CN200988691Y - Working clamp storage changing system on production line - Google Patents

Working clamp storage changing system on production line Download PDF

Info

Publication number
CN200988691Y
CN200988691Y CN 200620111849 CN200620111849U CN200988691Y CN 200988691 Y CN200988691 Y CN 200988691Y CN 200620111849 CN200620111849 CN 200620111849 CN 200620111849 U CN200620111849 U CN 200620111849U CN 200988691 Y CN200988691 Y CN 200988691Y
Authority
CN
China
Prior art keywords
manufacturing line
elevator
production line
frock clamp
lodgement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620111849
Other languages
Chinese (zh)
Inventor
左宗申
刘世启
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zongshen Technology Development and Research Co Ltd
Original Assignee
Chongqing Zongshen Technology Development and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zongshen Technology Development and Research Co Ltd filed Critical Chongqing Zongshen Technology Development and Research Co Ltd
Priority to CN 200620111849 priority Critical patent/CN200988691Y/en
Application granted granted Critical
Publication of CN200988691Y publication Critical patent/CN200988691Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses a lodgement and replacement system for assembly fixture on production lines, comprising a lifter, a production line, a plurality of lodgement stands, a plurality of fixture pallets and a control device. The lifter is positioned at the end of the production line, the outlet of the lifter is opposite to the production line, and a conveyor belt is arranged at the bottom of the lifter. The lodgement stands are arranged above and parallel to the production line, and a conveying chain is arranged on the lodgement stand. A plurality of buffer stands, on which buffer conveying chains are arranged, are arranged below and parallel to the production line. The assembly fixtures are fixed on the fixture pallets and positioned on the lodgement stands. The control device is connected with the lifter, the production line, the belt, the convoying chains and the buffer conveying chains respectively. The lodgement and replacement system for assembly fixture on production lines of the utility model enables effective storage and management of a plurality of assembly fixtures with various types, saves space, enables fast, convenient and accurate replacement of assembly fixtures, improves the replacement efficiency and reduces the workload for production personnel replacing the fixtures because the assembly fixture can be replaced while in production.

Description

Frock clamp memory change system on a kind of manufacturing line
Technical field the utility model relates to frock clamp memory change system on a kind of manufacturing line.
The manufacturing line of background technology for realizing producing in enormous quantities, frock clamp assembles or processing for overpaying of needing generally that quantity do not wait, when manufacturing line carries out the kind switching at needs, generally be that the frock clamp on the manufacturing line is carried by manual type, be about to former kind frock clamp and move, the new varieties frock clamp is brought and is installed on the manufacturing line from other memory change places from manufacturing line.The weak point of this former frock clamp memory change system: 1, storage location makes handling process increase labor content with separating of place to use; 2, move and to transport the efficient of installation low; 3, obsolete frock clamp needs the place to store.
The summary of the invention the purpose of this utility model is exactly at the deficiencies in the prior art, a kind of effective storage and management that realizes quantity frock clamp how wide in variety is provided, reduce taking of place, can realize changing fast, easily and accurately frock clamp, but the limit is changed the frock clamp limit and is produced frock clamp memory change system on the manufacturing line of the work capacity of raising switching efficiency reduction producers when switching kind when switching kind.
For achieving the above object, the utility model adopts following technical scheme:
Frock clamp memory change system is made of elevator, manufacturing line, storage rack, jig pallet, control setup on a kind of manufacturing line, and elevator is located at the end of manufacturing line, and outlet is over against manufacturing line, and the bottom of elevator is provided with belt conveyor; Directly over manufacturing line, with manufacturing line parallel up and down set up storage rack, storage rack is provided with chain; Under manufacturing line, with manufacturing line parallel up and down be provided with the buffer memory frame, the buffer memory frame is provided with the buffer memory chain; Frock clamp is fixed on the jig pallet, and places on the storage rack; Control setup is electrically connected with elevator, manufacturing line, belt conveyor, chain, buffer memory chain respectively.
When needs are changed frock clamp, control setup is arranged to the replacing state, and the number of plies that the lifting function is risen to need to change by control setup, control setup instruction respective stored is changed layer and is let pass anchor clamps on elevator and pallet thereof, and be transported to the manufacturing line working lining, at this moment the chain of working lining connects away the anchor clamps on the elevator, enters mode of operation; The frock clamp that is replaced can be delivered to elevator by the manufacturing line working lining earlier, is transferred to accumulation layer or buffer memory frame by elevator again, if be transferred to the buffer memory frame earlier, then be transferred to elevator by the buffer memory frame again, be transferred to accumulation layer by elevator again, so change frock clamp repeatedly.
Be respectively equipped with retaining on the bottom of described manufacturing line, storage rack, buffer memory frame, elevator and stop device, and be electrically connected with control setup respectively.Retaining stops that device is used for indicating and controlling the work, storage, buffer memory of frock clamp and in the stand of elevator
Two ends at manufacturing line are equipped with elevator.The two ends, the left and right sides of manufacturing line all are provided with elevator, so just form a circulation by left and right sides elevator, manufacturing line, storage rack, buffer memory frame, reach simultaneously and store, change
Described storage rack is a multilayer.Storage rack is a multiple-structure, makes full use of spatial altitude, makes the stored number of each layer storage rack few, both can store frock clamp more, again can quick storage or replacing frock clamp.
Frock clamp memory change system on a kind of manufacturing line of the present utility model, can realize the effective storage and the management of quantity frock clamp how wide in variety, reduce taking of place, can realize changing fast, easily and accurately frock clamp, but the limit is changed the frock clamp limit and is produced the work capacity of raising switching efficiency reduction producers when switching kind when switching kind.
Description of drawings Fig. 1 is a structural representation of the present utility model
Fig. 2 is the birds-eye view of Fig. 1
The specific embodiment is further described the utility model below in conjunction with accompanying drawing, referring to Fig. 1, Fig. 2:
Frock clamp memory change system on a kind of manufacturing line is made of elevator 1, manufacturing line 2, storage rack 3, jig pallet 4, control setup 5, and elevator 1 is located at the end of manufacturing line 2, and outlet is over against manufacturing line 2, and the bottom of elevator 1 is provided with belt conveyor 11; Directly over manufacturing line 2, with manufacturing line parallel storage rack 3 of having set up about in the of 2, storage rack 3 is provided with chain 31; Under manufacturing line 2, with manufacturing line parallel buffer memory frame 6 that is provided with about in the of 2, buffer memory frame 6 is provided with buffer memory chain 61; Frock clamp is fixed on the jig pallet 4, and places on the storage rack 3; Control setup 5 is electrically connected with elevator 1, manufacturing line 2, belt conveyor 11, chain 31, buffer memory chain 61 respectively.
Be respectively equipped with retaining on the bottom of described manufacturing line 2, storage rack 3, buffer memory frame 6, elevator 1 and stop device 7, and be electrically connected with control setup 5 respectively.
Be equipped with elevator 1 at the two ends of manufacturing line 2.
Described storage rack 3 is a multilayer.
Principle of work: when needs are changed frock clamp, control setup 5 is arranged to the replacing state, and make the elevator 1 on the right can rise to storage rack 3 numbers of plies of need changing by control setup 2, the retaining of control setup 5 instruction respective stored framves 3 accumulation layers stops device 7 and lets pass a frock clamp to the belt conveyor 11 of the right elevator 1 and be transported to the working lining of manufacturing line 2, at this moment the chain 31 of manufacturing line 2 connects away the frock clamp on the elevator 1, enter mode of operation, simultaneously, after the elevator 1 on the left side is received the frock clamp that need that chain 31 transportation of manufacturing line 2 comes change, after rising to the replacing layer of the storage rack 3 that needs memory change, chain 31 to the replacing layer of this storage rack 3 discharges frock clamps to store this frock clamp, changes repeatedly with this.

Claims (4)

1, frock clamp memory change system on a kind of manufacturing line, it is characterized in that: constitute by elevator (1), manufacturing line (2), storage rack (3), jig pallet (4), control setup (5), elevator (1) is located at the end of manufacturing line (2), outlet is over against manufacturing line (2), and the bottom of elevator (1) is provided with belt conveyor (11); Directly over manufacturing line (2), with manufacturing line (2) parallel up and down set up storage rack (3), storage rack (3) is provided with chain (31); Under manufacturing line (2), with manufacturing line (2) parallel up and down be provided with buffer memory frame (6), buffer memory frame (6) is provided with buffer memory chain (61); Frock clamp is fixed on the jig pallet (4), and places on the storage rack (3); Control setup (5) is electrically connected with elevator (1), manufacturing line (2), belt conveyor (11), chain (31), buffer memory chain (61) respectively.
2, frock clamp memory change system on a kind of manufacturing line according to claim 1, it is characterized in that: be respectively equipped with retaining on the bottom of described manufacturing line (2), storage rack (3), buffer memory frame (6), elevator (1) and stop device (7), and be electrically connected with control setup (5) respectively.
3, frock clamp memory change system on a kind of manufacturing line according to claim 1 is characterized in that: be equipped with elevator (1) at the two ends of manufacturing line (2).
4, frock clamp memory change system on a kind of manufacturing line according to claim 1 is characterized in that: described storage rack (3) is a multilayer.
CN 200620111849 2006-12-04 2006-12-04 Working clamp storage changing system on production line Expired - Fee Related CN200988691Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620111849 CN200988691Y (en) 2006-12-04 2006-12-04 Working clamp storage changing system on production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620111849 CN200988691Y (en) 2006-12-04 2006-12-04 Working clamp storage changing system on production line

Publications (1)

Publication Number Publication Date
CN200988691Y true CN200988691Y (en) 2007-12-12

Family

ID=38939732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620111849 Expired - Fee Related CN200988691Y (en) 2006-12-04 2006-12-04 Working clamp storage changing system on production line

Country Status (1)

Country Link
CN (1) CN200988691Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101306759B (en) * 2008-05-13 2011-01-26 王树生 Multilayer workpiece conveying device
CN102554714A (en) * 2010-12-08 2012-07-11 鸿富锦精密工业(深圳)有限公司 Combined production line
CN102653096A (en) * 2012-05-11 2012-09-05 苏州金牛精密机械有限公司 Tray placing frame
CN102785792A (en) * 2012-07-27 2012-11-21 长城汽车股份有限公司 Spacing device of equipment for delivering welding workpieces in circulating manner
CN101910028B (en) * 2007-12-24 2014-04-23 克朗斯股份公司 Method for product replacement for filling device, and caching system
CN106276190A (en) * 2016-10-26 2017-01-04 苏州赛斯特机器人技术有限公司 A kind of multilamellar two-wire circulation pipeline
CN106743490A (en) * 2017-02-27 2017-05-31 桂林电子科技大学 A kind of workpiece rapid batch arrangement apparatus for meeting industrial engineering
CN107042996A (en) * 2016-02-05 2017-08-15 佛山市柯博明珠数码电子有限公司 A kind of electronic product integral type automated three-dimensional workshop
CN107934342A (en) * 2017-12-21 2018-04-20 大连万盛合机电设备有限公司 Truss parallel fabrication transfer matic tray library
CN109422055A (en) * 2017-08-22 2019-03-05 天津精创科技有限公司 Frock clamp replaces system on a kind of production line
CN109420931A (en) * 2017-08-22 2019-03-05 天津精创科技有限公司 A kind of artificial clamping tool detection system

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101910028B (en) * 2007-12-24 2014-04-23 克朗斯股份公司 Method for product replacement for filling device, and caching system
CN101306759B (en) * 2008-05-13 2011-01-26 王树生 Multilayer workpiece conveying device
CN102554714A (en) * 2010-12-08 2012-07-11 鸿富锦精密工业(深圳)有限公司 Combined production line
CN102653096A (en) * 2012-05-11 2012-09-05 苏州金牛精密机械有限公司 Tray placing frame
CN102785792A (en) * 2012-07-27 2012-11-21 长城汽车股份有限公司 Spacing device of equipment for delivering welding workpieces in circulating manner
CN107042996A (en) * 2016-02-05 2017-08-15 佛山市柯博明珠数码电子有限公司 A kind of electronic product integral type automated three-dimensional workshop
CN107042996B (en) * 2016-02-05 2024-03-19 佛山市柯博明珠数码电子有限公司 Electronic product integrated automatic three-dimensional production workshop
CN106276190B (en) * 2016-10-26 2018-07-24 苏州赛斯特机器人技术有限公司 A kind of multilayer two-wire circulation conveying line
CN106276190A (en) * 2016-10-26 2017-01-04 苏州赛斯特机器人技术有限公司 A kind of multilamellar two-wire circulation pipeline
CN106743490A (en) * 2017-02-27 2017-05-31 桂林电子科技大学 A kind of workpiece rapid batch arrangement apparatus for meeting industrial engineering
CN106743490B (en) * 2017-02-27 2023-12-08 桂林电子科技大学 Quick batch arrangement device of work piece that accords with industrial engineering
CN109422055A (en) * 2017-08-22 2019-03-05 天津精创科技有限公司 Frock clamp replaces system on a kind of production line
CN109420931A (en) * 2017-08-22 2019-03-05 天津精创科技有限公司 A kind of artificial clamping tool detection system
CN107934342A (en) * 2017-12-21 2018-04-20 大连万盛合机电设备有限公司 Truss parallel fabrication transfer matic tray library
CN107934342B (en) * 2017-12-21 2024-05-14 大连万盛合机电设备有限公司 Tray warehouse of automatic line for parallel truss processing

Similar Documents

Publication Publication Date Title
CN200988691Y (en) Working clamp storage changing system on production line
CN208516326U (en) Charging tray charging & discharging machine
CN102556674B (en) Circulation type tobacco stacking/unstacking device
CN203820065U (en) Automatic-circulating-type forming brick palletizing system
CN206939674U (en) A kind of transmission system for lifting material
CN104617023A (en) Conveying device of crystalline silicon solar battery piece material rest
CN210762879U (en) Automatic disc separating mechanism
TW201904842A (en) Detection system and detection method
CN110102503A (en) A kind of novel high speed sorting line
CN208471052U (en) Automatic pipe workpiece unloading stacks integrated device
CN207497689U (en) A kind of circuit board automatic sheet feeder
CN206068872U (en) A kind of degumming machine automatic blanking device
CN206140232U (en) Lift stepping mechanism
CN110203638A (en) Feeding production line and tunnel type vacuum drying system
CN208530945U (en) It is a kind of to move case apparatus certainly
CN207596955U (en) Full-automatic coating machine
CN207313717U (en) A kind of carbon annode handler
CN206631949U (en) A kind of express transportation system and quick despatch shipping platform
CN203391199U (en) Rapid mould changing system
CN206032718U (en) Novel high -efficient bed board machine
CN203993066U (en) A kind of Full-automatic screw locking machine
CN205169494U (en) Storage rack for transportation
CN212892593U (en) LED support loading attachment
CN208150353U (en) Fully automatic stereo formula sorting line
CN208120264U (en) Automatic loading and unloading spindle house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071212

Termination date: 20141204

EXPY Termination of patent right or utility model