CN206625553U - For pouring the formwork bracing system of high-low bay structure simultaneously - Google Patents

For pouring the formwork bracing system of high-low bay structure simultaneously Download PDF

Info

Publication number
CN206625553U
CN206625553U CN201720280712.2U CN201720280712U CN206625553U CN 206625553 U CN206625553 U CN 206625553U CN 201720280712 U CN201720280712 U CN 201720280712U CN 206625553 U CN206625553 U CN 206625553U
Authority
CN
China
Prior art keywords
low
stay
scaffold
bracing system
place form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720280712.2U
Other languages
Chinese (zh)
Inventor
李满
万展君
龚达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201720280712.2U priority Critical patent/CN206625553U/en
Application granted granted Critical
Publication of CN206625553U publication Critical patent/CN206625553U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to it is a kind of be used for while pour the formwork bracing system of high-low bay structure, located at low across stay in place form and high between stay in place form, the formwork bracing system includes branch:Branch is located at the low support frame on stay in place form, the top of support frame as described above formed with positioned at wait to pour to be formed it is low across the supporting part of superstructure;And the scaffold for being placed in the supporting part is arranged, the scaffold stays on the height across the bottom of stay in place form, it is achieved thereby that low pour across structure and height across structure simultaneously.Pour high-low bay structure simultaneously using the formwork bracing system, accelerating construction progress, after the completion of pouring, by support frame expose it is low cut off across the part of structure, so as to which scaffold be removed, realize the turnover recycling of scaffold, saved material cost.Solve prior art must first construct it is low across structural slab, after its blanks and moulding and conserving just can formwork construction cantilevered plate, the problem of causing construction speed slow.

Description

For pouring the formwork bracing system of high-low bay structure simultaneously
Technical field
Technical field of building construction is the utility model is related to, refers in particular to a kind of be used for while pour the template branch of high-low bay structure Support system.
Background technology
Often will first construct cantilevered plate in conventional construction method, during the such high-low bay labyrinth containing cantilevered plate of construction Lower section it is low across structural slab, upward formwork, this traditional construction method cause construction speed very again after its blanks and moulding and conserving Slowly.
Utility model content
The defects of the purpose of this utility model is to overcome prior art, there is provided one kind is used to pour high-low bay structure simultaneously Formwork bracing system, can solve prior art must first construct it is low across structural slab, after its blanks and moulding and conserving just can formwork apply Work cantilevered plate, the problem of causing construction speed slow.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provide it is a kind of be used for while pour the formwork bracing system of high-low bay structure, branch is located at low across knot Between stay in place form, the formwork bracing system includes for structure template and height:
Branch is located at the low support frame on stay in place form, and the top of support frame as described above is formed with positioned at shape to be poured Into it is low across the supporting part of superstructure;And
The scaffold for being placed in the supporting part is arranged, the scaffold stays on the height across the bottom of stay in place form.
The beneficial effects of the utility model are:Using the supporting part that support frame is set by scaffold support to be poured low Across the top of structure, the scaffold is used to support height across stay in place form, it is achieved thereby that low pour across structure and height across structure simultaneously Build, accelerating construction progress, after the completion of pouring, by support frame expose it is low cut off across the part of structure, so that scaffold be removed, The turnover recycling of scaffold is realized, has saved material cost.
The utility model be used for simultaneously pour the formwork bracing system of high-low bay structure further improvement is that, the branch Support also includes the bearing for being fixedly arranged on the supporting part bottom.
The utility model be used for simultaneously pour the formwork bracing system of high-low bay structure further improvement is that,
The supporting part includes the first cross bar and the first montant being vertically located on first cross bar;
The bearing includes the second cross bar and the second montant being vertically located on second cross bar, second montant Top be fixedly connected on the bottom of first cross bar.
The utility model be used for simultaneously pour the formwork bracing system of high-low bay structure further improvement is that, the pin Hand cradle includes the transverse tube and vertical tube that transverse and longitudinal is staggered, and the transverse tube is fixedly connected with the vertical tube by fastener, the vertical tube Bottom is sheathed on support frame as described above on corresponding first montant, is placed on first cross bar.
The utility model be used for simultaneously pour the formwork bracing system of high-low bay structure further improvement is that, the height Flitch is provided with across the bottom of stay in place form, the flitch is supported in the height across stay in place form and the transverse tube of the scaffold top Between.
The utility model be used for simultaneously pour the formwork bracing system of high-low bay structure further improvement is that, it is described low Bar construction is equipped with stay in place form, the bar construction is fixedly connected with the bearing of support frame as described above.
The utility model be used for simultaneously pour the formwork bracing system of high-low bay structure further improvement is that,
The high template of encorbelmenting for including vertically arranged beam forms across stay in place form and laterally setting;
The bottom of the template of encorbelmenting is stayed at the top of the scaffold, the sidepiece of the scaffold stays on the beam The outside of template.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model is used to pour the formwork bracing system of high-low bay structure simultaneously.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, the utility model provide it is a kind of be used for and meanwhile pour the formwork bracing system of high-low bay structure, have The features such as structurally simple, economical practical, solving prior art must first construct low across structural slab, can just be propped up after its blanks and moulding and conserving Mould is constructed cantilevered plate, and the problem of causing construction speed slow is used for the utility model while pours high-low bay below in conjunction with the accompanying drawings The formwork bracing system of structure illustrates.
As shown in figure 1, the formwork bracing system branch that the utility model is used to pour high-low bay structure simultaneously is located at low across knot Between stay in place form 15, the support system includes support frame 11 and scaffold 12 for structure template 14 and height.It is low across stay in place form 14 To be formed low across structure 16 for pouring, high to be used to pour across stay in place form 15 to be formed high across structure 17, support frame 11 is located at low On stay in place form 14, and the top of the support frame 11 is formed with positioned at waiting to pour the low support above structure 16 to be formed Portion 111, scaffold 12, which is arranged, to be placed on the supporting part 111, and scaffold 12 stay on it is high across the bottom of stay in place form 15, from And realize and low poured across structure and while high across structure.
It is low horizontally disposed across stay in place form 14, bar construction, the bottom of support frame 11 are equipped with stay in place form 14 low Portion be placed in it is low be fixedly connected on stay in place form 14 and with the bar construction, scaffold 12, which is arranged, is placed in the top of support frame 11 Supporting part 111 on, height be placed in across stay in place form 15 on scaffold 12.
Support frame 11 includes supporting part 111 and is fixedly arranged on the bearing 112 of the bottom of supporting part 111.Supporting part 111 includes first Cross bar and the first montant being vertically located on first cross bar;Bearing 112 include the second cross bar and be vertically located in this second The second montant on cross bar, the second cross bar are be arranged in parallel with the first cross bar, and the first cross bar is fixedly connected at the top of the second montant Bottom.Scaffold 12 is supported on shape to be poured positioned at low above stay in place form 14 by supporting part 111 by supporting part 111 Into it is low across the top of structure 16, avoid scaffold 12 and the low contact across structure 16 so that scaffold 12 can have enough to meet the need repetition Utilize, height is supported across stay in place form 15 by scaffold 12 so that be high low to be propped up across stay in place form 14 across stay in place form 15 and simultaneously If low across structure 17 while poured across structure 16 and height so as to realize.As a preferred embodiment, the first cross bar, first Montant, the second cross bar and the second montant are a diameter of 20mm reinforcing bar.
Scaffold 12 includes the transverse tube 121 and vertical tube 122 that transverse and longitudinal is staggered, and transverse tube 121 and vertical tube 122 are consolidated by fastener Fixed connection, the first montant that the bottom of vertical tube 122 is sheathed on supporting part 111 are placed on the first cross bar.It is preferable as one Embodiment, the steel pipe that the steel pipe in scaffold 12 is a diameter of 48mm.
The high template 151 of encorbelmenting for including vertically arranged beam forms 152 across stay in place form 15 and laterally setting.Scaffold 12 Top stay on the bottom of template 151 of encorbelmenting, the sidepiece of scaffold 12 stays on the outside of the beam forms 152.Encorbelment mould Plate 151 is used to pour to form cantilevered plate 171, and beam forms 152 is used to pour to form structural beams 172.In the bottom for encorbelmenting template 151 Flitch 13 is provided with, the flitch 13 is used to support height, and flitch 13 is supported in high encorbelmenting across stay in place form 15 across stay in place form 15 Between the transverse tube 121 at template 151 and the top of scaffold 12.
Be used to pour the formwork bracing system of high-low bay structure simultaneously using the utility model, at the same to it is low across structural slab and Cantilevered plate is poured, and after concrete formation maintenance, cutting off reinforcing bar unnecessary in support frame makes it be flushed with low across structural slab That is collapsible die.
Scaffold support low is used to be poured across the top of structure, the scaffold using the supporting part that support frame is set It is high across stay in place form in support, it is achieved thereby that low pour across structure and height across structure simultaneously, accelerating construction progress, pouring Cheng Hou, by support frame expose it is low cut off across the part of structure, so that scaffold be removed, the turnover for realizing scaffold repeats profit With having saved material cost.Support frame structure is simple, is made using the welding of job site reinforcing bar clout, economical and practical.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.

Claims (7)

1. a kind of formwork bracing system for being used to pour high-low bay structure simultaneously, branch is located at low across stay in place form and high across structure mould Between plate, it is characterised in that the formwork bracing system includes:
Branch is located at the low support frame on stay in place form, and the top of support frame as described above is formed with positioned at waiting to pour what is formed It is low across the supporting part of superstructure;And
The scaffold for being placed in the supporting part is arranged, the scaffold stays on the height across the bottom of stay in place form.
2. the formwork bracing system as claimed in claim 1 for being used to pour high-low bay structure simultaneously, it is characterised in that the branch Support also includes the bearing for being fixedly arranged on the supporting part bottom.
3. the formwork bracing system as claimed in claim 2 for being used to pour high-low bay structure simultaneously, it is characterised in that
The supporting part includes the first cross bar and the first montant being vertically located on first cross bar;
The bearing includes the second cross bar and the second montant being vertically located on second cross bar, the top of second montant Portion is fixedly connected on the bottom of first cross bar.
4. the formwork bracing system as claimed in claim 3 for being used to pour high-low bay structure simultaneously, it is characterised in that the pin Hand cradle includes the transverse tube and vertical tube that transverse and longitudinal is staggered, and the transverse tube is fixedly connected with the vertical tube by fastener, the vertical tube Bottom is sheathed on support frame as described above on corresponding first montant, is placed on first cross bar.
5. the formwork bracing system as claimed in claim 4 for being used to pour high-low bay structure simultaneously, it is characterised in that the height Flitch is provided with across the bottom of stay in place form, the flitch is supported in the height across stay in place form and the transverse tube of the scaffold top Between.
6. the formwork bracing system as claimed in claim 2 for being used to pour high-low bay structure simultaneously, it is characterised in that described low Bar construction is equipped with stay in place form, the bar construction is fixedly connected with the bearing of support frame as described above.
7. the formwork bracing system as claimed in claim 1 for being used to pour high-low bay structure simultaneously, it is characterised in that
The high template of encorbelmenting for including vertically arranged beam forms across stay in place form and laterally setting;
The bottom of the template of encorbelmenting is stayed at the top of the scaffold, the sidepiece of the scaffold stays on the beam forms Outside.
CN201720280712.2U 2017-03-22 2017-03-22 For pouring the formwork bracing system of high-low bay structure simultaneously Active CN206625553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720280712.2U CN206625553U (en) 2017-03-22 2017-03-22 For pouring the formwork bracing system of high-low bay structure simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720280712.2U CN206625553U (en) 2017-03-22 2017-03-22 For pouring the formwork bracing system of high-low bay structure simultaneously

Publications (1)

Publication Number Publication Date
CN206625553U true CN206625553U (en) 2017-11-10

Family

ID=60208167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720280712.2U Active CN206625553U (en) 2017-03-22 2017-03-22 For pouring the formwork bracing system of high-low bay structure simultaneously

Country Status (1)

Country Link
CN (1) CN206625553U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625475A (en) * 2018-04-28 2018-10-09 中国十七冶集团有限公司 A kind of high-low bay concreting method
CN112854817A (en) * 2021-01-07 2021-05-28 中国建筑第八工程局有限公司 Connecting structure for structural beam and support frame and method thereof
CN112900489A (en) * 2021-01-22 2021-06-04 中建八局轨道交通建设有限公司 High-low span pipe gallery construction method and construction device thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625475A (en) * 2018-04-28 2018-10-09 中国十七冶集团有限公司 A kind of high-low bay concreting method
CN112854817A (en) * 2021-01-07 2021-05-28 中国建筑第八工程局有限公司 Connecting structure for structural beam and support frame and method thereof
CN112900489A (en) * 2021-01-22 2021-06-04 中建八局轨道交通建设有限公司 High-low span pipe gallery construction method and construction device thereof

Similar Documents

Publication Publication Date Title
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN201666157U (en) Inverted arch integral type moving die carrier
CN203081466U (en) Integrated moving framework for inverted arch of tunnel
CN107053440A (en) A kind of precast plate girder pedestal preparation method
CN203487779U (en) Tool type stock mould for masonry constructional column concrete pouring
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN205712565U (en) A kind of prefabricated two-sided wall
CN203361642U (en) Assembled-structure cast-in-place stair steel molding plate
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN115070935A (en) Prefabricated bridge approach box girder reinforcement binding positioner of high pile pier
CN211286688U (en) Simple floor thickness and levelness control tool
CN210530314U (en) Formwork frame is pour to steel concrete combination shear wall T type node
CN207377118U (en) Agent structure increases a layer aluminum alloy mould plate jacking apparatus
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN207582971U (en) Pump line bearing
CN112144865A (en) Early-dismantling formwork support system
CN108590042B (en) Multifunctional stirrup for controlling thickness of steel bar protection layer and floor slab
CN207194317U (en) A kind of type quick detaching split heads
CN206016254U (en) Building precast constructional column exempts from the U-shaped shell of formwork
CN210508036U (en) Cast-in-place concrete form removal-free steel mesh reinforced high-strength fiber cement pressure template structure
CN216516400U (en) Integral floor core mould
CN214696832U (en) Structure construction of descending board
CN221031430U (en) Auxiliary device is built to smart of little space cantilever plate