fig. 2 shows the structural representation of equipment slots;
Fig. 3 shows the structural representation of part flow arrangement;
Schematic diagram when Fig. 4 shows construction.
In figure: 1, main slurry pipe, 2, how logical filling adaptor, 3, valve, 4. pulley, 6, infrared transmitter, 7, infrared remote receiver, 8, clip, 9, part flow arrangement, 10, multiple way union, 11, junction block, 12, track, 13, threaded guide rod, 14, lining trolley, 16, equipment slots, 18, motor, 19, grouting port, 20, tunnel, 21, construction location.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in detail.Following examples will contribute to those skilled in the art and understand the utility model further, but not limit the utility model in any form.It should be pointed out that to those skilled in the art, without departing from the concept of the premise utility, some distortion and improvement can also be made.These all belong to protection domain of the present utility model.
Embodiment 1
As shown in the figure, a kind of tunnel lining concrete grouting device, comprises lining trolley 14, and described lining trolley 14 is provided with equipment slots 16 above, on the uniform cell wall being arranged on equipment slots 16 both sides of junction block 11, is provided with track 12 in described equipment slots 16; Equipment slots 16 is arranged in the middle of lining trolley 14, and its both sides are the construction location 21 of workman.
Part flow arrangement 9 is installed on the track 12, bottom has pulley 4 to contact track 12, its inside is provided with the multiple way union 10 being communicated with main slurry pipe 1, described multiple way union 10 is identical with junction block 11 diameter, when both connect, interface adopts clip 8 to seal, also be connected with many logical filling adaptors 2 outside described junction block 11, valve 3 is arranged on above many logical filling adaptors 2.
Also be provided with the threaded guide rod 13 driving part flow arrangement 9 to move around on the track 12 in equipment slots 16, described threaded guide rod 13 is with action rotating campaign by the motor 18 being arranged on equipment slots 16 end.Described motor 18 is PLC control motor.
In addition, also comprise infrared transmitter 6 and infrared remote receiver 7, described infrared transmitter 6 is arranged on part flow arrangement 9, and infrared remote receiver 7 is arranged on junction block 11 side, and described infrared transmitter 6 is identical with infrared remote receiver 7 horizontal level.Described infrared transmitter 6 quantity is 2, is arranged on part flow arrangement 9 both sides, and infrared remote receiver 7 quantity is equal to junction block 11 quantity, is connected with signal transmission line between described infrared remote receiver 7 and motor 18.
This tunnel lining concrete grouting device disclosed in the utility model, form of construction work is such, is driven into by lining trolley 14 in tunnel 20, and will lead to filling adaptor 2 more and be connected with grouting port 19, main slurry pipe 1 connects concrete slurry.Motor 18 drives threaded guide rod 13 to rotate, and part flow arrangement 9 is moved on the track 12, when infrared transmitter 6 is irradiated to infrared remote receiver 7, motor 18 stops automatically, now the interface of multiple way union 10 is aimed at junction block 11, and both are tightly connected by constructor by clip 8, starts slip casting.
In first module slip casting process, the how logical filling adaptor 2 that constructor starts to prepare next slip casting unit is connected with grouting port 19, after first module slip casting completes, take off clip 8, motor 18 drives part flow arrangement 9 to continue to move through infrared transmitter 6 on the track 12 and again locates, connect slip casting, by the above-mentioned steps that constantly circulates, do not need to rearrange grouting pipeline, constructor can also control uninterrupted and the switch time of distribution pipe simultaneously, improve construction precision, shorten the engineering time, greatly reduce labour's work.

Claims (6)

1. a tunnel lining concrete grouting device, comprise lining trolley (14), it is characterized in that, described lining trolley (14) is provided with equipment slots (16) above, on the uniform cell wall being arranged on equipment slots (16) both sides of junction block (11), track (12) is installed in described equipment slots (16); Part flow arrangement (9) is arranged on track (12), its inside is provided with the multiple way union (10) being communicated with main slurry pipe (1), described multiple way union (10) is identical with junction block (11) diameter, when both connect, interface adopts clip (8) sealing, described junction block (11) outside is also connected with many logical filling adaptors (2), and valve (3) is arranged on above many logical filling adaptors (2).
2. tunnel lining concrete grouting device according to claim 1, it is characterized in that, also be provided with the threaded guide rod (13) driving part flow arrangement (9) to move around on track (12) in described equipment slots (16), described threaded guide rod (13) is by being arranged on motor (18) the band action rotating campaign of equipment slots (16) end.
3. tunnel lining concrete grouting device according to claim 2, is characterized in that, described motor (18) is PLC control motor.
4. tunnel lining concrete grouting device according to claim 1, is characterized in that, described equipment slots (16) is arranged in the middle of lining trolley (14).
5. according to the tunnel lining concrete grouting device in claim 1-4 described in any one, it is characterized in that, also comprise infrared transmitter (6) and infrared remote receiver (7), described infrared transmitter (6) is arranged on part flow arrangement (9), infrared remote receiver (7) is arranged on junction block (11) side, and described infrared transmitter (6) is identical with infrared remote receiver (7) horizontal level.
6. tunnel lining concrete grouting device according to claim 5, it is characterized in that, described infrared transmitter (6) quantity is 2, be arranged on part flow arrangement (9) both sides, infrared remote receiver (7) quantity is equal to junction block (11) quantity, is connected with signal transmission line between described infrared remote receiver (7) and motor (18).
CN201420705490.0U 2014-11-23 2014-11-23 A kind of tunnel lining concrete grouting device Withdrawn - After Issue CN204267046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420705490.0U CN204267046U (en) 2014-11-23 2014-11-23 A kind of tunnel lining concrete grouting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420705490.0U CN204267046U (en) 2014-11-23 2014-11-23 A kind of tunnel lining concrete grouting device

Publications (1)

Publication Number Publication Date
CN204267046U true CN204267046U (en) 2015-04-15

Family

ID=52801918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420705490.0U Withdrawn - After Issue CN204267046U (en) 2014-11-23 2014-11-23 A kind of tunnel lining concrete grouting device

Country Status (1)

Country Link
CN (1) CN204267046U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564102A (en) * 2014-11-23 2015-04-29 史法战 Tunnel lining concrete grouting device
CN105736012A (en) * 2014-11-23 2016-07-06 史法战 Concrete grouting device for tunnel lining
CN107130982A (en) * 2017-06-30 2017-09-05 云南公投建设集团隧道工程有限公司 Large Longitudinal Slope two serves as a contrast concrete construction equipment and construction method
CN114320361A (en) * 2021-12-16 2022-04-12 中铁十局集团青岛工程有限公司 Lining mould-carrying grouting system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564102A (en) * 2014-11-23 2015-04-29 史法战 Tunnel lining concrete grouting device
CN105736012A (en) * 2014-11-23 2016-07-06 史法战 Concrete grouting device for tunnel lining
CN104564102B (en) * 2014-11-23 2016-08-17 北京通成达水务建设有限公司 A kind of tunnel lining concrete grouting device
CN107130982A (en) * 2017-06-30 2017-09-05 云南公投建设集团隧道工程有限公司 Large Longitudinal Slope two serves as a contrast concrete construction equipment and construction method
CN107130982B (en) * 2017-06-30 2019-05-10 云南公投建设集团隧道工程有限公司 Large longitudinal slope two serves as a contrast concrete construction equipment and construction method
CN114320361A (en) * 2021-12-16 2022-04-12 中铁十局集团青岛工程有限公司 Lining mould-carrying grouting system
CN114320361B (en) * 2021-12-16 2023-10-20 中铁十局集团青岛工程有限公司 Lining belt mould grouting system

Similar Documents

Publication Publication Date Title
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN103032078B (en) Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN103899335B (en) Synchronize tunneling operation system and the method for inverted arch synchronization lining
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN102345461B (en) Subsequent project and shield driving parallel construction method for long-distance railway tunnel
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN103032081B (en) Cross-river large-diameter slurry shield excavation and double-lining parallel construction method
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN104533450B (en) One-time-concreting construction method of inverted arch low wall of single-track tunnel
CN103470272A (en) Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN207567810U (en) A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation
CN110273695A (en) A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure
CN203809016U (en) Inverted arch lining trolley and synchronous tunnel operating system
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN205823300U (en) A kind of construction equipment of ditch cable trench in double track tunnel
CN102518010B (en) Combined device for laying and grouting ballastless track board
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN209194586U (en) A kind of underground pipe gallery removable support template
CN107060831A (en) One kind is used for tunnel groove constructing device
CN210151779U (en) Municipal administration utility tunnel hydraulic template platform truck
CN204552760U (en) Traveling type hydraulic formwork jumbo
CN202628118U (en) Formwork trolley for long and large box culvert
CN205955749U (en) Tunnel invert construction equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150415

Effective date of abandoning: 20160817

C25 Abandonment of patent right or utility model to avoid double patenting