CN1257143A - 用于钢管桩的盖板 - Google Patents

用于钢管桩的盖板 Download PDF

Info

Publication number
CN1257143A
CN1257143A CN99111305A CN99111305A CN1257143A CN 1257143 A CN1257143 A CN 1257143A CN 99111305 A CN99111305 A CN 99111305A CN 99111305 A CN99111305 A CN 99111305A CN 1257143 A CN1257143 A CN 1257143A
Authority
CN
China
Prior art keywords
steel pipe
cover plate
pipe pile
base plate
stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN99111305A
Other languages
English (en)
Other versions
CN1179100C (zh
Inventor
朴暎浩
金性焕
金敬锡
赵成敏
李基洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Korea Expressway Corp
Original Assignee
Korea Expressway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1019980055835A external-priority patent/KR100262977B1/ko
Priority claimed from KR1019990005395A external-priority patent/KR100281308B1/ko
Application filed by Korea Expressway Corp filed Critical Korea Expressway Corp
Publication of CN1257143A publication Critical patent/CN1257143A/zh
Application granted granted Critical
Publication of CN1179100C publication Critical patent/CN1179100C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T403/00Joints and connections
    • Y10T403/70Interfitted members
    • Y10T403/7098Non-circular rod section is joint component

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

一种钢管桩的盖板,它包括在钢管桩上的底板下部建一十字型加强板12,将铁加强杆或圆杆20向外弯曲地连接在盖板10的底板11上表面,在底板11上形成有十字型排列的固定孔11A,在加强板12的相对位置上形成有固定螺槽12A,它们通过螺栓B连接。形成有上下固定孔21B的加强块12C,通过焊接使它们保持间隔的恒定宽度固定,并使它们通过穿过钢管桩100相对位置上的固定孔100B的螺栓B被连接和固定。

Description

用于钢管桩的盖板
本发明涉及用于钢管桩的盖板。在建造桥梁之类的建筑物时通过打桩作业打入桩、尤其是钢管桩来压实地面,钢管桩被强行挤进地面以便在钢管上部放置混凝土基底的加强件时保持安全强度。
在建造桥梁和建筑物时,一般对地面进行压实以增加软地面的强度。有如下几种压实方式:普通压入(碎石、沙石、长基石和预应力等)、打桩(木桩、搅拌好的混凝土和预应力混凝土桩等)和深基底压入(井形基底和水下基底等)。
本发明涉及用于钢管桩的盖板,在打入钢管桩时该盖板能够支承上部基本结构的负载。
根据图1对现有盖板结构描述如下。
现有盖板10的特征是:在插入一个盖板10并在覆盖在钢管桩100(埋置在地中并突出在地面)上部的底板11的下部将盖板10与一个十字型加强板12焊接起来后,在上述底板11的周围恒定间隔地焊接铁加强杆20。
这些铁加强杆20的上部向外弯曲以使它们易于与其它铁加强杆连接。
但是,按照加强板12建造在底板11下部的这种结构,要在现场提供现有盖板10,并且必须在现场切割、弯曲和制作,然后焊接/连接盖板10,因此它有较差的加工性,铁加强杆和盖板的底板在每侧是对头焊接的,即,焊接处是一个圆形部分,因而固定部分较短并且固定张力负载较小,结果导致随后安装的基底负载不能可靠地被支承。
因此,本发明的目的是要解决上述问题,它是通过在制作盖板时使铁加强杆螺栓焊接或螺栓连接在盖板的底板的上表面,从而使它易于使用、特别是增加现场强度来解决上述问题的。
为实现上述目的,本发明的特征是:在覆盖在钢管桩上部的底板的下部建造一个十字型加强板,通过连接方法将铁加强杆连接/固定在盖板的底板上表面周围,在底板上形成十字型排列的固定孔以便建造在上述盖板下部的十字型加强板可通过螺栓被连接,盖板的底板的下部和十字型加强板的上部可以通过形成在加强板相对位置上的固定螺槽采用螺栓连接方法或一种盖板和加强板的固定方法对接,通过焊接固定形成带有上下固定孔的加强块,加强块在上述加强板的外侧保持间隔开的恒定宽度,并通过穿过位于钢管桩相对位置上的固定孔的螺栓被连接/固定。铁加强杆可以垂直或向外弯曲。
另一方面,在盖板的底板的上表面四周形成螺纹孔以便连接盖板的底板和铁加强杆,并且通过在铁加强杆底端形成外螺纹槽的螺纹进行连接,但是,上述螺纹孔和外螺纹的直径大于铁加强杆的直径。
此外,底板的上表面和铁加强杆或圆杆可以通过焊接方法连接。
图1显示了一个现有盖板被安装的状态;
图2显示了现有的铁加强杆焊接的一个主要部分被放大;
图3显示了本发明的详细图;
图4显示了安装后的本发明的横截面图;
图5显示了一个盖板和一个底板被焊接的横截面图;
图6a和6b显示了铁加强杆或圆杆被焊接的横截面图;
图7a和图7b分别是显示根据本发明一个盖板的另一实例的分解立体图和横截面图。
结合希望的实际示例的附图可对上述的本发明进行如下详细描述。
与现有技术相同或相当的本发明的部件采用与现有技术相同的标号进行描述。
首先,描述本发明的构成,其特征在于,在盖在如图3或图5所示地被安装以压实地面的钢管桩上部的底板的下部建造一个十字型加强板12,通过连接方法将铁加强杆或圆杆20垂直或向外弯曲地连接/固定在盖板10的底板11上表面周围,在底板上形成十字型排列的固定孔11A以便建造在上述盖板10下部的十字型加强板12可通过螺栓B被连接,盖板的底板11的下部和十字型加强板的上部可以通过形成在加强板相对位置上的固定螺槽采用螺栓连接方法或一种盖板和加强板的固定方法对接,通过焊接固定形成带有上下固定孔12B的加强块12C,加强块在上述加强板12的外侧保持间隔开的恒定宽度,并通过穿过位于钢管桩100相对位置上的固定孔100B的螺栓B被连接/固定。
另一方面,在盖板10的底板11的上表面四周形成螺纹孔11B以便连接盖板10的底板11和加强杆或圆杆20,并且通过在铁加强杆20底端形成外螺纹槽21B的螺纹进行连接,但是,上述螺纹孔11B和外螺纹21B的直径大于铁加强杆20的直径。
此外,底板11的上表面和铁加强杆或圆杆20可通过如图6所示的结合方式进行连接。
图7a和7b是显示本发明底板另一实例的示意图。一个薄钢板11D插入一个底板11,并且主要部分11C和十字型加强板12的加强块12C的上部通过螺栓B固定。该薄钢板11D正适合于焊接的主要部分的内圆环,焊接的主要部分是由一个恒定长度的钢板卷起并折叠成环形而形成的。
此外,通过将钢板插入主要部分11C的内圆环部分,它也可被放置在十字型加强板12的上部。
如上所述组成的本发明的特性如下。
首先安装盖板10,使十字型加强板12上部的固定螺槽12A与将要如图4和图6所示地盖在一个钢管上部开口上的底板11的固定孔11A对齐,并通过螺栓B固定它们以使盖板10的加强板12可以插入钢管桩的上部开口,并且调节钢管100的固定孔100B和加强板12外侧的加强块12C的固定孔12B,并随后通过螺栓B固定它们。
此外,也可通过如图5和图6b所示的焊接方法进行连接。这种方式通常在所用的钢管直径较小时使用。
将被建造在上述钢管桩100上部的基底的试验应力铁加强杆可以与建制在底板11上的铁加强杆20捆绑在一起,然后装入基底混凝土。
因此,本发明的特性是:通过使基底的负载均匀地传递在底板11上而使基底的总负载均匀地分布在钢管桩100上。
同时,本发明使盖板10的底板11和铁加强杆20通过螺纹连接起来可保持安全连接而不会有类似焊接的过多工作,这可通过连接直径比铁加强杆直径大的螺纹来实现。
此外,铁加强杆20和底板11也可通过如图6a和图6b所示的焊接进行连接。
通过固定单独制造的加强块12C,可以排除固定孔12B穿孔的困难。(比加强板12宽的)加强块12C和钢管100的内侧的连接部位增大,对应地它的结合强度也增大。
即,本发明解决了在十字型加强板12上加工固定孔12B的困难而不会导致强度变化,上述可行实例的试验表明:在铁加强杆20的面积是384.4mm2时,张力负载达到16.103kgf,张力强度达到42kgf/mm2,因此,它们比现有技术的张力负载和张力强度增大了6-8倍。
此外,底板如图7a和7b所示是相对地较厚,因此需要大的单位生产价格和成本。通过盘绕长部件、焊接接触侧边并使一个薄钢板焊接或连接在一个十字型加强板12上而使单位价格降低。并且也不会有强度变化。
因此,在打入钢管桩时,通过直接将铁加强杆固定在将盖在钢管桩上部的盖板的上部,本发明可以使现场制作简单,尤其是在制造过程中或现场不需要单独的焊接工作而具有容易组装和制作的效果,并使它们容易处理。

Claims (8)

1、一种用于钢管桩的盖板,其特征在于,它包括:
一个盖板(10),它在底板(11)的下部制作有一个十字型加强板(12);以及
铁加强杆(20),它们以恒定的间距固定在底板(11)的上表面周围。
2、如权利要求1所述的用于钢管桩的盖板,其特征在于,所述相连接的装置是通过使底板(11)的上表面和铁加强杆(20)连接的焊接方法而加以连接的。
3、如权利要求1所述的用于钢管桩的盖板,其特征在于,所述相连接的装置是通过底板(11)上表面周围的螺纹孔(11B)和形成在铁加强杆或圆杆(20)底端的外螺纹槽(21B)加以连接的,其中,上述螺纹孔(11B)和外螺纹槽(21B)的直径大于圆杆(20)的直径。
4、如权利要求1所述的用于钢管桩的盖板,其特征在于,底板(11)和加强板(12)的所述相连接的装置包括:
十字型排列在底板(11)上的固定孔(11A);
形成在加强板(12)的对应位置上的固定螺槽(12A);以及
穿过固定孔和固定螺槽连接的螺栓(B)。
5、如权利要求1所述的用于钢管桩的盖板,其特征在于,底板(11)和加强板(12)的所述固定装置是通过使底板(11)的下部和十字型加强板(12)的上部相接触并焊接而加以固定的。
6、如权利要求1所述的用于钢管桩的盖板,其特征在于,加强块(12C)和钢管(100)是通过螺栓(B)连接的;
其中,具有恒定宽度的所述加强块(12C)分别通过焊接固定在加强板(12)的外侧,并在其上垂直地形成有固定孔(12B),并且
其中所述钢管(100)在对应位置形成有固定孔(100B)。
7、如权利要求1至4任一权利要求所述的用于钢管桩的盖板,其特征在于,它包括:
一个包括一个主要部分(11C)的盖板(10),主要部分(11C)是由一恒定长度的板卷成环形并且焊接接触部分形成的;
一个薄钢板(11D),它插入并焊接在被焊接的主要部分的内圆环部分上;以及
穿过主要部分和加强块固定的螺栓(B)。
8、如权利要求7所述的用于钢管桩的盖板,其特征在于,一个薄钢板插入在主要部分(11C)的内圆环部分上,并被放置在十字型加强板(12)的上部。
CNB991113055A 1998-12-17 1999-08-04 用于钢管桩的盖板 Expired - Fee Related CN1179100C (zh)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR55835/1998 1998-12-17
KR1019980055835A KR100262977B1 (ko) 1998-12-17 1998-12-17 강관 말뚝용 덮개판
KR5395/1999 1999-02-18
KR1019990005395A KR100281308B1 (ko) 1999-02-18 1999-02-18 강관 말뚝용 덮개판

Publications (2)

Publication Number Publication Date
CN1257143A true CN1257143A (zh) 2000-06-21
CN1179100C CN1179100C (zh) 2004-12-08

Family

ID=26634446

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB991113055A Expired - Fee Related CN1179100C (zh) 1998-12-17 1999-08-04 用于钢管桩的盖板

Country Status (3)

Country Link
US (1) US6254314B1 (zh)
JP (1) JP3284110B2 (zh)
CN (1) CN1179100C (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104024530A (zh) * 2011-12-28 2014-09-03 Posco公司 一种钢管插座以及利用其连接钢管桩和钢管柱的连接方法
CN105083743A (zh) * 2015-07-16 2015-11-25 上海外高桥造船有限公司 桩腿固定装置
CN112764112A (zh) * 2019-10-21 2021-05-07 韩国道路公社 利用电磁波来探知铺装道路坑洞征候的系统和方法

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0029498D0 (en) * 2000-12-02 2001-01-17 Oceans Engineering Ltd A method of making a foundation
US6893598B1 (en) 2003-09-05 2005-05-17 Mark A. March Finishing guide for concrete piers
CA2449194C (en) * 2003-11-12 2013-03-05 Paul W. Fournier Service line distribution base
US7575225B1 (en) * 2005-05-03 2009-08-18 Denis Saldana Security fence cap
DE102005044989B3 (de) * 2005-09-21 2006-12-14 Nordex Energy Gmbh Verfahren zur Gründung eines Fundamentkörpers für eine Windenenergieanlage
MY144329A (en) * 2009-03-20 2011-08-23 Ong Chin Dr Chai Circular pile head for underpinning a slab
US8220214B1 (en) * 2009-05-02 2012-07-17 Purdy Charles L Prefabricated weight distribution element
US8734058B1 (en) * 2013-12-05 2014-05-27 Harold F Schmidt Method of piling remediation for supporting girders and other structural members
JP6468888B2 (ja) * 2015-03-09 2019-02-13 前田建設工業株式会社 杭頭免震仕口部構造
JP6535515B2 (ja) * 2015-06-08 2019-06-26 株式会社竹中工務店 杭頭接合構造
DE102016203267A1 (de) * 2016-02-29 2017-08-31 Innogy Se Gründungspfahl für eine Windenergieanlage
EP3228755A1 (en) * 2016-04-08 2017-10-11 Pipe & Piling Supplies Ltd End cap for securing a structure upon a pile
CN108951681B (zh) * 2018-08-02 2020-09-11 苏州培星智能装备科技有限公司 抗拔型混凝土管桩与承台的连接结构
CN113982018B (zh) * 2021-10-22 2022-12-27 中交路桥华南工程有限公司 装配式的钢管桩顶部承重结构

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1048993A (en) * 1911-05-20 1912-12-31 Lock Joint Pipe Co Reinforced-concrete caisson.
US1545456A (en) * 1921-07-19 1925-07-07 Union Metal Mfg Co Reenforced-metal tube
US1515257A (en) * 1922-08-29 1924-11-11 Krasnow Harry Metal building structure
US2374624A (en) * 1942-02-24 1945-04-24 Ethel F Schwendt Precast foundation
US3487646A (en) * 1968-08-19 1970-01-06 Paul Henri Gatien Load bearing pile
US3543524A (en) * 1969-06-20 1970-12-01 Armco Steel Corp Thin-walled pile with closure plug
US4472085A (en) * 1981-12-14 1984-09-18 The Union Metal Manufacturing Co. Caisson cap
US4748778A (en) * 1986-12-24 1988-06-07 Rafter Sr Roy L Seagull guard
US5073065A (en) * 1990-12-06 1991-12-17 Advanced Mining Systems, Inc. Mine roof bolt with resin retention and resin mixing device
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
WO1996018001A1 (fr) * 1994-12-05 1996-06-13 Shogen Okawa Outil a traiter les tetes de pieux coules sur place, procede de traitement de tetes de pieux et procede de realisation de pieux coules sur place
US5746036A (en) * 1995-07-10 1998-05-05 Angelette; A. M. Railroad crossing signal foundation and spider and method of producing the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104024530A (zh) * 2011-12-28 2014-09-03 Posco公司 一种钢管插座以及利用其连接钢管桩和钢管柱的连接方法
CN104024530B (zh) * 2011-12-28 2016-08-24 Posco公司 一种钢管插座以及利用其连接钢管桩和钢管柱的连接方法
US9863113B2 (en) 2011-12-28 2018-01-09 Posco Steel pipe socket and method of connecting steel pipe pile and steel pipe column using the same
CN105083743A (zh) * 2015-07-16 2015-11-25 上海外高桥造船有限公司 桩腿固定装置
CN112764112A (zh) * 2019-10-21 2021-05-07 韩国道路公社 利用电磁波来探知铺装道路坑洞征候的系统和方法

Also Published As

Publication number Publication date
CN1179100C (zh) 2004-12-08
JP2000178982A (ja) 2000-06-27
JP3284110B2 (ja) 2002-05-20
US6254314B1 (en) 2001-07-03

Similar Documents

Publication Publication Date Title
CN1179100C (zh) 用于钢管桩的盖板
US5384993A (en) Tie down for building structures
CA1253481A (en) One piece holdown
US20030009964A1 (en) Prefabricated shearwall having improved structural characteristics
WO1995023268A1 (en) Wall structure
US20110170958A1 (en) Soil reinforcing connector and method of constructing a mechanically stabilized earth structure
WO2011084989A2 (en) Splice for a soil reinforcing element or connector
US5201156A (en) Water-shedding spacing mount for decks and fences
US5669196A (en) Eye bolt reinforcement steel coupler
CN1302346A (zh) 外部预应力加强装置的端部承载支承型锚固方法和设备
US5881527A (en) Portable precast concrete slabs for storage facility
WO1998007933A1 (en) Steel-wood system
CN1270650A (zh) 一种人孔盖的框架
CA2253062C (en) Lp insulator assembly and method for assembling the same
JP2909439B2 (ja) 柱と梁の接合構造
KR20060104253A (ko) 콘크리트구조물 외부 프리스트레싱 이중 보강방법 및 이에사용되는 장치
KR100677847B1 (ko) 콘크리트구조물 프리스트레싱 보강장치 및 이를 이용한보강방법
JP4355680B2 (ja) 耐震補強装置
KR200426656Y1 (ko) 강관의 두부 보강장치
EP0168294A2 (en) Mounting post
JP2881286B2 (ja) 遮音・防風壁板の落下防止装置
CN2739285Y (zh) 钢管脚手架连接件
CN218540452U (zh) 体外预应力锚固装置
KR20050021611A (ko) 기둥 슬래브간 접합부 전단 보강체 및 이를 이용한 전단보강구조
CN219825406U (zh) 一种用于地基基础加固的临时支撑体系的结构柱护筒

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ROAD CORPORATION, KOREA

Free format text: FORMER OWNER: ROAD CORPORATION, KOREA; LI JIHONG

Effective date: 20080822

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080822

Address after: Gyeonggi Do, South Korea

Patentee after: Korea Expressway Corp. (KR)

Address before: Gyeonggi Do, South korea

Patentee before: Korea Expressway Corp. (KR)

Patentee before: Li Jihong

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20041208

Termination date: 20150804

EXPY Termination of patent right or utility model