CN204173804U - A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure - Google Patents

A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure Download PDF

Info

Publication number
CN204173804U
CN204173804U CN201420418170.7U CN201420418170U CN204173804U CN 204173804 U CN204173804 U CN 204173804U CN 201420418170 U CN201420418170 U CN 201420418170U CN 204173804 U CN204173804 U CN 204173804U
Authority
CN
China
Prior art keywords
tower crane
climbing
fitting
built
type support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420418170.7U
Other languages
Chinese (zh)
Inventor
昌学林
吴能淼
蒋韶鑫
彭绍勇
吴杰
谢超
麻国培
秦锴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201420418170.7U priority Critical patent/CN204173804U/en
Application granted granted Critical
Publication of CN204173804U publication Critical patent/CN204173804U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The inside-climbing tower crane that the utility model discloses a kind of structural beams bearing-type is installed and climbing structure, comprise structural core cylinder and mix clay structure beam, the reinforced frame that tower crane built-in fitting mixes in clay structure beam with structural core cylinder welds, H type support steel beam is welded on the steel plate of tower crane built-in fitting, the top flange plate of H type support steel beam is provided with connecting bore, the utility model pin effectively utilizes existing structure, without the need to bracket pre-buried in elevator or punch, at the enterprising line operate of structural beam slab, safety can obtain actv. guarantee; It is few that built-in fitting drops into material, after being used to complete in embedded concrete structure beam, without the need to carrying out post-processed, structural beams carries out the load-carrying member of tower body, can calculate according to the bearing capacity of beam, if cannot meet the demands, can shore reinforcing under beam, process is convenient, the jacking of tower crane and the transhipment of H type support steel beam are all carried out on floor face, and more convenient operation is quick, and potential safety hazard reduces.

Description

A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
Technical field
The inside-climbing tower crane that the utility model relates to a kind of structural beams bearing-type is installed and climbing structure, belongs to architectural engineering construction technique field.
Background technology
In general inside-climbing tower crane uses, tower body is generally arranged in elevator hoistways, the mode of pre-buried bracket is adopted to support, or punch in elevator shear wall, installation and jacking operation are all carried out in elevator hoistways, need to set up non-productive operation platform, potential safety hazard is more, and inconvenient operation.After tower crane is used to complete, need to carry out post-processed to the pre-buried bracket in elevator or hole, follow-up work is numerous and diverse.
Utility model content
The purpose of this utility model is: provide a kind of inside-climbing tower crane of structural beams bearing-type easy for installation, well-set to install and climbing structure, can realize on flooring, complete inside-climbing tower crane fast installation and jacking operation, to overcome the deficiencies in the prior art.
The technical solution of the utility model
A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure, comprise structural core cylinder and mix clay structure beam, the reinforced frame that tower crane built-in fitting mixes in clay structure beam with structural core cylinder welds, H type support steel beam is welded on the steel plate of tower crane built-in fitting, and the top flange plate of H type support steel beam is provided with connecting bore.
The inside-climbing tower crane of aforesaid structural beams bearing-type is installed and in climbing structure, described tower crane built-in fitting is made up of steel plate and Ribbed Bar, and Ribbed Bar is evenly arranged on to be connected bottom steel plate and with the through hole on steel plate and welds.
The inside-climbing tower crane of aforesaid structural beams bearing-type is installed and in climbing structure, H type support steel beam bottom wing listrium is provided with junction steel plate, is evenly equipped with reinforcement gusset at H type support steel beam in web both sides.
The utility model principle to be installed by a kind of inside-climbing tower crane of structural beams bearing-type and jacking method builds, the method adopts structural core cylinder to mix the load-carrying element of clay structure beam as inside-climbing tower crane, by mixing at structural core cylinder on clay structure beam, H type support steel beam is set, inside-climbing tower crane pedestal is fixed on H type support steel beam by high strength bolt, in inside-climbing tower crane rises, adopt hydraulic ram to complete jacking to inside-climbing tower crane, the method makes all installations and jacking operation all carry out on flooring, without the need to bracket pre-buried in elevator hoistways, reduce potential safety hazard, duration is protected, after tower crane jack-up construction completes and dismantles, without the need to carrying out post-processed to built-in fitting, the cutting process work of bracket is carried out without the need to specially dropping into manpower, and directly adopt concrete structured beam to carry, if the bearing capacity of the original design of selected structural beams does not meet the work requirements of tower crane, can according to the performance parameters of tower crane and the adjustment requirement of bearing capacity being carried out to structural beams arrangement of reinforcement and concrete material, its bearing capacity is made to meet the job requirement of tower crane, also reinforcing can be shored according to actual conditions to shaping structural beams, its reinforcement means is more flexible, tower crane is arranged on Core Walls Structure concrete structured beam, without the need to bracket pre-buried in elevator hoistways and set up non-productive operation platform, also eliminate the work for the treatment of in later stage, H type support steel beam can recycle, directly upwards transport in floor, easy to operate.
The inside-climbing tower crane of aforesaid structural beams bearing-type is installed and in jacking method, mixes clay structure beam and H type support steel beam arranges tower crane built-in fitting at structural core cylinder.
The inside-climbing tower crane of aforesaid structural beams bearing-type is installed and in jacking method, this tower crane built-in fitting is made up of steel plate and Ribbed Bar, and Ribbed Bar is evenly arranged on to be connected bottom steel plate and with the through hole on steel plate and welds.
The inside-climbing tower crane of aforesaid structural beams bearing-type is installed and in jacking method, the reinforced frame that Ribbed Bar and the structural core cylinder of tower crane built-in fitting mix clay structure beam welds, and to the level of tower crane built-in fitting and steel plate Pass line adjustment, then complete the mixed earth that structural core cylinder mixes clay structure beam to build, the upper surface of the steel plate of this tower crane built-in fitting need expose concrete surface, lower surface is embedded in cement concrete, after this tower crane installation of embedded parts uses, can directly stay in flooring, without the need to carrying out post-processed.
Owing to have employed technique scheme, compared with prior art, traditional bracket installs type inside-climbing tower crane operating technique, from materials processing to installation, jack-up construction all needs at substantial manpower, material, duration, difficulty of construction is large simultaneously, safety can not get ensureing, a kind of structural beams bearing-type of the utility model inside-climbing tower crane is adopted to install and climbing structure, for the feature that the construction of high-rise building inside-climbing tower crane is difficult, adopt structural beams as the load-carrying element of inside-climbing tower crane, effectively utilize existing structure, without the need to bracket pre-buried in elevator or punch, avoid the operation in elevator hoistways, at the enterprising line operate of structural beam slab, safety can obtain actv. guarantee, it is few that built-in fitting drops into material, after being used to complete in embedded concrete structure beam, without the need to carrying out post-processed, structural beams carries out the load-carrying member of tower body, can calculate according to the bearing capacity of beam, if cannot meet the demands, reinforcing can be shored under beam, process is convenient, the jacking of tower crane and the transhipment of H type support steel beam are all carried out on floor face, more convenient operation is quick, and potential safety hazard reduces, in jacking process, the levelness of tower body and tower body angle are easy to be adjusted, to operator's safety, easily operating environment.
Accompanying drawing explanation
Accompanying drawing 1 is inside-climbing tower crane installation in position front view in the utility model;
Accompanying drawing 2 is inside-climbing tower crane installation in position lateral plan in the utility model;
Accompanying drawing 3 is embedded part structure schematic diagram in the utility model;
Accompanying drawing 4 is the steel plate structure schematic diagram of built-in fitting;
Accompanying drawing 5 is H type support steel beam structural representation in the utility model;
Accompanying drawing 6 is that in the utility model, built-in fitting imbeds structural beams schematic diagram.
Being labeled as in accompanying drawing: 1-structural core cylinder mixes clay structure beam, 2-built-in fitting, 3-H type support steel beam, 4-steel plate, 5-connecting bore, 6-Ribbed Bar, 7-junction steel plate, 8-strengthen gusset, 9-inside-climbing tower crane, 10-high strength bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described in detail, but not as any limitation of the invention.
The utility model embodiment: a kind of inside-climbing tower crane of structural beams bearing-type is installed and jacking method, structural core cylinder is adopted to mix the load-carrying element of clay structure beam as inside-climbing tower crane, by mixing at structural core cylinder on clay structure beam, H type support steel beam is set, inside-climbing tower crane pedestal is fixed on H type support steel beam by high strength bolt, adopts hydraulic ram to complete jacking to inside-climbing tower crane in inside-climbing tower crane rises.
Wherein mix clay structure beam and H type support steel beam arranges tower crane built-in fitting at structural core cylinder, this tower crane built-in fitting is made up of steel plate and Ribbed Bar, Ribbed Bar is evenly arranged on to be connected bottom steel plate and with the through hole on steel plate and welds, the reinforced frame that Ribbed Bar and the structural core cylinder of tower crane built-in fitting mix clay structure beam welds, and to the level of tower crane built-in fitting and steel plate Pass line adjustment, then complete the mixed earth that structural core cylinder mixes clay structure beam and build.
Concrete manufacturing process
1, processing and installation tower crane built-in fitting
According to job schedule requirement, the processing of tower crane built-in fitting is carried out in steel structure processing place, according to designing requirement by steel plate perforate, and the termination of Ribbed Bar is welded in the hole of open pore steel plate, before the floor beam slab casting concrete of the tower crane base determined, by tower crane installation of embedded parts in the reinforcing steel bar shelf of corresponding Core Walls Structure concrete structured beam, and carry out the adjustment of level and steel plate absolute altitude, after in place, tower crane built-in fitting is welded on beam steel support body and is fixed, guarantee the displacement that can not cause built-in fitting in the process of casting concrete.
2, H type support steel beam is installed
According to the operating needs of tower crane, install at tower crane or before jacking, carry out the installation of H type support steel beam.After steel bar meter place processes H profile steel beam, respectively weld one piece of junction steel plate at two ends flange plate, during installation, the steel plate at girder steel two ends be placed on tower crane built-in fitting, and with the Plate Welding of built-in fitting.
3, the installation of tower crane
After H type support steel beam installation in position, by high strength bolt, the carriage of tower crane is connected with H profile steel beam, can starts tower crane installation in position.
4, the jacking of tower crane
During tower crane jacking, unclamped by the high strength bolt that the C type frame at pedestal place is connected with H type support steel beam, adopt hydraulic ram to carry out jacking, the transhipment of girder steel and jacking operation construction are all carried out on flooring, and safety is secure.
The inside-climbing tower crane of a kind of structural beams bearing-type constructed by said method is installed and climbing structure, as shown in drawings, comprise structural core cylinder and mix clay structure beam 1, the reinforced frame that tower crane built-in fitting 2 mixes in clay structure beam 1 with structural core cylinder welds, H type support steel beam 3 is welded on the steel plate 4 of tower crane built-in fitting 2, and the top flange plate of H type support steel beam 3 is provided with connecting bore 5.
wherein said tower crane built-in fitting 2 is made up of steel plate 4 and Ribbed Bar 6, Ribbed Bar 6 is evenly arranged on to be connected bottom steel plate 4 and with the through hole on steel plate 4 and welds, H type support steel beam 3 bottom wing listrium is provided with junction steel plate 7, is evenly equipped with reinforcement gusset 8 at H type support steel beam 4 in web both sides.

Claims (3)

1. the inside-climbing tower crane of a structural beams bearing-type is installed and climbing structure, comprise structural core cylinder and mix clay structure beam (1), it is characterized in that: the reinforced frame that tower crane built-in fitting (2) and structural core cylinder mix in clay structure beam (1) welds, H type support steel beam (3) is welded on the steel plate (4) of tower crane built-in fitting (2), and the top flange plate of H type support steel beam (3) is provided with connecting bore (5).
2. the inside-climbing tower crane of structural beams bearing-type according to claim 1 is installed and climbing structure, it is characterized in that: described tower crane built-in fitting (2) is made up of steel plate (4) and Ribbed Bar (6), Ribbed Bar (6) is evenly arranged on steel plate (4) bottom and is connected with the through hole on steel plate (4) and welds.
3. the inside-climbing tower crane of structural beams bearing-type according to claim 1 is installed and climbing structure, it is characterized in that: on H type support steel beam (3) bottom wing listrium, be provided with junction steel plate (7), be evenly equipped with reinforcement gusset (8) at H type support steel beam (4) in web both sides.
CN201420418170.7U 2014-07-28 2014-07-28 A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure Expired - Fee Related CN204173804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420418170.7U CN204173804U (en) 2014-07-28 2014-07-28 A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420418170.7U CN204173804U (en) 2014-07-28 2014-07-28 A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure

Publications (1)

Publication Number Publication Date
CN204173804U true CN204173804U (en) 2015-02-25

Family

ID=52562633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420418170.7U Expired - Fee Related CN204173804U (en) 2014-07-28 2014-07-28 A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure

Country Status (1)

Country Link
CN (1) CN204173804U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105016221A (en) * 2015-07-03 2015-11-04 杨海良 Base reinforcing and fixing mechanism for crane
CN105314548A (en) * 2014-07-28 2016-02-10 中建四局第六建筑工程有限公司 Installing and jacking method and structure for internal-climbing tower crane supported by structural beam
CN109928307A (en) * 2017-12-19 2019-06-25 广东庞源工程机械有限公司 A kind of novel tower airfoil type attached wall structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105314548A (en) * 2014-07-28 2016-02-10 中建四局第六建筑工程有限公司 Installing and jacking method and structure for internal-climbing tower crane supported by structural beam
CN105016221A (en) * 2015-07-03 2015-11-04 杨海良 Base reinforcing and fixing mechanism for crane
CN109928307A (en) * 2017-12-19 2019-06-25 广东庞源工程机械有限公司 A kind of novel tower airfoil type attached wall structure
CN109928307B (en) * 2017-12-19 2023-11-10 广东庞源工程机械有限公司 Novel tower wing type wall-attached structure

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN103510702B (en) Steel core concrete column pin type concrete pouring construction method
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN201614738U (en) Support device for mould board assembly of steel reinforced concrete transfer beams
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN206722404U (en) A kind of narrow end wall single side formwork horizontal reinforcing device
CN103104091A (en) Sliding mold whole lifting platform and construction method
CN105603843A (en) Assembled reinforced concrete prefabricated pavement slab and construction method thereof
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
CN103790423A (en) Construction method of large concrete granary
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN102518300A (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN105314548A (en) Installing and jacking method and structure for internal-climbing tower crane supported by structural beam
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN103266623A (en) Integral horizontally moving type traveling shuttering construction device for long-strip-shaped uniform section concrete structure
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN203603462U (en) Post-cast strip beam plate formwork supporting structure
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN102605945B (en) Manufacturing method of big wood formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225

Termination date: 20200728

CF01 Termination of patent right due to non-payment of annual fee