CN118647948B - 加工时间预测装置以及加工时间预测方法 - Google Patents

加工时间预测装置以及加工时间预测方法 Download PDF

Info

Publication number
CN118647948B
CN118647948B CN202280091041.9A CN202280091041A CN118647948B CN 118647948 B CN118647948 B CN 118647948B CN 202280091041 A CN202280091041 A CN 202280091041A CN 118647948 B CN118647948 B CN 118647948B
Authority
CN
China
Prior art keywords
shaft
machining
unit
axis
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202280091041.9A
Other languages
English (en)
Chinese (zh)
Other versions
CN118647948A (zh
Inventor
小木曾太郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fanuc Corp
Original Assignee
Fanuc Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fanuc Corp filed Critical Fanuc Corp
Priority to CN202510194915.9A priority Critical patent/CN120065919A/zh
Publication of CN118647948A publication Critical patent/CN118647948A/zh
Application granted granted Critical
Publication of CN118647948B publication Critical patent/CN118647948B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form
    • G05B19/406Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form characterised by monitoring or safety
    • G05B19/4063Monitoring general control system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form
    • G05B19/406Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form characterised by monitoring or safety
    • G05B19/4069Simulating machining process on screen
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form
    • G05B19/416Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form characterised by control of velocity, acceleration or deceleration
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of program data in numerical form
    • G05B19/414Structure of the control system, e.g. common controller or multiprocessor systems, interface to servo, programmable interface controller
    • G05B19/4145Structure of the control system, e.g. common controller or multiprocessor systems, interface to servo, programmable interface controller characterised by using same processor to execute programmable controller and numerical controller function [CNC] and PC controlled NC [PCNC]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32063Adapt speed of tool as function of deviation from target rate of workpieces
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/33Director till display
    • G05B2219/33099Computer numerical control [CNC]; Software control [SWC]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/37Measurements
    • G05B2219/37336Cutting, machining time

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Numerical Control (AREA)
CN202280091041.9A 2022-02-18 2022-02-18 加工时间预测装置以及加工时间预测方法 Active CN118647948B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202510194915.9A CN120065919A (zh) 2022-02-18 2022-02-18 轴动作完成判断装置以及轴动作完成判断方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/006693 WO2023157244A1 (ja) 2022-02-18 2022-02-18 加工時間予測装置及び加工時間予測方法

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202510194915.9A Division CN120065919A (zh) 2022-02-18 2022-02-18 轴动作完成判断装置以及轴动作完成判断方法

Publications (2)

Publication Number Publication Date
CN118647948A CN118647948A (zh) 2024-09-13
CN118647948B true CN118647948B (zh) 2025-02-18

Family

ID=87578138

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202280091041.9A Active CN118647948B (zh) 2022-02-18 2022-02-18 加工时间预测装置以及加工时间预测方法
CN202510194915.9A Pending CN120065919A (zh) 2022-02-18 2022-02-18 轴动作完成判断装置以及轴动作完成判断方法

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202510194915.9A Pending CN120065919A (zh) 2022-02-18 2022-02-18 轴动作完成判断装置以及轴动作完成判断方法

Country Status (5)

Country Link
US (2) US12298735B2 (https=)
JP (2) JP7572574B2 (https=)
CN (2) CN118647948B (https=)
DE (1) DE112022005535T5 (https=)
WO (1) WO2023157244A1 (https=)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023157244A1 (ja) * 2022-02-18 2023-08-24 ファナック株式会社 加工時間予測装置及び加工時間予測方法
CN116911469B (zh) * 2023-09-12 2024-01-12 成都飞机工业(集团)有限责任公司 一种数控机床加工时间预测方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789194A (zh) * 2011-05-20 2012-11-21 发那科株式会社 具备加工时间预测部以及加工误差预测部的数值控制装置
CN109557895A (zh) * 2017-09-27 2019-04-02 欧姆龙株式会社 信息处理装置、信息处理方法以及计算机可读记录介质

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03110607A (ja) 1989-09-26 1991-05-10 Fanuc Ltd サーボモータの制御方式
JP2005513601A (ja) * 2001-12-18 2005-05-12 エムティエス・システムズ・コーポレーション 制御システムのための制御パラメータを確定する方法
JP2004034214A (ja) * 2002-07-02 2004-02-05 Yaskawa Electric Corp 同期制御軸の位置決め完了検出方法
JP2004126956A (ja) 2002-10-02 2004-04-22 Okuma Corp 数値制御装置
JP2007011680A (ja) 2005-06-30 2007-01-18 Nachi Fujikoshi Corp サイクルタイムシミュレーション装置
JP4815907B2 (ja) 2005-07-14 2011-11-16 株式会社ジェイテクト 加工時間予測方法および予測装置ならびに加工時間予測機能を備えたncデータ編集装置
JP4802170B2 (ja) 2007-10-18 2011-10-26 株式会社ソディック 加工時間算出装置およびそのプログラム
JP5566469B2 (ja) * 2010-10-27 2014-08-06 株式会社牧野フライス製作所 数値制御方法
JP4980458B2 (ja) 2010-10-27 2012-07-18 ファナック株式会社 数値制御工作機械の加工時間予測装置
JP6066041B2 (ja) * 2012-07-17 2017-01-25 三菱日立パワーシステムズ株式会社 加工支援装置および加工支援システム
JP6002571B2 (ja) 2012-12-20 2016-10-05 オークマ株式会社 工作機械における切削加工方法
DE112013006613B4 (de) * 2013-02-07 2023-04-27 Mitsubishi Electric Corporation Servo-Regelungsvorrichtung
JP2014219911A (ja) 2013-05-10 2014-11-20 東芝機械株式会社 シミュレーション装置およびシミュレーションプログラム
KR101638623B1 (ko) * 2016-01-25 2016-07-11 경일대학교산학협력단 공작물의 가공 시뮬레이션 시스템 및 이를 이용한 방법
JP6378249B2 (ja) 2016-05-16 2018-08-22 ファナック株式会社 サーボ制御および機械運動の遅れを考慮する加工時間予測機能を有する数値制御装置
CN109839901A (zh) * 2017-11-24 2019-06-04 友嘉实业股份有限公司 加工时间预估系统
JP6878378B2 (ja) * 2018-10-31 2021-05-26 ファナック株式会社 数値制御装置
JP7310465B2 (ja) * 2018-12-27 2023-07-19 オムロン株式会社 同期制御装置、同期制御システム、同期制御方法、及びシミュレーション装置
CN110221580B (zh) * 2019-05-29 2020-07-10 华中科技大学 一种基于主轴数据仿真的进给速度优化方法
JP7269097B2 (ja) * 2019-05-30 2023-05-08 ファナック株式会社 回転軸の制御装置
JP7101718B2 (ja) * 2019-06-12 2022-07-15 株式会社Kokusai Electric 加熱部、温度制御システム、処理装置および半導体装置の製造方法
JP7414461B2 (ja) * 2019-10-18 2024-01-16 ファナック株式会社 プログラム作成支援装置、プログラム作成支援システム、及びプログラム作成支援方法
WO2023157244A1 (ja) * 2022-02-18 2023-08-24 ファナック株式会社 加工時間予測装置及び加工時間予測方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789194A (zh) * 2011-05-20 2012-11-21 发那科株式会社 具备加工时间预测部以及加工误差预测部的数值控制装置
CN109557895A (zh) * 2017-09-27 2019-04-02 欧姆龙株式会社 信息处理装置、信息处理方法以及计算机可读记录介质

Also Published As

Publication number Publication date
CN118647948A (zh) 2024-09-13
US12298735B2 (en) 2025-05-13
DE112022005535T5 (de) 2024-09-19
US20250238014A1 (en) 2025-07-24
JP7572574B2 (ja) 2024-10-23
JP2024177216A (ja) 2024-12-19
WO2023157244A1 (ja) 2023-08-24
US20250068141A1 (en) 2025-02-27
JP7610069B2 (ja) 2025-01-07
JPWO2023157244A1 (https=) 2023-08-24
CN120065919A (zh) 2025-05-30

Similar Documents

Publication Publication Date Title
JP7610069B2 (ja) 軸動作完了判断装置及び軸動作完了判断方法
JP6469065B2 (ja) 機械学習装置及び加工時間予測装置
CN103071826B (zh) 一种高速高精多轴pcb数控钻床及其控制方法
US8736217B2 (en) Servo motor control device for controlling servo motor configured to drive feed axis of machine tool
JP2020149505A (ja) 把持力調整装置及び把持力調整システム
CN111052015A (zh) 数控系统及电动机控制装置
US10416645B2 (en) Numerical controller enabling increase in number of analysis digits of program instruction
CN106489105A (zh) 控制参数调整装置
JP6961128B1 (ja) シミュレーション装置、工作機械システム、シミュレーション方法および加工方法
CN107966956B (zh) 数值控制装置
CN112236729B (zh) 数控装置
US9434075B2 (en) Method for operating a multi-limb manipulator
CN203061919U (zh) 一种高速高精多轴pcb数控钻床
JPS6315604B2 (https=)
JP3926739B2 (ja) ねじ切り加工制御方法及びその装置
CN116872199A (zh) 并联机器人动态轮廓误差预补偿方法及装置
CN121057984A (zh) 控制装置以及计算机可读取的记录介质
JP2019068510A (ja) パラメータ決定支援装置
JP6702931B2 (ja) 数値制御装置
Sztendel et al. Five-axis machine tool condition monitoring using dSPACE real-time system
JPH03150090A (ja) 主軸モータの制御方式
CN112904802B (zh) 程序解析装置
JP6048174B2 (ja) 数値制御装置とロストモーション補償方法
JP5063981B2 (ja) 電動機の位置制御装置
JP3199769B2 (ja) サーボ制御装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant