CN201902010U - Instrumental overhanging scaffold hoop - Google Patents

Instrumental overhanging scaffold hoop Download PDF

Info

Publication number
CN201902010U
CN201902010U CN2010206764444U CN201020676444U CN201902010U CN 201902010 U CN201902010 U CN 201902010U CN 2010206764444 U CN2010206764444 U CN 2010206764444U CN 201020676444 U CN201020676444 U CN 201020676444U CN 201902010 U CN201902010 U CN 201902010U
Authority
CN
China
Prior art keywords
hoop
anchor ear
overhanging
tool
instrumental
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206764444U
Other languages
Chinese (zh)
Inventor
卢传林
丁勇祥
张云泰
张鹏武
王飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN2010206764444U priority Critical patent/CN201902010U/en
Application granted granted Critical
Publication of CN201902010U publication Critical patent/CN201902010U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an instrumental overhanging scaffold hoop, which is characterized in that the hoop is U-shaped, and the lower ends of the vertical sections of the U-shaped hoop are respectively provided with an anchoring bolt section. Each anchoring bolt section of the hoop is provided with a pin hole. The length of the horizontal section of the hoop is fit to the width of overhanging I-steel. The length of each vertical section of the hoop is fit to the sum of the thickness of a structural floor slab and the height of the overhanging I-steel. The corresponding positions on which the hoop penetrates through the surface of the structural floor slab are respectively provided with a PVC (polyvinyl chloride) pipe. The hoop is fixedly connected with the overhanging I-steel through a nut. A steel plate is embedded under the surface of the structural floor slab, and round holes are respectively arranged on the positions of the corresponding PVC pipes on the steel plate, wherein the diameter of each round hole is equal to the direction of each vertical section of the hoop. The instrumental overhanging scaffold hoop provided by the utility model has a wide usable range, and all overhanging scaffolds and overhanging discharging platform hoops outside high-rise buildings can be applied according to reference; the instrumental overhanging scaffold hoop can be disassembled and assembled, and is convenient to turnover for use; and the materials are saved, the cost is lowered, and the scientific and technical innovation and green building are embodied.

Description

Tool-type builder's jack anchor ear
Technical field
The utility model relates to a kind of tool-type builder's jack anchor ear.
Background technology
In current building structure construction process, people continue to use traditional round steel " Ω " form that is made into of utilizing always and are embedded in the structure floor, has convenience operation, but this kind anchor ear form required round steel quantity of material in highrise building is big, and when the later stage external scaffolding is removed, need a large amount of oxygen weldings to cut off anchor ear, round steel can't reuse after cutting off fritter.
The utility model content
Technical problem to be solved in the utility model provides a kind of tool-type builder's jack anchor ear, after adopting this tool anchor ear, anchor ear passes through floor slab structure and adopts bolt, this kind anchor ear is installed and is removed all very convenient and can guarantee the construction safety that builder's jack is set up, and saved resource, can fully accomplish recycling, play the purpose that reduces cost preferably.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of tool-type builder's jack anchor ear is characterized in that: described anchor ear is the U font, and the lower end of the vertical section of this U font anchor ear is provided with the anchor bolt section.A pin hole is set on the described anchor bolt section.
The horizontal section length of described anchor ear adapts with the i iron width size of encorbelmenting.
The length of described anchor ear vertical section and structure floor thickness and the i iron height sum of encorbelmenting adapt.
Described anchor ear passes structure floor face corresponding position and is provided with pvc pipe.
Described anchor ear is connected by fixed by nut with the i iron of encorbelmenting.
Pre-embedded steel slab and establish the round hole that diameter is equal to anchor ear vertical section diameter under the described structure floor face in the corresponding pvc pipe of steel plate position.
The utlity model has following advantage:
The utility model scope of application is wide, and encorbelmenting the frame and the discharging platform anchor ear of encorbelmenting outside the Van Gogh layer building all can be with reference to application; The suitable use of dismantled and assembled, convenient turnover; Save material, reduced cost, embodied scientific and technical innovation and green building.
Description of drawings
Fig. 1 is the utility model structure chart
Fig. 2 is an A node diagram among Fig. 1
Among the figure: the vertical section of 1-anchor ear, 2-anchor bolt section, the 3-i iron of encorbelmenting, 4-structure floor, 5-PVC pipe, 6-nut, 7-steel plate, 8-pin hole
The specific embodiment
The utility model is described in further detail below in conjunction with Figure of description.
A kind of tool-type builder's jack anchor ear is characterized in that: described anchor ear is the U font, and the lower end of the vertical section 1 of this U font anchor ear is provided with anchor bolt section 2.
On the described anchor ear anchor bolt section 2 pin hole 8 is set.
The horizontal section length of described anchor ear adapts with the i iron 3 width sizes of encorbelmenting.
The length of described anchor ear vertical section 1 and structure floor 4 thickness and the i iron 3 height sums of encorbelmenting adapt.
Described anchor ear passes structure floor face corresponding position and is provided with pvc pipe 5.
Described anchor ear is fixedlyed connected by nut 6 with the i iron 3 of encorbelmenting.
4 following pre-embedded steel slabs 7 of described structure floor are also established the round hole that diameter is equal to anchor ear vertical section 1 diameter in steel plate 7 corresponding pvc pipes 5 positions.
Specific practice: the novel frame anchor ear of encorbelmenting adopts the U font, sets up standard and force request according to the highrise building builder's jack, adopts round steel to make.Its vertical section length determines that according to structure floor 4 thickness, i iron 3 height size of encorbelmenting its horizontal section length is determined according to the i iron 3 width size of encorbelmenting.Its intensity, rigidity must satisfy the requirement of design load ultimate bearing capacity, and 30 a diameter phi 6 pin holes 8 are set in the anchor ear bottom far from the bottom, and widow bolts is with hold-doun nut 6 positions.
Builder's jack adopts 3 anchor ears to fix fixedly the time, and 2 anchor ear spacings of 1 anchor ear in front and back are 3m, and spacing is taken as 300mm between 2 anchor ears in back.Every anchor ear bolt adopts 2 more than or equal to the M20 fixed by nut.
Concrete construction technology: the pvc pipe in the pre-buried diameter phi in structure floor face relevant position 〉=25, and anchor ear passed pvc pipe to strengthen the pvc pipe fixation.Pre-embedded steel slab at the bottom of plate, its sectional dimension is determined according to actual conditions, and cut off the round hole that diameter is equal to the anchor ear diameter in the pre-buried position of the corresponding PVC of steel plate, treat that the structure floor construction is finished and begun to set up and when encorbelmenting i iron anchor ear is connected with i iron and at the bottom of floor, uses more than or equal to the connection of M20 bolt fixed to carry out.

Claims (6)

1. tool-type builder's jack anchor ear, it is characterized in that: described anchor ear is the U font, the lower end of the vertical section of this U font anchor ear is provided with the anchor bolt section, and a pin hole is set on the described anchor bolt section.
2. tool-type builder's jack anchor ear as claimed in claim 1 is characterized in that: the horizontal section length of described anchor ear adapts with the i iron width size of encorbelmenting.
3. tool-type builder's jack anchor ear as claimed in claim 1 is characterized in that: the length of described anchor ear vertical section and structure floor thickness and the i iron height sum of encorbelmenting adapt.
4. tool-type builder's jack anchor ear as claimed in claim 3 is characterized in that: described anchor ear passes structure floor face corresponding position and is provided with pvc pipe.
5. tool-type builder's jack anchor ear as claimed in claim 4 is characterized in that: pre-embedded steel slab and establish the round hole that diameter is equal to anchor ear vertical section diameter in the corresponding pvc pipe of steel plate position under the described structure floor face.
6. tool-type builder's jack anchor ear as claimed in claim 1 is characterized in that: described anchor ear is connected by fixed by nut with the i iron of encorbelmenting.
CN2010206764444U 2010-12-23 2010-12-23 Instrumental overhanging scaffold hoop Expired - Fee Related CN201902010U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206764444U CN201902010U (en) 2010-12-23 2010-12-23 Instrumental overhanging scaffold hoop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206764444U CN201902010U (en) 2010-12-23 2010-12-23 Instrumental overhanging scaffold hoop

Publications (1)

Publication Number Publication Date
CN201902010U true CN201902010U (en) 2011-07-20

Family

ID=44272610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206764444U Expired - Fee Related CN201902010U (en) 2010-12-23 2010-12-23 Instrumental overhanging scaffold hoop

Country Status (1)

Country Link
CN (1) CN201902010U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444271A (en) * 2011-11-01 2012-05-09 中建三局建设工程股份有限公司 Suspended scaffolding with cast-in-place concrete structure
CN102635226A (en) * 2012-05-04 2012-08-15 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN102650149A (en) * 2012-05-04 2012-08-29 中天建设集团有限公司 I steel reinforcement and hoop fixing structure
CN103046753A (en) * 2011-10-13 2013-04-17 永升建设集团有限公司 Overhanging base frame construction method adopting U-shaped fastener
CN104032945A (en) * 2013-08-19 2014-09-10 重庆建工第九建设有限公司 Recyclable rebar anchor pull ring and mounting support thereof
CN104989101A (en) * 2015-05-25 2015-10-21 中国五冶集团有限公司 Discharging platform construction method
CN105003069A (en) * 2015-07-16 2015-10-28 上海建工四建集团有限公司 Large-span cable-stayed locking dewatering operating platform and construction method thereof
CN105735630A (en) * 2016-02-19 2016-07-06 江苏华海钢结构有限公司 Fixing method for steel beam
CN105888226A (en) * 2014-11-28 2016-08-24 华北冶建工程建设有限公司 High-rise building suspending scaffold cantilever beam anchoring method
CN110469104A (en) * 2019-08-19 2019-11-19 重庆建工第三建设有限责任公司 A kind of detachable anchor ring construction technology

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046753A (en) * 2011-10-13 2013-04-17 永升建设集团有限公司 Overhanging base frame construction method adopting U-shaped fastener
CN102444271B (en) * 2011-11-01 2015-12-09 中建三局建设工程股份有限公司 Suspended scaffolding
CN102444271A (en) * 2011-11-01 2012-05-09 中建三局建设工程股份有限公司 Suspended scaffolding with cast-in-place concrete structure
CN102635226A (en) * 2012-05-04 2012-08-15 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN102650149A (en) * 2012-05-04 2012-08-29 中天建设集团有限公司 I steel reinforcement and hoop fixing structure
CN102635226B (en) * 2012-05-04 2014-05-28 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN104032945A (en) * 2013-08-19 2014-09-10 重庆建工第九建设有限公司 Recyclable rebar anchor pull ring and mounting support thereof
CN105888226A (en) * 2014-11-28 2016-08-24 华北冶建工程建设有限公司 High-rise building suspending scaffold cantilever beam anchoring method
CN104989101A (en) * 2015-05-25 2015-10-21 中国五冶集团有限公司 Discharging platform construction method
CN105003069A (en) * 2015-07-16 2015-10-28 上海建工四建集团有限公司 Large-span cable-stayed locking dewatering operating platform and construction method thereof
CN105735630A (en) * 2016-02-19 2016-07-06 江苏华海钢结构有限公司 Fixing method for steel beam
CN110469104A (en) * 2019-08-19 2019-11-19 重庆建工第三建设有限责任公司 A kind of detachable anchor ring construction technology
CN110469104B (en) * 2019-08-19 2021-07-13 重庆建工第三建设有限责任公司 Detachable anchor ring construction process

Similar Documents

Publication Publication Date Title
CN201902010U (en) Instrumental overhanging scaffold hoop
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN113931313A (en) Super high-rise core tube horizontal structure construction method
CN202787926U (en) Overhanging scaffold simple and convenient to disassemble and assemble
CN202370234U (en) Tool type elevator hoistway construction platform
CN202324606U (en) U-shaped force bearing seat
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN202596148U (en) Reusable cantilever scaffold anchoring compression ring
CN202509764U (en) Template bracing structure for constructional column
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN108222503A (en) A kind of combined large pier stud steel form
CN206815795U (en) A kind of new builder's jack component
CN202440833U (en) Structure for supporting construction elevator base on top plate of basement
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN201447862U (en) Instrumental operating platform used for elevator shaft shear wall shuttering erection
CN201339320Y (en) High-altitude overhanging hanging reinforced concrete hanging bracket
CN204040457U (en) Wooden frame plastic formwork system
CN211714541U (en) Special handling frame for installing shear wall template in elevator shaft
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN203603461U (en) Floor aluminum shuttering splicing formwork structure system
CN209907936U (en) Integrated template system of cast-in-situ overhanging window board with secondary structure
CN203320922U (en) Supporting device for forming of elevator shaft template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720

Termination date: 20151223

EXPY Termination of patent right or utility model