CN103711298A - Method for constructing anchoring system of structural steel overhanging scaffold - Google Patents

Method for constructing anchoring system of structural steel overhanging scaffold Download PDF

Info

Publication number
CN103711298A
CN103711298A CN201310730648.XA CN201310730648A CN103711298A CN 103711298 A CN103711298 A CN 103711298A CN 201310730648 A CN201310730648 A CN 201310730648A CN 103711298 A CN103711298 A CN 103711298A
Authority
CN
China
Prior art keywords
shaped steel
cantilever beams
anchor
tool
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310730648.XA
Other languages
Chinese (zh)
Inventor
孙成帅
马一方
陆伟
车其杰
程瑶
申展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201310730648.XA priority Critical patent/CN103711298A/en
Publication of CN103711298A publication Critical patent/CN103711298A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides a method for constructing an anchoring system of a structural steel overhanging scaffold. The method for constructing the anchoring system of the structural steel overhanging scaffold comprises the steps that after a floor formwork project is completely erected and passes acceptance inspection, according to the placing position of a structural steel overhanging girder, the installation position of a tool type anchoring bolt combined piece is determined, nails penetrate through fixing holes in a bottom anchoring steel plate, so that the bottom anchoring steel plate is fixed to a formwork, the bottom anchoring steel plate is coated with a release agent or a plastic film is laid on the bottom anchoring steel plate, each anchor bolt is sleeved with a PVC embedded sleeve, plate ribs and reinforcing steel bars are bound according to the design requirements, and after an upper-layer wall body of a layer to be overhung reaches certain strength, tool type pulling rings are additionally arranged through PVC embedded sleeve holes. The anchoring system of the structural steel overhanging scaffold is of an assembling type and tool type, materials are saved, disassembly and assembly are simple, revolution is convenient, and labor is saved; cutting is not need after the system is used, the following process is prevented from being influenced, the work period is shortened, and the system is environmentally friendly and remarkable in economic benefit.

Description

A kind of the shaped steel suspension scaffolding draws anchor system construction method
Technical field
The present invention relates to a kind of the shaped steel suspension scaffolding that meets the requirements such as scaffold safety, construction facility and draw anchoring piece
Background technology
The shaped steel suspension scaffolding using in building construction process at present draws anchoring piece, substantially be all embedded in floor and body of wall, this easy pre-buried anchoring piece that draws, its shortcoming is that fixation complexity is installed, it is large that pre-buried precision is controlled difficulty, cannot realize standard completely and builder's jack be drawn to the safety requirements of anchor system, potential safety hazard is large; And while removing, must cut by arc welding, affect later stage operation, during construction, part is yielding, affects amount of deflection.Can not have enough to meet the need use, waste lot of materials, construction cost is high.
Summary of the invention
In order to solve existing building construction the shaped steel suspension scaffolding, draw and in anchor system, exist draw ring, pressure ring can not have enough to meet the need the problem of the aspects such as use, potential safety hazard are large, the invention provides a kind of brand-new the shaped steel suspension scaffolding and draw anchoring piece, finely solved the difficult problem that current the shaped steel suspension scaffolding draws anchor system to exist, technological design is reasonable, construction quality is good, it is safe and reliable, cost-saving to construct.
The shaped steel suspension scaffolding of the present invention draws the structure technology scheme of anchoring piece as follows:
The shaped steel suspension scaffolding of the present invention draws anchoring piece to comprise bottom anchor steel plate, anchor plate bolt hole, anchor bolt, bolting steel pressing plate, keeper plate of steel bolt hole and two supporting nut, wherein, anchor plate spiro keyhole position is on bottom anchor steel plate, keeper plate of steel spiro keyhole position is on bolting steel pressing plate, anchor bolt is through the anchor plate bolt hole on bottom anchor steel plate, and through the keeper plate of steel bolt hole on bolting steel pressing plate, one end of anchor bolt is fixed on bottom anchor steel plate, and on the other end of anchor bolt, cover has two supporting nuts; Bolting steel pressing plate compresses anchor bolt, and two supporting nuts are tightened anchor bolt.
Invention the shaped steel suspension scaffolding draw anchor system construction method to be, in form work engineering, install complete, after acceptance(check), the position of placing according to shaped steel Cantilever Beams, determine tool-type anchor bolt composite member installation site, with nail, cross the fixing hole on bottom anchor steel plate, be fixed in template.Brushing demoulding body or paving plastic film on bottom anchor steel plate, and on anchor bolt, overlap PVC service sleeve, by designing requirement colligation plate muscle and stiffener, after reinforcing bar template and pre-buried acceptance(check), can start casting beams board concrete, after concrete reaches construction requirement intensity, shaped steel Cantilever Beams is placed between anchor bolt, and compress with bolting steel pressing plate 4, with two supporting nuts, tighten, and with timber wedge jam-pack, complete the installation of shaped steel Cantilever Beams between shaped steel Cantilever Beams and anchor bolt, can carry out next procedure operation; While removing shaped steel Cantilever Beams, unclamp two supporting nuts, take away after bolting steel pressing plate, shaped steel Cantilever Beams can be removed, finally can this tool-type anchor bolt composite member be taken out from beam slab below, realize the turnover of this tool-type anchor bolt composite member and use.
Accompanying drawing explanation
Fig. 1 is the structural representation that the shaped steel suspension scaffolding of the present invention draws anchoring piece.
Fig. 2 is the structure upward view that the shaped steel suspension scaffolding of the present invention draws anchoring piece.
Fig. 3 is the structure top view that the shaped steel suspension scaffolding of the present invention draws anchoring piece.
Fig. 4 is the mounting structure schematic diagram that the shaped steel suspension scaffolding of the present invention draws anchoring piece.
Fig. 5 is tool-type draw ring bolt combination part assembling applying working condition figure.
Fig. 6 is tool-type draw ring tool-type anchor bolt composite member elevation.
Fig. 7 is that the shaped steel suspension scaffolding of the present invention draws anchor system to install and use schematic diagram.
Description of reference numerals: 1-bottom anchor steel plate, 2-bottom anchor steel plate, 3-anchor bolt, 4-bolting steel pressing plate, 5-keeper plate of steel bolt hole, the two supporting nuts of 6-, 7-demoulding body, 8-stiffener, 9-shaped steel Cantilever Beams, 10-timber wedge, 11-fixing hole, 12-wire nail, 13-template, 14-draw ring reinforcing bar, 15-individual layer billet, 16-double nut, 17-PVC service sleeve.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is described in further detail.
As shown in Figure 1, the shaped steel suspension scaffolding of the present invention draws anchoring piece to comprise bottom anchor steel plate 1, anchor plate bolt hole 2, anchor bolt 3, bolting steel pressing plate 4, keeper plate of steel bolt hole 5 and two supporting nut 6, wherein, anchor plate bolt hole 2 is positioned on bottom anchor steel plate 1, as shown in Figure 2, keeper plate of steel bolt hole 5 is positioned on bolting steel pressing plate 4, as shown in Figure 3; Anchor bolt 3 is through the anchor plate bolt hole 2 on bottom anchor steel plate 1, and through the keeper plate of steel bolt hole 5 on bolting steel pressing plate 4, one end of anchor bolt 3 is fixed on bottom anchor steel plate 1, and on the other end of anchor bolt 3, cover has two supporting nuts 6; Bolting steel pressing plate 4 compresses anchor bolt 3, and two supporting nuts 6 are tightened anchor bolt 3.
Adopt a kind of the shaped steel suspension scaffolding of the present invention to draw anchor system construction method to be, in form work engineering, install complete, after acceptance(check), the position of placing according to shaped steel Cantilever Beams, determine tool-type anchor bolt composite member installation site, with nail 12, through the fixing hole 11 on bottom anchor steel plate 1, be fixed in template 13.Brushing demoulding body 7 or paving plastic film on bottom anchor steel plate 1, and on anchor bolt 3, overlap PVC service sleeve, by designing requirement colligation plate muscle and stiffener 8, after reinforcing bar template and pre-buried acceptance(check), can start casting beams board concrete, after concrete reaches construction requirement intensity, shaped steel Cantilever Beams 9 is placed between anchor bolt 3, and compress with bolting steel pressing plate 4, with two supporting nuts 6, tighten, and with timber wedge 10 jam-packs, complete the installation of shaped steel Cantilever Beams between shaped steel Cantilever Beams 9 and anchor bolt 3, can carry out next procedure operation; While removing shaped steel Cantilever Beams, unclamp two supporting nuts 6, take away after bolting steel pressing plate 3, shaped steel Cantilever Beams 9 can be removed, finally can this tool-type anchor bolt composite member be taken out from beam slab below, realize the turnover of this tool-type anchor bolt composite member and use.
As shown in Fig. 5, Fig. 6 and Fig. 7, treat that overhang layer last layer wall form engineering installs complete, after acceptance(check), the position of placing according to shaped steel Cantilever Beams, determine tool-type wire-rope sling bolt combination part installation site, suspension ring reinforcing bar 14, through PVC service sleeve 17, there is being is screw thread one side to penetrate billet 15, and tightened with double nut 16.By wire rope or reinforcing pull rod and last layer building structure drawknot for designing requirement, complete shaped steel Cantilever Beams and install, can carry out next procedure operation; While removing shaped steel Cantilever Beams, unclamp double nut 16, take away after bolting steel pressing plate 16, shaped steel Cantilever Beams can be removed, finally can in concrete shear force wall, this tool-type bolt combination part be taken out, realize the turnover of this tool-type bolt combination part and use.
The present invention has the following advantages: when (one) removes shaped steel Cantilever Beams, unclamp two supporting nuts, take away after bolting steel pressing plate, shaped steel Cantilever Beams can be removed, finally can this anchor bolt composite member be taken out from beam slab below, realize the turnover of this tool-type anchor bolt composite member and use; (2) unclamp draw ring double nut, take away after bolting steel pressing plate, can in concrete shear force wall, this tool-type bolt combination part be taken out, realize the turnover of this tool-type draw ring bolt combination part and use.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited to this, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; can expect easily changing or replacing, within all should being encompassed in protection scope of the present invention.

Claims (1)

1. a shaped steel suspension scaffolding draws anchor system construction method, it is characterized in that, in form work engineering, install complete, after acceptance(check), the position of placing according to shaped steel Cantilever Beams, determine tool-type anchor bolt composite member installation site, with nail, cross the fixing hole on bottom anchor steel plate, be fixed in template.Brushing demoulding body or paving plastic film on bottom anchor steel plate, and on anchor bolt, overlap PVC service sleeve, by designing requirement colligation plate muscle and stiffener, after reinforcing bar template and pre-buried acceptance(check), can start casting beams board concrete, after concrete reaches construction requirement intensity, shaped steel Cantilever Beams is placed between anchor bolt, and compress with bolting steel pressing plate, with two supporting nuts, tighten, and with timber wedge jam-pack, complete the installation of shaped steel Cantilever Beams between shaped steel Cantilever Beams and anchor bolt, can carry out next procedure operation; While removing shaped steel Cantilever Beams, unclamp two supporting nuts, take away after bolting steel pressing plate, shaped steel Cantilever Beams can be removed, finally can this tool-type anchor bolt composite member be taken out from beam slab below, realize the turnover of this tool-type anchor bolt composite member and use;
Treat that overhang layer last layer wall form engineering installs complete, after acceptance(check), the position of placing according to shaped steel Cantilever Beams, determine tool-type wire-rope sling bolt combination part installation site, suspension ring reinforcing bar, through PVC service sleeve, there is being is screw thread one side to penetrate billet, and tightened with double nut.By wire rope or reinforcing pull rod and last layer building structure drawknot for designing requirement, complete shaped steel Cantilever Beams and install, can carry out next procedure operation; While removing shaped steel Cantilever Beams, unclamp double nut, take away after bolting steel pressing plate, shaped steel Cantilever Beams can be removed, finally can in concrete shear force wall, this tool-type bolt combination part be taken out, realize the turnover of this tool-type bolt combination part and use.
CN201310730648.XA 2013-12-27 2013-12-27 Method for constructing anchoring system of structural steel overhanging scaffold Pending CN103711298A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310730648.XA CN103711298A (en) 2013-12-27 2013-12-27 Method for constructing anchoring system of structural steel overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310730648.XA CN103711298A (en) 2013-12-27 2013-12-27 Method for constructing anchoring system of structural steel overhanging scaffold

Publications (1)

Publication Number Publication Date
CN103711298A true CN103711298A (en) 2014-04-09

Family

ID=50404611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310730648.XA Pending CN103711298A (en) 2013-12-27 2013-12-27 Method for constructing anchoring system of structural steel overhanging scaffold

Country Status (1)

Country Link
CN (1) CN103711298A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132189A (en) * 2014-04-29 2014-11-05 中建四局第六建筑工程有限公司 Concrete pump pipe fixing system applied under condition of high and steep slope
CN107882348A (en) * 2017-12-28 2018-04-06 山西五建集团有限公司 The integral totally enclosed special upper people's escape way of tower crane
CN107916775A (en) * 2017-11-21 2018-04-17 上海建工五建集团有限公司 A kind of reinforcing device and method of builder's jack and laminated floor slab
CN108756202A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 A kind of recyclable building builder's jack fixing device and application method
CN111207872A (en) * 2020-03-12 2020-05-29 淮安市博彦土木工程科学研究院有限公司 Stress monitoring system of overhanging steel wire rope/pull rod system of overhanging scaffold
CN111236620A (en) * 2020-01-16 2020-06-05 中铁二局集团有限公司 Anchor bolt sleeve and construction method for recoverable cantilever scaffold anchor bolt
CN112144859A (en) * 2020-10-22 2020-12-29 中联建设集团股份有限公司 Prefabricated laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure
CN112942789A (en) * 2021-02-04 2021-06-11 广东世纪达建设集团有限公司 Water drop type curtain wall construction method
CN113047593A (en) * 2021-05-14 2021-06-29 中铁七局集团郑州工程有限公司 Construction method of cantilever beam scaffold
CN113152871A (en) * 2021-04-18 2021-07-23 广西建工第一建筑工程集团有限公司 Tool type temporary cantilever steel beam foundation system device and mounting and dismounting use method
CN113216263A (en) * 2021-04-26 2021-08-06 哈尔滨工业大学(深圳) Active and passive dual-protection seawater sea sand reinforced concrete member and preparation method thereof
CN114673336A (en) * 2022-04-26 2022-06-28 中国电建集团河南工程有限公司 Novel detachable embedded bolt type cantilever frame construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2411390A (en) * 2003-08-01 2005-08-31 Jason Alex Sudborough Extendable loading platforms
CN2818654Y (en) * 2005-07-12 2006-09-20 上海市第二建筑有限公司 Self-walking straight-arm overhead operating platform
CN202248831U (en) * 2011-09-15 2012-05-30 浙江城建建设集团有限公司 Flying ring used for lacing diagonal steel wire rope and building structure
CN202596148U (en) * 2012-06-11 2012-12-12 江苏金土木建设集团有限公司 Reusable cantilever scaffold anchoring compression ring
CN203080890U (en) * 2013-02-07 2013-07-24 安宜建设集团有限公司 Cantilever scaffold with excellent safety performance
CN203271106U (en) * 2013-05-31 2013-11-06 中国建筑第六工程局有限公司 Profile steel anchoring device of cantilever scaffold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2411390A (en) * 2003-08-01 2005-08-31 Jason Alex Sudborough Extendable loading platforms
CN2818654Y (en) * 2005-07-12 2006-09-20 上海市第二建筑有限公司 Self-walking straight-arm overhead operating platform
CN202248831U (en) * 2011-09-15 2012-05-30 浙江城建建设集团有限公司 Flying ring used for lacing diagonal steel wire rope and building structure
CN202596148U (en) * 2012-06-11 2012-12-12 江苏金土木建设集团有限公司 Reusable cantilever scaffold anchoring compression ring
CN203080890U (en) * 2013-02-07 2013-07-24 安宜建设集团有限公司 Cantilever scaffold with excellent safety performance
CN203271106U (en) * 2013-05-31 2013-11-06 中国建筑第六工程局有限公司 Profile steel anchoring device of cantilever scaffold

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132189A (en) * 2014-04-29 2014-11-05 中建四局第六建筑工程有限公司 Concrete pump pipe fixing system applied under condition of high and steep slope
CN107916775A (en) * 2017-11-21 2018-04-17 上海建工五建集团有限公司 A kind of reinforcing device and method of builder's jack and laminated floor slab
CN107882348A (en) * 2017-12-28 2018-04-06 山西五建集团有限公司 The integral totally enclosed special upper people's escape way of tower crane
CN108756202A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 A kind of recyclable building builder's jack fixing device and application method
CN111236620A (en) * 2020-01-16 2020-06-05 中铁二局集团有限公司 Anchor bolt sleeve and construction method for recoverable cantilever scaffold anchor bolt
CN111207872A (en) * 2020-03-12 2020-05-29 淮安市博彦土木工程科学研究院有限公司 Stress monitoring system of overhanging steel wire rope/pull rod system of overhanging scaffold
CN112144859A (en) * 2020-10-22 2020-12-29 中联建设集团股份有限公司 Prefabricated laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure
CN112942789A (en) * 2021-02-04 2021-06-11 广东世纪达建设集团有限公司 Water drop type curtain wall construction method
CN112942789B (en) * 2021-02-04 2023-03-10 广东世纪达建设集团有限公司 Water drop type curtain wall construction method
CN113152871A (en) * 2021-04-18 2021-07-23 广西建工第一建筑工程集团有限公司 Tool type temporary cantilever steel beam foundation system device and mounting and dismounting use method
CN113216263A (en) * 2021-04-26 2021-08-06 哈尔滨工业大学(深圳) Active and passive dual-protection seawater sea sand reinforced concrete member and preparation method thereof
CN113047593A (en) * 2021-05-14 2021-06-29 中铁七局集团郑州工程有限公司 Construction method of cantilever beam scaffold
CN114673336A (en) * 2022-04-26 2022-06-28 中国电建集团河南工程有限公司 Novel detachable embedded bolt type cantilever frame construction method

Similar Documents

Publication Publication Date Title
CN103711298A (en) Method for constructing anchoring system of structural steel overhanging scaffold
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN205036072U (en) A shaped steel formwork support that encorbelments for high altitude structure of encorbelmenting
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN105113775A (en) Basic structure of cantilever scaffold
CN111734166A (en) Detachable conversion device and reverse dismantling construction method using same
CN113605771A (en) Prestress assembly type frame structure system
CN105926925A (en) Joist steel cantilever beam of suspended scaffold and construction method thereof
CN105507573A (en) Method for mounting external cantilever scaffolds made of shape steel
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN202945798U (en) Overhanging type scaffold corner device
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN202596148U (en) Reusable cantilever scaffold anchoring compression ring
CN220166700U (en) Bridge wet joint template construction device
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN102953344A (en) Climbing cone type triangular cantilever bracket
CN219548348U (en) Novel detachable combined cantilever supporting structure
CN209244242U (en) A kind of fixed device of half tool-type U-bolt of the shaped steel suspension scaffolding
CN207999071U (en) A kind of wall column root concrete capping tools
CN203145430U (en) Detachable anchor ring structure for fixing cantilever beam
CN108222503A (en) A kind of combined large pier stud steel form
CN113404277A (en) Elasticity-adjustable cantilever beam assembly and construction method thereof
CN103046753A (en) Overhanging base frame construction method adopting U-shaped fastener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Sun Chengshuai

Inventor after: Ma Yifang

Inventor after: Lu Wei

Inventor after: Che Qijie

Inventor after: Cheng Yao

Inventor after: Shen Zhan

Inventor after: Du Yanzhao

Inventor before: Sun Chengshuai

Inventor before: Ma Yifang

Inventor before: Lu Wei

Inventor before: Che Qijie

Inventor before: Cheng Yao

Inventor before: Shen Zhan

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20140409

RJ01 Rejection of invention patent application after publication