CN105507573A - Method for mounting external cantilever scaffolds made of shape steel - Google Patents

Method for mounting external cantilever scaffolds made of shape steel Download PDF

Info

Publication number
CN105507573A
CN105507573A CN201510866482.3A CN201510866482A CN105507573A CN 105507573 A CN105507573 A CN 105507573A CN 201510866482 A CN201510866482 A CN 201510866482A CN 105507573 A CN105507573 A CN 105507573A
Authority
CN
China
Prior art keywords
shaped steel
hole
mounting method
iron plate
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510866482.3A
Other languages
Chinese (zh)
Other versions
CN105507573B (en
Inventor
周学军
王维才
徐平
陈荣
庞一鸣
吕志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN201510866482.3A priority Critical patent/CN105507573B/en
Publication of CN105507573A publication Critical patent/CN105507573A/en
Application granted granted Critical
Publication of CN105507573B publication Critical patent/CN105507573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention provides a method for mounting external cantilever scaffolds made of shape steel. The method includes providing detachable compression rings; providing detachable hang rings; embedding the compression rings, then mounting and positioning cantilever beams made of shape steel, fastening fixed ends of the cantilever beams by the aid of the compression rings, penetrating the hang rings by steel wire ropes and then fastening cantilever ends of the cantilever beams made of the shape steel. The method has the advantages that the method is simple; the compression rings and the hang rings can be reused after being detached, and accordingly the method is favorable for protecting environments.

Description

The mounting method of shaped steel Overhanging Outside Scaffold
Technical field
The present invention relates to a kind of mounting method of shaped steel Overhanging Outside Scaffold.
Background technology
Shaped steel Overhanging Outside Scaffold has obtained general application at present in high level and Super High engineering construction, and its form of structure generally has the various ways such as beam type, cable-stayed type, diagonal-bracing type and combined type.Existing shaped steel Overhanging Outside Scaffold is when installation, the U-shaped ring built-in fitting of the HPB235 level reinforcement fabrication of usual employing twice φ 16 ~ φ 18, carry out anchoring (being arranged on the bottom of concrete slab principal rod) with structural slab, namely pre-buried a large amount of reinforcing bar does the fixed end that pressure ring is used for fixing shaped steel Cantilever Beams.Shaped steel Cantilever Beams outer end arranges wire rope and last layer building structure oblique pull and is fastenedly connected, and sockets end need bury a large amount of reinforcing bars in advance and make suspension ring at building.Aforementioned pressure ring and suspension ring are single use, and install and dismounting all inconveniences, also easily cause seepage if dealt with improperly.
China Patent Publication No. is that the application for a patent for invention of CN2013129552 discloses a kind of reinforcing bar cable-stayed type the shaped steel suspension scaffolding, when type steel support place floor concreting by embedded part A, embedded part B is embedded in floor, then section steel suspended is installed to type steel support place floor, one end and embedded part A, embedded part B(and pressure ring) be welded and fixed.By oblique pull reinforcing bar one end and upper strata embedded bar head (i.e. suspension ring) sleeve connection, under other end insert type girder steel in double angle preformed hole, fix with sleeve, suitably increase pretightning force, thus complete the installation of shaped steel Overhanging Outside Scaffold.In this technology, there is following defect in the installation of shaped steel Overhanging Outside Scaffold: the reinforcing bar of suspension ring and pressure ring all needs pre-buried, after to be onstructed, need these reinforcing bars to dismantle, deal with the seepage that can cause exterior wall improperly.Further, the reinforcing bar disassembled cannot utilize again, can only abandon, both add cost, also be unfavorable for environmental protection.
Therefore, the mounting method of the shaped steel Overhanging Outside Scaffold designing a kind of improvement is necessary.
Summary of the invention
The invention provides the simple environmentally friendly shaped steel Overhanging Outside Scaffold mounting method of a kind of method.
For achieving the above object, the mounting method of shaped steel Overhanging Outside Scaffold of the present invention comprises: provide pressure ring, and pressure ring comprises the adjustable base of more than two, each adjustable base is fixed with a screw rod; Pressure ring also comprises pressing plate, and pressing plate is provided with at least one first circular hole and at least one adjustable waist-shaped hole of coordinating with screw rod, and wherein a screw rod is through the first circular hole, and another root screw rod is through adjustable waist-shaped hole; There is provided suspension ring, suspension ring comprise iron plate, are fixed on the connecting reinforcement in iron plate centre position; Also comprise symmetrical a pair through hole being arranged on connecting reinforcement both sides; Sleeve pipe highly a little more than slab thickness is packed into screw rod; Adjustable base is pre-buried; Water after smashing floor concrete, shaped steel Cantilever Beams is installed and locates; Circular hole on pressing plate and adjustable waist-shaped hole are packed into the screw rod being arranged in shaped steel Cantilever Beams both sides respectively and fastening; Sleeve pipe is imbedded in the concrete structured beam of last layer with low inside and high outside state; Oblique pull wire rope is penetrated from sleeve pipe lower entrance, and successively through after a pair through hole of suspension ring, again returns from the eminence entrance of sleeve pipe; By two of oblique pull wire rope vertical rod outer with outrigger shaped steel Cantilever Beams and suspension scaffold respectively, that interior vertical rod is connected is fastening good, and tightens up with wire clips.
The mounting method of shaped steel Overhanging Outside Scaffold of the present invention has following beneficial effect: pressure ring and suspension ring are the assembly can assembled/dismantle, and structure is simple, and it is convenient to install.Further, after pressure ring and suspension ring disassemble, reusable, be conducive to environmental protection.And pressure ring and suspension ring can utilize the waste materials in construction to prepare, and both save construction cost, and are also conducive to environmental protection.
Further, in the mounting method of shaped steel Overhanging Outside Scaffold of the present invention, the adjustable base of pressure ring is provided with second circular hole, after screw rod stretches into the second circular hole, by welding mode and adjustable base fix.
Further, in the mounting method of shaped steel Overhanging Outside Scaffold of the present invention, the first circular hole and adjustable waist-shaped hole are arranged on the length direction of pressing plate.
Further, in the mounting method of shaped steel Overhanging Outside Scaffold of the present invention, four angles of adjustable base are respectively equipped with fixing hole.
Further, in the mounting method of shaped steel Overhanging Outside Scaffold of the present invention, connecting reinforcement is fixed on by the mode of welding that iron plate is upper or both are one-body molded, and iron plate is rectangle or circle.
Further, in the mounting method of shaped steel Overhanging Outside Scaffold of the present invention, sleeve pipe is pvc pipe.
Accompanying drawing explanation
Fig. 1 is the adjustable base front view of the pressure ring that the embodiment of the present invention uses.
Fig. 2 is the pressing plate front view of the pressure ring that the embodiment of the present invention uses.
Fig. 3 is the using state figure of the pressure ring that the embodiment of the present invention uses.
Fig. 4 is the front view of the suspension ring that the embodiment of the present invention uses.
Fig. 5 is the suspension ring scheme of installation that the embodiment of the present invention uses.
Fig. 6 is the using state figure of the suspension ring that use of the embodiment of the present invention and pressure ring.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention will be further described.
See Fig. 1 and Fig. 2, pressure ring used in the present invention comprises adjustable base 11 and pressing plate 12, and adjustable base 11 comprises iron plate 111 and screw rod 211 further, and in the middle of iron plate 111, have circular hole 112, four angles have fixing hole 113.One end of screw rod 211 puts in circular hole 112, and carries out two-sided welding with iron plate 111 and form complete adjustable base 11.
Circular hole 123 and adjustable waist-shaped hole 114 is had at the length direction two ends of pressing plate 12.During practice of construction, iron plate 111 must have product certificate, carries out eliminating rust, clearing up and brush two times rustproof paints after machining.Adjustable base 11 and pressing plate 12 also can machine in factory's customization.
According to the requirement of JGJ130-2011 " building operations fastener type steel pipe scaffold technical specification of security ", outrigger shaped steel Cantilever Beams tail end at two places and should to be fixed on reinforced concrete beam and plate above, and canned paragraph length should not be less than 1.25 times of cantilever span.The spacing of shaped steel Cantilever Beams is arranged according to builder's jack support body vertical rod advance, and each advance arranges one.See Fig. 3, before adjustable base 11 is pre-buried, first the PVC plastic sleeve pipe 115 highly a little more than slab thickness is packed into screw rod 211.Place adjustable base 11 respectively in the both sides of predetermined installation shaped steel Cantilever Beams 7, and fixed by the fixing hole 113 on adjustable base 11, namely complete the pre-buried installation work of adjustable base 11.
Water when smashing floor concrete 117, by concrete 117 vibration compacting, surfacing, guarantees the accuracy of pre-buried position.After concrete 117 waters, tower crane is by shaped steel Cantilever Beams 7 handling on flooring, and it is in place that shaped steel Cantilever Beams 7 is distributed to the position needing to install by installation personnel, and the length of then encorbelmenting as required carries out adjusting, locating.
After shaped steel Cantilever Beams 7 is had good positioning, circular hole 123 on pressing plate 12 and adjustable waist-shaped hole 114 are packed into the screw rod 211 being arranged in shaped steel Cantilever Beams 7 both sides by installation personnel respectively, use nut 116 fastening again, namely complete the installation anchoring work of shaped steel Cantilever Beams 7 and building.
See Fig. 4, suspension ring used in the present invention comprise a pair through hole 3 being arranged on connecting reinforcement both sides of iron plate 1, connecting reinforcement 2 and symmetry, and the axis of through hole 3 is vertical with iron plate 1, and the cross section of through hole 3 is circular.Connecting reinforcement 2 adopts the mode of welding to be fixed on the middle position of iron plate 1, and the two also can be one machine-shaping.Connecting reinforcement 2 and iron plate 1 must carry out eliminating rust, clearing up and brush two times rustproof paints.
According to the requirement of JGJ130-2011 " building operations fastener type steel pipe scaffold technical specification of security ", suspension ring can must come into operation after design checking is qualified, and in the present invention, the intensity of iron plate and iron plate and concrete contact area meet above-mentioned code requirement.Under the prerequisite meeting code requirement, iron plate of the present invention can be square, also can be circular, oval or rectangle, pentagon, hexagon or the uniform plate body of other thickness.
See Fig. 5, be embedded with the PVC plastic sleeve pipe 6 of inclination in the concrete structured beam 5 of last layer, sleeve pipe 6 keeps low inside and high outside state.Oblique pull wire rope 4 penetrates from sleeve pipe 6 lower entrance, and successively through after a pair through hole 3 of suspension ring, again returns from the eminence entrance of sleeve pipe 6.Preferably, through hole 3 is circular hole, and namely the cross section of through hole 3 is circular, and the axis of through hole 3 is vertical with iron plate 1 arranges.
See Fig. 6, it is fastening good that wire rope 4 passes the vertical rod 8 outer with outrigger shaped steel Cantilever Beams 7 and suspension scaffold respectively of latter two head of PVC plastic sleeve pipe 6, interior vertical rod 9 is connected, finally use wire clips (supporting with wire rope specification) 10 to tighten up, namely complete oblique pull wire rope 4 and draw anchor work by suspension ring and concrete structured beam 5.
During dismounting, first remove suspension ring.Wire clips 10 is loosened, extracts wire rope 4 out, namely complete the dismounting work of suspension ring.Remove pressure ring again.Turned on by nut 116 on screw rod 211, remove pressing plate 12, recycling tower crane hangs out shaped steel Cantilever Beams 7, then touches screw rod 211 top with hand hammer, i.e. dismountable adjustable base.After above-mentioned dismounting, with microdilatancy pea gravel concreten, hole to be provided is blocked.Hole to be provided due to suspension ring place is low inside and high outside, and therefore, the hole blocked can not seepage, so just completely eliminates the hidden danger of exterior wall leakage.
Suspension ring of the present invention can utilize the remaining iron plate leftover pieces in job site and bar dowel head to process.Before installing, repeat the link such as blanking, processing at every turn.Pressure ring of the present invention and suspension ring fitting operation convenient and swift, be easy to dismounting, use more than 50 times can be had enough to meet the need continuously.Effectively can increase work efficiency, both save construction cost, be conducive to environmental protection again.

Claims (10)

1. the mounting method of shaped steel Overhanging Outside Scaffold, comprising:
There is provided pressure ring, described pressure ring comprises the adjustable base of more than two, adjustable base described in each is fixed with a screw rod; Described pressure ring also comprises pressing plate, and described pressing plate is provided with at least one first circular hole and at least one adjustable waist-shaped hole of coordinating with described screw rod, and wherein a described screw rod is through described first circular hole, and screw rod described in another root is through described adjustable waist-shaped hole;
There is provided suspension ring, described suspension ring comprise iron plate, are fixed on the connecting reinforcement in iron plate centre position; Described suspension ring also comprise symmetrical a pair through hole being arranged on connecting reinforcement both sides;
Sleeve pipe highly a little more than slab thickness is packed into described screw rod;
Adjustable base is pre-buried;
Water after smashing floor concrete, shaped steel Cantilever Beams is installed and locates;
Described first circular hole on described pressing plate and described adjustable waist-shaped hole are packed into the described screw rod being arranged in shaped steel Cantilever Beams both sides respectively and fastening;
Described sleeve pipe is imbedded in the concrete structured beam of last layer with low inside and high outside state;
Oblique pull wire rope is penetrated from described sleeve pipe lower entrance, and successively through after through hole described in a pair of described suspension ring, again returns from the eminence entrance of described sleeve pipe;
By two of described oblique pull wire rope vertical rod outer with outrigger shaped steel Cantilever Beams and suspension scaffold respectively, that interior vertical rod is connected is fastening good, and tightens up with wire clips.
2. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: adjustable base described in each is provided with second circular hole, after described screw rod stretches into described second circular hole, by welding mode and adjustable base fix.
3. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: described first circular hole and described adjustable waist-shaped hole are arranged on the length direction of described pressing plate.
4. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: four angles of described adjustable base are respectively equipped with fixing hole.
5. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: described connecting reinforcement is fixed on iron plate by the mode of welding.
6. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: described connecting reinforcement and iron plate one-body molded.
7. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: described iron plate is rectangle or circle.
8. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: described iron plate is the uniform plate body of thickness, and the axis of described through hole is vertical with described iron plate to be arranged.
9. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: the cross section of the through hole on described iron plate is for circular.
10. the mounting method of shaped steel Overhanging Outside Scaffold according to claim 1, is characterized in that: described sleeve pipe is pvc pipe.
CN201510866482.3A 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold Active CN105507573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510866482.3A CN105507573B (en) 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510866482.3A CN105507573B (en) 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold

Publications (2)

Publication Number Publication Date
CN105507573A true CN105507573A (en) 2016-04-20
CN105507573B CN105507573B (en) 2017-09-26

Family

ID=55715845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510866482.3A Active CN105507573B (en) 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold

Country Status (1)

Country Link
CN (1) CN105507573B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592948A (en) * 2016-12-19 2017-04-26 山东万鑫建设有限公司 Design and construction technology of self-stabilized section steel suspended scaffold
CN107023154A (en) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 A kind of new builder's jack component and its construction method
CN109555300A (en) * 2018-12-27 2019-04-02 上海建工二建集团有限公司 A kind of builder's jack
CN111779249A (en) * 2020-07-21 2020-10-16 湖北三江航天建筑工程有限公司 High-altitude overhanging construction platform and building method
CN113216590A (en) * 2021-05-13 2021-08-06 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020047071A (en) * 2002-05-11 2002-06-21 손경식 Rail railing (scaffolding) clamping device in the construction site.
CN201190411Y (en) * 2008-05-07 2009-02-04 中天建设集团有限公司 Wire rope device for auto tightening suspension I-beam
CN203441076U (en) * 2013-07-25 2014-02-19 陕西建工集团第一建筑工程有限公司 Steel wire rope fixing ring for construction of high-rise building
CN203684643U (en) * 2013-12-16 2014-07-02 中建八局第四建设有限公司 Fixing component for fixing cantilever beam
CN104153555A (en) * 2014-08-27 2014-11-19 中国建筑第五工程局有限公司东莞分公司 Detachable overhung steel beam pre-buried fixing device with horizontal fixing assembly
CN104164970A (en) * 2014-07-04 2014-11-26 中建四局第一建筑工程有限公司 Construction method and device for recycled steel wire rope pull ring
CN203977839U (en) * 2014-06-11 2014-12-03 绍兴县明煌建材科技有限公司 The pre-buried wire rope drag hook component of a kind of outer outrigger scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020047071A (en) * 2002-05-11 2002-06-21 손경식 Rail railing (scaffolding) clamping device in the construction site.
CN201190411Y (en) * 2008-05-07 2009-02-04 中天建设集团有限公司 Wire rope device for auto tightening suspension I-beam
CN203441076U (en) * 2013-07-25 2014-02-19 陕西建工集团第一建筑工程有限公司 Steel wire rope fixing ring for construction of high-rise building
CN203684643U (en) * 2013-12-16 2014-07-02 中建八局第四建设有限公司 Fixing component for fixing cantilever beam
CN203977839U (en) * 2014-06-11 2014-12-03 绍兴县明煌建材科技有限公司 The pre-buried wire rope drag hook component of a kind of outer outrigger scaffold
CN104164970A (en) * 2014-07-04 2014-11-26 中建四局第一建筑工程有限公司 Construction method and device for recycled steel wire rope pull ring
CN104153555A (en) * 2014-08-27 2014-11-19 中国建筑第五工程局有限公司东莞分公司 Detachable overhung steel beam pre-buried fixing device with horizontal fixing assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
石伟国: "高层建筑型钢悬挑脚手架设计及施工技术探讨", 《建筑技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592948A (en) * 2016-12-19 2017-04-26 山东万鑫建设有限公司 Design and construction technology of self-stabilized section steel suspended scaffold
CN107023154A (en) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 A kind of new builder's jack component and its construction method
CN109555300A (en) * 2018-12-27 2019-04-02 上海建工二建集团有限公司 A kind of builder's jack
CN111779249A (en) * 2020-07-21 2020-10-16 湖北三江航天建筑工程有限公司 High-altitude overhanging construction platform and building method
CN113216590A (en) * 2021-05-13 2021-08-06 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method

Also Published As

Publication number Publication date
CN105507573B (en) 2017-09-26

Similar Documents

Publication Publication Date Title
CN105507573A (en) Method for mounting external cantilever scaffolds made of shape steel
CN110805257B (en) Flower basket overhanging type section steel bearing beam structure and construction method
CN101122132B (en) Demountable composite material face plate brad supporting system and its construction method
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN105926916A (en) Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring
CN202139833U (en) Cantilever scaffold for building construction
CN104453197A (en) High-altitude large-cantilever concrete structure structural steel supporting platform
CN103711298A (en) Method for constructing anchoring system of structural steel overhanging scaffold
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN111236621A (en) Fixing system for beam-side embedded overhanging scaffold
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN202596148U (en) Reusable cantilever scaffold anchoring compression ring
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN209907894U (en) Flower basket pull rod type overhanging scaffold
CN103195235A (en) Design and calculation for detachable steel plate type steel fixture
CN209723400U (en) Using a kind of prefabricated integral frame bean column node that sleeve quickly connects
CN205153506U (en) Compression ring
CN205134928U (en) Hoisting ring
CN211647259U (en) Scaffold wall connecting piece
CN211597650U (en) Overhanging type scaffold
CN208854833U (en) A kind of prefabricated components reserve the grouting of hanging ring hole and use formwork structure
CN207959911U (en) A kind of builder's jack gusseted
CN203755642U (en) Cantilever scaffold profile steel anchoring device
CN205777422U (en) Encorbelment combined type support system based on intelligent monitoring oblique pull

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant