CN1247878C - 单管圆隧道双层结构的施工方法 - Google Patents

单管圆隧道双层结构的施工方法 Download PDF

Info

Publication number
CN1247878C
CN1247878C CN 03116673 CN03116673A CN1247878C CN 1247878 C CN1247878 C CN 1247878C CN 03116673 CN03116673 CN 03116673 CN 03116673 A CN03116673 A CN 03116673A CN 1247878 C CN1247878 C CN 1247878C
Authority
CN
China
Prior art keywords
tunnel
jurisdiction
prefabricated
section
lane plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03116673
Other languages
English (en)
Other versions
CN1470743A (zh
Inventor
沈秀芳
陈鸿
曹伟飚
乔宗昭
王曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority to CN 03116673 priority Critical patent/CN1247878C/zh
Publication of CN1470743A publication Critical patent/CN1470743A/zh
Application granted granted Critical
Publication of CN1247878C publication Critical patent/CN1247878C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及隧道类,特别涉及一种单管圆隧道双层结构的施工方法,该方法包括管片的预制、管片拼装、车道板的预制、上层车道板的放置安装、底层车道板的放置安装,以及衬砌圆环的纵向拼接,其中管片预制时,位于隧道两侧的管片上增设有牛腿结构,其特点是施工简单合理、工程成本低,车道板支承占用空间小。

Description

单管圆隧道双层结构的施工方法
技术领域
本发明涉及隧道类,特别涉及一种单管圆隧道双层结构的施工方法。
背景技术
目前,盾构法道路隧道的施工方法都是在传统的单管内(即衬砌圆环)设置单层车道的施工方式,该方式是根据隧道直径大小的不同将若干片呈圆弧状的管片拼接成衬砌圆环,再将衬砌圆环纵向拼接,构成隧道,车道板一般设置在隧道拱底部位,底部可设置中间立柱,因此车道板跨度小,自重轻,易安装。而对于双层隧道,其上层车道板设置很困难,原因在于操作空间小,而且其底部没有设置中间立柱的空间,车道板跨度大,自重又很重。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种单管圆隧道双层结构的施工方法,该方法采用与预制管片相结合的牛腿结构作为上层车道板的支点,在保证工程质量的前提下,最大限度地节省了支承车道板所需占用的空间。
本发明目的实现由以下技术方案完成:
本发明包括管片的预制、管片拼装构成衬砌圆环、车道板的预制、底层车道板的放置安装、以及衬砌圆环的纵向拼接,其特征是管片预制时,位于隧道两侧的管片上增设有牛腿结构,还需进行上层车道板的放置安装,安装时,首先对位于隧道侧面的预制牛腿结构表面进行找平处理,即在其表面现浇一层混凝土,然后将上层车道板架设上去。
管片之间的拼装以及衬砌圆环之间的纵向拼接均可以采用螺栓连接。
架设上层车道板时,在车道板与牛腿之间设置橡胶支座。
本发明的优点施工简单合理、工程成本低,车道板支承占用空间小。
附图概述
附图1为本发明断面图;
附图2为本发明带牛腿预制块管片主视图;
附图3为本发明带牛腿预制块管片俯视图;
附图4为本发明管片连接示意图;
具体技术方案
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-4所示,标号1-9分别表示:牛腿预制块管片(1)、封顶块管片(2)、邻接块管片(3)、标准块管片(4)、底层车道板(5)、车道板(6)、牛腿(7)、弯螺栓孔(8)、靴形手孔(9)。
本实施例中主要包括管片的预制、管片现场拼装构成衬砌圆环、车道板的预制、上层车道板的放置安装、底层车道板的放置安装,以及衬砌圆环的纵向拼接。
在管片的预制阶段主要包括二块牛腿预制块管片(1)、一块封顶块管片(2)、二块邻接块管片(3)、三块标准块管片(4)、共计八块管片的预制。
在管片的拼装阶段是将以上8块管片拼接成圆环状管道,即衬砌圆环,其中各管片之间的连接采用一种螺栓连接方式,即将弯螺栓分别通过两块管片预留的靴形手孔(9)和弯螺栓孔(8)用螺母固定连接。
在车道板放置安装时,将底层车道板(5)置于管道拱底,管道内在底层车道板(5)上方且与其平行位置上设置车道板(6),车道板(6)与底层车道板(5)之间的间距为4.2米,该车道板由牛腿(7)支承,牛腿(7)与位于管道侧壁的管片(1)预制成为一体。
在上层车道板的放置安装时,首先对位于隧道侧面的预制牛腿结构表面进行找平处理,即在其表面现浇一层混凝土,然后将上层车道板架设上去。
车道板(6)与牛腿(7)之间设置有橡胶支座,衬砌圆环管道的长度通常为1.5米,外直径为11米。
衬砌圆环之间的纵向拼接可以采用与管片拼装相同的连接方式,即螺栓连接方式。
本领域技术人员可以认识到,采用本发明施工方法的衬砌圆环的直径、长度的大小及车道板间距的大小,以及采用同样方法设置车道板数量的多少均可以根据实际需要,或大或小、或多或少。
根据实际情况,上述的牛腿结构也可以在已拼装完成的隧道内现浇完成。车道板的安装即可以先预制,后安装;也可以现场浇注完成。

Claims (4)

1、一种单管圆隧道双层结构的施工方法,包括管片的预制、管片拼装构成衬砌圆环、底层车道板的放置安装,以及衬砌圆环的纵向拼接,其特征是管片预制阶段,在位于隧道两侧的管片上增设有牛腿结构,而且还要进行上层车道板的放置安装。
2、根据权利要求1所述的一种单管圆隧道双层结构的施工方法,其特征在于,在进行上层车道板的安装时,首先对位于隧道侧面的预制牛腿结构表面进行找平处理,然后将上层车道板架设上去。
3、根据权利要求1或2所述的一种单管圆隧道双层结构的施工方法,其特征在于,所述的找平处理是在牛腿结构的表面现浇一层混凝土。
4、根据权利要求1或2所述的一种单管圆隧道双层结构的施工方法,其特征在于,架设上层车道板时,在车道板与牛腿之间设置橡胶支座。
CN 03116673 2003-04-28 2003-04-28 单管圆隧道双层结构的施工方法 Expired - Fee Related CN1247878C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03116673 CN1247878C (zh) 2003-04-28 2003-04-28 单管圆隧道双层结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03116673 CN1247878C (zh) 2003-04-28 2003-04-28 单管圆隧道双层结构的施工方法

Publications (2)

Publication Number Publication Date
CN1470743A CN1470743A (zh) 2004-01-28
CN1247878C true CN1247878C (zh) 2006-03-29

Family

ID=34152615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03116673 Expired - Fee Related CN1247878C (zh) 2003-04-28 2003-04-28 单管圆隧道双层结构的施工方法

Country Status (1)

Country Link
CN (1) CN1247878C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614124B (zh) * 2008-06-27 2011-12-07 中铁隧道集团有限公司 敞开式硬岩掘进机掘进与二次衬砌同步施工方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1594832B (zh) * 2004-06-18 2010-09-01 上海市第二市政工程有限公司 双层公路隧道的盾构掘进与道路同步施工方法
CN101560881B (zh) * 2009-05-15 2011-06-22 中铁第四勘察设计院集团有限公司 一种双层盾构隧道
CN101936167B (zh) * 2009-06-29 2012-07-18 上海市基础工程有限公司 桥梁托换结合盾构施工穿越桥梁桩基的施工方法
CN107859522A (zh) * 2017-11-21 2018-03-30 上海市政工程设计研究总院(集团)有限公司 一种叠合式盾构法隧道结构及其施工方法
CN108561155A (zh) * 2018-04-18 2018-09-21 中铁二院工程集团有限责任公司 拼装预制二次衬砌的山岭隧道结构及预制二次衬砌拼装台车
CN110821517A (zh) * 2019-11-28 2020-02-21 云南省建设投资控股集团有限公司 隧道内部双层结构预制拼装施工方法
CN111271090B (zh) * 2020-03-17 2021-06-04 中铁二局集团有限公司 一种城市地下综合管廊中隔板施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614124B (zh) * 2008-06-27 2011-12-07 中铁隧道集团有限公司 敞开式硬岩掘进机掘进与二次衬砌同步施工方法

Also Published As

Publication number Publication date
CN1470743A (zh) 2004-01-28

Similar Documents

Publication Publication Date Title
CN100451263C (zh) 双向钢-叠合板混凝土组合楼盖
CN1247878C (zh) 单管圆隧道双层结构的施工方法
CN101078198A (zh) 一种应用于自锚式悬索桥的钢箱梁架设方法
CN203475598U (zh) 耐震、预制的钢筋桁架剪力墙混合结构建筑物
CN104265306A (zh) 一种市政盾构隧道
CN100532726C (zh) 一种无吊顶轨道交通高架车站
CN211735106U (zh) 一种辅助钢箱梁拼接吊装的支架
CN113565332A (zh) 一种屋盖钢结构与风管同步滑移施工方法
CN1609341A (zh) 高架桥梁架设施工工艺
CN103883128A (zh) 一种多层大跨度钢结构安装方法
CN101769032B (zh) 一种大跨度地下厂房的吊顶结构及其施工工艺
WO2024074079A1 (zh) 一种预制拼装式钢筋混凝土挡土墙及其施工方法
CN1266370C (zh) 双圆盾构法隧道衬砌结构施工方法
CN1247877C (zh) 单管圆隧道的双层结构
KR101020765B1 (ko) 포스트텐션 방식의 아치형 프리캐스트 콘크리트 풍도 슬래브 및 이의 시공방법
CN214658146U (zh) 混凝土与装配式相结合降低地下室层高的结构
CN211549001U (zh) 一种设置凸廊的地下车库
CN113957755A (zh) 一种中低速磁浮交通组合u形梁结构
CN205636505U (zh) 一种预埋式钢混结合部压浆填充装置和系统
CN105908631A (zh) 一种预埋式钢混结合部压浆填充装置及施工方法
CN100507209C (zh) 双层结构圆隧道的控制变形方法
CN215802764U (zh) 一种螺旋坡道
CN116771048A (zh) 金属屋面铝板檐口内自然排水构造及其控制方法
CN218540956U (zh) 一种沿海装配式管廊连接节点
CN116025095B (zh) 一种索梁复合的大跨度索托拱壳及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060329

Termination date: 20150428

EXPY Termination of patent right or utility model