CN106351245A - Tower crane foundation base and construction method thereof - Google Patents

Tower crane foundation base and construction method thereof Download PDF

Info

Publication number
CN106351245A
CN106351245A CN201610750488.9A CN201610750488A CN106351245A CN 106351245 A CN106351245 A CN 106351245A CN 201610750488 A CN201610750488 A CN 201610750488A CN 106351245 A CN106351245 A CN 106351245A
Authority
CN
China
Prior art keywords
section
heavy
body frame
tower crane
gooseneck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610750488.9A
Other languages
Chinese (zh)
Other versions
CN106351245B (en
Inventor
吴国来
沈舜民
陈加才
陈北溪
程华回
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Original Assignee
FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd filed Critical FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Priority to CN201610750488.9A priority Critical patent/CN106351245B/en
Publication of CN106351245A publication Critical patent/CN106351245A/en
Application granted granted Critical
Publication of CN106351245B publication Critical patent/CN106351245B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Abstract

The invention discloses a tower crane foundation base, comprising multiple main body frame columns, multiple reinforcement anchorage retention plates, and multiple large-section steel cross beam frames, whereinmultiple reinforcement anchorage retention plates are respectively embedded on multiple main body frame columns and external ends of multiple large-section steel cross beam frames are fixed to multiple reinforcement anchorage retention plates. Because the external ends of multiple large-section steel cross beam frames are fixed to multiple reinforcement anchorage retention plates, the large-section steel cross beam frame tower crane foundation is convenient to disassemble and assemble, and is saved in time, labor and land, and meets green construction requirements.

Description

Tower crane pedestal and its construction method
Technical field
The present invention relates to a kind of construction implement field, more particularly to a kind of tower crane pedestal and its construction method.
Background technology
With the construction and development in city, high-rise, high-rise building gets more and more, and the form of tower crane is varied , such as: independent cushion cap tower crane, be arranged at basement bottom board or top board tower crane, Core Walls Structure inner climbing crane tower etc..Building In construction, the vertical transport of various construction materials is completed by tower crane, and what the stability of tower crane and firmness directly influenced applies The safety of work and progress.The construction of especially modern high-rise building and deeper subsurface room, tower crane is often arranged on basement Centre, in the basement construction stage, foundation base platform the following is hanging, and the therefore requirement to tower crane is at a relatively high, once tower crane Structure goes wrong, and the consequence that it leads to will be hardly imaginable.The stable one of principal element of impact tower crane overall structure is just It is tower crane pedestal, all of load-bearing is all transmitted by tower crane pedestal;In addition, tower crane pedestal is also subjected to additionally Natural wind, so, tower crane pedestal stable and be firmly extremely important.
Content of the invention
It is an object of the present invention to provide a kind of version is simple, energy-conserving and environment-protective, reusable tower crane base Plinth seat.
Further object is that providing, one kind is convenient to assemble and disassemble, time and labour saving saves land, meeting green construction will again The construction method of the tower crane pedestal asked.
For achieving the above object, the technical solution of the present invention is:
The present invention is a kind of tower crane pedestal, including many body frame trestles, polylith Bar Anchorage plate, heavy in section gooseneck frame Frame;Described polylith Bar Anchorage plate is embedded on many body frame trestles respectively, and the outer end of heavy in section gooseneck framework is fixed On polylith Bar Anchorage plate.
Described heavy in section gooseneck framework is made up of many heavy in section H type goosenecks and Duo Gen heavy in section H type steel longeron, Many heavy in section H type goosenecks are fixed between many heavy in section H type steel longerons respectively.
Described heavy in section gooseneck framework by two heavy in section H type goosenecks, two heavy in section H type steel longerons, two Heavy in section H type steel carling is constituted;Two described heavy in section H type goosenecks are parallel respectively to be fixed on two heavy in section H type steel Between longeron, two heavy in section H type steel carlings are parallel respectively to be fixed between two heavy in section H type goosenecks.
Described Bar Anchorage plate is made up of reinforcing bar, anchor plate;Described reinforcing bar is l shape reinforcing bar, and main body is imbedded at its l end In frame column, its other end stretches out body frame trestle surface;Described anchor plate is angle steel shape, one side and l shape reinforcing bar The external part stretching out body frame trestle surface is welded and fixed, and another side of anchor plate opens up multiple through holes and bolt passes through This through hole is affixed with heavy in section gooseneck framework outer end.
Described body frame trestle is made up of four heavy in section frame columns, and four heavy in section frame columns are in rectangular layout, greatly Four outer ends of section steel crossbeam frame are separately fixed on four heavy in section frame columns, and heavy in section gooseneck framework is apart from building ground Face 100mm-300 mm.
Pre-embedded steel slab on body frame trestle, by fixing for heavy in section gooseneck framework stress on body frame trestle.
The present invention is a kind of construction method of tower crane pedestal, comprises the following steps:
(1) surveying setting-out;
(2) to built-in fitting, pre-buried position is accurately positioned;
(3) making of built-in fitting, after body frame trestle reinforcing bar binding completes acceptance(check), embedded bar anchor on body frame trestle Gu plate;
(4) installation of embedded parts completes, disturbing concrete, heat and moisture preserving maintenance in time after concreting is qualified, and carries out in time Built-in fitting position check measurement;
(5) heavy in section gooseneck framework is installed after body frame trestle concrete strength reaches 70%, heavy in section gooseneck framework with pre- Embedded part adopts high-strength bolt to connect.
After such scheme, because the present invention includes many body frame trestles, polylith Bar Anchorage plate, heavy in section steel horizontal stroke Beam framework;Described polylith Bar Anchorage plate is embedded on many body frame trestles respectively, the outer end of heavy in section gooseneck framework It is fixed on polylith Bar Anchorage plate, have the advantage that
1st, because the outer end of heavy in section of the present invention gooseneck framework is bolted on polylith Bar Anchorage plate so that this Bright heavy in section gooseneck framework tower crane is convenient to assemble and disassemble, and time and labour saving saves land again, meets green construction requirement.
2nd, compared with traditional tower crane, the tower-crane foundation structure form of this present invention is simple, energy-conserving and environment-protective, and repeating makes With.
3rd, because the heavy in section gooseneck framework tower crane basis instrument of the present invention is on body frame trestle, e.g., the present invention can It is arranged on basement roof, agent structure conversion layer is first-class, but stress is on body frame trestle, rather than stress is in basement Top board or agent structure conversion layer flooring.
The present invention is further illustrated with specific embodiment below in conjunction with the accompanying drawings.
Brief description
Fig. 1 is the front view of the present invention;
Fig. 2 is the schematic diagram that body frame trestle of the present invention is connected with Bar Anchorage plate;
Fig. 3 is the front view of Bar Anchorage plate of the present invention.
Specific embodiment
As shown in Figure 1 and Figure 2, the present invention is a kind of tower crane pedestal, including many body frame trestles 1, polylith Bar Anchorage Plate 2, heavy in section gooseneck framework 3.
Described polylith Bar Anchorage plate 2 is embedded on many body frame trestles 1 respectively, heavy in section gooseneck framework 3 Outer end is fixed on polylith Bar Anchorage plate 2.
Described heavy in section gooseneck framework 3 by 31, two heavy in section H type steel longerons 32 of two heavy in section H type goosenecks, Two heavy in section H type steel carlings 33 are constituted;Two described heavy in section H type goosenecks 31 are parallel respectively to be fixed on two big section Between face H type steel longeron 32, two heavy in section H type steel carlings 33 are parallel respectively to be fixed on two heavy in section H type goosenecks 31 Between.
Described Bar Anchorage plate 2 is made up of reinforcing bar 21, anchor plate 22.Described reinforcing bar 21 is l shape reinforcing bar 21, its l end In embedment body frame trestle, its other end stretches out body frame trestle 1 surface;Described anchor plate 2 is angle steel shape, one side The external part stretching out body frame trestle 1 surface with l shape reinforcing bar 21 is welded and fixed, and another side of anchor plate 2 opens up multiple Through hole 221(is as shown in Figure 3) and bolt is affixed with heavy in section gooseneck framework 3 outer ends by this through hole 221.
Described body frame trestle 1 is made up of four heavy in section frame columns 11, the rectangular cloth of four heavy in section frame columns 11 Put, four outer ends of heavy in section gooseneck framework 3 are separately fixed on four heavy in section frame columns 11, heavy in section gooseneck framework 3 apart from flooring 100mm-300 mm.
The present invention is a kind of construction method of tower crane pedestal, comprises the following steps:
(1) surveying setting-out;
(2) to built-in fitting, pre-buried position is accurately positioned;
(3) built-in fitting, after body frame trestle 1 reinforcing bar binding completes acceptance(check), embedded bar anchor on body frame trestle 1 are made Gu plate 2, anchorage length is 500mm.
(4) installation of embedded parts completes, and inspects for acceptance by design requirement, qualified after can disturbing concrete, concrete is strong Degree not less than c50 commerical ready-mixed concrete, pour and must not collide during smashing, shift bar built-in fitting, concreting qualified after and When heat and moisture preserving maintenance, and carry out built-in fitting position in time check measurement, should before concrete initial set in time if offsetting Recover;
(5) heavy in section gooseneck framework 3, heavy in section gooseneck framework 3 are installed after body frame trestle 1 concrete strength reaches 70% It is connected using m20 high-strength bolt with built-in fitting;
(6), after the completion of body frame trestle 1 concrete construction, sedimentation and displacement observation point are performed on the built-in fitting of basic corner, and Perform protocol;
(7) lightning protection on basis, is held by the regulation of existing industry standard " building machinery uses act of technique for security " jgj33 OK.Tower crane grounding resistance is not more than 4 ω.
(8) tower crane chassis is installed;
(9) tower crane is checked and accepted;
(10) dismounting of tower crane is identical with conventional tower crane dismounting operation, other in addition to high-strength bolt after steel structure base dismounting Steel beam column is reusable.
The above, only present pre-ferred embodiments, the version of heavy in section gooseneck framework have multiple, therefore The scope that the present invention is implemented, the equivalence changes made according to scope of the present invention patent and description can not be limited with this With modification, all should still remain within the scope of the patent.

Claims (7)

1. a kind of tower crane pedestal it is characterised in that: include many body frame trestles, polylith Bar Anchorage plate, heavy in section steel horizontal Beam framework;Described polylith Bar Anchorage plate is embedded on many body frame trestles respectively, the outer end of heavy in section gooseneck framework It is fixed on polylith Bar Anchorage plate.
2. tower crane pedestal according to claim 1 it is characterised in that: described heavy in section gooseneck framework is big by many Section H type gooseneck and Duo Gen heavy in section H type steel longeron are constituted, and many heavy in section H type goosenecks fix many heavy in section h respectively Between section longitudinal beam.
3. tower crane pedestal according to claim 1 and 2 it is characterised in that: described heavy in section gooseneck framework is by two Root heavy in section H type gooseneck, two heavy in section H type steel longerons, two heavy in section H type steel carlings are constituted;Described two are big Section H type gooseneck is parallel respectively to be fixed between two heavy in section H type steel longerons, and two heavy in section H type steel carlings are respectively Parallel it is fixed between two heavy in section H type goosenecks.
4. tower crane pedestal according to claim 1 it is characterised in that: described Bar Anchorage plate is by reinforcing bar, anchor plate Composition;Described reinforcing bar is l shape reinforcing bar, and in its l end embedment body frame trestle, its other end stretches out body frame trestle surface;Institute The anchor plate stated is angle steel shape, and the external part that body frame trestle surface is stretched out with l shape reinforcing bar in one side is welded and fixed, anchoring Multiple through holes are opened up on another side of plate and bolt is affixed with heavy in section gooseneck framework outer end by this through hole.
5. tower crane pedestal according to claim 1 it is characterised in that: described body frame trestle is by four heavy in section frames Trestle is constituted, and four heavy in section frame columns are in rectangular layout, and four outer ends of heavy in section gooseneck framework are separately fixed at four On the frame column of heavy in section, heavy in section gooseneck framework is apart from flooring 100mm-300 mm.
6. a kind of construction method of tower crane pedestal according to claim 1 it is characterised in that: pre- on body frame trestle Bury steel plate, by fixing for heavy in section gooseneck framework stress on body frame trestle.
7. tower crane pedestal according to claim 6 construction method it is characterised in that: comprise the following steps:
(1) surveying setting-out;
(2) to built-in fitting, pre-buried position is accurately positioned;
(3) making of built-in fitting, after body frame trestle reinforcing bar binding completes acceptance(check), embedded bar anchor on body frame trestle Gu plate;
(4) installation of embedded parts completes, disturbing concrete, heat and moisture preserving maintenance in time after concreting is qualified, and carries out in time Built-in fitting position check measurement;
(5) heavy in section gooseneck framework is installed after body frame trestle concrete strength reaches 70%, heavy in section gooseneck framework with pre- Embedded part adopts high-strength bolt to connect.
CN201610750488.9A 2016-08-29 2016-08-29 Tower crane pedestal and its construction method Active CN106351245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610750488.9A CN106351245B (en) 2016-08-29 2016-08-29 Tower crane pedestal and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610750488.9A CN106351245B (en) 2016-08-29 2016-08-29 Tower crane pedestal and its construction method

Publications (2)

Publication Number Publication Date
CN106351245A true CN106351245A (en) 2017-01-25
CN106351245B CN106351245B (en) 2018-12-14

Family

ID=57855874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610750488.9A Active CN106351245B (en) 2016-08-29 2016-08-29 Tower crane pedestal and its construction method

Country Status (1)

Country Link
CN (1) CN106351245B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512639A (en) * 2019-07-10 2019-11-29 中铁二局第一工程有限公司 A kind of no floor steel structure tower crane foundation construction method and constructing structure
CN113073677A (en) * 2021-03-29 2021-07-06 四川省建筑科学研究院有限公司 Tower crane suspended foundation device for reinforced concrete core barrel and construction method thereof
CN115198786A (en) * 2022-07-05 2022-10-18 广州建筑工程监理有限公司 H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT522691B1 (en) * 2019-05-15 2021-01-15 Jak Gewerke Und Maschb Gmbh Foundation for a building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201581409U (en) * 2009-12-25 2010-09-15 浙江中成建工集团有限公司 Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN103485360A (en) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 Steel platform tower crane foundation and construction method thereof
CN203795458U (en) * 2014-03-31 2014-08-27 上海绿地建设(集团)有限公司 Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement
CN203998719U (en) * 2014-03-20 2014-12-10 中国建筑第六工程局有限公司 A kind of high-building construction tower crane adheres to uses shaped steel anchor structure
CN105332388A (en) * 2015-11-27 2016-02-17 中国一冶集团有限公司 Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method
CN206052762U (en) * 2016-08-29 2017-03-29 福建省九龙建设集团有限公司 Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201581409U (en) * 2009-12-25 2010-09-15 浙江中成建工集团有限公司 Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN103485360A (en) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 Steel platform tower crane foundation and construction method thereof
CN203998719U (en) * 2014-03-20 2014-12-10 中国建筑第六工程局有限公司 A kind of high-building construction tower crane adheres to uses shaped steel anchor structure
CN203795458U (en) * 2014-03-31 2014-08-27 上海绿地建设(集团)有限公司 Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement
CN105332388A (en) * 2015-11-27 2016-02-17 中国一冶集团有限公司 Assembled concrete-filled steel tubular column cap type tower crane foundation structure and construction method
CN206052762U (en) * 2016-08-29 2017-03-29 福建省九龙建设集团有限公司 Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512639A (en) * 2019-07-10 2019-11-29 中铁二局第一工程有限公司 A kind of no floor steel structure tower crane foundation construction method and constructing structure
CN113073677A (en) * 2021-03-29 2021-07-06 四川省建筑科学研究院有限公司 Tower crane suspended foundation device for reinforced concrete core barrel and construction method thereof
CN115198786A (en) * 2022-07-05 2022-10-18 广州建筑工程监理有限公司 H-shaped reinforced concrete tower crane beam foundation borne by main body structure and reinforcing method

Also Published As

Publication number Publication date
CN106351245B (en) 2018-12-14

Similar Documents

Publication Publication Date Title
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN102535845A (en) Construction method of bearing frame of corridor structure
CN203947771U (en) A kind of Bailey beam pendent form support system
CN106351245A (en) Tower crane foundation base and construction method thereof
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN209585294U (en) A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction
CN206110635U (en) Automatic convertible integrally lift up elevator shaft operating platform of landing leg
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN104961058B (en) A kind of double Z shaped support steel beam and crane supporting member and preparation method containing it
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN102605945B (en) Manufacturing method of big wood formwork
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN206052762U (en) Stress is in the shaped steel crossbeam tower crane pedestal of section beam-column
CN212176590U (en) Outer frame safety protection structure is exempted from to assembled building
CN108240113A (en) Detachably across the support device at hole and method
CN113958120A (en) Inclined frame concrete cylindrical formwork reinforcing system
CN204754150U (en) Dish -type node formula scaffold
CN208347285U (en) A kind of construction and decoration high-altitude construction supporting structure
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN110805256A (en) Construction process of flower basket pull rod tool type overhanging scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant