CN107023154A - A kind of new builder's jack component and its construction method - Google Patents

A kind of new builder's jack component and its construction method Download PDF

Info

Publication number
CN107023154A
CN107023154A CN201710311061.3A CN201710311061A CN107023154A CN 107023154 A CN107023154 A CN 107023154A CN 201710311061 A CN201710311061 A CN 201710311061A CN 107023154 A CN107023154 A CN 107023154A
Authority
CN
China
Prior art keywords
brace
sleeve pipe
steel
jack component
suspension scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710311061.3A
Other languages
Chinese (zh)
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Minghuang Building Materials Technology Co Ltd
Original Assignee
Shaoxing Minghuang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Minghuang Building Materials Technology Co Ltd filed Critical Shaoxing Minghuang Building Materials Technology Co Ltd
Priority to CN201710311061.3A priority Critical patent/CN107023154A/en
Publication of CN107023154A publication Critical patent/CN107023154A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of new builder's jack component, including I-steel suspension scaffold, I-steel suspension scaffold is connected by U-shaped anchor ear with floor plates, and oblique pull bar assembly is connected with I-steel suspension scaffold, oblique pull bar assembly includes brace, the end of brace, which is provided with coarse-pitch thread, coarse-pitch thread, is embedded with sleeve pipe, and sleeve pipe is provided with adjusting nut.The present invention has the advantages that material is saved, part is few, security is greatly improved using overall brace adjustment length, and perforate connection technique on steel I-beam.

Description

A kind of new builder's jack component and its construction method
Technical field
The present invention relates to a kind of new builder's jack component and its construction method, it is adaptable to high-rise external scaffolding Erection construction.
Background technology
At present, outer outrigger scaffold all uses the method that girder steel is encorbelmented, and its shortcoming is:Brace is made using steel bar welding nut Carry out adjustment length into the gaily decorated basket, the connector existed when welding does not meet specification in potential safety hazard, and girder steel is also deposited using welding In potential safety hazard.It is therefore proposed that of the invention.
The content of the invention
For the above-mentioned technical problem of prior art, it is an object of the invention to provide a kind of new builder's jack framework and Its construction method, using overall brace adjustment length, and perforate connection technique on steel I-beam, with material saving, part Less, the advantages of security is greatly improved.
To reach above-mentioned purpose, the present invention is achieved by the following technical solutions:
A kind of new builder's jack component, including I-steel suspension scaffold, the I-steel suspension scaffold pass through U-shaped anchor ear and floor Plate is connected, and oblique pull bar assembly is connected with I-steel suspension scaffold, and the oblique pull bar assembly includes brace, the brace End, which is provided with coarse-pitch thread, the coarse-pitch thread, is embedded with sleeve pipe, and described sleeve pipe is provided with adjusting nut.
Described I-steel suspension scaffold is coupled by bolt with brace.
Described floor plates are provided with plastic feet, and the bottom of described U-shaped anchor ear is located on plastic feet, U-shaped anchor ear End through floor plates and being fixed by iron plate.
A kind of construction method of new builder's jack component, comprises the following steps:
(1)Brace and the position of sleeve pipe and absolute altitude are determined in last layer formwork;
(2)With hole making drill perforate in the template on the outside of the beam propped up;
(3)Its lower end exposes outside template, and application adhesive tape suitable for reading wraps screw rod with sleeve pipe, and is fixed on effective tied silk is covered On reinforcing bar, brace staggers with vertical rod;
(4)By in brace threading, and fixed lower end I-shaped steel fastener, then fixed top lock washer and nut, it is allowed to Brace is tightened up, and adjusts I-steel height of encorbelmenting, last double nut is fixed.
The new builder's jack component is progressively removed when removing by reverse-order.
The new builder's jack component and its construction method of the present invention has the advantages that:1st, oblique pull rod unit is more Less, it is safer firm;
2nd, material is saved, and saves a large amount of artificial and material costs;
3rd, adjustment length is simpler, pre-buried more simple and convenient;
4th, slotted on steel I-beam punching connecting mode is more scientific, more material saving.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 for the present invention in U-shaped anchor ear structural representation;
Wherein, 1 it is I-steel suspension scaffold, 2 be U-shaped anchor ear, 3 be floor plates, 4 be brace, 5 be coarse-pitch thread, 6 be sleeve pipe, 7 is Adjusting nut, 8 be bolt, 9 be plastic feet, 10 be iron plate.
Embodiment
With reference to specific embodiment, the present invention is further illustrated, but protection scope of the present invention is not limited to This.
As illustrated in fig. 1 and 2, new builder's jack component of the invention, including I-steel suspension scaffold 1, I-steel is encorbelmented Frame 1 is connected by U-shaped anchor ear 2 with floor plates 3, and floor plates 3 are provided with plastic feet 9, and the bottom of U-shaped anchor ear 2 is located at plastic bottom On seat 9, the end of U-shaped anchor ear 2 is fixed through floor plates 3 and by iron plate 10.
Oblique pull bar assembly is connected with I-steel suspension scaffold 1, oblique pull bar assembly includes brace 4, and I-steel suspension scaffold 1 leads to Cross bolt 8 with brace 4 to couple, the end of brace 4 is provided with to be embedded with sleeve pipe 6, sleeve pipe 6 on coarse-pitch thread 5, coarse-pitch thread 5 and set There is adjusting nut 7.
The construction method of the new builder's jack component of the present invention, comprises the following steps:
(1)Brace 4 and the position of sleeve pipe 6 and absolute altitude are determined in last layer formwork;
(2)With hole making drill perforate in the template on the outside of the beam propped up, perforate should not be excessive, should can be passed through i.e. with sleeve pipe 6 Can;
(3)The lower end of sleeve pipe 6 is exposed outside template, and mortar leakage prevention is entered, and application adhesive tape suitable for reading wraps screw rod with sleeve pipe 6, prevents Grouting, and sleeve pipe 6 is fixed on reinforcing bar with tied silk, brace 4 staggers with vertical rod;After concreting, in time by brace 4 Extract out, conveniently tear outboard template open;
(4)By in the threading 6 of brace 4, and fixed lower end I-shaped steel fastener, then fixed top lock washer and nut, make Tighten up brace 4, and adjust the height of I-steel suspension scaffold 1, last double nut is fixed.Progressively torn open by reverse-order during dismounting Remove.
The present invention is using overall brace adjustment length, and perforate connection technique on steel I-beam, with material saving, portion The advantages of part is few, security is greatly improved.
Above-described embodiment is only used for illustrating the inventive concept of the present invention, rather than the restriction to rights protection of the present invention, All changes for carrying out unsubstantiality to the present invention using this design, all should fall into protection scope of the present invention.

Claims (5)

1. a kind of new builder's jack component, it is characterised in that:Including I-steel suspension scaffold, the I-steel suspension scaffold passes through U-shaped anchor ear is connected with floor plates, and oblique pull bar assembly is connected with I-steel suspension scaffold, and the oblique pull bar assembly includes oblique pull Bar, the end of the brace, which is provided with coarse-pitch thread, the coarse-pitch thread, is embedded with sleeve pipe, and described sleeve pipe is provided with adjusting nut.
2. new builder's jack component as claimed in claim 1, it is characterised in that:Described I-steel suspension scaffold passes through spiral shell Bolt couples with brace.
3. new builder's jack component as claimed in claim 1, it is characterised in that:Described floor plates are provided with plastic bottom Seat, the bottom of described U-shaped anchor ear is located on plastic feet, and the end of U-shaped anchor ear is fixed through floor plates and by iron plate.
4. a kind of construction method of new builder's jack component, it is characterised in that comprise the following steps:
(1)Brace and the position of sleeve pipe and absolute altitude are determined in last layer formwork;
(2)With hole making drill perforate in the template on the outside of the beam propped up;
(3)Its lower end exposes outside template, and application adhesive tape suitable for reading wraps screw rod with sleeve pipe, and is fixed on effective tied silk is covered On reinforcing bar, brace staggers with vertical rod;
(4)By in brace threading, and fixed lower end I-shaped steel fastener, then fixed top lock washer and nut, it is allowed to Brace is tightened up, and adjusts I-steel height of encorbelmenting, last double nut is fixed.
5. the construction method of new builder's jack component as claimed in claim 4, it is characterised in that:The novel suspended is carried load or luggage hand Frame member is progressively removed when removing by reverse-order.
CN201710311061.3A 2017-05-05 2017-05-05 A kind of new builder's jack component and its construction method Pending CN107023154A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710311061.3A CN107023154A (en) 2017-05-05 2017-05-05 A kind of new builder's jack component and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710311061.3A CN107023154A (en) 2017-05-05 2017-05-05 A kind of new builder's jack component and its construction method

Publications (1)

Publication Number Publication Date
CN107023154A true CN107023154A (en) 2017-08-08

Family

ID=59528353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710311061.3A Pending CN107023154A (en) 2017-05-05 2017-05-05 A kind of new builder's jack component and its construction method

Country Status (1)

Country Link
CN (1) CN107023154A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700817A (en) * 2017-09-25 2018-02-16 永升建设集团有限公司 The construction method of overhanging type scaffold
CN107842192A (en) * 2017-11-23 2018-03-27 安徽同济建设集团有限责任公司 A kind of making of the outer builder's jack closed cover of architectural engineering and installation method
CN114000695A (en) * 2021-10-18 2022-02-01 西安安德固模架工程有限公司 Scaffold for supporting multilayer concrete structure and mounting method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203977839U (en) * 2014-06-11 2014-12-03 绍兴县明煌建材科技有限公司 The pre-buried wire rope drag hook component of a kind of outer outrigger scaffold
WO2014192564A1 (en) * 2013-05-28 2014-12-04 株式会社トータル環境 High-rise building and maintenance method therefor
CN105507573A (en) * 2015-12-01 2016-04-20 江苏省华建建设股份有限公司 Method for mounting external cantilever scaffolds made of shape steel
CN105735630A (en) * 2016-02-19 2016-07-06 江苏华海钢结构有限公司 Fixing method for steel beam
CN205444870U (en) * 2015-12-29 2016-08-10 福建省永泰建筑工程公司 Special fixed knot of suspension type construction trolley constructs
CN206815795U (en) * 2017-05-05 2017-12-29 绍兴明煌建材科技有限公司 A kind of new builder's jack component

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014192564A1 (en) * 2013-05-28 2014-12-04 株式会社トータル環境 High-rise building and maintenance method therefor
CN203977839U (en) * 2014-06-11 2014-12-03 绍兴县明煌建材科技有限公司 The pre-buried wire rope drag hook component of a kind of outer outrigger scaffold
CN105507573A (en) * 2015-12-01 2016-04-20 江苏省华建建设股份有限公司 Method for mounting external cantilever scaffolds made of shape steel
CN205444870U (en) * 2015-12-29 2016-08-10 福建省永泰建筑工程公司 Special fixed knot of suspension type construction trolley constructs
CN105735630A (en) * 2016-02-19 2016-07-06 江苏华海钢结构有限公司 Fixing method for steel beam
CN206815795U (en) * 2017-05-05 2017-12-29 绍兴明煌建材科技有限公司 A kind of new builder's jack component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700817A (en) * 2017-09-25 2018-02-16 永升建设集团有限公司 The construction method of overhanging type scaffold
CN107842192A (en) * 2017-11-23 2018-03-27 安徽同济建设集团有限责任公司 A kind of making of the outer builder's jack closed cover of architectural engineering and installation method
CN114000695A (en) * 2021-10-18 2022-02-01 西安安德固模架工程有限公司 Scaffold for supporting multilayer concrete structure and mounting method thereof

Similar Documents

Publication Publication Date Title
CN107190866B (en) A kind of construction method of assembled architecture overhanging outrigger anchor hoop
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN106013774B (en) A kind of sliding formwork flexibility platform device for being suitble to dispatch
CN107023154A (en) A kind of new builder's jack component and its construction method
CN205036072U (en) A shaped steel formwork support that encorbelments for high altitude structure of encorbelmenting
CN102900021A (en) Split mounting type bridge wet joint construction method
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN206530050U (en) A kind of super large reserved opening hanging mould structure
CN106429883A (en) Tower crane foundation used for bridge construction
CN106351245A (en) Tower crane foundation base and construction method thereof
CN206815795U (en) A kind of new builder's jack component
CN103510466B (en) Wet joint construction method for T-shaped beam bridge deck system
CN216196612U (en) Support structure of cantilever scaffold and support system of cantilever scaffold
CN208309396U (en) A kind of bridge pier column overturn-preventing operation platform
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN207211389U (en) A kind of assembled architecture is encorbelmented outrigger anchor hoop
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN209244242U (en) A kind of fixed device of half tool-type U-bolt of the shaped steel suspension scaffolding
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN206753017U (en) A kind of pull-back cable Superimposed fastener
CN207268072U (en) A kind of overhanging type type steel scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170808

RJ01 Rejection of invention patent application after publication