CN203808484U - Integrated cantilevered and attached external scaffolding - Google Patents
Integrated cantilevered and attached external scaffolding Download PDFInfo
- Publication number
- CN203808484U CN203808484U CN201420209641.3U CN201420209641U CN203808484U CN 203808484 U CN203808484 U CN 203808484U CN 201420209641 U CN201420209641 U CN 201420209641U CN 203808484 U CN203808484 U CN 203808484U
- Authority
- CN
- China
- Prior art keywords
- cantilevered
- steel plate
- fixed
- facade
- pull bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
本实用新型公开一种整体悬挑附着式外脚手架,包括悬挑工字梁和拉杆,所述悬挑工字梁的一端固定于建筑外立面上,另一端与拉杆连接,所述拉杆的另一端斜拉固定于建筑外立面;本实用新型所述整体悬挑附着式外脚手架,(1)与现在通常使用的悬挑脚手架相比,可成品化制作,较美观,符合标准化要求;(2)整体悬挑,节省了悬挑工字钢固定段,用料较少,比较经济;(3)由于是整体外悬挑,无需在柱、剪力墙部位留洞,在外脚手架拆除后,外墙比较美观;(4)安装比较方便,提高工作效率。
The utility model discloses an integral cantilevered attached external scaffold, which comprises a cantilevered I-beam and a tie rod. One end of the cantilevered I-beam is fixed on the building facade, and the other end is connected with the tie rod. The other end is cable-stayed and fixed on the facade of the building; the integral cantilevered attached external scaffold described in the utility model, (1) compared with the cantilevered scaffold commonly used at present, can be finished, more beautiful, and meets the standardization requirements; (2) The overall cantilever saves the fixed section of the cantilevered I-beam, and uses less materials, which is more economical; (3) Because it is an overall external cantilever, there is no need to leave holes in the columns and shear walls. After the external scaffolding is removed , The exterior wall is more beautiful; (4) The installation is more convenient and the work efficiency is improved.
Description
技术领域 technical field
本实用新型涉及一种外脚手架,尤其涉及一种整体悬挑附着式外脚手架,属于建筑施工设备技术领域。 The utility model relates to an external scaffold, in particular to an integral cantilevered and attached external scaffold, which belongs to the technical field of building construction equipment.
背景技术 Background technique
在高层建筑工程主体结构施工过程中,随着主体结构的增高,需要搭设脚手架,由于落地式脚手架受高度的限制,在主体上升至一定高度后,需要采用悬挑式脚手架。目前通常使用的脚手架为型钢悬挑双排钢管脚手架,即在该层施工时,埋设用于锚固的U形钢筋拉环,在梁板混凝土达到一定强度后,安装悬挑型钢、斜拉钢丝绳、架体等。 In the construction process of the main structure of high-rise building projects, with the increase of the main structure, scaffolding needs to be erected. Since the floor-standing scaffold is limited by height, after the main body rises to a certain height, a cantilevered scaffold is required. At present, the commonly used scaffolding is steel cantilevered double-row steel pipe scaffolding, that is, during the construction of this layer, U-shaped steel bar pull rings for anchorage are buried, and when the beam-slab concrete reaches a certain strength, cantilevered steel, cable-stayed steel wire ropes, frame etc.
根据现行规范规定,此种脚手架固定段长度不应小于悬挑段长度的1.25倍,材料用量较多,不经济。同时遇到柱、剪力墙部位,需预留墙洞,脚手架拆除后预留洞不便修补,造成结构不美观。 According to the current regulations, the length of the fixed section of this kind of scaffold should not be less than 1.25 times the length of the cantilever section, and the amount of materials used is large, which is uneconomical. At the same time, when encountering columns and shear walls, it is necessary to reserve wall holes. After the scaffolding is removed, the reserved holes are inconvenient to repair, resulting in unsightly structure.
实用新型内容 Utility model content
实用新型目的:本实用新型的目的在于针对现有技术的不足,提供一种整体悬挑附着式外脚手架,搭设在建筑结构外墙外边线外,用于上料、安全防护与施工作业的临时结构架。 Purpose of the utility model: The purpose of this utility model is to address the deficiencies in the prior art and provide an integral cantilevered attached external scaffold, which is erected outside the outer edge of the outer wall of the building structure and used for temporary scaffolding for feeding, safety protection and construction operations. structural frame.
技术方案:本实用新型所述的一种整体悬挑附着式外脚手架,包括悬挑工字梁和拉杆,所述悬挑工字梁的一端固定于建筑外立面上,另一端与拉杆连接,所述拉杆的另一端斜拉固定于建筑外立面。 Technical solution: An integral cantilevered attached external scaffold described in the utility model includes a cantilevered I-beam and a tie rod, one end of the cantilevered I-beam is fixed on the building facade, and the other end is connected to the tie rod , the other end of the tie rod is fixed to the building facade by cable-staying.
进一步完善上述技术方案,所述悬挑工字梁的一端设有封口钢板,该端通过封口钢板与穿墙螺栓或穿梁螺栓固定于建筑外立面上。 To further improve the above technical solution, one end of the cantilevered I-beam is provided with a sealing steel plate, and this end is fixed on the facade of the building through the sealing steel plate and wall-through bolts or beam-through bolts.
进一步地,所述封口钢板与悬挑工字梁之间焊接有加劲板。 Further, a stiffening plate is welded between the sealing steel plate and the cantilevered I-beam.
进一步完善上述技术方案,所述拉杆上设有高低调节杆,以调节拉杆长度,使拉杆受力。 To further improve the above technical solution, the pull rod is provided with a height adjusting rod to adjust the length of the pull rod so that the pull rod is stressed.
进一步地,所述拉杆的两端分别焊接有连接钢板,上端的连接钢板通过穿墙螺栓或穿梁螺栓固定于建筑外立面上,下端的连接钢板与设在悬挑工字梁上的钢片穿孔销接。 Further, the two ends of the pull rod are respectively welded with connecting steel plates, the connecting steel plates at the upper end are fixed on the facade of the building through wall bolts or beam bolts, and the connecting steel plates at the lower end are connected with the steel plates on the cantilevered I-beams. Pieces perforated and pinned.
进一步,所述悬挑工字梁上设有固定立杆的套筒,其中:用于固定外立杆的套筒位于钢片的外侧。 Further, the cantilevered I-beam is provided with a sleeve for fixing the upright, wherein: the sleeve for fixing the outer upright is located outside the steel sheet.
本实用新型与现有技术相比,其有益效果是:本实用新型所述整体悬挑附着式外脚手架,(1)与现在通常使用的悬挑脚手架相比,可成品化制作,较美观,符合标准化要求;(2)整体悬挑,节省了悬挑工字钢固定段,用料较少,比较经济;(3)由于是整体外悬挑,无需在柱、剪力墙部位留洞,在外脚手架拆除后,外墙比较美观;(4)安装比较方便,提高工作效率。 Compared with the prior art, the utility model has the beneficial effects as follows: the integral cantilevered attached external scaffold described in the utility model, (1) compared with the cantilevered scaffold commonly used at present, can be finished and is more beautiful, It meets the standardization requirements; (2) The overall cantilever saves the fixed section of the cantilevered I-beam, and uses less materials, which is more economical; (3) Because it is an overall external cantilever, there is no need to leave holes in the columns and shear walls. After the external scaffolding is removed, the external wall is more beautiful; (4) The installation is more convenient and the work efficiency is improved.
附图说明 Description of drawings
图1为实施例1所述整体悬挑附着式外脚手架的结构示意图。 FIG. 1 is a schematic structural view of the overall cantilevered attached external scaffold described in Example 1. FIG.
图中:1、楼板;2、墙体;3、悬挑工字钢;4、穿墙螺栓;5、高低调节杆;6、钢片;7、拉杆;8、连接钢板;9、封口钢板;10、加劲板;11、立杆;12、套筒。 In the figure: 1. Floor; 2. Wall; 3. Cantilever I-beam; 4. Wall bolt; 5. Height adjustment rod; 6. Steel sheet; 7. Pull rod; 8. Connecting steel plate; ; 10, stiffening plate; 11, vertical rod; 12, sleeve.
具体实施方式 Detailed ways
下面对本实用新型技术方案进行详细说明,但是本实用新型的保护范围不局限于所述实施例。 The technical solutions of the utility model are described in detail below, but the protection scope of the utility model is not limited to the embodiments.
实施例1:如图1所示,一种整体悬挑附着式外脚手架,包括悬挑工字钢3和拉杆7,所述悬挑工字钢3的一端设有封口钢板9,该端通过封口钢板9与穿墙螺栓4固定于建筑外立面上,且所述封口钢板9与悬挑工字钢3之间焊接有上、下加劲板10。 Embodiment 1: As shown in Figure 1, a kind of overall cantilevered attached external scaffolding includes cantilevered I-beam 3 and pull rod 7, and one end of said cantilevered I-beam 3 is provided with a sealing steel plate 9, and this end passes through The sealing steel plate 9 and the wall-through bolts 4 are fixed on the facade of the building, and upper and lower stiffening plates 10 are welded between the sealing steel plate 9 and the cantilevered I-beam 3 .
所述拉杆7上设有高低调节杆5,以调节拉杆长度,使拉杆受力;所述拉杆7的两端分别焊接有连接钢板8,上端的连接钢板8通过穿墙螺栓4斜拉固定于建筑外立面上,下端的连接钢板8与设在悬挑工字钢3上的钢片6穿孔销接。 The pull rod 7 is provided with a height adjusting rod 5 to adjust the length of the pull rod so that the pull rod is stressed; the two ends of the pull rod 7 are respectively welded with a connecting steel plate 8, and the connecting steel plate 8 at the upper end is fixed to the On the building facade, the connecting steel plate 8 at the lower end is perforated and pinned with the steel sheet 6 on the cantilevered I-beam 3 .
所述悬挑工字钢3的上设有固定立杆11的套筒12,其中:用于固定外立杆的套筒位于钢片的外侧。 A sleeve 12 for fixing the vertical rod 11 is arranged on the cantilevered I-beam 3, wherein the sleeve for fixing the outer vertical rod is located outside the steel sheet.
施工时: During construction:
1、根据上述整体悬挑附着式外脚手架的结构,在工厂或施工现场,加工好成品。 1. According to the structure of the above-mentioned overall cantilevered attached external scaffold, the finished product is processed in the factory or on the construction site.
2、当主体施工至需悬挑脚手架时,在穿墙螺杆部位预埋套管供拆模后固定悬挑工字钢封边钢板的穿墙螺杆通过,同时在施工上层时预埋套管供连接拉杆的穿墙螺杆穿过。 2. When the main body is constructed to the point where cantilevered scaffolding is required, the bushings are embedded in the part of the wall-penetrating screw for the passage of the wall-penetrating screw that fixes the cantilevered I-steel edge-sealed steel plate after the formwork is removed. The through-wall screw connecting the tie rod passes through.
3、脚手架搭设时,用塔吊吊住悬挑工字钢至固定点,用穿墙螺杆固定;将拉杆下端与悬挑工字钢用螺杆销接固定,调节拉杆高低调节杆,将拉杆上端与上部穿墙螺杆连接,连接后适当调节拉杆高低调节杆使拉杆受力。 3. When erecting the scaffold, use a tower crane to hang the cantilevered I-beam to a fixed point, and fix it with a wall-through screw; fix the lower end of the tie rod with the cantilevered I-beam with a screw pin, adjust the height adjustment lever of the tie rod, and connect the upper end of the tie rod to the The upper part is connected by the screw through the wall. After the connection, the height adjustment rod of the tie rod is properly adjusted to make the tie rod bear the force.
4、按照外脚手架设计要求搭设脚手架架体。 4. Set up the scaffold body according to the design requirements of the external scaffold.
5、外脚手架的拆除按照相反的顺序实施。 5. The removal of the external scaffolding shall be carried out in reverse order.
如上所述,尽管参照特定的优选实施例已经表示和表述了本实用新型,但其不得解释为对本实用新型自身的限制。在不脱离所附权利要求定义的本实用新型的精神和范围前提下,可对其在形式上和细节上作出各种变化。 As stated above, although the invention has been shown and described with reference to certain preferred embodiments, this should not be construed as limiting the invention itself. Various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420209641.3U CN203808484U (en) | 2014-04-25 | 2014-04-25 | Integrated cantilevered and attached external scaffolding |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420209641.3U CN203808484U (en) | 2014-04-25 | 2014-04-25 | Integrated cantilevered and attached external scaffolding |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203808484U true CN203808484U (en) | 2014-09-03 |
Family
ID=51447261
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420209641.3U Expired - Lifetime CN203808484U (en) | 2014-04-25 | 2014-04-25 | Integrated cantilevered and attached external scaffolding |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203808484U (en) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926925A (en) * | 2016-06-21 | 2016-09-07 | 中天建设集团有限公司天津分公司 | Joist steel cantilever beam of suspended scaffold and construction method thereof |
| CN106906913A (en) * | 2017-03-16 | 2017-06-30 | 浙江绿筑集成科技有限公司 | A kind of connecting node of transfer structure for SRC beams and shear wall |
| CN108149918A (en) * | 2017-12-29 | 2018-06-12 | 上海建工二建集团有限公司 | Easily-assembled and disassembled reusable cantilever tripod and application method thereof |
| CN109372239A (en) * | 2018-10-30 | 2019-02-22 | 中国建筑第四工程局有限公司 | A basket-type cantilevered scaffold |
| CN109779225A (en) * | 2019-03-13 | 2019-05-21 | 中国十七冶集团有限公司 | A kind of change overhanging type external scaffold and construction method |
| CN109914780A (en) * | 2019-04-19 | 2019-06-21 | 四川优筑科技有限公司 | It is a kind of for building the inclined pull type suspension supporting I-steel supporting element of external scaffolding |
| CN110725597A (en) * | 2019-10-23 | 2020-01-24 | 中国十九冶集团有限公司 | The erection structure and erection method of ring beam construction platform at the top of concrete silo |
| CN111364745A (en) * | 2020-04-30 | 2020-07-03 | 中建四局第三建设有限公司 | Unsupported self-supporting profile steel platform |
| CN112942782A (en) * | 2021-02-01 | 2021-06-11 | 浙江城建建设集团有限公司 | Improved cantilever scaffold bearing member |
| CN120739309A (en) * | 2025-08-05 | 2025-10-03 | 中建八局第三建设有限公司 | Construction method of irregular outer vertical surface of pyramid structure |
-
2014
- 2014-04-25 CN CN201420209641.3U patent/CN203808484U/en not_active Expired - Lifetime
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926925A (en) * | 2016-06-21 | 2016-09-07 | 中天建设集团有限公司天津分公司 | Joist steel cantilever beam of suspended scaffold and construction method thereof |
| CN106906913A (en) * | 2017-03-16 | 2017-06-30 | 浙江绿筑集成科技有限公司 | A kind of connecting node of transfer structure for SRC beams and shear wall |
| CN108149918A (en) * | 2017-12-29 | 2018-06-12 | 上海建工二建集团有限公司 | Easily-assembled and disassembled reusable cantilever tripod and application method thereof |
| CN109372239A (en) * | 2018-10-30 | 2019-02-22 | 中国建筑第四工程局有限公司 | A basket-type cantilevered scaffold |
| CN109779225A (en) * | 2019-03-13 | 2019-05-21 | 中国十七冶集团有限公司 | A kind of change overhanging type external scaffold and construction method |
| CN109914780A (en) * | 2019-04-19 | 2019-06-21 | 四川优筑科技有限公司 | It is a kind of for building the inclined pull type suspension supporting I-steel supporting element of external scaffolding |
| CN110725597A (en) * | 2019-10-23 | 2020-01-24 | 中国十九冶集团有限公司 | The erection structure and erection method of ring beam construction platform at the top of concrete silo |
| CN111364745A (en) * | 2020-04-30 | 2020-07-03 | 中建四局第三建设有限公司 | Unsupported self-supporting profile steel platform |
| CN112942782A (en) * | 2021-02-01 | 2021-06-11 | 浙江城建建设集团有限公司 | Improved cantilever scaffold bearing member |
| CN120739309A (en) * | 2025-08-05 | 2025-10-03 | 中建八局第三建设有限公司 | Construction method of irregular outer vertical surface of pyramid structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105926916B (en) | Overhang combined type support system and construction method based on intelligent monitoring oblique pull | |
| CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
| CN205777424U (en) | A kind of pull-up builder's jack support means being anchored in outside structure | |
| CN110306774B (en) | Method and device for installing socket type cantilever scaffold | |
| CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
| CN110805257A (en) | Flower basket overhanging type section steel bearing beam structure and construction method | |
| CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
| CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
| CN207177255U (en) | The detachable suspension scaffold of concrete wall | |
| CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
| CN206319597U (en) | A kind of cantilever steel girder erecting device | |
| CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
| CN206289945U (en) | A kind of assembled Portable safety crosshead | |
| CN104989092A (en) | Construction method of high-altitude overhang superposition type steel truss bearing platform | |
| CN204456810U (en) | A kind of gaily decorated basket pull bar suspension scaffold | |
| CN204983173U (en) | Steel construction beam -column connection node | |
| CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
| CN209413271U (en) | Casing wall-through pull rod formula connects wall fixed Combination device | |
| CN202718375U (en) | Installation and operation platform of high-altitude cantilever structure | |
| CN206554483U (en) | A kind of full fabricated scaffold is encorbelmented component | |
| CN108867548B (en) | Construction platform and construction platform erection method for on-site watering high pile wharf | |
| CN208618838U (en) | A kind of safety device | |
| CN207109843U (en) | A kind of goaf transmission line foundation bracing means | |
| CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
| CN211949540U (en) | Building scaffold drawknot spare |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140903 |