CN102605945B - Manufacturing method of big wood formwork - Google Patents
Manufacturing method of big wood formwork Download PDFInfo
- Publication number
- CN102605945B CN102605945B CN201210097917.9A CN201210097917A CN102605945B CN 102605945 B CN102605945 B CN 102605945B CN 201210097917 A CN201210097917 A CN 201210097917A CN 102605945 B CN102605945 B CN 102605945B
- Authority
- CN
- China
- Prior art keywords
- rib
- panel
- crossbeam
- large form
- shear wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域 technical field
本发明属于建筑工程用模板及制作方法,尤其是涉及一种建筑工程剪力墙外筒外侧木大模板及制作方法。 The invention belongs to a formwork for construction engineering and a manufacturing method thereof, in particular to a large wooden formwork on the outer side of an outer cylinder of a shear wall of a construction engineering and a manufacturing method thereof. the
背景技术 Background technique
现有建筑工程大模板通常是由钢面板、钢肋等焊接而成的拼装式或整体式大模板,只适用于竖向结构现浇混凝土工程施工,大模板制作成本高,运输、存放及修理资源投入大,且在施工时平面模板仍然采用钢制小模板、木模板等多种形式,使模板工程施工工艺较为复杂,在较多地区没有得到普遍使用;目前模板工程普遍采用多层胶合建筑木模板做面板,用方木做肋条,施工时在现场进行面板逐块拼装并用铁钉将其与方木肋条逐根钉牢固,拆除时先将方木肋条逐根拆除再将面板逐块拆除,面板接缝偏差大,施工作业量大,铁钉用量多,且面板及方木损耗大。 The large formwork of existing construction projects is usually an assembled or integral large formwork welded by steel panels, steel ribs, etc., which is only suitable for the construction of vertical structure cast-in-place concrete projects. The production cost of large formwork is high, and transportation, storage and repair The resource investment is large, and the plane formwork still adopts various forms such as small steel formwork and wooden formwork during construction, which makes the construction process of formwork engineering more complicated and has not been widely used in many areas; currently, formwork engineering generally adopts multi-layer glued buildings The wooden formwork is used as the panel, and the square wood is used as the rib. During construction, the panel is assembled piece by piece on site and nailed to the square wood ribs one by one with iron nails. , the deviation of panel joints is large, the construction work is heavy, the amount of iron nails is large, and the loss of panels and square timber is large. the
发明内容 Contents of the invention
本发明的目的是提供一种用于建筑工程剪力墙的木大模板及其制作方法,在加工场地制作,面板接缝严密,工艺简单,操作方便,安全可靠,工效高,材料损耗小,有效降低施工成本。 The purpose of the present invention is to provide a large wooden formwork for shear walls in construction projects and its manufacturing method. It is made in the processing site, the panel seams are tight, the process is simple, the operation is convenient, safe and reliable, the work efficiency is high, and the material loss is small. Effectively reduce construction costs. the
本发明的目的是这样来实现的,一种木大模板,其特点是该剪力墙外筒外侧木大模板主要由面板、肋、横梁、吊环及对拉加固系统组成,面板平面为矩形,根据剪力墙楼层高度及外侧面长度分段尺寸制作,面板为若干张多层胶合建筑木模板对接拼装而成,肋竖向紧靠面板背面并用铁钉将面板与肋钉牢,此肋长度大于面板高度且上下均伸出面板,若干条肋平行于面板竖边按照一定间距均匀布置,横梁上下各一根,其与面板长度相等,平行于面板水平边分别设在肋顶端和底端部位,并用铁钉将横梁钉在各肋背面,吊环两个分别设在顶横梁左右1/4跨处的肋上,此左右吊环均用螺栓制作,顶端煨弯并焊接成环,底端穿过肋中部且在该肋左右均设压板、垫片及螺母将其与该肋紧固,肋及横梁为方木制作而成,对拉加固系统由定位对拉螺栓、加固对拉螺栓、套管、钢管组成。 The purpose of the present invention is achieved in this way, a large wooden formwork, which is characterized in that the large wooden formwork on the outer side of the shear wall outer cylinder is mainly composed of panels, ribs, beams, suspension rings and tension reinforcement systems, and the plane of the panels is rectangular. According to the height of the floor of the shear wall and the length of the outer side, the panel is made of several multi-layer glued building wooden formwork butt joints and assembled. It is larger than the height of the panel and protrudes from the top and bottom of the panel. Several ribs are parallel to the vertical side of the panel and are evenly arranged at a certain distance. There is one beam at the top and bottom, which is equal to the length of the panel. They are respectively arranged at the top and bottom of the ribs parallel to the horizontal side of the panel , and nail the beam to the back of each rib with iron nails. Two suspension rings are respectively set on the ribs at the left and right 1/4 span of the top beam. In the middle of the rib and on the left and right sides of the rib, there are pressure plates, gaskets and nuts to fasten it to the rib. The rib and the beam are made of square wood. , Composed of steel pipes. the
制作前根据剪力墙外墙平面确定此剪力墙外筒外侧木大模板尺寸,做好混凝土侧压力计算确定肋的间距及对拉螺栓孔横竖双向间距,确保此剪力墙外筒外侧木大模板有足够的强度和刚度。制作程序为:肋、横梁方木下料及木面板配料——在左右两根肋上划横梁高度线并在上下两横梁上划肋间距线——吊环吊点处肋开孔并安装吊环——将横梁按照划线用铁钉与各肋钉牢——用塔吊通过吊环将肋架翻身——肋架对角线复核并校正——在肋上划出面板底边线——沿底边线开始进行逐块面板铺设并用铁钉将面板与各肋钉牢——在面板上放出加固对拉螺栓中心线并在面板上钻对拉螺栓孔。制作质量允许偏差要求:模板高度±3㎜,模板长度-2㎜,模板板面对角线差≤3㎜,板面平整度2㎜,相邻面板拼缝高低差≤1㎜,相邻面板拼缝间隙≤1㎜,对拉螺栓孔中心位移2㎜。 Before fabrication, determine the size of the large wooden formwork outside the outer cylinder of the shear wall according to the plane of the outer wall of the shear wall, and calculate the lateral pressure of the concrete to determine the spacing of the ribs and the horizontal and vertical two-way spacing of the bolt holes to ensure that the wooden formwork on the outer cylinder of the shear wall Large formwork has sufficient strength and rigidity. The production procedure is: cutting ribs, beam square timber and wood panel ingredients—drawing the height line of the beam on the left and right ribs and drawing the rib spacing line on the upper and lower beams—opening holes in the ribs at the lifting points of the rings and installing the rings—putting The beams are nailed to the ribs with iron nails according to the marking line—the rib frame is turned over with the tower crane through the ring—the diagonal line of the rib frame is checked and corrected—the bottom edge line of the panel is drawn on the rib—start along the bottom edge line Lay a panel and nail the panel and each rib firmly with iron nails—release the center line of the reinforcement bolt on the panel and drill holes for the bolt on the panel. Production quality tolerance requirements: template height ± 3 mm, template length - 2 mm, template face angle difference ≤ 3 mm, board surface flatness 2 mm, adjacent panel seam height difference ≤ 1 mm, adjacent panels The seam gap is ≤1㎜, and the center displacement of the tie bolt hole is 2㎜. the
剪力墙外筒外侧木大模板采用塔式起重机起吊就位安装,用钢丝绳穿过吊环进行两点起吊,吊装就位、调平后先用底部定位对拉螺栓将下部横梁固定好,再用加固对拉螺栓穿过各螺栓孔将该剪力墙内外模板加固,此对拉螺栓穿过剪力墙的一段设套管以便对拉螺栓拆除,剪力墙外筒外侧木大模板接长时,每两块拼接对齐后在接口处采用大刀片将其两肋夹紧,加固对拉螺栓水平钢管接头按照规范错开搭接。安装质量允许偏差要求:轴线位置4㎜,截面内部尺寸±2 ㎜,层高垂直度3㎜,相邻模板板面高低差2㎜,表面平整度<4㎜。 The large wooden formwork on the outer side of the outer cylinder of the shear wall is hoisted and installed in place by a tower crane, and two-point hoisting is carried out with a wire rope passing through the lifting ring. Reinforcement bolts pass through each bolt hole to reinforce the inner and outer formwork of the shear wall, and the tension bolts pass through a section of the shear wall to set up a casing for the removal of the tension bolts. , After every two pieces are spliced and aligned, a large blade is used to clamp the two ribs at the interface, and the horizontal steel pipe joints of the reinforcement bolts are staggered and lapped according to the specifications. Permissible deviation requirements for installation quality: axis position 4mm, internal dimension of section ±2mm, layer height verticality 3mm, height difference between adjacent formwork panels 2mm, surface flatness <4mm. the
混凝土浇筑并达到侧模板拆除条件时,先保留顶层3~4个加固对拉螺栓及底部3~4个定位对拉螺栓不松动,将其它加固对拉螺栓及定位对拉螺栓均拆开并从套管中抽出,用塔吊钢丝绳挂住吊环后,再将顶层3~4个加固对拉螺栓及底部3~4个定位对拉螺栓拆开抽出,将该剪力墙外筒外侧木大模板直接起吊到上一层刷完脱模剂后进行安装,重复周转使用。 When the concrete is poured and the conditions for removing the side formwork are met, the 3 to 4 reinforcement bolts on the top layer and the 3 to 4 positioning bolts on the bottom are not loosened, and the other reinforcement bolts and positioning bolts are disassembled and removed from the Pull it out from the casing, hang the ring with the steel wire rope of the tower crane, and then disassemble the 3 to 4 reinforcement bolts on the top layer and the 3 to 4 positioning bolts on the bottom and pull them out. Lift it to the upper layer and brush the release agent for installation, and repeat the turnover. the
本发明所提出一种木大模板及其制作方法,在加工场地制作,面板接缝严密,工艺简单,操作方便,安全可靠,工效高,材料损耗小,有效降低施工成本。 The present invention proposes a large wooden formwork and a manufacturing method thereof, which are manufactured at a processing site, have tight panel seams, simple process, convenient operation, safety and reliability, high work efficiency, low material loss, and effectively reduce construction costs. the
现结合附图和实施例对本发明所提出的木大模板施工技术作进一步的说明。 The wooden formwork construction technology proposed by the present invention will be further described in conjunction with the accompanying drawings and embodiments. the
附图说明 Description of drawings
图1是本发明木大模板制作示意图。 Fig. 1 is a schematic diagram of making a large wooden formwork of the present invention. the
图2是本发明木大模板安装示意图。 Fig. 2 is a schematic diagram of the installation of the large wooden formwork of the present invention. the
图1、图2中:1、面板 2、横梁 3、肋 4、螺栓孔 5、吊环 6、定位对拉螺栓 7、加固对拉螺栓 8、大刀片 9、套管 10、钢管。 In Fig. 1 and Fig. 2: 1. Panel 2. Beam 3. Rib 4. Bolt hole 5. Lifting ring 6. Locating pull bolt 7. Reinforced pull bolt 8. Large blade 9. Sleeve 10. Steel pipe. the
具体实施方式 Detailed ways
从图1、图2中可以看出:一种木大模板施工技术,其特征是该剪力墙外筒外侧木大模板主要由面板(1)、肋(3)、横梁(2)、吊环(5)及对拉加固系统组成,面板(1)平面为矩形,根据剪力墙楼层高度及外侧面长度分段尺寸制作,面板(1)为若干张多层胶合建筑木模板对接拼装而成,肋(3)竖向紧靠面板(1)背面并用铁钉将面板(1)与肋(3)钉牢,此肋(3)长度大于面板(1)高度且上下均伸出面板(1),若干条肋(3)平行于面板(1)竖边按照一定间距均匀布置,横梁(2)上下各一根,其与面板(1)长度相等,平行于面板(1)水平边分别设在肋(3)顶端和底端部位,并用铁钉将横梁(2)钉在各肋(3)背面,吊环(5)两个分别设在顶横梁(2)左右1/4跨处的肋(3)上,此左右吊环(5)均用螺栓制作,顶端煨弯并焊接成环,底端穿过肋(3)中部且在该肋(3)左右均设压板、垫片及螺母将其与该肋(3)紧固,肋(3)及横梁(2)为方木制作而成,对拉加固系统由定位对拉螺栓(6)、加固对拉螺栓(7)、套管(9)、钢管(10)组成。 It can be seen from Figures 1 and 2 that a large wooden formwork construction technology is characterized in that the large wooden formwork on the outer side of the shear wall is mainly composed of panels (1), ribs (3), beams (2), and suspension rings. (5) and the tension reinforcement system. The plane of the panel (1) is rectangular. It is made according to the height of the shear wall floor and the length of the outer side. , the rib (3) is vertically close to the back of the panel (1) and the panel (1) and the rib (3) are nailed firmly with iron nails. The length of the rib (3) is greater than the height of the panel (1) and extends above and below the panel (1) ), a number of ribs (3) parallel to the vertical side of the panel (1) are evenly arranged at a certain interval, and a crossbeam (2) has one upper and lower beams, which are equal to the length of the panel (1), and are respectively arranged parallel to the horizontal side of the panel (1). At the top and bottom of the ribs (3), nail the beams (2) to the back of each rib (3) with iron nails, and the two rings (5) are respectively set on the ribs at the left and right 1/4 spans of the top beam (2) (3), the left and right lifting rings (5) are all made of bolts, the top end is bent and welded to form a ring, the bottom end passes through the middle of the rib (3) and pressure plates, gaskets and nuts are arranged on the left and right sides of the rib (3) to It is fastened with the rib (3), the rib (3) and the crossbeam (2) are made of square wood, and the tension reinforcement system consists of positioning tension bolts (6), reinforcing tension bolts (7), sleeves ( 9), composed of steel pipe (10). the
制作前根据剪力墙外墙平面确定此剪力墙外筒外侧木大模板尺寸,做好混凝土侧压力计算确定肋(3)的间距及对拉螺栓孔(4)横竖双向间距,确保此剪力墙外筒外侧木大模板有足够的强度和刚度。制作程序为:肋(3)、横梁(2)方木下料及木面板(1)配料——在左右两根肋(3)上划横梁(2)高度线并在上下两横梁(2)上划肋(3)间距线——吊环(5)吊点处肋(3)开孔并安装吊环(5)——将横梁(2)按照划线用铁钉与各肋(3)钉牢——用塔吊通过吊环(5)将肋(3)架翻身——肋(3)架对角线复核并校正——在肋(3)上划出面板(1)底边线——沿底边线开始进行逐块面板(1)铺设并用铁钉将面板(1)与各肋(3)钉牢——在面板(1)上放出加固对拉螺栓(7)中心线并在面板(1)上钻对拉螺栓孔(4)。制作质量允许偏差要求:模板高度±3㎜,模板长度-2㎜,模板板面对角线差≤3㎜,板面平整度2㎜,相邻面板(1)拼缝高低差≤1㎜,相邻面板(1)拼缝间隙≤1㎜,对拉螺栓孔(4)中心位移2㎜。 Before fabrication, determine the size of the large wooden formwork on the outer side of the shear wall outer cylinder according to the plane of the outer wall of the shear wall, and calculate the concrete lateral pressure to determine the distance between the ribs (3) and the horizontal and vertical two-way distances between the tension bolt holes (4) to ensure that the shear wall The large wooden formwork on the outer side of the external cylinder of the force wall has sufficient strength and rigidity. The production procedure is: ribs (3), beams (2) square wood cutting and wood panels (1) ingredients - draw the height line of the beams (2) on the left and right ribs (3) and draw on the upper and lower beams (2) Rib (3) Spacing Line - Rib (3) hole at the lifting point of the lifting ring (5) and install the lifting ring (5) - Nail the beam (2) to each rib (3) with iron nails according to the marking line - Use the tower crane to turn the rib (3) frame over through the lifting ring (5) - review and correct the diagonal line of the rib (3) frame - draw the bottom line of the panel (1) on the rib (3) - start along the bottom line Lay the panels (1) one by one and nail the panels (1) and the ribs (3) firmly with iron nails - put out the center line of the reinforcement bolt (7) on the panel (1) and drill the centerline on the panel (1) Pull the bolt holes (4). Production quality tolerance requirements: template height ± 3 mm, template length - 2 mm, template face diagonal difference ≤ 3 mm, board surface flatness 2 mm, adjacent panels (1) seam height difference ≤ 1 mm, The seam gap between adjacent panels (1) is ≤1mm, and the center displacement of the pull bolt hole (4) is 2mm. the
剪力墙外筒外侧木大模板采用塔式起重机起吊就位安装,用钢丝绳穿过吊环(5)进行两点起吊,吊装就位、调平后先用底部定位对拉螺栓(6)将下部横梁(2)固定好,再用加固对拉螺栓(7)穿过各螺栓孔(4)将该剪力墙内外模板加固,此对拉螺栓穿过剪力墙的一段设套管(9)以便对拉螺栓拆除,剪力墙外筒外侧木大模板接长时,每两块拼接对齐后在接口处采用大刀片(8)将其两肋(3)夹紧,加固对拉螺栓(7)水平钢管(10)接头按照规范错开搭接。安装质量允许偏差要求:轴线位置4㎜,截面内部尺寸±2 ㎜,层高垂直度3㎜,相邻模板板面高低差2㎜,表面平整度<4㎜。 The large wooden formwork on the outer side of the outer cylinder of the shear wall is hoisted and installed in place by a tower crane, and the wire rope is passed through the lifting ring (5) for two-point hoisting. The beam (2) is fixed, and then the reinforcement bolts (7) are used to pass through the bolt holes (4) to reinforce the inner and outer formwork of the shear wall. In order to remove the tension bolts, when the large wooden formwork outside the outer cylinder of the shear wall is lengthened, use a large blade (8) at the interface to clamp the two ribs (3) after every two pieces are spliced and aligned, and reinforce the tension bolts (7 ) Horizontal steel pipe (10) joints are staggered and lapped according to the specifications. Permissible deviation requirements for installation quality: axis position 4mm, internal dimension of section ±2mm, layer height verticality 3mm, height difference between adjacent formwork panels 2mm, surface flatness <4mm. the
混凝土浇筑并达到侧模板拆除条件时,先保留顶层3~4个加固对拉螺栓(7)及底部3~4个定位对拉螺栓(6)不松动,将其它加固螺栓(7)及定位对拉螺栓(6)均拆开并从套管(9)中抽出,用塔吊钢丝绳挂住吊环(5)后,再将顶层3~4个加固对拉螺栓(7)及底部3~4个定位对拉螺栓(6)拆开抽出,将该剪力墙外筒外侧木大模板直接起吊到上一层刷完脱模剂后进行安装,重复周转使用。 When the concrete is poured and the conditions for removing the side formwork are met, the 3 to 4 reinforcement bolts (7) on the top layer and the 3 to 4 positioning bolts (6) on the bottom are not loosened, and the other reinforcement bolts (7) and positioning bolts are Pull the bolts (6) apart and pull them out from the casing (9), hang the rings (5) with the steel wire rope of the tower crane, and then position the 3-4 reinforcement bolts (7) on the top layer and the 3-4 bolts on the bottom Disassemble and pull out the pull bolts (6), and lift the large wooden formwork outside the outer cylinder of the shear wall directly to the upper layer for installation after brushing the release agent, and repeat the turnover. the
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210097917.9A CN102605945B (en) | 2012-04-06 | 2012-04-06 | Manufacturing method of big wood formwork |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210097917.9A CN102605945B (en) | 2012-04-06 | 2012-04-06 | Manufacturing method of big wood formwork |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102605945A CN102605945A (en) | 2012-07-25 |
| CN102605945B true CN102605945B (en) | 2014-11-26 |
Family
ID=46523674
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210097917.9A Active CN102605945B (en) | 2012-04-06 | 2012-04-06 | Manufacturing method of big wood formwork |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102605945B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102979304B (en) * | 2012-12-13 | 2015-05-20 | 中铁二局股份有限公司 | Construction method of double shear wall formworks at deformation joint of high-rise building |
| CN103225394B (en) * | 2013-05-06 | 2015-04-08 | 中国十七冶集团有限公司 | Big wood template construction method of indoor constructional engineering shear wall |
| CN107905534A (en) * | 2017-11-30 | 2018-04-13 | 上海宝冶集团有限公司 | The method for fixing formwork for placing with square steel tube replacement flitch |
| CN121345308B (en) * | 2025-12-16 | 2026-03-31 | 中铁城建集团第二工程有限公司 | Detailed method for large-scale aluminum formwork for exterior walls in conjunction with formwork suspension systems in aerial building construction factories |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2876403A1 (en) * | 2004-10-11 | 2006-04-14 | Eric Baschin | Formwork e.g. form panel, forming assembly for e.g. casting walls, has framework formed by wooden parts that are assembled to form frames connected by sills/bracings/counter-bucklings such that framework is homogeneous and non-deformable |
| CN201474292U (en) * | 2009-07-30 | 2010-05-19 | 中建三局建设工程股份有限公司 | Midsize template assembled large template |
| CN101824908A (en) * | 2010-04-27 | 2010-09-08 | 中建七局第二建筑有限公司 | Shear wall large template and shear wall large template system |
| CN201605795U (en) * | 2010-01-18 | 2010-10-13 | 张恒亮 | Building formwork |
-
2012
- 2012-04-06 CN CN201210097917.9A patent/CN102605945B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2876403A1 (en) * | 2004-10-11 | 2006-04-14 | Eric Baschin | Formwork e.g. form panel, forming assembly for e.g. casting walls, has framework formed by wooden parts that are assembled to form frames connected by sills/bracings/counter-bucklings such that framework is homogeneous and non-deformable |
| CN201474292U (en) * | 2009-07-30 | 2010-05-19 | 中建三局建设工程股份有限公司 | Midsize template assembled large template |
| CN201605795U (en) * | 2010-01-18 | 2010-10-13 | 张恒亮 | Building formwork |
| CN101824908A (en) * | 2010-04-27 | 2010-09-08 | 中建七局第二建筑有限公司 | Shear wall large template and shear wall large template system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102605945A (en) | 2012-07-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114562059B (en) | Shear wall connector, assembled shear wall and assembly method | |
| CN101280560B (en) | Lattice column assembly and installation method thereof | |
| CN103758348B (en) | Profile steel framework structure concrete floor slab suspension mould pouring construction method | |
| CN102926504B (en) | Construction method of steel and concrete overlapped beam combined part | |
| CN104196222A (en) | Cantilever frame of tool type profile steel cantilever scaffold | |
| CN102518300A (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
| CN102605945B (en) | Manufacturing method of big wood formwork | |
| CN108755442A (en) | Guiding and positioning device for the installation of heavy steel member high-altitude | |
| CN108979120A (en) | The anchoring process of split type anchoring piece and truss superimposed sheet and fashioned iron suspension scaffold | |
| CN104005556A (en) | Shaped and fabricated formwork construction process used for shear wall at expansion and contraction joint | |
| CN103603494B (en) | A kind of ultra-thin steel truss sloping core construction method and formwork structure | |
| CN111411643A (en) | A construction method for a construction elevator foundation supported on a basement roof | |
| CN204059904U (en) | A kind of hoistway operation platform being applied to multi-platform operation | |
| CN112609966B (en) | Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system | |
| CN104453235B (en) | Current conversion station fire wall construction technology | |
| CN206158172U (en) | Entrance to a cave template | |
| CN210025768U (en) | A operation platform system for caisson template installation | |
| CN204850048U (en) | Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel | |
| CN204282391U (en) | A kind of heel foundation formwork erecting structure | |
| CN218205143U (en) | A permanent prefabricated composite formwork system | |
| CN107060173B (en) | Construction Method of Early Formwork Removal in the Structural Hole of Fair-faced Concrete Waffle Slab | |
| CN207048314U (en) | A kind of shaping type stair wooden model board component | |
| CN115419260B (en) | A permanent prefabricated composite formwork system and construction method | |
| CN102720353A (en) | Post-construction one-side shear wall formwork for settlement joint of tower and construction method | |
| CN105780929A (en) | Assembling type protective shed of prefabricated house |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20120725 Assignee: Ma'anshan MCC Jinkang Real Estate Co.,Ltd. Assignor: CHINA MCC17 GROUP Co.,Ltd. Contract record no.: X2024980045188 Denomination of invention: The production method of wooden formwork Granted publication date: 20141126 License type: Common License Record date: 20250102 |
|
| EE01 | Entry into force of recordation of patent licensing contract |