Tower crane foundation base and construction method thereof Download PDFInfo
- Publication number
- CN106351245A CN106351245A CN201610750488.9A CN201610750488A CN106351245A CN 106351245 A CN106351245 A CN 106351245A CN 201610750488 A CN201610750488 A CN 201610750488A CN 106351245 A CN106351245 A CN 106351245A
- Authority
- CN
- China
- Prior art keywords
- section
- heavy
- body frame
- tower crane
- gooseneck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Abstract
The invention discloses a tower crane foundation base, comprising multiple main body frame columns, multiple reinforcement anchorage retention plates, and multiple large-section steel cross beam frames, whereinmultiple reinforcement anchorage retention plates are respectively embedded on multiple main body frame columns and external ends of multiple large-section steel cross beam frames are fixed to multiple reinforcement anchorage retention plates. Because the external ends of multiple large-section steel cross beam frames are fixed to multiple reinforcement anchorage retention plates, the large-section steel cross beam frame tower crane foundation is convenient to disassemble and assemble, and is saved in time, labor and land, and meets green construction requirements.
Description
Technical field
The present invention relates to a kind of construction implement field, more particularly to a kind of tower crane pedestal and its construction method.
Background technology
With the construction and development in city, high-rise, high-rise building gets more and more, and the form of tower crane is varied
, such as: independent cushion cap tower crane, be arranged at basement bottom board or top board tower crane, Core Walls Structure inner climbing crane tower etc..Building
In construction, the vertical transport of various construction materials is completed by tower crane, and what the stability of tower crane and firmness directly influenced applies
The safety of work and progress.The construction of especially modern high-rise building and deeper subsurface room, tower crane is often arranged on basement
Centre, in the basement construction stage, foundation base platform the following is hanging, and the therefore requirement to tower crane is at a relatively high, once tower crane
Structure goes wrong, and the consequence that it leads to will be hardly imaginable.The stable one of principal element of impact tower crane overall structure is just
It is tower crane pedestal, all of load-bearing is all transmitted by tower crane pedestal;In addition, tower crane pedestal is also subjected to additionally
Natural wind, so, tower crane pedestal stable and be firmly extremely important.
Content of the invention
It is an object of the present invention to provide a kind of version is simple, energy-conserving and environment-protective, reusable tower crane base
Plinth seat.
Further object is that providing, one kind is convenient to assemble and disassemble, time and labour saving saves land, meeting green construction will again
The construction method of the tower crane pedestal asked.
For achieving the above object, the technical solution of the present invention is:
The present invention is a kind of tower crane pedestal, including many body frame trestles, polylith Bar Anchorage plate, heavy in section gooseneck frame
Frame;Described polylith Bar Anchorage plate is embedded on many body frame trestles respectively, and the outer end of heavy in section gooseneck framework is fixed
On polylith Bar Anchorage plate.
Described heavy in section gooseneck framework is made up of many heavy in section H type goosenecks and Duo Gen heavy in section H type steel longeron,
Many heavy in section H type goosenecks are fixed between many heavy in section H type steel longerons respectively.
Described heavy in section gooseneck framework by two heavy in section H type goosenecks, two heavy in section H type steel longerons, two
Heavy in section H type steel carling is constituted;Two described heavy in section H type goosenecks are parallel respectively to be fixed on two heavy in section H type steel
Between longeron, two heavy in section H type steel carlings are parallel respectively to be fixed between two heavy in section H type goosenecks.
Described Bar Anchorage plate is made up of reinforcing bar, anchor plate;Described reinforcing bar is l shape reinforcing bar, and main body is imbedded at its l end
In frame column, its other end stretches out body frame trestle surface;Described anchor plate is angle steel shape, one side and l shape reinforcing bar
The external part stretching out body frame trestle surface is welded and fixed, and another side of anchor plate opens up multiple through holes and bolt passes through
This through hole is affixed with heavy in section gooseneck framework outer end.
Described body frame trestle is made up of four heavy in section frame columns, and four heavy in section frame columns are in rectangular layout, greatly
Four outer ends of section steel crossbeam frame are separately fixed on four heavy in section frame columns, and heavy in section gooseneck framework is apart from building ground
Face 100mm-300 mm.
Pre-embedded steel slab on body frame trestle, by fixing for heavy in section gooseneck framework stress on body frame trestle.
The present invention is a kind of construction method of tower crane pedestal, comprises the following steps:
(1) surveying setting-out;
(2) to built-in fitting, pre-buried position is accurately positioned;
(3) making of built-in fitting, after body frame trestle reinforcing bar binding completes acceptance(check), embedded bar anchor on body frame trestle
Gu plate;
(4) installation of embedded parts completes, disturbing concrete, heat and moisture preserving maintenance in time after concreting is qualified, and carries out in time
Built-in fitting position check measurement;
(5) heavy in section gooseneck framework is installed after body frame trestle concrete strength reaches 70%, heavy in section gooseneck framework with pre-
Embedded part adopts high-strength bolt to connect.
After such scheme, because the present invention includes many body frame trestles, polylith Bar Anchorage plate, heavy in section steel horizontal stroke
Beam framework;Described polylith Bar Anchorage plate is embedded on many body frame trestles respectively, the outer end of heavy in section gooseneck framework
It is fixed on polylith Bar Anchorage plate, have the advantage that
1st, because the outer end of heavy in section of the present invention gooseneck framework is bolted on polylith Bar Anchorage plate so that this
Bright heavy in section gooseneck framework tower crane is convenient to assemble and disassemble, and time and labour saving saves land again, meets green construction requirement.
2nd, compared with traditional tower crane, the tower-crane foundation structure form of this present invention is simple, energy-conserving and environment-protective, and repeating makes
With.
3rd, because the heavy in section gooseneck framework tower crane basis instrument of the present invention is on body frame trestle, e.g., the present invention can
It is arranged on basement roof, agent structure conversion layer is first-class, but stress is on body frame trestle, rather than stress is in basement
Top board or agent structure conversion layer flooring.
The present invention is further illustrated with specific embodiment below in conjunction with the accompanying drawings.
Brief description
Fig. 1 is the front view of the present invention;
Fig. 2 is the schematic diagram that body frame trestle of the present invention is connected with Bar Anchorage plate;
Fig. 3 is the front view of Bar Anchorage plate of the present invention.
Specific embodiment
As shown in Figure 1 and Figure 2, the present invention is a kind of tower crane pedestal, including many body frame trestles 1, polylith Bar Anchorage
Plate 2, heavy in section gooseneck framework 3.
Described polylith Bar Anchorage plate 2 is embedded on many body frame trestles 1 respectively, heavy in section gooseneck framework 3
Outer end is fixed on polylith Bar Anchorage plate 2.
Described heavy in section gooseneck framework 3 by 31, two heavy in section H type steel longerons 32 of two heavy in section H type goosenecks,
Two heavy in section H type steel carlings 33 are constituted;Two described heavy in section H type goosenecks 31 are parallel respectively to be fixed on two big section
Between face H type steel longeron 32, two heavy in section H type steel carlings 33 are parallel respectively to be fixed on two heavy in section H type goosenecks 31
Between.
Described Bar Anchorage plate 2 is made up of reinforcing bar 21, anchor plate 22.Described reinforcing bar 21 is l shape reinforcing bar 21, its l end
In embedment body frame trestle, its other end stretches out body frame trestle 1 surface;Described anchor plate 2 is angle steel shape, one side
The external part stretching out body frame trestle 1 surface with l shape reinforcing bar 21 is welded and fixed, and another side of anchor plate 2 opens up multiple
Through hole 221(is as shown in Figure 3) and bolt is affixed with heavy in section gooseneck framework 3 outer ends by this through hole 221.
Described body frame trestle 1 is made up of four heavy in section frame columns 11, the rectangular cloth of four heavy in section frame columns 11
Put, four outer ends of heavy in section gooseneck framework 3 are separately fixed on four heavy in section frame columns 11, heavy in section gooseneck framework
3 apart from flooring 100mm-300 mm.
The present invention is a kind of construction method of tower crane pedestal, comprises the following steps:
(1) surveying setting-out;
(2) to built-in fitting, pre-buried position is accurately positioned;
(3) built-in fitting, after body frame trestle 1 reinforcing bar binding completes acceptance(check), embedded bar anchor on body frame trestle 1 are made
Gu plate 2, anchorage length is 500mm.
(4) installation of embedded parts completes, and inspects for acceptance by design requirement, qualified after can disturbing concrete, concrete is strong
Degree not less than c50 commerical ready-mixed concrete, pour and must not collide during smashing, shift bar built-in fitting, concreting qualified after and
When heat and moisture preserving maintenance, and carry out built-in fitting position in time check measurement, should before concrete initial set in time if offsetting
Recover;
(5) heavy in section gooseneck framework 3, heavy in section gooseneck framework 3 are installed after body frame trestle 1 concrete strength reaches 70%
It is connected using m20 high-strength bolt with built-in fitting;
(6), after the completion of body frame trestle 1 concrete construction, sedimentation and displacement observation point are performed on the built-in fitting of basic corner, and
Perform protocol;
(7) lightning protection on basis, is held by the regulation of existing industry standard " building machinery uses act of technique for security " jgj33
OK.Tower crane grounding resistance is not more than 4 ω.
(8) tower crane chassis is installed;
(9) tower crane is checked and accepted;
(10) dismounting of tower crane is identical with conventional tower crane dismounting operation, other in addition to high-strength bolt after steel structure base dismounting
Steel beam column is reusable.
The above, only present pre-ferred embodiments, the version of heavy in section gooseneck framework have multiple, therefore
The scope that the present invention is implemented, the equivalence changes made according to scope of the present invention patent and description can not be limited with this
With modification, all should still remain within the scope of the patent.
Claims (7)
1. a kind of tower crane pedestal it is characterised in that: include many body frame trestles, polylith Bar Anchorage plate, heavy in section steel horizontal
Beam framework;Described polylith Bar Anchorage plate is embedded on many body frame trestles respectively, the outer end of heavy in section gooseneck framework
It is fixed on polylith Bar Anchorage plate.
2. tower crane pedestal according to claim 1 it is characterised in that: described heavy in section gooseneck framework is big by many
Section H type gooseneck and Duo Gen heavy in section H type steel longeron are constituted, and many heavy in section H type goosenecks fix many heavy in section h respectively
Between section longitudinal beam.
3. tower crane pedestal according to claim 1 and 2 it is characterised in that: described heavy in section gooseneck framework is by two
Root heavy in section H type gooseneck, two heavy in section H type steel longerons, two heavy in section H type steel carlings are constituted;Described two are big
Section H type gooseneck is parallel respectively to be fixed between two heavy in section H type steel longerons, and two heavy in section H type steel carlings are respectively
Parallel it is fixed between two heavy in section H type goosenecks.
4. tower crane pedestal according to claim 1 it is characterised in that: described Bar Anchorage plate is by reinforcing bar, anchor plate
Composition;Described reinforcing bar is l shape reinforcing bar, and in its l end embedment body frame trestle, its other end stretches out body frame trestle surface;Institute
The anchor plate stated is angle steel shape, and the external part that body frame trestle surface is stretched out with l shape reinforcing bar in one side is welded and fixed, anchoring
Multiple through holes are opened up on another side of plate and bolt is affixed with heavy in section gooseneck framework outer end by this through hole.
5. tower crane pedestal according to claim 1 it is characterised in that: described body frame trestle is by four heavy in section frames
Trestle is constituted, and four heavy in section frame columns are in rectangular layout, and four outer ends of heavy in section gooseneck framework are separately fixed at four
On the frame column of heavy in section, heavy in section gooseneck framework is apart from flooring 100mm-300 mm.
6. a kind of construction method of tower crane pedestal according to claim 1 it is characterised in that: pre- on body frame trestle
Bury steel plate, by fixing for heavy in section gooseneck framework stress on body frame trestle.
7. tower crane pedestal according to claim 6 construction method it is characterised in that: comprise the following steps:
(1) surveying setting-out;
(2) to built-in fitting, pre-buried position is accurately positioned;
(3) making of built-in fitting, after body frame trestle reinforcing bar binding completes acceptance(check), embedded bar anchor on body frame trestle
Gu plate;
(4) installation of embedded parts completes, disturbing concrete, heat and moisture preserving maintenance in time after concreting is qualified, and carries out in time
Built-in fitting position check measurement;
(5) heavy in section gooseneck framework is installed after body frame trestle concrete strength reaches 70%, heavy in section gooseneck framework with pre-
Embedded part adopts high-strength bolt to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610750488.9A CN106351245B (en) | 2016-08-29 | 2016-08-29 | Tower crane pedestal and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610750488.9A CN106351245B (en) | 2016-08-29 | 2016-08-29 | Tower crane pedestal and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106351245A true CN106351245A (en) | 2017-01-25 |
CN106351245B CN106351245B (en) | 2018-12-14 |
Family
ID=57855874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610750488.9A Active CN106351245B (en) | 2016-08-29 | 2016-08-29 | Tower crane pedestal and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106351245B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512639A (en) * | 2019-07-10 | 2019-11-29 | 中铁二局第一工程有限公司 | A kind of no floor steel structure tower crane foundation construction method and constructing structure |
CN113073677A (en) * | 2021-03-29 | 2021-07-06 | 四川省建筑科学研究院有限公司 | Tower crane suspended foundation device for reinforced concrete core barrel and construction method thereof |
CN115198786A (en) * | 2022-07-05 | 2022-10-18 | 广州建筑工程监理有限公司 | H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT522691B1 (en) * | 2019-05-15 | 2021-01-15 | Jak Gewerke Und Maschb Gmbh | Foundation for a building |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201581409U (en) * | 2009-12-25 | 2010-09-15 | 浙江中成建工集团有限公司 | Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit |
CN103485360A (en) * | 2013-10-12 | 2014-01-01 | 中建八局第三建设有限公司 | Steel platform tower crane foundation and construction method thereof |
CN203795458U (en) * | 2014-03-31 | 2014-08-27 | 上海绿地建设(集团)有限公司 | Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement |
CN203998719U (en) * | 2014-03-20 | 2014-12-10 | 中国建筑第六工程局有限公司 | A kind of high-building construction tower crane adheres to uses shaped steel anchor structure |
CN105332388A (en) * | 2015-11-27 | 2016-02-17 | 中国一冶集团有限公司 | Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method |
CN206052762U (en) * | 2016-08-29 | 2017-03-29 | 福建省九龙建设集团有限公司 | Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column |
-
2016
- 2016-08-29 CN CN201610750488.9A patent/CN106351245B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201581409U (en) * | 2009-12-25 | 2010-09-15 | 浙江中成建工集团有限公司 | Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit |
CN103485360A (en) * | 2013-10-12 | 2014-01-01 | 中建八局第三建设有限公司 | Steel platform tower crane foundation and construction method thereof |
CN203998719U (en) * | 2014-03-20 | 2014-12-10 | 中国建筑第六工程局有限公司 | A kind of high-building construction tower crane adheres to uses shaped steel anchor structure |
CN203795458U (en) * | 2014-03-31 | 2014-08-27 | 上海绿地建设(集团)有限公司 | Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement |
CN105332388A (en) * | 2015-11-27 | 2016-02-17 | 中国一冶集团有限公司 | Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method |
CN206052762U (en) * | 2016-08-29 | 2017-03-29 | 福建省九龙建设集团有限公司 | Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110512639A (en) * | 2019-07-10 | 2019-11-29 | 中铁二局第一工程有限公司 | A kind of no floor steel structure tower crane foundation construction method and constructing structure |
CN113073677A (en) * | 2021-03-29 | 2021-07-06 | 四川省建筑科学研究院有限公司 | Tower crane suspended foundation device for reinforced concrete core barrel and construction method thereof |
CN115198786A (en) * | 2022-07-05 | 2022-10-18 | 广州建筑工程监理有限公司 | H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method |
Also Published As
Publication number | Publication date |
---|---|
CN106351245B (en) | 2018-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN203947771U (en) | A kind of Bailey beam pendent form support system | |
CN106351245A (en) | Tower crane foundation base and construction method thereof | |
CN104674665B (en) | Large-spatial structures vestibule bridge installation method | |
CN206352391U (en) | Socket joint type key slot type Quick Release support system | |
CN105442839A (en) | Erecting method of cantilever structure formwork bent | |
CN209585294U (en) | A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction | |
CN206110635U (en) | Automatic convertible integrally lift up elevator shaft operating platform of landing leg | |
CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
CN106437123A (en) | Supporting leg automatic turnover type overall lifting elevator well operation platform | |
CN104961058B (en) | A kind of double Z shaped support steel beam and crane supporting member and preparation method containing it | |
CN109457814B (en) | Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure | |
CN208534069U (en) | The assembled support device of steel bar truss floor support plate composite floor system | |
CN102605945B (en) | Manufacturing method of big wood formwork | |
CN114277672B (en) | Large-span prestressed concrete bent cap structure and construction method thereof | |
CN206052762U (en) | Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column | |
CN212176590U (en) | Outer frame safety protection structure is exempted from to assembled building | |
CN108240113A (en) | Detachably across the support device at hole and method | |
CN113958120A (en) | Inclined frame concrete cylindrical formwork reinforcing system | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN208347285U (en) | A kind of construction and decoration high-altitude construction supporting structure | |
CN210289075U (en) | Adjustable elevator shaft operating platform system that can have enough to meet need | |
CN110805256A (en) | Construction process of flower basket pull rod tool type overhanging scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |