CN206815795U - A kind of new builder's jack component - Google Patents

A kind of new builder's jack component Download PDF

Info

Publication number
CN206815795U
CN206815795U CN201720497026.0U CN201720497026U CN206815795U CN 206815795 U CN206815795 U CN 206815795U CN 201720497026 U CN201720497026 U CN 201720497026U CN 206815795 U CN206815795 U CN 206815795U
Authority
CN
China
Prior art keywords
suspension scaffold
brace
steel suspension
utility
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720497026.0U
Other languages
Chinese (zh)
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Minghuang Building Materials Technology Co Ltd
Original Assignee
Shaoxing Minghuang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Minghuang Building Materials Technology Co Ltd filed Critical Shaoxing Minghuang Building Materials Technology Co Ltd
Priority to CN201720497026.0U priority Critical patent/CN206815795U/en
Application granted granted Critical
Publication of CN206815795U publication Critical patent/CN206815795U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of new builder's jack component, including I-steel suspension scaffold, I-steel suspension scaffold is connected by U-shaped anchor ear with floor plates, and oblique pull bar assembly is connected with I-steel suspension scaffold, oblique pull bar assembly includes brace, the end of brace is provided with coarse-pitch thread, and sleeve pipe is embedded with coarse-pitch thread, and sleeve pipe is provided with adjusting nut.The utility model uses overall brace adjustment length, and perforate connection technique on steel I-beam, has the advantages that material is saved, part is few, security greatly improves.

Description

A kind of new builder's jack component
Technical field
A kind of new builder's jack component is the utility model is related to, sets up and applies suitable for high-rise external scaffolding Work.
Background technology
At present, the method that outer outrigger scaffold is all encorbelmented using girder steel, its shortcoming are:Brace is made using steel bar welding nut Carry out adjustment length into the gaily decorated basket, potential safety hazard when welding does not meet specification be present, and the connector on girder steel is also deposited using welding In potential safety hazard.It is therefore proposed that the utility model.
Utility model content
For the above-mentioned technical problem of prior art, the purpose of this utility model is to provide a kind of new builder's jack structure Part, using overall brace adjustment length, and perforate connection technique on steel I-beam, there is material to save, part is few, security The advantages that greatly improving.
To reach above-mentioned purpose, the utility model is achieved through the following technical solutions:
A kind of new builder's jack component, including I-steel suspension scaffold, the I-steel suspension scaffold by U-shaped anchor ear with Floor plates are connected, and oblique pull bar assembly is connected with I-steel suspension scaffold, and the oblique pull bar assembly includes brace, the oblique pull The end of bar is provided with coarse-pitch thread, and sleeve pipe is embedded with the coarse-pitch thread, and described sleeve pipe is provided with adjusting nut.
Described I-steel suspension scaffold is coupled by bolt with brace.
Described floor plates are provided with plastic feet, and the bottom of described U-shaped anchor ear is located on plastic feet, U-shaped anchor ear End through floor plates and being fixed by iron plate.
New builder's jack component of the present utility model has the advantages that:
1st, oblique pull rod unit is less, safer firm;
2nd, material saves, and saves a large amount of artificial and material costs;
3rd, adjustment length is simpler, pre-buried more simple and convenient;
4th, slotted on steel I-beam punching connecting mode is more scientific, more material saving.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the U-shaped anchor ear in the utility model;
Wherein, 1 it is I-steel suspension scaffold, 2 be U-shaped anchor ear, 3 be floor plates, 4 be brace, 5 be coarse-pitch thread, 6 is set Pipe, 7 be adjusting nut, 8 be bolt, 9 be plastic feet, 10 be iron plate.
Embodiment
The utility model is further described with reference to specific embodiment, but the scope of protection of the utility model is simultaneously Not limited to this.
As illustrated in fig. 1 and 2, new builder's jack component of the present utility model, including I-steel suspension scaffold 1, I-steel Suspension scaffold 1 is connected by U-shaped anchor ear 2 with floor plates 3, and floor plates 3 are provided with plastic feet 9, and the bottom of U-shaped anchor ear 2 is positioned at modeling Expect on base 9, the end of U-shaped anchor ear 2 is fixed through floor plates 3 and by iron plate 10.
Oblique pull bar assembly is connected with I-steel suspension scaffold 1, oblique pull bar assembly includes brace 4, and I-steel suspension scaffold 1 is logical Cross bolt 8 with brace 4 to couple, the end of brace 4 is provided with coarse-pitch thread 5, is embedded with sleeve pipe 6 on coarse-pitch thread 5, sets on sleeve pipe 6 There is adjusting nut 7.
The construction method of the new builder's jack component of the utility model, comprises the following steps:
(1)Brace 4 and the position of sleeve pipe 6 and absolute altitude are determined in last layer formwork;
(2)With hole making drill perforate in the template on the outside of the beam propped up, perforate is unsuitable excessive, should can be worn with sleeve pipe 6 Cross;
(3)The lower end of sleeve pipe 6 is exposed outside template, and mortar leakage prevention is entered, and application adhesive tape suitable for reading wraps screw rod and sleeve pipe 6, Prevent from being in the milk, and sleeve pipe 6 is fixed on reinforcing bar with tied silk, brace 4 staggers with vertical rod;, in time will be oblique after concreting Pull bar 4 is extracted out, conveniently tears outboard template open;
(4)By in the threading 6 of brace 4, and fixed lower end I-shaped steel fastener, then fixed top lock washer and spiral shell Mother, it is allowed to tighten up brace 4, and adjusts the height of I-steel suspension scaffold 1, last double nut is fixed.Reverse-order is pressed during dismounting Progressively remove.
The utility model uses overall brace adjustment length, and perforate connection technique on steel I-beam, has material section Save, the advantages that part is few, security greatly improves.
Above-described embodiment is only used for illustrating inventive concept of the present utility model, rather than to the utility model rights protection Restriction, it is all using this design to the utility model carry out unsubstantiality change, protection model of the present utility model all should be fallen into Enclose.

Claims (3)

  1. A kind of 1. new builder's jack component, it is characterised in that:Including I-steel suspension scaffold, the I-steel suspension scaffold passes through U-shaped anchor ear is connected with floor plates, and oblique pull bar assembly is connected with I-steel suspension scaffold, and the oblique pull bar assembly includes oblique pull Bar, the end of the brace are provided with coarse-pitch thread, sleeve pipe are embedded with the coarse-pitch thread, and described sleeve pipe is provided with adjusting nut.
  2. 2. new builder's jack component as claimed in claim 1, it is characterised in that:Described I-steel suspension scaffold passes through spiral shell Bolt couples with brace.
  3. 3. new builder's jack component as claimed in claim 1, it is characterised in that:Described floor plates are provided with plastic bottom Seat, the bottom of described U-shaped anchor ear are located on plastic feet, and the end of U-shaped anchor ear is fixed through floor plates and by iron plate.
CN201720497026.0U 2017-05-05 2017-05-05 A kind of new builder's jack component Expired - Fee Related CN206815795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720497026.0U CN206815795U (en) 2017-05-05 2017-05-05 A kind of new builder's jack component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720497026.0U CN206815795U (en) 2017-05-05 2017-05-05 A kind of new builder's jack component

Publications (1)

Publication Number Publication Date
CN206815795U true CN206815795U (en) 2017-12-29

Family

ID=60754989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720497026.0U Expired - Fee Related CN206815795U (en) 2017-05-05 2017-05-05 A kind of new builder's jack component

Country Status (1)

Country Link
CN (1) CN206815795U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023154A (en) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 A kind of new builder's jack component and its construction method
CN113216590A (en) * 2021-05-13 2021-08-06 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023154A (en) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 A kind of new builder's jack component and its construction method
CN113216590A (en) * 2021-05-13 2021-08-06 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method

Similar Documents

Publication Publication Date Title
CN201902010U (en) Instrumental overhanging scaffold hoop
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN106150087B (en) A kind of combined frame column template and its construction method
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN106801511A (en) A kind of super large reserved opening hanging mould structure and its construction method
CN206815795U (en) A kind of new builder's jack component
CN106013774B (en) A kind of sliding formwork flexibility platform device for being suitble to dispatch
CN206530050U (en) A kind of super large reserved opening hanging mould structure
CN107023154A (en) A kind of new builder's jack component and its construction method
CN206289945U (en) A kind of assembled Portable safety crosshead
CN204081445U (en) To encorbelment i iron anchor device
CN205955173U (en) Modular link wall spare subassembly
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN210289148U (en) Be used for building aluminium template bracing piece iron pipe
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN206957184U (en) External corner column sleeve buries screw rod and fixes suspension scaffold shaped steel connector
CN206319597U (en) A kind of cantilever steel girder erecting device
CN206034887U (en) I -steel cantilever beam of suspension type scaffold frame
CN207080169U (en) A kind of wall attaching parts for bridge construction safety climbing ladder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20200505