CN102650158A - Connecting device used in casting of shear walls in upper and lower layers - Google Patents

Connecting device used in casting of shear walls in upper and lower layers Download PDF

Info

Publication number
CN102650158A
CN102650158A CN2012101215891A CN201210121589A CN102650158A CN 102650158 A CN102650158 A CN 102650158A CN 2012101215891 A CN2012101215891 A CN 2012101215891A CN 201210121589 A CN201210121589 A CN 201210121589A CN 102650158 A CN102650158 A CN 102650158A
Authority
CN
China
Prior art keywords
section steel
channel
bar
hypomere
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101215891A
Other languages
Chinese (zh)
Inventor
姚晓东
陆建飞
沈映
李晓莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2012101215891A priority Critical patent/CN102650158A/en
Publication of CN102650158A publication Critical patent/CN102650158A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a connecting device used in the casting of shear walls in upper and lower layers, which is formed by an upper section U-bar, a middle section U-bar and a lower section U-bar through welding, wherein the upper section U-bar is vertically arranged and the notch is leftward, the middle section U-bar is horizontally arranged and the notch is downward, the lower section U-bar is vertically arranged and the notch is rightward, the left end of the middle section U-bar and the upper section U-bar are welded to form an L shape, the upper end of the lower section U-bar is welded at the right end of the middle section U-bar, and a drill hole is arranged in the middle of the lower section U-bar for a split bolt to penetrate through and to be fixed. With the connecting device, a series of problems such as slab misplacement, verticality deviation, framework shifting, framework bulging and flatness deviation found in the shear walls in the upper and the lower layers are effectively solved, and besides, the connecting device is simple and light, can be used repeatedly and plays a positive promoting role in construction efficiency, civilized construction, construction safety, construction quality and the like.

Description

When building, a kind of levels shear wall connects a batch device
Technical field
Construction equipment when the present invention relates to the levels shear wall and building.
Background technology
In structure construction procedure, it is common common quality defect that outer surface of wall verticality, planeness deviation exceed standard, especially at the position of levels exterior wall and floor handing-over; In addition, at the hoistway place, that the shear wall formwork difficulty of construction is installed at the exterior wall place is big, and there is bigger potential safety hazard.
How levels shear wall junction template carries out fasteningly with clamping in the building operations, and manually-operated is wasted time and energy, and there is bigger potential safety hazard in many places such as personnel, material in the exterior wall edge in operating process.The most serious problem is, even the lot of manpower and material resources of cost also may not necessarily be installed intactly with connecing batch template, degree of gravity vertical forwall surface, planeness deviation common quality defect such as exceed standard is very common,
Summary of the invention
Technical problem to be solved by this invention just provides a kind of levels shear wall when building connects a batch device, prevents that the junction from faulting of slab ends phenomenon largely taking place, and improves construction quality and efficiency of construction, guarantees construction safety simultaneously preferably.
For solving the problems of the technologies described above; The present invention adopts following technical scheme: connect a batch device when a kind of levels shear wall is built, it is characterized in that: by the epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel are welded; Wherein vertical setting of epimere channel-section steel and notch are left; The interlude channel-section steel be horizontally disposed with and notch downward, the hypomere channel-section steel vertically be provided with and notch to the right, interlude channel-section steel left end is L shaped with epimere channel-section steel welding formation; Hypomere channel-section steel upper end is welded in interlude channel-section steel right-hand member, and hypomere channel-section steel middle part is provided with a boring confession split bolt and passes and fix.
As preferably, said epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel all adopt the 10# channel-section steel, and the equal in length of said epimere channel-section steel and hypomere channel-section steel and length are all greater than 2500mm, and the length of said interlude channel-section steel is 100mm.
As preferably, said boring is located at the hypomere channel-section steel from weld seam 100mm place, upper end, and the diameter of said boring is no more than screw diameter 4mm.
As preferably, said epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel adopt butt weld to weld together.
The present invention can solve levels shear wall faulting of slab ends, perpendicularity deviation, race mould effectively, some row problems such as mould, planeness deviation expand; And it is simple and easy light and handy; Can reuse, can play positive impetus efficiency of construction, civilized construction, construction safety, construction quality etc.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is further described:
Fig. 1 is an architecture sketch map of the present invention;
Fig. 2 uses sketch map for the present invention.
The specific embodiment
As depicted in figs. 1 and 2; The embodiment that connects batch device 1 when building for a kind of levels shear wall of the present invention, by epimere channel-section steel 11, interlude channel-section steel 12 and hypomere channel-section steel 13 are welded; Wherein vertical setting of epimere channel-section steel and notch are left; The interlude channel-section steel be horizontally disposed with and notch downward, the hypomere channel-section steel vertically be provided with and notch to the right, interlude channel-section steel left end is L shaped with epimere channel-section steel welding formation; Hypomere channel-section steel upper end is welded in interlude channel-section steel right-hand member, and hypomere channel-section steel middle part is provided with a boring confession split bolt 14 and passes and fix.Said epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel all adopt the 10# channel-section steel, and the equal in length of said epimere channel-section steel and hypomere channel-section steel and length are all greater than 2500mm, and the length of said interlude channel-section steel is 100mm.Said boring is located at the hypomere channel-section steel from weld seam 100mm place, upper end, and the diameter of said boring is no more than screw diameter 4mm.Said epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel adopt butt weld to weld together.
As shown in Figure 2; 5 constructions of lower floor's shear wall are accomplished; Upper strata shear force wall reinforcing steel bar 4 has woven completion and has been in place, and batch device 1 that connects when template 3 is built through the levels shear wall is fixed, wherein; Batch device 1 that connects when the levels shear wall is built is fixed on lower floor's shear wall through split bolt, and connecing between batch device 1 and the template 3 when the levels shear wall is built is provided with flitch 2.

Claims (4)

1. connect a batch device when levels shear wall is built; It is characterized in that: by epimere channel-section steel (11); Interlude channel-section steel (12) and hypomere channel-section steel (13) are welded, wherein the epimere channel-section steel vertically be provided with and notch left, the interlude channel-section steel be horizontally disposed with and notch downward; Vertical setting of hypomere channel-section steel and notch are to the right; It is L shaped that interlude channel-section steel left end and epimere channel-section steel weld formation, and hypomere channel-section steel upper end is welded in interlude channel-section steel right-hand member, and hypomere channel-section steel middle part is provided with a boring confession split bolt (14) and passes and fix.
2. when building, a kind of levels shear wall according to claim 1 connects a batch device; It is characterized in that: said epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel all adopt the 10# channel-section steel; The equal in length of said epimere channel-section steel and hypomere channel-section steel and length are all greater than 2500mm, and the length of said interlude channel-section steel is 100mm.
3. connect a batch device when a kind of levels shear wall according to claim 2 is built, it is characterized in that: said boring is located at the hypomere channel-section steel from weld seam 100mm place, upper end, and the diameter of said boring is no more than screw diameter 4mm.
4. connect a batch device when a kind of levels shear wall according to claim 3 is built, it is characterized in that: said epimere channel-section steel, interlude channel-section steel and hypomere channel-section steel adopt butt weld to weld together.
CN2012101215891A 2012-04-24 2012-04-24 Connecting device used in casting of shear walls in upper and lower layers Pending CN102650158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101215891A CN102650158A (en) 2012-04-24 2012-04-24 Connecting device used in casting of shear walls in upper and lower layers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101215891A CN102650158A (en) 2012-04-24 2012-04-24 Connecting device used in casting of shear walls in upper and lower layers

Publications (1)

Publication Number Publication Date
CN102650158A true CN102650158A (en) 2012-08-29

Family

ID=46692275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101215891A Pending CN102650158A (en) 2012-04-24 2012-04-24 Connecting device used in casting of shear walls in upper and lower layers

Country Status (1)

Country Link
CN (1) CN102650158A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943564A (en) * 2012-10-23 2013-02-27 中国华冶科工集团有限公司 Flexible concrete rabbet connecting construction method
CN104727553B (en) * 2013-12-21 2017-01-11 中建四局第三建筑工程有限公司 Aluminum alloy shear wall and floor template adopted construction method and device
CN113374254A (en) * 2021-06-28 2021-09-10 中冶建工集团有限公司 Construction method for improving forming quality of junction of new and old cast-in-place concrete walls
CN114046041A (en) * 2021-10-13 2022-02-15 北京市第三建筑工程有限公司 Formwork reinforcing structure of as-cast finish concrete wall post-cast strip and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4949935A (en) * 1989-06-22 1990-08-21 Lee Yuan Ho Apparatus for positioning and supporting an inner mold panel of a form
CN201437641U (en) * 2009-07-31 2010-04-14 中冶集团华冶资源开发有限责任公司 Formwork fixing device
CN101748891A (en) * 2009-12-29 2010-06-23 青建集团股份公司 Connecting layer structure of fair-faced concrete outer wall template
CN202559746U (en) * 2012-04-24 2012-11-28 中天建设集团有限公司 Continuing device for upper-lower-layer shear wall during pouring

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4949935A (en) * 1989-06-22 1990-08-21 Lee Yuan Ho Apparatus for positioning and supporting an inner mold panel of a form
CN201437641U (en) * 2009-07-31 2010-04-14 中冶集团华冶资源开发有限责任公司 Formwork fixing device
CN101748891A (en) * 2009-12-29 2010-06-23 青建集团股份公司 Connecting layer structure of fair-faced concrete outer wall template
CN202559746U (en) * 2012-04-24 2012-11-28 中天建设集团有限公司 Continuing device for upper-lower-layer shear wall during pouring

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张敏: "混凝土接槎部位施工质量控制", 《山西建筑》, vol. 34, no. 04, 1 February 2008 (2008-02-01), pages 238 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943564A (en) * 2012-10-23 2013-02-27 中国华冶科工集团有限公司 Flexible concrete rabbet connecting construction method
CN104727553B (en) * 2013-12-21 2017-01-11 中建四局第三建筑工程有限公司 Aluminum alloy shear wall and floor template adopted construction method and device
CN113374254A (en) * 2021-06-28 2021-09-10 中冶建工集团有限公司 Construction method for improving forming quality of junction of new and old cast-in-place concrete walls
CN113374254B (en) * 2021-06-28 2022-12-23 中冶建工集团有限公司 Construction method for improving forming quality of junction of new and old cast-in-place concrete walls
CN114046041A (en) * 2021-10-13 2022-02-15 北京市第三建筑工程有限公司 Formwork reinforcing structure of as-cast finish concrete wall post-cast strip and construction method thereof
CN114046041B (en) * 2021-10-13 2023-08-18 北京市第三建筑工程有限公司 Template reinforcing structure of bare concrete wall post-pouring strip and construction method thereof

Similar Documents

Publication Publication Date Title
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN103669655A (en) Construction technology for pouring concrete of walls on two sides of deformation joint
CN204023411U (en) Novel assembled bracket bracket construction equipment
CN109577553A (en) A kind of new-type fabricated construction precast column unit and beam-column node construction method
CN102650158A (en) Connecting device used in casting of shear walls in upper and lower layers
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN104005556B (en) For the fixed form combination shuttering construction technology of expansion joint place shear wall
CN104196163A (en) Two-direction pre-stressed prefabricated hollow concrete slab and manufacturing method thereof
CN102518300A (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN210562611U (en) Combined connection node of steel pipe column and frame beam
CN106150085A (en) A kind of stiffened column Formwork Installation Method
CN202745355U (en) Lifting type elevator shaft operating platform
CN112302209B (en) Steel and concrete shear wall mixed structure and manufacturing method thereof
CN103075001A (en) Steel tube fastener slip form platform system
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN202559746U (en) Continuing device for upper-lower-layer shear wall during pouring
CN104563496A (en) Construction structure of cylindrical die
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN203361642U (en) Assembled-structure cast-in-place stair steel molding plate
CN102155095A (en) Arranging method of concrete reinforcements of steel rib of large-scale metallurgical workshop
CN206174441U (en) Elevator shaft operation platform
CN102605945A (en) Big wood formwork and manufacturing method
CN102720353A (en) Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120829