CN102605945B CN201210097917.9A CN201210097917A CN102605945B CN 102605945 B CN102605945 B CN 102605945B CN 201210097917 A CN201210097917 A CN 201210097917A CN 102605945 B CN102605945 B CN 102605945B
Authority
CN
China
Prior art keywords
rib
panel
large form
crossbeam
split bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210097917.9A
Other languages
Chinese (zh)
Other versions
CN102605945A (en
Inventor
匡恒
刘伟
杨巧利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201210097917.9A priority Critical patent/CN102605945B/en
Publication of CN102605945A publication Critical patent/CN102605945A/en
Application granted granted Critical
Publication of CN102605945B publication Critical patent/CN102605945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a big wood formwork. The big wood formwork on the outer side of an outer barrel of a shear wall mainly consists of a panel (1), ribs (3), crossbeams (2), hoisting rings (5) and an oppositely pulling and reinforcing system. By the aid of construction technology for the big wood formwork on the outer side of the outer barrel of the shear wall in building engineering, the big wood formwork is manufactured in a processing field, joints of the panel are close, and the big wood formwork is simple in process, convenient in operation, high in work efficiency and low in loss of materials, is safe and reliable, and effectively reduces construction cost.

Description

The preparation method of wood large form
Technical field
The invention belongs to form for construction engineering and preparation method, especially relate to the outer side rail large form of a kind of construction work shear wall urceolus and preparation method.
Background technology
Pin-connected panel or monolithic large form that existing building engineering large form is normally welded by steel facing, steel rib etc., be only applicable to the construction of vertical structure cast-in-place concrete, large form cost of manufacture is high, transportation, deposit and repair resource and have high input, and flat formwork still adopts the various ways such as the little template of steel, wooden form when construction, make formwork comparatively complicated, in more regions, generally do not used; Form work engineering generally adopts multilayer gluing construction timber shutterings to make panel at present, with the lumps of wood, do rib, during construction, carry out at the scene panel block-by-block assembled and with iron nail, itself and lumps of wood rib is solid by root stickfast, during dismounting, first lumps of wood rib is removed and panel block-by-block removed again by root, slab joint deviation is large, construction operation amount is large, and iron nail consumption is many, and panel and lumps of wood loss large.
Summary of the invention
The object of this invention is to provide a kind of wooden large form for construction work shear wall and preparation method thereof, in processing place, make, slab joint is tight, and technique is simple, easy to operate, safe and reliable, and work efficiency is high, and spillage of material is little, effectively reduces construction cost.
The object of the present invention is achieved like this, a kind of wooden large form, be characterized in that the outer side rail large form of this shear wall urceolus is mainly by panel, rib, crossbeam, suspension ring and to drawing hardened system to form, panel plane is rectangle, according to shear wall story height and lateral surface length segmentation size, make, panel is that several multilayer gluing construction timber shutterings docking are assembled, rib vertically near back side of panel and with iron nail by panel and rib stickfast, this rib length is greater than panel height and equal extending panel up and down, some ribs are parallel to panel vertical edge and are evenly arranged according to a determining deviation, each up and down, crossbeam, it equates with panel length, be parallel to panel horizontal sides and be located at respectively rib top and bottom part, and with iron nail, crossbeam is followed closely at each ribbed back face, two, suspension ring are located at respectively head piece left and right 1/4 across on the rib of locating, these left and right suspension ring are all made of bolt, top simmering and bending are also welded into ring, pressing plate is all established through rib middle part and in this rib left and right in bottom, pad and nut are fastening by itself and this rib, rib and crossbeam are that the lumps of wood is made, to drawing hardened system by locating split bolt, reinforce split bolt, sleeve pipe, steel pipe forms.
Before making, according to shear wall exterior wall plane, determine the outer side rail large form size of this shear wall urceolus, carry out the spacing of concrete lateral pressure calculative determination rib and split bolt hole two-way spacing anyhow, guarantee that the outer side rail large form of this shear wall urceolus has enough strength and stiffness.Production process is: rib, the blanking of the crossbeam lumps of wood and wooden boards batching---on two roots of left and right, draw crossbeam altitude line and on upper and lower two crossbeams, draw rib spacing line---the rib perforate of suspension ring suspension centre place is also installed suspension ring---crossbeam is used to iron nail and each rib stickfast to the layout line---with tower crane, by suspension ring, rib frame is stood up---rib frame diagonal is checked and is proofreaied and correct---on rib, mark panel hemline---along hemline start to carry out the laying of block-by-block panel and with iron nail by panel and each rib stickfast---on panel, emit reinforcing split bolt center line and on panel, bore split bolt hole.Making quality allowable variation requires: template height ± 3 ㎜, and template length-2 ㎜, template plate face diagonal is poor≤3 ㎜, plate surface evenness 2 ㎜, adjacent panels piece difference of height≤1 ㎜, adjacent panels gap joint≤1 ㎜, split bolt hole the center displacement 2 ㎜.
The outer side rail large form of shear wall urceolus adopts pillar crane to lift by crane installation in place, with steel wire penetrating suspension ring, carry out 2 liftings, hoisted in position, after leveling, first with location, bottom split bolt, lower beam is fixed, with reinforcing split bolt, through each bolt hole, this shear wall inner and outer template is reinforced again, this split bolt is established sleeve pipe through a section of shear wall so that split bolt is removed, during the outer side rail large form spreading of shear wall urceolus, after every two splicing alignment, at interface, adopt large blade that its both sides of the chest are clamped, reinforce split bolt horizontal steel tube joint according to the standard overlap joint that staggers.Installation quality allowable variation requires: axial location 4 ㎜, inside dimension ± 2, cross section ㎜, floor height verticality 3 ㎜, adjacent forms plate face difference of height 2 ㎜, surface finish < 4 ㎜.
Concreting when reaching side template and removing condition, first retain 3~4 the location split bolts in 3~4 reinforcing split bolts of top layer and bottom loosening, other is reinforced to split bolt and locate split bolt and all take apart and extract out from sleeve pipe, with tower crane wire rope, tangle after suspension ring, again 3~4 of top layers are reinforced to 3~4 the location split bolts in split bolt and bottom and taken apart extraction, the outer side rail large form of this shear wall urceolus is directly lifted to after last layer has been brushed release agent and is installed, repeat turnover and use.
A kind of wooden large form proposed by the invention and preparation method thereof, makes in processing place, and slab joint is tight, and technique is simple, easy to operate, safe and reliable, and work efficiency is high, and spillage of material is little, effectively reduces construction cost.
Now in conjunction with the accompanying drawings and embodiments wooden large formwork construction technology proposed by the invention is further described.
Accompanying drawing explanation
Fig. 1 is that the present invention's wood large form is made schematic diagram.
Fig. 2 is the present invention's wood large form scheme of installation.
In Fig. 1, Fig. 2: 1, panel 2, crossbeam 3, rib 4, bolt hole 5, suspension ring 6, location split bolt 7, reinforcing split bolt 8, large blade 9, sleeve pipe 10, steel pipe.
The specific embodiment
From Fig. 1, in Fig. 2, can find out: a kind of wooden large formwork construction technology, it is characterized in that the outer side rail large form of this shear wall urceolus is mainly by panel (1), rib (3), crossbeam (2), suspension ring (5) and to drawing hardened system to form, panel (1) plane is rectangle, according to shear wall story height and lateral surface length segmentation size, make, panel (1) is that several multilayer gluing construction timber shutterings docking are assembled, rib (3) vertically near panel (1) back side and with iron nail by panel (1) and rib (3) stickfast, this rib (3) length is greater than panel (1) height and equal extending panel (1) up and down, some ribs (3) are parallel to panel (1) vertical edge and are evenly arranged according to a determining deviation, each up and down, crossbeam (2), itself and panel (1) are equal in length, be parallel to panel (1) horizontal sides and be located at respectively rib (3) top and bottom part, and with iron nail, crossbeam (2) is followed closely at each rib (3) back side, (5) two, suspension ring are located at respectively head piece (2) left and right 1/4 across on the rib of locating (3), these left and right suspension ring (5) are all made of bolt, top simmering and bending are also welded into ring, pressing plate is all established through rib (3) middle part and in this rib (3) left and right in bottom, pad and nut are fastening by itself and this rib (3), rib (3) and crossbeam (2) are made for the lumps of wood, to drawing hardened system by locating split bolt (6), reinforce split bolt (7), sleeve pipe (9), steel pipe (10) forms.
Before making, according to shear wall exterior wall plane, determine the outer side rail large form size of this shear wall urceolus, carry out the spacing of concrete lateral pressure calculative determination rib (3) and split bolt hole (4) two-way spacing anyhow, guarantee that the outer side rail large form of this shear wall urceolus has enough strength and stiffness.(3), the process is as follows: rib beam (2) the wood and wood panel (1) under the ingredients - in about two rib root (3) (2) the high line and cross beams cross rib on the two beams (2) (3) the spacing between lines - rings rib (5) the hanging point (3) hole and install the rings (5), (2) according to the line to beams with nails with the rib (3) nail up - with the tower crane by rings (5) the rib (3) (3) turn - rib frame diagonal check and correction, the ribs (3) to create panel (1) bottom line - along the bottom edge and start to piece panel (1) laid nails will panel (1) and (3) the rib nail up - released on the panel (1) reinforcement of the center line of the bolt (7) and on the panel (1) the bolt holes (4).Making quality allowable variation requires: template height ± 3 ㎜, and template length-2 ㎜, template plate face diagonal is poor≤3 ㎜, plate surface evenness 2 ㎜, adjacent panels (1) piece difference of height≤1 ㎜, adjacent panels (1) gap joint≤1 ㎜, split bolt hole (4) the center displacement 2 ㎜.
The outer side rail large form of shear wall urceolus adopts pillar crane to lift by crane installation in place, with steel wire penetrating suspension ring (5), carry out 2 liftings, hoisted in position, after leveling, first with bottom, locating split bolt (6) fixes lower beam (2), with reinforcing split bolt (7), through each bolt hole (4), this shear wall inner and outer template is reinforced again, this split bolt is established sleeve pipe (9) through a section of shear wall so that split bolt is removed, during the outer side rail large form spreading of shear wall urceolus, after every two splicing alignment, at interface, adopt large blade (8) that its both sides of the chest (3) are clamped, reinforce split bolt (7) horizontal steel tube (10) joint according to the standard overlap joint that staggers.Installation quality allowable variation requires: axial location 4 ㎜, inside dimension ± 2, cross section ㎜, floor height verticality 3 ㎜, adjacent forms plate face difference of height 2 ㎜, surface finish < 4 ㎜.
Concreting when reaching side template and removing condition, first retain 3~4 reinforcing split bolts (7) of top layer and 3~4 the location split bolts in bottom (6) loosening, other is added to fixing bolt (7) and locate split bolt (6) and all take apart and extract out from sleeve pipe (9), with tower crane wire rope, tangle after suspension ring (5), take 3~4 reinforcing split bolts (7) of top layer and 3~4 the location split bolts in bottom (6) apart extraction again, the outer side rail large form of this shear wall urceolus is directly lifted to after last layer has been brushed release agent and is installed, repeat turnover and use.

Claims (6)

1. the preparation method of a wooden large form, this wood large form is mainly by panel (1), rib (3), crossbeam (2), suspension ring (5) and to drawing hardened system to form, panel (1) plane is rectangle, according to shear wall story height and lateral surface length segmentation size, makes, rib (3) vertically near panel (1) back side and with iron nail by panel (1) and rib (3) stickfast, some ribs (3) are parallel to panel (1) vertical edge and are evenly arranged according to a determining deviation, each up and down, crossbeam (2), it is equal in length with panel (1), is parallel to panel (1) horizontal sides and is located at respectively rib (3) top and bottom part, and with iron nail, crossbeam (2) is followed closely at each rib (3) back side, (5) two, suspension ring are located at respectively head piece (2) left and right 1/4 across on the rib of locating (3), top simmering and bending are also welded into ring, pressing plate is all established through rib (3) middle part and in this rib (3) left and right in bottom, pad and nut are fastening by itself and rib (3), to drawing hardened system by locating split bolt (6), reinforce split bolt (7), sleeve pipe (9), steel pipe (10) forms, before it is characterized in that making, according to shear wall exterior wall plane, determine the outer side rail large form size of this shear wall urceolus, carrying out concrete lateral pressure calculates, determine the spacing of rib (3) and split bolt hole (4) two-way spacing anyhow, guarantee that the outer side rail large form of this shear wall urceolus has enough strength and stiffness, its production process is:
A, rib (3), crossbeam (2) lumps of wood blanking and wooden boards (1) batching;
B, in left and right, two roots (3) are upper draws crossbeam (2) altitude line and in upper rib (3) spaced lines of drawing of upper and lower two crossbeams (2);
C, rib (3) perforate of suspension ring (5) suspension centre place are also installed suspension ring (5), and crossbeam (2) is used to iron nail and each rib (3) stickfast to the layout line;
D, with tower crane, by suspension ring (5), rib (3) frame is stood up, rib (3) frame diagonal is checked and is proofreaied and correct---on rib (3), mark panel (1) hemline, along hemline start to carry out block-by-block panel (1) is laid and with iron nail by panel (1) and each rib (3) stickfast;
E, on panel (1), emit and reinforce split bolt (7) center line and in the upper split bolt hole (4) of boring of panel (1).
2. the preparation method of wooden large form according to claim 1, making quality allowable variation requires: template height ± 3 ㎜, template length-2 ㎜, template plate face diagonal is poor≤3 ㎜, plate surface evenness 2 ㎜, adjacent panels (1) piece difference of height≤1 ㎜, adjacent panels (1) gap joint≤1 ㎜, split bolt hole (4) the center displacement 2 ㎜.
3. the preparation method of a kind of wooden large form according to claim 1, is characterized in that panel (1) is that several multilayer gluing construction timber shutterings docking are assembled.
4. the preparation method of a kind of wooden large form according to claim 1, is characterized in that rib (3) and crossbeam (2) are made for the lumps of wood.
5. the preparation method of a kind of wooden large form according to claim 1, is characterized in that rib (3) length is greater than panel (1) height and equal extending panel (1) up and down.
6. the preparation method of a kind of wooden large form according to claim 1, is characterized in that left and right suspension ring (5) all make with bolt.
CN201210097917.9A 2012-04-06 2012-04-06 Manufacturing method of big wood formwork Active CN102605945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210097917.9A CN102605945B (en) 2012-04-06 2012-04-06 Manufacturing method of big wood formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210097917.9A CN102605945B (en) 2012-04-06 2012-04-06 Manufacturing method of big wood formwork

Publications (2)

Publication Number Publication Date
CN102605945A CN102605945A (en) 2012-07-25
CN102605945B true CN102605945B (en) 2014-11-26

Family

ID=46523674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210097917.9A Active CN102605945B (en) 2012-04-06 2012-04-06 Manufacturing method of big wood formwork

Country Status (1)

Country Link
CN (1) CN102605945B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979304B (en) * 2012-12-13 2015-05-20 中铁二局股份有限公司 Construction method of double shear wall formworks at deformation joint of high-rise building
CN103225394B (en) * 2013-05-06 2015-04-08 中国十七冶集团有限公司 Big wood template construction method of indoor constructional engineering shear wall
CN107905534A (en) * 2017-11-30 2018-04-13 上海宝冶集团有限公司 The method for fixing formwork for placing with square steel tube replacement flitch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2876403A1 (en) * 2004-10-11 2006-04-14 Eric Baschin Formwork e.g. form panel, forming assembly for e.g. casting walls, has framework formed by wooden parts that are assembled to form frames connected by sills/bracings/counter-bucklings such that framework is homogeneous and non-deformable
CN201474292U (en) * 2009-07-30 2010-05-19 中建三局建设工程股份有限公司 Midsize template assembled large template
CN101824908A (en) * 2010-04-27 2010-09-08 中建七局第二建筑有限公司 Shear wall large template and shear wall large template system
CN201605795U (en) * 2010-01-18 2010-10-13 张恒亮 Building formwork

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2876403A1 (en) * 2004-10-11 2006-04-14 Eric Baschin Formwork e.g. form panel, forming assembly for e.g. casting walls, has framework formed by wooden parts that are assembled to form frames connected by sills/bracings/counter-bucklings such that framework is homogeneous and non-deformable
CN201474292U (en) * 2009-07-30 2010-05-19 中建三局建设工程股份有限公司 Midsize template assembled large template
CN201605795U (en) * 2010-01-18 2010-10-13 张恒亮 Building formwork
CN101824908A (en) * 2010-04-27 2010-09-08 中建七局第二建筑有限公司 Shear wall large template and shear wall large template system

Also Published As

Publication number Publication date
CN102605945A (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN102134907B (en) Construction method of steel bar truss floor support plate
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN102444203A (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN104196222A (en) Cantilever frame of tool type profile steel cantilever scaffold
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN103276893A (en) Novel composite structure for supporting rigid building template and construction method
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN205314589U (en) Overhanging type discharging platform
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN202324606U (en) U-shaped force bearing seat
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN106351245A (en) Tower crane foundation base and construction method thereof
CN102605945B (en) Manufacturing method of big wood formwork
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN105019645B (en) Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN206942138U (en) Cast template splices bridge plate
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN104499715A (en) Template overhanging construction method for floor system with composite structure by utilizing profiled steel beams
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant