CN106499180A - A kind of new exterior sheathing is reinforced and external scaffolding drawknot device and its construction method - Google Patents

A kind of new exterior sheathing is reinforced and external scaffolding drawknot device and its construction method Download PDF

Info

Publication number
CN106499180A
CN106499180A CN201611127682.8A CN201611127682A CN106499180A CN 106499180 A CN106499180 A CN 106499180A CN 201611127682 A CN201611127682 A CN 201611127682A CN 106499180 A CN106499180 A CN 106499180A
Authority
CN
China
Prior art keywords
drawknot
bar
rod bush
exterior sheathing
reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611127682.8A
Other languages
Chinese (zh)
Other versions
CN106499180B (en
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Ming Huang Science and Technology Ltd.
Original Assignee
Shaoxing Minghuang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Minghuang Building Materials Technology Co Ltd filed Critical Shaoxing Minghuang Building Materials Technology Co Ltd
Priority to CN201611127682.8A priority Critical patent/CN106499180B/en
Publication of CN106499180A publication Critical patent/CN106499180A/en
Application granted granted Critical
Publication of CN106499180B publication Critical patent/CN106499180B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Abstract

The present invention relates to a kind of new exterior sheathing is reinforced and external scaffolding drawknot device, including drawknot bar, the outside of the drawknot bar is provided with drawknot rod bush, and the drawknot rod bush is fixed by cruciform fastening for falsework, and the end of drawknot sleeve pipe is provided with mountain type fixture.The present invention is accurately controlled beam wall thickness, and construction quality is more preferable;It is convenient to mount and dismount, and most of material is reusable, cost is lower;After dismounting, metope is not boxed out hole and steel bar end, overall more attractive in appearance, and avoids the infiltration phenomenon that hole and steel bar end bring.

Description

A kind of new exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
Technical field
The present invention relates to a kind of new exterior sheathing is reinforced and external scaffolding drawknot device and its construction method, it is adaptable to build Beyond the region of objective existence side template strengthening and external scaffolding drawknot bar are fixed.
Background technology
The reinforcement means of building surrounding outboard template is almost iron wire nail or screw rod is fixed at present, and which has the disadvantage to reinforce Not enough firmly or complicated construction technique, and fixed beam wall thickness is unable to, construction quality is poor, and the construction of external scaffolding bolt bar is typically all It is to be separately provided to complete, relatively costly.It is therefore proposed that of the invention.
Content of the invention
For the above-mentioned technical problem of prior art, the invention provides a kind of new exterior sheathing is reinforced and external scaffolding draws Knot device and its construction method, which makes full use of outboard template drawknot bar as drawknot node, low cost and good fixing effect.
For reaching above-mentioned purpose, the present invention is achieved by the following technical solutions:
A kind of new exterior sheathing is reinforced and external scaffolding drawknot device, and including drawknot bar, the outside of the drawknot bar is provided with drawknot Rod bush, the drawknot rod bush are fixed by cruciform fastening for falsework, and the end of drawknot sleeve pipe is provided with mountain type fixture.
A kind of new exterior sheathing reinforcing and the construction method of external scaffolding drawknot device, comprise the following steps:
(1)Reinforcing bar is laid in floor template:Before beam reinforcing steel bars of wallboards is basically completed, in the relevant position for needing, by template The hole of certain diameter being got out, drawknot bar being penetrated in pattern hole by interior outward, the steel bar end of the inside one end withstands beam side form within the walls Plate, then hammers in following flat panel form in the iron plate hole with nail on drawknot bar, and the drawknot bar passed outside template coordinates Steel pipe or the lumps of wood, and reinforced by mountain type fixture and nut, then pour concrete;
(2)After the concrete curing phase, external mold and drawknot head are removed, beam metope pothole and drawknot boom end is reserved, is used outrigger Drawknot stem nut connects, and is inserted in mountain type fixture, and nut tightened up fixation, then with cruciform fastening for falsework by drawknot rod bush and out-mould scaffold Erect bar to buckle;
(3)When shelf is removed, cruciform fastening for falsework of the drawknot rod bush with outer foot flatrack vertical rod is removed, then nut is back-outed, torn open Except mountain type fixture and drawknot rod bush, then drawknot bar is back-outed.
The step(1)In hole a diameter of 16mm.
The new exterior sheathing reinforcing of the present invention and external scaffolding drawknot device and its construction method have the advantages that:
1st, the present invention is accurately controlled beam wall thickness, and construction quality is more preferable;
2nd, the present invention is convenient to mount and dismount, and most of material is reusable, and cost is lower;
3rd, after the present invention is removed, metope is not boxed out hole and steel bar end, overall more attractive in appearance, and avoids hole and steel bar end brings Infiltration phenomenon.
Description of the drawings
Fig. 1 is the schematic diagram of the drawknot bar connection full-page proof for pouring the front present invention;
Fig. 2 be pour terminate form removal after the present invention drawknot bar connect full-page proof schematic diagram;
Fig. 3 is the drawknot bar connection full-page proof of the present invention the schematic diagram being connected with external scaffolding;
Wherein, 1 be drawknot bar, 2 be drawknot rod bush, 3 be cruciform fastening for falsework, 4 be mountain type fixture, 5 be template, 6 be nail, 7 For external scaffolding vertical rod.
Specific embodiment
With reference to specific embodiment, the present invention is further illustrated, but protection scope of the present invention is not limited to This.
As Figure 1-3, new exterior sheathing of the invention is reinforced and external scaffolding drawknot device, including drawknot bar 1, drawknot The outside of bar 1 is provided with drawknot rod bush 2, and drawknot rod bush 2 is fixed by cruciform fastening for falsework 3, and the end of drawknot sleeve pipe 2 is provided with mountain Type fixture 4.
The new exterior sheathing reinforcing of the present invention and the construction method of external scaffolding drawknot device, comprise the following steps:
(1)Reinforcing bar is laid in floor template 5:Before beam reinforcing steel bars of wallboards is basically completed, in the relevant position for needing, by template 5 holes for getting out a diameter of 16mm, are penetrated drawknot bar 1 in pattern hole outward by interior, and the steel bar end of the inside one end withstands beam within the walls Side template, then hammers in following flat panel form 5 in the iron plate hole with nail 6 on drawknot bar 1, passes the drawing outside template 5 Knot bar 1 coordinates steel pipe or the lumps of wood, and is reinforced by mountain type fixture 4 and nut, then pours concrete;
(2)After the concrete curing phase, external mold and 1 chieftain of drawknot bar are removed, 1 end of beam metope pothole and drawknot bar is reserved, with outer 1 nut of frame drawknot bar connects, and is inserted in mountain type fixture 4, and nut tightened up fixation, then with cruciform fastening for falsework 3 by drawknot rod bush 2 and External scaffolding vertical rod 7 is buckled;
(3)When shelf is removed, cruciform fastening for falsework 3 of the drawknot rod bush 2 with outer foot flatrack vertical rod 7 is removed, then nut is back-outed, Mountain type fixture 4 and drawknot rod bush 2 is removed, then drawknot bar 1 is back-outed.
The present invention makes full use of the drawknot bar 1 of outboard template 5 as drawknot node, low cost and good fixing effect.
Above-described embodiment is only used for the inventive concept for illustrating the present invention, rather than the restriction to rights protection of the present invention, All changes for carrying out unsubstantiality using this design to the present invention, all should fall into protection scope of the present invention.

Claims (3)

1. a kind of new exterior sheathing is reinforced and external scaffolding drawknot device, it is characterised in that:Including drawknot bar, the drawknot bar Outside is provided with drawknot rod bush, and the drawknot rod bush is fixed by cruciform fastening for falsework, and the end of drawknot sleeve pipe is provided with mountain type admittedly Determine part.
2. a kind of new exterior sheathing reinforce and external scaffolding drawknot device construction method, it is characterised in that comprise the following steps:
(1)Reinforcing bar is laid in floor template:Before beam reinforcing steel bars of wallboards is basically completed, in the relevant position for needing, by template The hole of certain diameter being got out, drawknot bar being penetrated in pattern hole by interior outward, the steel bar end of the inside one end withstands beam side form within the walls Plate, then hammers in following flat panel form in the iron plate hole with nail on drawknot bar, and the drawknot bar passed outside template coordinates Steel pipe or the lumps of wood, and reinforced by mountain type fixture and nut, then pour concrete;
(2)After the concrete curing phase, external mold and drawknot head are removed, beam metope pothole and drawknot boom end is reserved, is used outrigger Drawknot stem nut connects, and is inserted in mountain type fixture, and nut tightened up fixation, then with cruciform fastening for falsework by drawknot rod bush and out-mould scaffold Erect bar to buckle;
(3)When shelf is removed, cruciform fastening for falsework of the drawknot rod bush with outer foot flatrack vertical rod is removed, then nut is back-outed, torn open Except mountain type fixture and drawknot rod bush, then drawknot bar is back-outed.
3. as claimed in claim 1 new exterior sheathing reinforce and external scaffolding drawknot device construction method, it is characterised in that:Institute State step(1)In hole a diameter of 16mm.
CN201611127682.8A 2016-12-09 2016-12-09 A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method Active CN106499180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611127682.8A CN106499180B (en) 2016-12-09 2016-12-09 A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611127682.8A CN106499180B (en) 2016-12-09 2016-12-09 A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method

Publications (2)

Publication Number Publication Date
CN106499180A true CN106499180A (en) 2017-03-15
CN106499180B CN106499180B (en) 2019-01-08

Family

ID=58330673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611127682.8A Active CN106499180B (en) 2016-12-09 2016-12-09 A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method

Country Status (1)

Country Link
CN (1) CN106499180B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942791A (en) * 2021-04-13 2021-06-11 北京天润建设有限公司 Small-space lifting scaffold and construction method
CN115506583A (en) * 2022-10-17 2022-12-23 中国建筑第八工程局有限公司 Embedded sleeve installation device in floor slab and embedded sleeve installation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3217369A1 (en) * 1982-05-08 1983-11-10 Helmut 7418 Metzingen Maier Screw anchor for scaffolds
CN201883673U (en) * 2010-12-15 2011-06-29 中建四局第六建筑工程有限公司 Scaffold engineering tool type wall connecting element
CN202658872U (en) * 2012-06-12 2013-01-09 中城建第六工程局集团有限公司 Tool connecting tube of building scaffold
CN103132690A (en) * 2013-03-13 2013-06-05 江苏南通三建集团有限公司 Basement exterior wall unilateral template and method for supporting template thereof
CN103437459A (en) * 2013-09-11 2013-12-11 中建新疆建工集团第五建筑工程有限公司 Through-wall opposite-pulling screw sleeve wall-connecting element
CN205777443U (en) * 2016-05-24 2016-12-07 中铁五局集团建筑工程有限责任公司 A kind of straight screw sleeve interconnection system rigid connecting tube

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3217369A1 (en) * 1982-05-08 1983-11-10 Helmut 7418 Metzingen Maier Screw anchor for scaffolds
CN201883673U (en) * 2010-12-15 2011-06-29 中建四局第六建筑工程有限公司 Scaffold engineering tool type wall connecting element
CN202658872U (en) * 2012-06-12 2013-01-09 中城建第六工程局集团有限公司 Tool connecting tube of building scaffold
CN103132690A (en) * 2013-03-13 2013-06-05 江苏南通三建集团有限公司 Basement exterior wall unilateral template and method for supporting template thereof
CN103437459A (en) * 2013-09-11 2013-12-11 中建新疆建工集团第五建筑工程有限公司 Through-wall opposite-pulling screw sleeve wall-connecting element
CN205777443U (en) * 2016-05-24 2016-12-07 中铁五局集团建筑工程有限责任公司 A kind of straight screw sleeve interconnection system rigid connecting tube

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942791A (en) * 2021-04-13 2021-06-11 北京天润建设有限公司 Small-space lifting scaffold and construction method
CN115506583A (en) * 2022-10-17 2022-12-23 中国建筑第八工程局有限公司 Embedded sleeve installation device in floor slab and embedded sleeve installation method

Also Published As

Publication number Publication date
CN106499180B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
CN206174146U (en) Assembly type structure's assembly node
CN104963431A (en) Corner structural column construction method
CN106320704A (en) Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN203856202U (en) Simple pullable sizing device of reserved holes
CN105155830A (en) Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN207228633U (en) Exempt from that template is cast-in-place to build the prefabricated connector of heat-insulating and decorating wall plug-in type
CN105256995B (en) A kind of shear wall structure movement joint inner side template bracing means and construction method
CN106351245A (en) Tower crane foundation base and construction method thereof
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN203891462U (en) Form erecting device for fair-faced concrete independent columns
CN201190408Y (en) Tool type exterior scaffolding of section steel fastening tube
CN107023154A (en) A kind of new builder's jack component and its construction method
CN210685393U (en) Eave cantilever concrete structure formwork support
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN208380049U (en) The dismountable triangle sets mould assembly steel overhanging support of Overhanging Outside Scaffold
CN207160217U (en) Building frame construction provided with side bar
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN110485742A (en) A kind of positioning device and construction method of the pre-buried pedestal anchor bolt in isolated footing
CN207686280U (en) A kind of aluminum alloy mould plate early dismantling head device that assortable full hall scaffold uses
CN106320662B (en) Decorating outer wall of building ultra-wide concrete wire construction method
CN211447283U (en) Connecting beam of main building and skirt house
CN205369874U (en) Elevartor shaft outer wall cantilever frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 312000 Dashan Village, Anchang Town, Keqiao District, Shaoxing City, Zhejiang Province

Patentee after: Shaoxing Ming Huang Science and Technology Ltd.

Address before: 312000 Dashan Village, Anchang Town, Keqiao District, Shaoxing City, Zhejiang Province

Patentee before: SHAOXING MINGHUANG BUILDING MATERIAL TECHNOLOGY Co.,Ltd.