CN205976447U CN201620907446.7U CN201620907446U CN205976447U CN 205976447 U CN205976447 U CN 205976447U CN 201620907446 U CN201620907446 U CN 201620907446U CN 205976447 U CN205976447 U CN 205976447U
Authority
CN
China
Prior art keywords
scaffold
type
screw sleeve
component
straight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620907446.7U
Other languages
Chinese (zh)
Inventor
刘志荣
许家宝
仲永胜
吴先锋
王志强
宋俊
陈江
聂磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Anjian investment and Construction Co.,Ltd.
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Water Resources Development Co Ltd filed Critical Anhui Water Resources Development Co Ltd
Priority to CN201620907446.7U priority Critical patent/CN205976447U/en
Application granted granted Critical
Publication of CN205976447U publication Critical patent/CN205976447U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a scaffold frame of connecting with straight screw sleeve links wall spare, including the pre -buried component of L type, straight screw sleeve, link up screw rod and scaffold cross rod, the pre -buried component one end of L type is pre -buried in concrete member, the other end stretches out outside the concrete member, link up the screw rod through straight screw sleeve and the pre -buried structrual joint of L type, the other end that links up the screw rod has two positioning double -screw bolt, scaffold cross rod's one end has two positioning hole, positioning double -screw bolt wears out from positioning hole, and it is fixed with nut and gasket, it is fixed with the pole setting of scaffold frame that scaffold cross rod passes through the fastener. The utility model discloses a scaffold frame even wall spare puts up horizontal pole and the pre -buried structrual joint of L type through straight screw sleeve with scaffold, and the pre -buried component of L type is not demolishd when demolising, demolishs the back and only leaves less hole in concrete member, need not independent shutoff, has avoided outer wall infiltration hidden danger, has simplified the construction process, shortens the engineering time, practices thrift construction cost, has still improved the security and the reliability of scaffold frame.

Description

A kind of scaffold wall connecting piece with straight screw sleeve connection
Technical field
This utility model belongs to building field, specifically a kind of scaffold wall connecting piece with straight screw sleeve connection.
Background technology
Develop rapidly with national market economy, urban construction is on the middle and senior level, high-rise building is increasing, and architectural engineering is applied During work, console model scaffold, overhanging scaffold are applied on a large scale, and its economic input, human input, Technical investment are all Greatly increase.Traditional multiplex embedded steel tube of scaffold wall connecting piece way in building concrete component, then with steel pipe, fastener Embedded steel tube and scaffold upright rod are connected, reaches the effect connecting whole support body, this connection must be in exterior wall indwelling foot handss Eye;It is particularly easy to wall-connecting piece fastener is come loose or removed to cause serious potential safety hazard in construction stage workman;Scaffold is torn open Except when in advance first reinforce wall-connecting piece in window hole, then could remove wall-connecting piece;After dismounting, pre-buried steel pipe will slice off, Ran Houzai Tamped with pea gravel concreten plus extender, being finally layered floating foot trick with waterproof cement mortar makes it not seep water.This even wall Part not only wastes steel pipe, and operation is again complicated, and the treatment process of especially foot trick is especially complex, is also easy to leave lower infiltration hidden Suffer from.
Utility model content
The technical problems to be solved in the utility model is the defect overcoming prior art, provides one kind straight screw sleeve even The scaffold wall connecting piece connecing, scaffold cross bar is connected with L-type preburied component by this scaffold wall connecting piece by straight screw sleeve, tears open Except when L-type preburied component do not remove, be left in concrete component, after dismounting, only leave less hole in concrete component, It is compacted with concrete when doing next procedure floating, simplify scaffold and be installed on dismounting operation, shorten the engineering time, section About construction cost, also improves the safety and reliability of scaffold.
For solving above-mentioned technical problem, this utility model be employed technical scheme comprise that offer one kind straight screw sleeve even The scaffold wall connecting piece connecing, including L-type preburied component, straight screw sleeve, linking screw rod and scaffold cross bar, described L-type is pre- Bury component one end to be embedded in advance in building concrete component, the other end stretches out outside building concrete component, described linking screw rod L-type preburied component end is connected to by straight screw sleeve, one end that linking screw rod is not connected with L-type preburied component has two Positioning stud, one end of scaffold cross bar has two positioning through hole, and linking screw rod and scaffold cross bar are socketed, described positioning Stud passes from positioning through hole, and is fixed with nut and pad, and described scaffold cross bar passes through fastener and scaffold upright rod Fixing.
For the sake of simple declaration problem, below to the scaffold connecting with straight screw sleeve connection described in the utility model Part is all referred to as this wall-connecting piece.
The mounting means of this wall-connecting piece is integral built-in after first assembling, first uses L-type preburied component and linking screw rod straight Screw shell connects, then will be connected screw rod and scaffold cross bar assembling, and then integral built-in enters in building concrete component, Afterwards scaffold cross bar is buckled with scaffold upright rod, carry out concrete pouring construction, construction is removed with specific purpose tool, only after terminating Stay L-type preburied component in concrete component, between the end of L-type preburied component and concrete component, there is annular circular hole, In subsequent construction, filling is floating.
One end that described L-type preburied component stretches out building concrete component is provided with the first external screw thread, described linking screw rod One end end close with described L-type preburied component is provided with and first external screw thread identical the second external screw thread, described straight thread set Cylinder inwall is provided with the first female thread matching with the first external screw thread and the second external screw thread, described L-type preburied component, linking screw rod It is fixedly connected by threaded the reaching between straight screw sleeve.Thus, by straight screw sleeve be connected screw rod and L-type is pre- Bury component using threaded, be completely embedded firm, easy to disassemble.
Scaffold wall connecting piece with straight screw sleeve connection of the present utility model has production and processing industrialization, process for installing and detachingk Simply, the low advantage of cost loss;It is connected with L-type preburied component with straight screw sleeve, installation and removal are required for using special Pipe wrench, both can prevent workman from arbitrarily dismantling, and shorten the set-up time again, and safe, firm, increased the overall reliability of scaffold Property;Make full use of wall-connecting piece to be unlikely to deform, repeat the characteristics such as the number of turnover is many, effectively reduce construction cost;Do not need To foot trick special handling after wall-connecting piece dismounting, only when next procedure is constructed, hole need to be compacted floating, eliminate foot handss Eye infiltration hidden danger, solves the problems, such as that high level faces side security protection.
Brief description
Fig. 1 is the use state figure of the scaffold wall connecting piece that this utility model straight screw sleeve connects.
Fig. 2 is another kind of use state figure of the scaffold wall connecting piece that this utility model straight screw sleeve connects.
Specific embodiment
In order to be more clearly understood that this utility model, with reference to the accompanying drawings and detailed description to this utility model It is described further.
The scaffold wall connecting piece being connected with straight screw sleeve, as shown in figure 1, include L-type preburied component 1, straight screw sleeve 2nd, linking screw rod 3 and scaffold cross bar 6, described L-type preburied component 1 one end is embedded in building concrete component M in advance, another End is stretched out outside building concrete component M, and one end that L-type preburied component 1 stretches out building concrete component M is provided with the first outer spiral shell Stricture of vagina, the linking screw rod 3 one end end close with described L-type preburied component 1 is provided with and first external screw thread identical the second external screw thread, Straight screw sleeve 2 inwall is provided with the first female thread matching with the first external screw thread and the second external screw thread, described L-type preburied component 1 is fixedly connected by threaded the reaching between straight screw sleeve 2 with linking screw rod 3.The linking screw rod 3 not pre-buried structure with L-type One end that part 1 connects has two positioning studs 31, and one end of scaffold cross bar 6 has two positioning through hole, is connected 3 sets of screw rod Enter in scaffold cross bar 6, described positioning stud 31 passes from positioning through hole, and fixing with nut 4 and pad 5, described It is fixing with scaffold upright rod 8 that scaffold cross bar 6 passes through fastener 7.
The present embodiment with the construction method of scaffold wall connecting piece that straight screw sleeve connects be:
1st, scaffold cross bar 6, linking screw rod 3 and L-type preburied component 1 are connected firmly with straight screw sleeve 2;
2nd, determine position and the quantity of wall-connecting piece installation according to arrangement and method for construction with regard to the pre-buried requirement of wall-connecting piece, mark at the scene Note installation site;
3rd, before floor concreting, L-type preburied component 1 one end is vertically embedded in beam upper end specified location outside beam Side 100mm;Scaffold cross bar 6 is connected firmly with fastener 7 with scaffold upright rod 8;
4th, after every layer of wall-connecting piece installation, installation site and quantity are carried out verification check and accept, errorless after pour coagulation again Soil;
5th, when scaffold is removed, wall-connecting piece presses specification orderly release in company with scaffold cross bar 6 etc., arranges special messenger during dismounting Removed using specific purpose tool, note during dismounting handling with care, concentrate and stack to be used in turn (when L-type preburied component 1 is removed not Give dismounting, stay in concrete component);
6th, after scaffold is removed, next procedure starts to construct, and only need to be compacted with exterior wall putty for the hole that wall-connecting piece stays Floating.
Compared with traditional scaffold wall connecting piece, the scaffold wall connecting piece letter with straight screw sleeve connection of the present utility model Change working procedure, improve working performance, accelerating construction progress, improve the reliability of scaffold wall connecting piece.This connects simultaneously Wall part also can repeatedly be used in turn, and reduces construction cost, decreases the multiple working procedure processing foot trick, remarkable in economical benefits.
Using the speed of application of the scaffold wall connecting piece with straight screw sleeve connection of the present utility model is fast, efficiency high, can Significantly improve the stability of scaffold, easy to operation, and do not need indwelling foot trick due to during construction, disappear from basic Except the infiltration hidden danger of foot trick, using the engineering of the scaffold wall connecting piece with straight screw sleeve connection of the present utility model construction There is not any infiltration accident causing because of foot trick indwelling after completion.
In practice of construction, due to local have moulding or on turn over beam N etc., L-type preburied component 1 suitably can be lengthened, As shown in Figure 2.
The above, be only specific embodiment of the present utility model, be not limitation of the utility model, this area Technical staff in the case of without departing from this utility model Technology design principle, the change made using above-mentioned technology contents or repair Decorations are regarded as belonging to protection domain of the present utility model.

Claims (2)

1. with straight screw sleeve connect scaffold wall connecting piece it is characterised in that:Including L-type preburied component, straight screw sleeve, rank Connect screw rod and scaffold cross bar, described L-type preburied component one end is embedded in building concrete component in advance, and the other end stretches out to be built Build outside thing concrete component, described linking screw rod passes through straight screw sleeve and is connected to L-type preburied component end, be connected screw rod not with One end that L-type preburied component connects has two positioning studs, and one end of scaffold cross bar has two positioning through hole, is connected spiral shell Bar and scaffold cross bar are socketed, and described positioning stud passes from positioning through hole, and is fixed with nut and pad, described foot Hand cradle cross bar is fixed with scaffold upright rod by fastener.
2. the scaffold wall connecting piece with straight screw sleeve connection according to claim 1 it is characterised in that:Described L-type is pre- Bury component and stretch out one end of building concrete component and be provided with the first external screw thread, described linking screw rod and described L-type preburied component Close one end end is provided with and first external screw thread identical the second external screw thread, described straight screw sleeve inwall be provided with first outside The first female thread that screw thread and the second external screw thread match, between described L-type preburied component, linking screw rod are by straight screw sleeve Threaded reaching be fixedly connected.
CN201620907446.7U 2016-08-20 2016-08-20 Scaffold frame of connecting with straight screw sleeve links wall spare Active CN205976447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620907446.7U CN205976447U (en) 2016-08-20 2016-08-20 Scaffold frame of connecting with straight screw sleeve links wall spare

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620907446.7U CN205976447U (en) 2016-08-20 2016-08-20 Scaffold frame of connecting with straight screw sleeve links wall spare

Publications (1)

Publication Number Publication Date
CN205976447U true CN205976447U (en) 2017-02-22

Family

ID=58032498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620907446.7U Active CN205976447U (en) 2016-08-20 2016-08-20 Scaffold frame of connecting with straight screw sleeve links wall spare

Country Status (1)

Country Link
CN (1) CN205976447U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952775A (en) * 2017-02-27 2017-07-14 平高集团有限公司 A kind of rod assembly and the breaker using the rod assembly
CN109779238A (en) * 2019-03-13 2019-05-21 中国十七冶集团有限公司 A kind of multi-storey residential buildings outer scaffold wall connector
CN111794494A (en) * 2020-08-14 2020-10-20 中国建筑第七工程局有限公司 External scaffold wall connecting piece for full cast-in-place concrete outer wall and using method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952775A (en) * 2017-02-27 2017-07-14 平高集团有限公司 A kind of rod assembly and the breaker using the rod assembly
CN109779238A (en) * 2019-03-13 2019-05-21 中国十七冶集团有限公司 A kind of multi-storey residential buildings outer scaffold wall connector
CN109779238B (en) * 2019-03-13 2020-04-17 中国十七冶集团有限公司 Outer scaffold wall connecting piece for multi-storey residential building
CN111794494A (en) * 2020-08-14 2020-10-20 中国建筑第七工程局有限公司 External scaffold wall connecting piece for full cast-in-place concrete outer wall and using method

Similar Documents

Publication Publication Date Title
CN105926669B (en) A kind of Construction Method of Metro Station
CN106088337B (en) Large cantilever steel frame structure with pull rod and construction method thereof
CN201416148Y (en) Symmetrical anchoring rope pull rod shuttering for oblique post
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN106150060A (en) Based on assembled wall-connecting piece exterior wall scaffold system and construction method
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN204753628U (en) Guider that hangs down is transferred to contrary way of doing things steel -pipe column that can have enough to meet need
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN105714678B (en) A kind of combined type gravity anchorage
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN104131700A (en) Method and formwork for pouring door and window cast-in-place beam
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN103510466B (en) Wet joint construction method for T-shaped beam bridge deck system
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN206016230U (en) It is based on assembled wall-connecting piece exterior wall scaffold system
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN202509764U (en) Template bracing structure for constructional column
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN107023154A (en) A kind of new builder's jack component and its construction method
CN207143746U (en) Support beam template system under concrete support trestle plate
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN207130880U (en) A kind of assembled for steel building is threadedly coupled Rod Bracing node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190625

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co., Ltd.

Address before: 233010 South of Zhanggongshan Road, Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210421

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee after: Anhui Water Resources Development Co.,Ltd.

Patentee after: Shaanxi Anjian investment and Construction Co.,Ltd.

Address before: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Patentee before: Anhui Water Resources Development Co.,Ltd.

TR01 Transfer of patent right