CN102251582B - Barrier-free decoration structure of high and low incorporated buildings and construction method thereof - Google Patents

Barrier-free decoration structure of high and low incorporated buildings and construction method thereof Download PDF

Info

Publication number
CN102251582B
CN102251582B CN 201110125443 CN201110125443A CN102251582B CN 102251582 B CN102251582 B CN 102251582B CN 201110125443 CN201110125443 CN 201110125443 CN 201110125443 A CN201110125443 A CN 201110125443A CN 102251582 B CN102251582 B CN 102251582B
Authority
CN
China
Prior art keywords
building
low
built
high building
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110125443
Other languages
Chinese (zh)
Other versions
CN102251582A (en
Inventor
姚攀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yao Panfeng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110125443 priority Critical patent/CN102251582B/en
Publication of CN102251582A publication Critical patent/CN102251582A/en
Application granted granted Critical
Publication of CN102251582B publication Critical patent/CN102251582B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a barrier-free decoration structure of high and low incorporated buildings and a construction method thereof, post-pouring joints are arranged at a horizontal connecting part for the high and the lower buildings, which is close to the ends of the high and the low buildings, and support beams are arranged in the positions for setting the post-pouring joints on the bottom surface of the horizontal connecting part, thereby solving the differential settlement problem of the high and the low buildings, simultaneously solving the problem of enabling the low-rise building to be used as early as possible after completing the structure, having the advantages of simple construction measures, flexibility, effects of accelerating the construction progress and realizing economic benefits as early as possible and the like and being capable of being widely applied in construction of high and low incorporated structures.

Description

The height disjunctor is built accessible fitting structure and job practices thereof
Technical field
The present invention relates to a kind of disjunctor building and job practices thereof.
Background technology
Continuous development along with the continuous increase of City Building scale and anti-seismic technology, increasing height building is linked to be an integral body, form in picturesque disorder construction aesthetic perception, also can bring because the potential safety hazards such as relative settlement that difference in height causes to building construction simultaneously, if in work progress, can not well solve these hidden danger, very likely cause structural cracks even destruction.In order to address the above problem, present common way is to connect span centre and stay last-cost joint about 1m arranging, and treats that the height building settlement of both sides builds the last-cost joint concrete after stable.There is following problem in this technology: low-rise building tends to complete than highrise building is early, but before the shutoff last-cost joint, need support with beam and the plate of scaffold to the last-cost joint both sides, finish until high-building construction, just can carry out the last-cost joint construction behind the settlement stability, the use as early as possible that this will have influence on low-rise building tends to cause bigger economic loss.And settlement stability and foundation soil have relation, is difficult to accurately control the time of shutoff last-cost joint.
How to find a kind ofly can solve the height relative settlement, can not influence the use as early as possible of bottom building again, a difficult problem that has just become construction technical staff to face.
Summary of the invention
The purpose of this invention is to provide a kind of height disjunctor and build accessible fitting structure and job practices thereof, solve height disjunctor building owing to settlement difference, low-rise building is out of use technical problem before highrise building does not build up.
For achieving the above object, the present invention adopts following technical scheme:
A kind of height disjunctor is built accessible fitting structure, low building connects as one by being connected horizontal member with high building, described connection horizontal member is reinforced concrete member, the one end is supported on the low major structure of construction primary structure member, the other end is supported on the high building agent structure primary structure member, the bottom supporting of described connection horizontal member has brace summer, at least be installed with two last-cost joints on the described connection horizontal member, described last-cost joint is positioned at the brace summer length range, its both sides are provided with wire lath, the steel bar stress of described connection horizontal member is elongated at the last-cost joint place, and described brace summer one end is fixedlyed connected with low building primary structure member with the high building primary structure member.
Described high building agent structure primary structure member and low major structure of construction primary structure member are beam, post or wall.
Described connection horizontal member is beam or plate.
Described brace summer is cross binding beam, longitudinal bracing beam or both combinations, and the longitudinal bracing beam rides on the cross binding beam or is supported on the adjacent structural beams of striding.
Described brace summer is steel I-beam, the H section steel beam, and steel channel beam or rectangular steel pipe beam, above-mentioned brace summer is welding or rolling.
Described cross binding beam is fixedlyed connected with low major structure of construction primary structure member with high building agent structure primary structure member by built-in fitting, or directly is embedded in high building agent structure primary structure member and the low major structure of construction primary structure member.
The described cross binding beam that connects by built-in fitting be connected the horizontal member contact surface on be welded with peg, the position of burying underground of the cross binding beam of directly burying underground is opened and is worn the muscle hole, and is welded with peg at its external surface.
Described built-in fitting is made up of pre-embedded steel slab and pre-buried anchoring piece, and described pre-embedded steel slab is one or two, and described pre-buried anchoring piece is reinforcing bar or angle steel, is arranged between two pre-embedded steel slabs, and is welded to connect with pre-embedded steel slab.
The width of described last-cost joint is 10~1000mm.
Described height disjunctor is built the job practices of accessible fitting structure, and step is as follows:
Step 1, construction is finished high building agent structure primary structure member and low major structure of construction primary structure member and brace summer or the brace summer itself of built-in fitting, band built-in fitting directly is embedded in high building agent structure primary structure member and the low major structure of construction primary structure member simultaneously respectively;
Step 2, horizontal connecting elements between colligation high building and the low major structure of construction, install the horizontal connecting elements of its concrete blinding after-pouring, build in the process and establishing last-cost joint near high building with hanging down to build to hold to stay respectively, and at last-cost joint both sides installation wire lath, described wire lath passes the elongated steel bar stress of horizontal connecting elements; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building, this step can be carried out simultaneously with step 1;
Step 3, the concrete of the horizontal connecting elements of maintenance reaches its design strength; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building;
Step 4, the horizontal connecting elements bottom surface template of dismounting brace summer position, continue simultaneously to construct respectively high building and low other parts of building, and the sedimentation and deformation of observation high building and low building
Step 5, only pre-buried built-in fitting in step 1 is at built-in fitting welding or bolt brace summer; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building; Pre-buried brace summer or brace summer itself for the band built-in fitting do not have this step in step 1;
Step 6, the residue template of removing horizontal connecting elements; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building;
Step 7, most of load for the treatment of high building and low building apply finish and the stable back of sedimentation and deformation with expansive concrete shutoff last-cost joint;
Step 8, the expansive concrete of maintenance last-cost joint is until reaching its design strength.
After finishing, described step 8 removes the brace summer of horizontal connector bottom surface.
Compared with prior art the present invention has following characteristics and beneficial effect:
At first, can allow the free settling of height disjunctor building in the construction stage, discharge stress, can later stage operations such as finishing not produced obstacle again, make to enter operation stage in advance, effectively improve the utilization of building, thereby effectively increase economic efficiency.
Because structure of the present invention is owing to be provided with twice last-cost joint at least, and the steel bar stress of deformation joint position is elongated, when differential settlement takes place in the height building, the horizontal connector distortion that rotates, reinforcing bar in it can be out of shape with horizontal connector, therefore, need not to adopt sleeve or is welded to connect reinforcing bar, save operation, increased the globality of structure.
The differential settlement of handling between the height building of the present invention by taking simple structural measure, has been realized the just accessible construction of building, and especially low building can be utilized in advance, has accelerated construction speed, has saved construction cost.
The present invention can be widely used in two highly different constructions that building links into an integrated entity.
Description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is the embodiment of the invention one schematic diagram.
Fig. 2 is the embodiment of the invention two schematic diagrames.
Fig. 3 is Fig. 2 A-A sectional view embodiment one.
Fig. 4 is Fig. 2 A-A sectional view embodiment two.
Fig. 5 is the embodiment of the invention three schematic diagrames.
Fig. 6 is built-in fitting embodiment one schematic diagram.
Fig. 7 is built-in fitting embodiment two schematic diagrames.
Fig. 8 is the brace summer schematic diagram of burying underground.
Reference numeral: 1-hangs down major structure of construction primary structure member, 2-high building agent structure primary structure member, 3-and connects horizontal member, 4-steel bar stress, 5-last-cost joint, 6-built-in fitting, 6.1-pre-embedded steel slab, the pre-buried anchoring piece of 6.2-, 7-longitudinal bracing beam, 8-cross binding beam, 9-wire lath, 10-peg, 11-and wear muscle hole, 12-connector, 13-bolt.
The specific embodiment
Embodiment one is referring to shown in Figure 1, a kind of height disjunctor is built accessible fitting structure, low building connects as one by being connected horizontal member with high building, described connection horizontal member 3 is reinforced concrete member, the one end is supported on the low major structure of construction primary structure member 1, the other end is supported on the high building agent structure primary structure member 2, the bottom supporting of described connection horizontal member 3 has brace summer, at least be installed with two last-cost joints 5 on the described connection horizontal member 3, described last-cost joint 5 is positioned at the brace summer length range, its both sides are provided with wire lath 9, and the steel bar stress 4 of described connection horizontal member is elongated at last-cost joint 5 places.Described wire lath 9 adopts the fast easy-to-closing net usually.
Described high building agent structure primary structure member 2 and low major structure of construction primary structure member 1 are beam.
Described connection horizontal member 3 is plate.
Described brace summer is cross binding beam 8 and 7 both combinations of longitudinal bracing beam, and longitudinal bracing beam 7 rides on the cross binding beam 8.
Described cross binding beam is fixedlyed connected with low major structure of construction primary structure member 1 with high building agent structure primary structure member 2 by built-in fitting 6.Be connected horizontal member 3 contact surfaces on can be welded with peg 10.
Embodiment two is referring to Fig. 2~Fig. 4, different with embodiment one is, described brace summer is longitudinal bracing beam 7, and its two ends ride on the adjacent structural beams of striding, and is connected, is connected with bolted mixing by built-in fitting 6 welding or welding by connector 12 bolts 13 with the adjacent structural beams of striding.Described structural beams is reinforced concrete beam or section steel beam.
Embodiment three is referring to Fig. 5, different with embodiment one is, described high building agent structure primary structure member 2 and low major structure of construction primary structure member 1 are post or wall, described connection horizontal member 3 is beam, described brace summer is cross binding beam 8, fixedlys connected with low building primary structure member 1 with high building primary structure member 2 by built-in fitting.
Described built-in fitting 6 detail drawings are referring to Fig. 6 and Fig. 7, be made up of pre-embedded steel slab 6.1 and pre-buried anchoring piece 6.2, described pre-embedded steel slab 6.1 is one or two, and described pre-buried anchoring piece is reinforcing bar or angle steel, be arranged between two pre-embedded steel slabs 6.1, and be welded to connect with pre-embedded steel slab 6.1.
Described brace summer can also directly be embedded in high building agent structure primary structure member 2 and the low major structure of construction primary structure member 1, and its detail of construction is referring to Fig. 8, and the position of burying underground of brace summer is opened and worn muscle hole 11, and is welded with peg 10 at its external surface.
Described brace summer is steel I-beam, the H section steel beam, and steel channel beam or rectangular steel pipe beam, above-mentioned brace summer is welding or rolling.
Described height disjunctor is built the job practices of accessible fitting structure, and step is as follows:
Step 1, construction is finished high building agent structure primary structure member 2 and low major structure of construction primary structure member 1 and brace summer or the brace summer itself of built-in fitting 6, band built-in fitting directly is embedded in high building agent structure primary structure member 2 and the low major structure of construction primary structure member 1 simultaneously respectively;
Step 2, horizontal connecting elements 3 between colligation high building and the low major structure of construction, install the horizontal connecting elements 3 of its concrete blinding after-pouring, build in the process and establishing last-cost joint 5 near high building with hanging down to build to hold to stay respectively, and at last-cost joint 5 both sides installation wire lath 9, described wire lath 9 passes the elongated steel bar stress of horizontal connecting elements 3; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building, this step can be carried out simultaneously with step 1;
Step 3, the concrete of the horizontal connecting elements 3 of maintenance reaches its design strength; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building;
Step 4, the horizontal connecting elements bottom surface template of dismounting brace summer position, continue simultaneously to construct respectively high building and low other parts of building, and the sedimentation and deformation of observation high building and low building
Step 5, only pre-buried built-in fitting 6 in step 1 is at built-in fitting 6 welding or bolt brace summers; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building; Pre-buried brace summer or brace summer itself for the band built-in fitting do not have this step in step 1;
Step 6, the residue template of removing horizontal connecting elements 3; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building;
Step 7, most of load for the treatment of high building and low building apply finish and the stable back of sedimentation and deformation with expansive concrete shutoff last-cost joint 5;
Step 8, the expansive concrete of maintenance last-cost joint 5 is until reaching its design strength.
After finishing, described step 8 removes the brace summer of horizontal connector 3 bottom surfaces.

Claims (11)

1. a height disjunctor is built accessible fitting structure, low building connects as one by being connected horizontal member with high building, described connection horizontal member (3) is reinforced concrete member, the one end is supported on the low major structure of construction primary structure member (1), the other end is supported on the high building agent structure primary structure member (2), it is characterized in that: the bottom supporting of described connection horizontal member (3) has brace summer, at least be installed with two last-cost joints (5) on the described connection horizontal member (3), described last-cost joint (5) is positioned at the brace summer length range, its both sides are provided with wire lath (9), the steel bar stress of described connection horizontal member (4) is located elongated at last-cost joint (5), described brace summer one end is fixedlyed connected with low building primary structure member (1) with high building primary structure member (2).
2. height disjunctor according to claim 1 is built accessible fitting structure, it is characterized in that: described high building agent structure primary structure member (2) and low major structure of construction primary structure member (1) are beam, post or wall.
3. height disjunctor according to claim 1 is built accessible fitting structure, it is characterized in that: described connection horizontal member (3) is beam or plate.
4. height disjunctor according to claim 1 is built accessible fitting structure, it is characterized in that: described brace summer is cross binding beam (8), longitudinal bracing beam (7) or both combinations, and longitudinal bracing beam (7) rides over cross binding beam (8) and goes up or be supported on the adjacent structural beams of striding.
5. height disjunctor according to claim 1 is built accessible fitting structure, it is characterized in that: described brace summer is steel I-beam, the H section steel beam, and steel channel beam or rectangular steel pipe beam, above-mentioned brace summer is welding or rolling.
6. height disjunctor according to claim 4 is built accessible fitting structure, it is characterized in that: described cross binding beam (8) is fixedlyed connected with low major structure of construction primary structure member (1) with high building agent structure primary structure member (2) by built-in fitting (6), or directly is embedded in high building agent structure primary structure member (2) and the low major structure of construction primary structure member (1).
7. height disjunctor according to claim 6 is built accessible fitting structure, it is characterized in that: the described cross binding beam (8) that connects by built-in fitting be connected horizontal member (3) contact surface on be welded with peg (10), the position of burying underground of the cross binding beam of directly burying underground (8) is opened and is worn muscle hole (11), and is welded with peg (10) at its external surface.
8. height disjunctor according to claim 6 is built accessible fitting structure, it is characterized in that: described built-in fitting (6) is made up of pre-embedded steel slab (6.1) and pre-buried anchoring piece (6.2), described pre-embedded steel slab (6.1) is one or two, described pre-buried anchoring piece is reinforcing bar or angle steel, be arranged between two pre-embedded steel slabs (6.1), and be welded to connect with pre-embedded steel slab (6.1).
9. height disjunctor according to claim 1 is built accessible fitting structure, it is characterized in that: the width of described last-cost joint (5) is 10~1000mm.
10. according to any job practices that described height disjunctor is built accessible fitting structure of claim 1~9, it is characterized in that: step is as follows:
Step 1, respectively construction finish high building agent structure primary structure member (2) and low major structure of construction primary structure member (1) and with built-in fitting (6), be with brace summer or the brace summer itself of built-in fitting directly to be embedded in simultaneously in high building agent structure primary structure member (2) and the low major structure of construction primary structure member (1);
Step 2, connection horizontal member (3) between colligation high building and the low major structure of construction, install its concrete blinding after-pouring and connect horizontal member (3), build in the process and establishing last-cost joint (5) near high building with hanging down to build to hold to stay respectively, and at last-cost joint (5) both sides installation wire lath (9), described wire lath (9) passes the elongated steel bar stress that connects horizontal member (3); Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building, this step is carried out simultaneously with step 1;
Step 3, the concrete that maintenance connects horizontal member (3) reaches its design strength; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building;
Step 4, the horizontal connecting elements bottom surface template of dismounting brace summer position, continue simultaneously to construct respectively high building and low other parts of building, and the sedimentation and deformation of observation high building and low building
Step 5 is in step 1 only pre-buried built-in fitting (6), at built-in fitting (6) welding or bolt brace summer; Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building; Pre-buried brace summer or brace summer itself for the band built-in fitting do not have this step in step 1;
Step 6 is removed the residue template that connects horizontal member (3); Continue the other parts of high building and low building of constructing respectively simultaneously, and observe the sedimentation and deformation of high building and low building;
Step 7, most of load for the treatment of high building and low building apply finish and the stable back of sedimentation and deformation with expansive concrete shutoff last-cost joint (5);
Step 8, the expansive concrete of maintenance last-cost joint (5) is until reaching its design strength.
11. height disjunctor according to claim 10 is built the job practices of accessible fitting structure, it is characterized in that: remove the brace summer that connects horizontal member (3) bottom surface after described step 8 is finished.
CN 201110125443 2011-05-16 2011-05-16 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof Active CN102251582B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110125443 CN102251582B (en) 2011-05-16 2011-05-16 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110125443 CN102251582B (en) 2011-05-16 2011-05-16 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof

Publications (2)

Publication Number Publication Date
CN102251582A CN102251582A (en) 2011-11-23
CN102251582B true CN102251582B (en) 2013-08-21

Family

ID=44979124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110125443 Active CN102251582B (en) 2011-05-16 2011-05-16 Barrier-free decoration structure of high and low incorporated buildings and construction method thereof

Country Status (1)

Country Link
CN (1) CN102251582B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133740A (en) * 2015-08-05 2015-12-09 长安大学 Shock insulation construction applied to town building and construction method thereof

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535865B (en) * 2011-12-19 2014-08-20 悉地(北京)国际建筑设计顾问有限公司 Construction method of hexagon screen drum structure
CN104847111B (en) * 2015-05-29 2017-03-22 中国建筑东北设计研究院有限公司 Construction method for coupling beam between shear wall limbs
CN105735483B (en) * 2016-04-12 2018-04-13 姚攀峰 A kind of high-low connected house relative settlement reply structure and its construction method
CN114775700B (en) * 2022-04-29 2024-05-10 山东电力工程咨询院有限公司 System and method for treating sedimentation difference between bottom plate of garbage pool and frame column foundation of discharging platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1539276A1 (en) * 1987-03-30 1990-01-30 Научно-Исследовательская Лаборатория Физико-Химической Механики Материалов И Технологических Процессов Главмоспромстройматериалов Assembly joint of crossbar with column of ferroconcrete skeleton of building
CN1590665A (en) * 2003-09-04 2005-03-09 张英保 Connecting structure of building external wall board and on site pouring concrete floor board and its connecting method
JP2008157020A (en) * 2006-12-22 2008-07-10 Simpson Strong Tie Co Moment-frame connection
CN201261916Y (en) * 2008-09-09 2009-06-24 贵阳铝镁设计研究院 Late poured band structure adopting profiled bar short beam to improve shear force
CN201605661U (en) * 2009-11-06 2010-10-13 贵阳铝镁设计研究院 Concretion connecting structure of supporting structure and later concrete pouring beam
CN202081512U (en) * 2011-05-16 2011-12-21 姚攀峰 Barrier-free decoration structure of high-low connected building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1539276A1 (en) * 1987-03-30 1990-01-30 Научно-Исследовательская Лаборатория Физико-Химической Механики Материалов И Технологических Процессов Главмоспромстройматериалов Assembly joint of crossbar with column of ferroconcrete skeleton of building
CN1590665A (en) * 2003-09-04 2005-03-09 张英保 Connecting structure of building external wall board and on site pouring concrete floor board and its connecting method
JP2008157020A (en) * 2006-12-22 2008-07-10 Simpson Strong Tie Co Moment-frame connection
CN101343894A (en) * 2006-12-22 2009-01-14 辛普森紧固系统公司 Moment frame connector
CN201261916Y (en) * 2008-09-09 2009-06-24 贵阳铝镁设计研究院 Late poured band structure adopting profiled bar short beam to improve shear force
CN201605661U (en) * 2009-11-06 2010-10-13 贵阳铝镁设计研究院 Concretion connecting structure of supporting structure and later concrete pouring beam
CN202081512U (en) * 2011-05-16 2011-12-21 姚攀峰 Barrier-free decoration structure of high-low connected building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133740A (en) * 2015-08-05 2015-12-09 长安大学 Shock insulation construction applied to town building and construction method thereof

Also Published As

Publication number Publication date
CN102251582A (en) 2011-11-23

Similar Documents

Publication Publication Date Title
CN103243652B (en) A kind of large-span non-floor type cast-in-place beam falsework and construction method thereof
CN205531315U (en) Can dismantle steel bar truss building carrier plate support system
CN102251582B (en) Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN202139833U (en) Cantilever scaffold for building construction
CN104878766A (en) Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method
CN102661010B (en) Composite shear wall
CN105781099A (en) Movable combined type one-sided large template structure and construction method thereof
CN104746892B (en) Construction method that joist demolishes walls device and joist is demolished walls
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
KR20120096605A (en) Bracket support type downward construction system and method
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
CN110284702A (en) A kind of constructing device and construction method of hyperboloid arc mixed mud wall
CN105507573B (en) The installation method of shaped steel Overhanging Outside Scaffold
CN102518300A (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN204690763U (en) Long side slope protection concrete continuous fast pouring drawing-die system
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN202081512U (en) Barrier-free decoration structure of high-low connected building
CN102733406B (en) Railway construction method of solid concrete roadbed in large-size industrial plant
CN104234447A (en) Tool-type suspension staircase for deep foundation pit
CN109723081A (en) Subway station lattice column construction method
KR101387954B1 (en) Mehod for constructing underground wall in extension of undergound parking lot
CN110565667B (en) Steel sheet pile cofferdam with grouting platform
CN204677212U (en) A kind of structure reducing tunnel lining structure internal force
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING GUOTAI CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: YAO PANFENG

Effective date: 20130722

Owner name: YAO PANFENG

Effective date: 20130722

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100073 FENGTAI, BEIJING TO: 100161 FENGTAI, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130722

Address after: Guorun commercial building 46 No. 100161 Beijing Fengtai District West Fourth Ring Road Room 2301

Applicant after: Yao Panfeng

Applicant after: Yao Panfeng

Address before: 100073 Beijing Huayuan Huayuan, building No. 203, room 13, Fengtai District

Applicant before: Yao Panfeng

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160805

Address after: 100073 Beijing Huayuan Huayuan, building No. 203, room 13, Fengtai District