CN105507573B - The installation method of shaped steel Overhanging Outside Scaffold - Google Patents

The installation method of shaped steel Overhanging Outside Scaffold Download PDF

Info

Publication number
CN105507573B
CN105507573B CN201510866482.3A CN201510866482A CN105507573B CN 105507573 B CN105507573 B CN 105507573B CN 201510866482 A CN201510866482 A CN 201510866482A CN 105507573 B CN105507573 B CN 105507573B
Authority
CN
China
Prior art keywords
shaped steel
installation method
hole
iron plate
overhanging outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510866482.3A
Other languages
Chinese (zh)
Other versions
CN105507573A (en
Inventor
周学军
王维才
徐平
陈荣
庞鸣
庞一鸣
吕志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN201510866482.3A priority Critical patent/CN105507573B/en
Publication of CN105507573A publication Critical patent/CN105507573A/en
Application granted granted Critical
Publication of CN105507573B publication Critical patent/CN105507573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention provides a kind of installation method of shaped steel Overhanging Outside Scaffold, including provides dismountable pressure ring;Dismountable suspension ring are provided;By pressure ring it is pre-buried after, shaped steel Cantilever Beams are mounted and positioned, and its fixing end is fastened using pressure ring, the end of encorbelmenting of shaped steel Cantilever Beams will be fastened after steel wire penetrating suspension ring.The installation method of the present invention is simple, and the pressure ring and suspension ring after dismounting are reusable, are conducive to environmental protection.

Description

The installation method of shaped steel Overhanging Outside Scaffold
Technical field
The present invention relates to a kind of installation method of shaped steel Overhanging Outside Scaffold.
Background technology
Shaped steel Overhanging Outside Scaffold has obtained universal application in high-rise and Super High engineering construction at present, its structure shape Formula typically has the diversified forms such as beam type, cable-stayed type, diagonal-bracing type and combined type.Existing shaped steel Overhanging Outside Scaffold is being installed When, the U-shaped ring built-in fitting of 16~φ of twice φ 18 HPB235 level reinforcement fabrications is generally used, is anchored with structural slab (It is arranged on the bottom of concrete slab principal rod), i.e., pre-buried substantial amounts of reinforcing bar does pressure ring and is used for fixing the fixations of shaped steel Cantilever Beams End.Shaped steel Cantilever Beams outer end sets steel wire rope and last layer building structure oblique pull and is fastenedly connected, and socketing end in building needs in advance First bury substantial amounts of reinforcing bar and make suspension ring.Foregoing pressure ring and suspension ring are disposable, and are installed and dismounting inconvenience, if place Reason is improper to be also easy to cause seepage.
China Patent Publication No. discloses a kind of reinforcing bar cable-stayed type shaped steel for CN2013129552 application for a patent for invention and hanged Outrigger scaffold, in floor casting concrete where type steel support by embedded part A, embedded part B is embedded in floor, then by section steel suspended It is attached to floor where type steel support, one end and embedded part A, embedded part B(That is pressure ring)It is welded and fixed.Oblique pull reinforcing bar one end and upper strata is pre- Bury steel bar end(That is suspension ring)With sleeve connection, under other end insertion section steel beam in double angle preformed hole, fixed with sleeve, it is appropriate to increase Plus pretightning force, so as to complete the installation of shaped steel Overhanging Outside Scaffold.In this technology, the installation of shaped steel Overhanging Outside Scaffold exist with Lower defect:The reinforcing bar of suspension ring and pressure ring be required to it is pre-buried, it is to be onstructed finish after, it is necessary to these reinforcing bars are dismantled, deal with meeting improperly Cause the seepage of exterior wall.Further, the reinforcing bar disassembled can not be reused, and can only be abandoned, and both add cost, also not Beneficial to environmental protection.
Therefore, it is necessary to design a kind of installation method of improved shaped steel Overhanging Outside Scaffold.
The content of the invention
The present invention provides a kind of method simple environmentally friendly shaped steel Overhanging Outside Scaffold installation method.
To achieve the above object, the installation method of shaped steel Overhanging Outside Scaffold of the invention includes:Pressure ring, pressure ring bag are provided Include and be fixed with a screw rod on the adjustable base of more than two, each adjustable base;Pressure ring also include pressing plate, pressing plate be provided with At least one first circular hole and at least one adjustable waist-shaped hole that screw rod coordinates, wherein a screw rod passes through the first circular hole, it is another Root screw rod passes through adjustable waist-shaped hole;Suspension ring are provided, suspension ring include iron plate, are fixed on the connection reinforcing bar in iron plate centre position;Also wrap Include symmetrical a pair of through holes for being arranged on connection reinforcing bar both sides;The sleeve pipe that height is slightly above slab thickness is packed into screw rod;Can Adjust base pre-buried;Pour and smash after floor concrete, shaped steel Cantilever Beams are mounted and positioned;By the circular hole on pressing plate and adjustable waist-shaped hole Pack into the screw rod of shaped steel Cantilever Beams both sides and fasten respectively;Sleeve pipe is embedded to the mixed of last layer with low inside and high outside state In Xtah Crude Clay structure beam;Oblique pull steel wire rope is penetrated from sleeve pipe lower entrance, and sequentially passed through after a pair of through holes of suspension ring, again from The eminence entrance of sleeve pipe is returned;By two of oblique pull steel wire rope respectively with outrigger shaped steel Cantilever Beams and suspension scaffold outer vertical rod, interior vertical Bar connection is fastened, and is tightened up with rope card.
The installation method of the shaped steel Overhanging Outside Scaffold of the present invention has the advantages that:Pressure ring and suspension ring are can group The component of dress/dismounting, it is simple in construction, facility is installed.Further, it is reusable after pressure ring and suspension ring are disassembled, favorably In environmental protection.Moreover, pressure ring and suspension ring can be prepared using the waste materials in construction, construction cost is both saved, ring is also beneficial to Protect.
Further, in the installation method of shaped steel Overhanging Outside Scaffold of the invention, it is provided with the adjustable base of pressure ring One the second circular hole, screw rod is stretched into after the second circular hole, fixed by way of welding with adjustable base.
Further, in the installation method of shaped steel Overhanging Outside Scaffold of the invention, the first circular hole exists with adjustable waist-shaped hole Arranged on the length direction of pressing plate.
Further, in the installation method of shaped steel Overhanging Outside Scaffold of the invention, on four angles of adjustable base respectively Provided with fixing hole.
Further, in the installation method of shaped steel Overhanging Outside Scaffold of the invention, connection reinforcing bar is by way of welding It is fixed on that iron plate is upper or both to be integrally formed, iron plate is rectangle or circle.
Further, in the installation method of shaped steel Overhanging Outside Scaffold of the invention, sleeve pipe is pvc pipe.
Brief description of the drawings
Fig. 1 is the adjustable base front view of pressure ring used in the embodiment of the present invention.
Fig. 2 is the pressing plate front view of pressure ring used in the embodiment of the present invention.
Fig. 3 is the use state figure of pressure ring used in the embodiment of the present invention.
Fig. 4 is the front view of suspension ring used in the embodiment of the present invention.
Fig. 5 is suspension ring scheme of installation used in the embodiment of the present invention.
Fig. 6 is the use state figure of suspension ring used in the embodiment of the present invention and pressure ring.
Embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Referring to Fig. 1 and Fig. 2, pressure ring used in the present invention includes adjustable base 11 and pressing plate 12, and adjustable base 11 enters one Step includes iron plate 111 and screw rod 211, circular hole 112 is provided with the middle of iron plate 111, four angles have fixing hole 113.Screw rod 211 one end is put in circular hole 112, and forms complete adjustable base 11 with the progress two-sided welding of iron plate 111.
Circular hole 123 and adjustable waist-shaped hole 114 are had at the length direction two ends of pressing plate 12.During practice of construction, iron plate 111 must have product certificate, are derusted, cleared up after machining and two times antirust paints of brush.Adjustable base 11 and pressing plate 12 Also it can be machined in factory's customization.
According to JGJ130-2011《Construction fastener type steel pipe scaffold technical specification of security》Requirement, outrigger shaped steel Encorbelmenting tail beam should be at two and the above is fixed on reinforced concrete beam and plate, and canned paragraph length is no less than length of encorbelmenting 1.25 times of degree.The spacing of shaped steel Cantilever Beams is set according to builder's jack support body vertical rod advance, and each advance sets one.Ginseng See Fig. 3, before adjustable base 11 is pre-buried, the first PVC plastic sleeve pipe 115 that height is slightly above slab thickness is first packed into screw rod 211.Adjustable base 11 is placed respectively in the predetermined both sides for installing shaped steel Cantilever Beams 7, and passes through the fixing hole on adjustable base 11 113 fix, that is, complete the pre-buried installment work of adjustable base 11.
Pour when smashing floor concrete 117, by the vibration compacting of concrete 117, surfacing, it is ensured that pre-buried position it is accurate Property.After concrete 117 is poured, tower crane is by the handling of shaped steel Cantilever Beams 7 to flooring, and shaped steel Cantilever Beams 7 are distributed to by installation personnel Need position to be mounted in place, the length of then encorbelmenting as needed is adjusted, positioned.
After shaped steel Cantilever Beams 7 are had good positioning, installation personnel distinguishes the circular hole 123 and adjustable waist-shaped hole 114 on pressing plate 12 Pack into the screw rod 211 of the both sides of shaped steel Cantilever Beams 7, then fastened with nut 116, that is, complete shaped steel Cantilever Beams 7 and building Installation anchoring work.
Referring to Fig. 4, suspension ring used in the present invention include iron plate 1, connection reinforcing bar 2 and symmetrical be arranged on and connect reinforcing bar two A pair of through holes 3 of side, the axis of through hole 3 is vertical with iron plate 1, and the cross section of through hole 3 is circle.Reinforcing bar 2 is connected using welding Mode is fixed on the position in the middle of iron plate 1, and the two can also be integrally machined shaping.Connection reinforcing bar 2 and iron plate 1 must be removed Rust, cleaning and two times antirust paints of brush.
According to JGJ130-2011《Construction fastener type steel pipe scaffold technical specification of security》Requirement, suspension ring are necessary Through design checking it is qualified after can come into operation, in the present invention, the intensity of iron plate and iron plate are to meet above-mentioned with concrete contact area Code requirement.On the premise of code requirement is met, iron plate of the invention can be square or circular, oval Shape or rectangle, pentagon, hexagon or other plate bodys in uniform thickness.
Referring to Fig. 5, inclined second PVC plastic sleeve pipe 6, the second PVC plastic are embedded with the concrete structured beam 5 of last layer Material sleeve pipe 6 keeps low inside and high outside state.Oblique pull steel wire rope 4 is penetrated from the lower entrance of the second PVC plastic sleeve pipe 6, and is worn successively After a pair of the through holes 3 for crossing suspension ring, returned again from the eminence entrance of the second PVC plastic sleeve pipe 6.Preferably, through hole 3 is circular hole, I.e. the cross section of through hole 3 is vertically arranged for circle, and the axis of through hole 3 with iron plate 1.
Referring to Fig. 6, steel wire rope 4 pass second PVC plastic sleeve pipe 6 latter two head respectively with outrigger shaped steel Cantilever Beams 7 and outstanding Builder's jack outer vertical rod 8, the connection of interior vertical rod 9 are fastened, finally with rope card(With steel wire rope units specification)10 tighten up, that is, complete oblique rollering steel Cord 4 is worked by the drawing anchor of suspension ring and concrete structured beam 5.
During dismounting, suspension ring are first removed.Rope card 10 is loosened, steel wire rope 4 is extracted out, that is, completes the dismounting work of suspension ring.Tear open again Except pressure ring.Nut 116 on screw rod 211 is turned on, pressing plate 12 is removed, recycles tower crane to hang out shaped steel Cantilever Beams 7, then with small The top of hammer touch screw rod 211, you can remove adjustable base.After above-mentioned dismounting is finished, with microdilatancy pea gravel concreten by hole to be provided Block.Due to the hole to be provided at suspension ring be it is low inside and high outside, therefore, the hole blocked will not seepage, thus thoroughly disappear Except the hidden danger of exterior wall leakage.
The suspension ring of the present invention can be processed using the remaining iron plate leftover pieces in job site and bar dowel head.Without every time The links such as blanking, processing are repeated before installing.The pressure ring and suspension ring installation operation of the present invention is convenient and swift, it is easy to dismantle, can be continuous It is used in turn more than 50 times.Operating efficiency can be effectively improved, construction cost is both saved, is conducive to environmental protection again.

Claims (10)

1. the installation method of shaped steel Overhanging Outside Scaffold, including:
Pressure ring is provided, the pressure ring includes being fixed with a screw rod on the adjustable base of more than two, each adjustable base; The pressure ring also include pressing plate, the pressing plate be provided with the screw rod coordinate at least one first circular hole and at least one can Waist-shaped hole is adjusted, wherein a screw rod passes through first circular hole, another screw rod passes through the adjustable waist-shaped hole;
Suspension ring are provided, the suspension ring include iron plate, are fixed on the connection reinforcing bar in iron plate centre position;The suspension ring also include symmetrical A pair of through holes for being arranged on connection reinforcing bar both sides;
First sleeve by height higher than slab thickness packs into the screw rod;
Adjustable base is pre-buried;
Pour and smash after floor concrete, shaped steel Cantilever Beams are mounted and positioned;
First circular hole and the adjustable waist-shaped hole on the pressing plate is packed into the institute positioned at shaped steel Cantilever Beams both sides respectively State in screw rod and fasten;
In the concrete structured beam that second sleeve pipe is embedded to last layer with low inside and high outside state;
Oblique pull steel wire rope is penetrated from the second sleeve pipe lower entrance, and sequentially passes through through hole described in a pair of the suspension ring Afterwards, returned again from the eminence entrance of second sleeve pipe;
Two of the oblique pull steel wire rope is connected fastening with outrigger shaped steel Cantilever Beams and suspension scaffold outer vertical rod, interior vertical rod respectively It is good, and tightened up with rope card.
2. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:Each adjustable bottom Second circular hole is provided with seat, the screw rod is stretched into after second circular hole, is consolidated by way of welding with adjustable base It is fixed.
3. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:First circular hole with The adjustable waist-shaped hole is arranged on the length direction of the pressing plate.
4. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:The adjustable base Fixing hole is respectively equipped with four angles.
5. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:The connection reinforcing bar leads to The mode for crossing welding is fixed on iron plate.
6. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:It is described connection reinforcing bar with Iron plate is integrally formed.
7. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:The iron plate is rectangle Or it is circular.
8. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:The iron plate is thickness Uniform plate body, the axis of the through hole is vertically arranged with the iron plate.
9. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:It is logical on the iron plate The cross section in hole is circle.
10. the installation method of shaped steel Overhanging Outside Scaffold according to claim 1, it is characterised in that:The first sleeve And second sleeve pipe is pvc pipe.
CN201510866482.3A 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold Active CN105507573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510866482.3A CN105507573B (en) 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510866482.3A CN105507573B (en) 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold

Publications (2)

Publication Number Publication Date
CN105507573A CN105507573A (en) 2016-04-20
CN105507573B true CN105507573B (en) 2017-09-26

Family

ID=55715845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510866482.3A Active CN105507573B (en) 2015-12-01 2015-12-01 The installation method of shaped steel Overhanging Outside Scaffold

Country Status (1)

Country Link
CN (1) CN105507573B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592948B (en) * 2016-12-19 2019-02-26 山东万鑫建设有限公司 Self-stabilization fashioned iron scaffold cradle design and construction technique
CN107023154A (en) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 A kind of new builder's jack component and its construction method
CN109555300A (en) * 2018-12-27 2019-04-02 上海建工二建集团有限公司 Overhanging scaffold
CN111779249A (en) * 2020-07-21 2020-10-16 湖北三江航天建筑工程有限公司 High-altitude overhanging construction platform and building method
CN113216590B (en) * 2021-05-13 2022-09-30 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100483898B1 (en) * 2002-05-11 2005-04-18 손경식 Rail handrail clamping device of construction site
CN201190411Y (en) * 2008-05-07 2009-02-04 中天建设集团有限公司 Wire rope device for auto tightening suspension I-beam
CN203441076U (en) * 2013-07-25 2014-02-19 陕西建工集团第一建筑工程有限公司 Steel wire rope fixing ring for construction of high-rise building
CN203684643U (en) * 2013-12-16 2014-07-02 中建八局第四建设有限公司 Fixing component for fixing cantilever beam
CN203977839U (en) * 2014-06-11 2014-12-03 绍兴县明煌建材科技有限公司 The pre-buried wire rope drag hook component of a kind of outer outrigger scaffold
CN104164970A (en) * 2014-07-04 2014-11-26 中建四局第一建筑工程有限公司 Construction method and device for recycled steel wire rope pull ring
CN104153555B (en) * 2014-08-27 2016-09-28 中国建筑第五工程局有限公司东莞分公司 The detachable pre-buried fixing device of overhanging type steel beam containing horizontal fixation kit

Also Published As

Publication number Publication date
CN105507573A (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN105507573B (en) The installation method of shaped steel Overhanging Outside Scaffold
CN205976410U (en) Shaped steel is encorbelmented scaffold frame and can be dismantled type of falling U screw vacuum pump
CN204098463U (en) Builder's jack
CN105421748B (en) Anchoring device of cantilever scaffold
CN106400691B (en) Anti-collision wall mould bases integrated construction technique
CN206625428U (en) Pipe shaft post-cast floor slab closed system
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN106088447A (en) A kind of exterior wall builder's jack shaped steel eye protective brick device and construction method
CN106958313A (en) Pipe well post-cast floor slab closed system and construction method thereof
CN102251582B (en) Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN213804905U (en) Bailey beam suspension structure
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN207760803U (en) A kind of prefabricated amphistyly armour steel form
CN203640257U (en) Support of overhanging type scaffold
CN110344553A (en) A kind of formwork erecting structure and formwork support process of stair lifting construction piece post-cast strip
CN108240113A (en) Detachably across the support device at hole and method
CN211597650U (en) Overhanging type scaffold
CN102605964B (en) Separately mounted grille on elevator shaft opening and construction method of separately mounted grille
CN103046753A (en) Overhanging base frame construction method adopting U-shaped fastener
CN209538721U (en) The Cantilever Beams fixed structure of discharging platform
CN202081512U (en) Barrier-free decoration structure of high-low connected building
CN208088827U (en) The detachable earth anchor of iron on floor beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant