CN1472420A - 双圆盾构法隧道衬砌结构施工方法 - Google Patents

双圆盾构法隧道衬砌结构施工方法 Download PDF

Info

Publication number
CN1472420A
CN1472420A CNA031166741A CN03116674A CN1472420A CN 1472420 A CN1472420 A CN 1472420A CN A031166741 A CNA031166741 A CN A031166741A CN 03116674 A CN03116674 A CN 03116674A CN 1472420 A CN1472420 A CN 1472420A
Authority
CN
China
Prior art keywords
piece
stage
assembly unit
jurisdiction
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031166741A
Other languages
English (en)
Other versions
CN1266370C (zh
Inventor
沈秀芳
曹文宏
杨志豪
申伟强
狄永媚
袁金荣
曹伟飚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN 03116674 priority Critical patent/CN1266370C/zh
Publication of CN1472420A publication Critical patent/CN1472420A/zh
Application granted granted Critical
Publication of CN1266370C publication Critical patent/CN1266370C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本发明涉及隧道类,特别涉及一种双圆盾构隧道衬砌结构施工方法。该施工方法,主要包括管片的预制、管片的拼装、衬砌圆环的拼接,其中管片的拼装,是先拼装底部的大飞鸟块,然后在其两边依次拼装标准块,至封顶处时,再拼装顶部小飞鸟块,最后安装立柱块,形成二个封闭的结构体系。块与块之间的环向连接为固定连接,其优点是,可以节约地下空间、降低工程投资、加快工程进度、提高施工质量,可大大提高城市地铁、道路隧道投资的经济效益。

Description

双圆盾构法隧道衬砌结构施工方法
技术领域
本发明涉及隧道类,特别涉及一种双圆盾构隧道衬砌结构施工方法。
背景技术
我国所有已建或在建的隧道均为单圆盾构区间隧道。这种传统的建造方法主要优点为衬砌圆环的构造简单、衬砌拼装方便、推进速度快等等,该方法通常是一次掘进完成一条单圆隧道,如果需要两条以上的圆隧道,就只有分别掘进施工,就因此造成了以下的弊端:一是两条隧道分别施工会产生衬砌变形的相互影响;二是为了保证两条隧道的安全间距(约1倍隧道直径),加大了盾构工作井的规模,占用了过大的、宝贵的城市地下空间,特别是在狭窄的空间里施工难度很大;三是两条隧道分两次施工,再加上盾构转换、拆装、吊运等附加的工作量要比一次施工大,因而施工效率低。如果采用双圆盾构法,可以一次完成上、下行区间隧道的施工,采用现行的施工方法显然无法满足施工要求。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种双圆盾构法隧道衬砌结构的施工方法,将两条单圆隧道通过构造技术结合起来,一次完成上、下行区间隧道的施工。
本发明目的实现由以下技术方案完成:
本发明所采用的施工方法,主要包括管片的预制,如标准块的预制;管片的现场拼装,即衬砌圆环的构成;以及衬砌圆环的拼接,其特征是,管片的预制,还包括大飞鸟块、小飞鸟块和立柱块的预制;管片的现场拼装时,需先拼装底部的大飞鸟块,然后在其两边依次拼装标准块,至封顶处时,再拼装顶部小飞鸟块,最后安装立柱块,形成二个封闭的结构体系。
块与块之间的环向连接以及衬砌圆环之间的纵向拼接均为固定连接,所称的固定连接可以是预埋铸铁手孔及螺母用单头短直螺栓连接;也可以是将弯螺栓分别通过两个块预留的靴形手孔和弯螺栓孔用螺母固定连接;也可以是将直螺栓分别通过两个块预留的梯形手孔和直螺栓孔用螺母固定连接。
采用上述方案构成的衬砌结构的断面形状是两个相交的圆环形状。
本发明中的两个圆环相交定位取决于其直径大小,通常两个圆环中心距为R—2R,R为圆隧道的外半径。
本发明的优点是,可以节约地下空间、降低工程投资、加快工程进度、提高施工质量,可大大提高城市地铁、道路隧道投资的经济效益。
附图概述
附图1为本发明产品结构断面图;
附图2为本发明大飞鸟块主视图;
附图3为本发明大飞鸟块俯视图;
附图4为本发明小飞鸟块主视图;
附图5为本发明小飞鸟块俯视图;
附图6为本发明立柱块主视图;
附图7为本发明立柱块侧视图;
附图8为本发明标准块主视图;
附图9为本发明标准块侧视图;
附图10为本发明连接方式I示意图;
附图11为本发明连接方式II示意图;
附图12为本发明连接方式III示意图;
附图13为本发明拼装流程图;
具体技术方案
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-13所示,总参考标号1-12分别表示:大飞鸟块(1)、小飞鸟块(2)、立柱块(3)、标准块(4)、预埋铸铁手孔(5)、螺母(6)、靴形手孔(7)、弯螺栓孔(8)、梯形手孔(9)、直螺栓孔(10)、盾壳(11)、机械手(12)。管片拼装的附图中,黑色管片为正在拼装的管片,阴影部分为已拼装好的部分。
本实施例中所采用的施工方法,主要包括管片的预制,即标准块(4)、大飞鸟块(1)、小飞鸟块(2)和立柱块(3)的预制;管片的现场拼装,即衬砌圆环的构成;衬砌圆环的拼接。块与块之间的环向连接以及衬砌圆环之间的纵向拼接均为固定连接,所称的固定连接可以是预埋铸铁手孔(5)及螺母(6)用单头短直螺栓连接如图10;也可以是将弯螺栓分别通过两个块预留的靴形手孔(7)和弯螺栓孔(8)用螺母固定连接如图11;也可以是将直螺栓分别通过两个块预留的梯形手孔(9)和直螺栓孔(10)用螺母固定连接如图12。
进行管片现场拼装时,在盾壳(11)内部,利用机械手(12)首先安装底部的大飞鸟块(1),然后两个机械手从下到上在其两边依次同步拼装标准块(4),所有的标准块拼装完成后,安装位于顶部的小飞鸟块(2),最后安装立柱块,形成二个封闭的结构体系,拼装完成。
在上述方案构成的衬砌结构的断面形状是两个相交的圆环形状。
本实施例中,两环中心距为圆隧道的外半径的1.5倍。

Claims (3)

1、一种双圆盾构隧道施工方法,主要包括管片的预制阶段;管片的拼装阶段,即衬砌圆环的构成阶段;以及衬砌圆环的拼接阶段;其中在管片预制阶段主要包括标准块的预制。其特征是,在管片的预制阶段,还包括大飞鸟块、小飞鸟块和立柱块的预制;在管片的拼装阶段,先拼装底部的大飞鸟块,然后在其两边依次拼装标准块,至封顶处时,再拼装顶部小飞鸟块,最后安装立柱块,形成二个封闭的结构体系。
2、根据权利要求1所述的一种双圆盾构隧道施工方法,其特征在于所述的块与块之间的环向连接以及衬砌圆环之间的纵向拼接均为固定连接。
3、根据权利要求1或2所述的一种双圆盾构隧道施工方法,其特征在于所述的固定连接可以是预埋铸铁手孔及螺母用单头短直螺栓连接;也可以是将弯螺栓分别通过两个块预留的靴形手孔和弯螺栓孔用螺母固定连接;也可以是将直螺栓分别通过两个块预留的梯形手孔和直螺栓孔用螺母固定连接。
CN 03116674 2003-04-28 2003-04-28 双圆盾构法隧道衬砌结构施工方法 Expired - Fee Related CN1266370C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03116674 CN1266370C (zh) 2003-04-28 2003-04-28 双圆盾构法隧道衬砌结构施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03116674 CN1266370C (zh) 2003-04-28 2003-04-28 双圆盾构法隧道衬砌结构施工方法

Publications (2)

Publication Number Publication Date
CN1472420A true CN1472420A (zh) 2004-02-04
CN1266370C CN1266370C (zh) 2006-07-26

Family

ID=34152616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03116674 Expired - Fee Related CN1266370C (zh) 2003-04-28 2003-04-28 双圆盾构法隧道衬砌结构施工方法

Country Status (1)

Country Link
CN (1) CN1266370C (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363323B (zh) * 2007-08-08 2010-07-14 同济大学 盾构隧道预应力衬砌设计方法
CN101614124B (zh) * 2008-06-27 2011-12-07 中铁隧道集团有限公司 敞开式硬岩掘进机掘进与二次衬砌同步施工方法
CN102322027A (zh) * 2011-06-28 2012-01-18 广州轨道交通建设监理有限公司 一种采用矿山法扩挖盾构隧道建造地铁车站的方法
CN104564100A (zh) * 2014-12-28 2015-04-29 上海隧道工程股份有限公司 错缝矩形盾构管片结构的拼装结构及拼装方法
CN104612724A (zh) * 2015-01-09 2015-05-13 同济大学 一种类椭圆带立柱盾构隧道管片拼装结构
CN104695976A (zh) * 2014-12-28 2015-06-10 上海隧道工程股份有限公司 错缝矩形盾构的封顶管片及立柱管片的拼装结构及方法
CN105484761A (zh) * 2015-04-16 2016-04-13 中铁隧道勘测设计院有限公司 一种单管双洞矩形盾构隧道的衬砌结构及其拼装方法
CN110486039A (zh) * 2019-09-26 2019-11-22 西南交通大学 一种多用途的盾构隧道衬砌结构
CN111022072A (zh) * 2019-12-17 2020-04-17 云南功东高速公路建设指挥部 用于矿山法施工隧道二次衬砌加固的组合接头及安装方法
CN115341916A (zh) * 2022-10-20 2022-11-15 中铁第六勘察设计院集团有限公司 一种双线隧道拱圆盾构衬砌结构

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363323B (zh) * 2007-08-08 2010-07-14 同济大学 盾构隧道预应力衬砌设计方法
CN101614124B (zh) * 2008-06-27 2011-12-07 中铁隧道集团有限公司 敞开式硬岩掘进机掘进与二次衬砌同步施工方法
CN102322027A (zh) * 2011-06-28 2012-01-18 广州轨道交通建设监理有限公司 一种采用矿山法扩挖盾构隧道建造地铁车站的方法
CN104564100A (zh) * 2014-12-28 2015-04-29 上海隧道工程股份有限公司 错缝矩形盾构管片结构的拼装结构及拼装方法
CN104695976A (zh) * 2014-12-28 2015-06-10 上海隧道工程股份有限公司 错缝矩形盾构的封顶管片及立柱管片的拼装结构及方法
CN104612724A (zh) * 2015-01-09 2015-05-13 同济大学 一种类椭圆带立柱盾构隧道管片拼装结构
CN105484761A (zh) * 2015-04-16 2016-04-13 中铁隧道勘测设计院有限公司 一种单管双洞矩形盾构隧道的衬砌结构及其拼装方法
CN105484761B (zh) * 2015-04-16 2018-11-02 中铁隧道勘测设计院有限公司 一种单管双洞矩形盾构隧道的衬砌结构及其拼装方法
CN110486039A (zh) * 2019-09-26 2019-11-22 西南交通大学 一种多用途的盾构隧道衬砌结构
CN111022072A (zh) * 2019-12-17 2020-04-17 云南功东高速公路建设指挥部 用于矿山法施工隧道二次衬砌加固的组合接头及安装方法
CN115341916A (zh) * 2022-10-20 2022-11-15 中铁第六勘察设计院集团有限公司 一种双线隧道拱圆盾构衬砌结构
CN115341916B (zh) * 2022-10-20 2022-12-13 中铁第六勘察设计院集团有限公司 一种双线隧道拱圆盾构衬砌结构

Also Published As

Publication number Publication date
CN1266370C (zh) 2006-07-26

Similar Documents

Publication Publication Date Title
CN103114681B (zh) 高空大跨度钢筋混凝土梁的待浇筑结构
WO2021203625A1 (zh) 一种复合式支护结构、施工系统及方法
CN1266370C (zh) 双圆盾构法隧道衬砌结构施工方法
CN114961334B (zh) 一种高空大跨度悬挑结构封闭防护拆除体系及其施工方法
CN110469341B (zh) 一种地铁暗挖车站装配与浇筑组合集成结构及施工方法
CN100480398C (zh) 高炉大修拆装炉自吊装施工方法及炉顶起重装置
CN1609341A (zh) 高架桥梁架设施工工艺
CN106736271B (zh) 一种轧制/压制矩形钢管柱的制作方法
CN114482349A (zh) 一种穿心双拉杆钢框架支撑大跨玻璃幕墙系统的施工方法
CN112160247B (zh) 一种有限空间桥墩群空心高墩异步液压爬模施工方法
CN112253151B (zh) 一种超深圆形竖井双线盾构分体始发施工方法
CN102322138A (zh) 模块式滑模
CN1247878C (zh) 单管圆隧道双层结构的施工方法
CN114876239B (zh) 一种高空悬挑结构封闭防护拆除体系及其施工方法
CN2603201Y (zh) 一种双圆盾构法隧道的衬砌结构
CN207211869U (zh) 一种基础免开挖装配式塔式立体车库
CN106917415B (zh) 一种预制装配式地下结构及其施工方法
CN213267906U (zh) 一种圆形基坑浇筑用拼装式钢模板
CN105625202B (zh) 大断面多孔超长现浇箱涵的施工方法
CN107859522A (zh) 一种叠合式盾构法隧道结构及其施工方法
CN218374615U (zh) 一种用于幕墙飘带的单元化结构
CN1470742A (zh) 双圆盾构法隧道的衬砌结构
CN207130969U (zh) 一种新型l型建筑立柱
CN114263275B (zh) 高层装配式钢结构-核心筒同层施工工法
CN213741095U (zh) 一种连续弧形基坑支护体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060726

Termination date: 20150428

EXPY Termination of patent right or utility model