CN1148486C - 更新轨道用的机械 - Google Patents

更新轨道用的机械 Download PDF

Info

Publication number
CN1148486C
CN1148486C CNB011214104A CN01121410A CN1148486C CN 1148486 C CN1148486 C CN 1148486C CN B011214104 A CNB011214104 A CN B011214104A CN 01121410 A CN01121410 A CN 01121410A CN 1148486 C CN1148486 C CN 1148486C
Authority
CN
China
Prior art keywords
machinery
sleeper
track
evener
ballast aggregate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB011214104A
Other languages
English (en)
Other versions
CN1329198A (zh
Inventor
Լɪ��������
约瑟夫·陶依尔
¡
曼弗雷德·布伦宁格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of CN1329198A publication Critical patent/CN1329198A/zh
Application granted granted Critical
Publication of CN1148486C publication Critical patent/CN1148486C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/10Transporting, laying, removing or renewing sleepers under, or from under, installed rails for inserting or removing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

一种更新轨道(2)用的机械(1),它具有一个可支承在轨行机构(4)上的机架(5)。该机架配备有两套沿机械的纵向前后相隔一定距离的轨枕运送装置(19,21),分别用于收取旧轨枕(20)和铺放新轨枕(22)。在这两套轨枕运送装置之间有履带走行机构(17)和道碴整平机(23)。整平机(23)能围绕一根垂直轴线(29)转动180°。

Description

更新轨道用的机械
技术领域
本发明涉及一种更新轨道用的机械。该机械有一个可支承在轨行机构上的机架。该机架配备有两套沿机械的纵向相隔一定距离的轨枕运送装置,分别用于收取旧轨枕和铺放新轨枕。轨枕运送装置之间有履带走行机构和道碴整平机。
背景技术
这样一种机械已由欧洲专利EP 0621371B1公开。这部机械能沿两个走行方向进行轨道施工作业,其中的一个作业方向用于更新旧的铁路轨道,而相反的作业方向则用于在事先准备好的路基上铺设新轨道。更新轨道时,利用履带走行机构使机械在施工空档中在路基表面上走行。路基表面是在拆除了旧钢轨和旧轨枕并由沿作业方向位于前面的道碴整平机清除了旧道碴之后形成的。履带走行机构后面放置新轨枕和撑放新钢轨。铺设新轨道时,必须对机械进行改装,此时需将履带走行机构沿新的作业方向在新轨枕铺放装置的前面安装在机架上。另外,为了调转履带走行机构,需调转新轨枕铺放装置的轨枕升降机的方向,同时调整旧轨枕收取装置和道碴整平机的高度,使之进入不工作状态。
发明内容
本发明的目的就是要创造一种本文前言所述类型的更新轨道用的机械,要求这部机械能以最少的改装工作量调转作业的方向。
本发明的目的可用一部标准型机械这样来实现,一种更新轨道用的机械,它具有一个支承在轨行机构上的机架,该机架配备有两套沿机械的纵向相隔一定距离的轨枕运送装置,分别用于收取旧轨枕和铺放新轨枕,在轨枕运送装置之间有一个履带走行机构和一个道碴整平机,其中,道碴整平机从所述机架悬置并且在转动驱动装置的驱动下能围绕一垂直轴线转动180°。
使用这种结构的机械,就可以在更新轨道作业时实际上不必对机械进行多少改装,即可调转作业方向。这一点对某些情况可能具有很大的优点,比如更新一条复线的时候。在此情况下,机械更新了一条线路后,即可沿相反的方向在另一条线路上往回作业,而无需花费人力和时间调转整套机械设备。除此之外,从逻辑性的角度考虑,根据情况如果能从两端驶向轨道施工地点,确切地说能从两端进行作业而不必特意去顾及机械的方向,也是具有优点的。为此可将道碴整平机简单、迅速、顺利地调转到相应的作业方向而使之进入作业状态。
本发明的其它优点可参看从属权利要求或附图说明。
附图说明
下面借助附图所示实施例对本发明予以详细说明,附图中:
图1和2为一种适于沿反方向作业的轨道更新机械非常简化的侧视图,
图3为与机械连挂的轨枕运送车的侧视图,
图4和5分别为机械的道碴整平机范围的侧视详图,
图6为图4在切割线VI处的断面视图。
具体实施方式
图1是一部沿箭头3所示作业方向的更新轨道2用的机械1。该机械1有一个可支承在轨行机构4上的机架5,在其一端设有驾驶室亦即操作室6。机架5在其相对的另一端通过关节7装在一辆利用轨行机构10在轨道上可走行的轨枕运送车9的底架8上并能多方位地活动。如图3所示,与上述轨枕运送车相连的有一辆电动车11,以便向机械1提供能源,还有多辆轨枕运送车12。一台龙门吊车15能沿上述车辆9,11和12的走行轨14一直走到机架5与关节7毗邻的范围内。
作业时,机架5通过一个可调节高度的履带走行机构17支承在施工空档16腾空的路基18上,确切地说在路基上走行。履带走行机构17的前后有两条沿机械的纵向相隔一定距离的轨枕运送装置19和21形式的作业机组,用于收取旧轨枕20和铺放新轨枕22。轨枕运送装置之间有道碴整平机23。对此图4(或5)将作进一步介绍。
图2所示机械与图1所示者为同一部机械,不过是在沿箭头13所示相反的方向作业。此时轨枕运送装置19用于铺放新轨枕22,而轨枕运送装置21则改做用于收取旧轨枕20。对此在下文中将利用图5作进一步介绍。能转动180°的道碴整平机23现在处于箭头13所示的新作业方向。
如图4清楚所示,利用驱动装置48能围绕垂直轴线29转动的道碴整平机23是一条循环式清碴链26。利用驱动装置28可使清碴链在倾斜于轨道2的平面27内运转,并利用另一个驱动装置30可调节其高度。沿垂直方向与轨道2相隔一定距离的投碴范围32内,为清碴链26配备有一条横向传送带31。此传送带垂直于轨道的纵向延伸,并将清碴链26收取的道碴送往边坡(见图6)。横向传送带31后面有另外一条横向传送带33。此传送带沿轨道的纵向略高于传送带31,用于将道碴投到相对的另一个边坡。两条横向传送带31和33沿机械的横向是错开的,使处于轨道中心线上相应的收取道碴端部34或35处于清碴链26投碴范围32的下面。两条横向传送带31和33装在一个共用的承载架36上,承载架通过一个与道碴整平机23相连的平行四边形连接装置37装在道碴整平机上,并能围绕一根垂直于机械纵向的轴线38调节高度。
图4所示作业时,利用一个能调节高度的辅助走行机构39,使机械1在施工空档16内就位,并支承在履带走行机构17上。机械沿箭头3所示方向前进时,用相应的钢轨导向装置41(图1)将轨道2的旧钢轨40从旧轨枕20上抬起和拆除,然后在操作室42范围内,由轨枕运送装置19从轨道2的道床43上将旧轨枕20取走,并通过轨枕运送车9(图3)沿作业方向送到前面堆码起来。这些堆码起来的旧轨枕20即由龙门吊车15送往轨枕运送车12以便运走。
此后由道碴整平机23,确切地说由清碴链26清除道床43的表面,以形成路基18,并将清除的道碴通过横向传送带31或33投到轨道2的边坡上(图6)。利用平行四边形连接装置37围绕轴线38转动横向传送带31,33,可以选择使两条横向传送带31或33中的哪一条传送带的道碴收取端34或35处于清碴链26抛出道碴范围32以内,就是说决定将收上来的道碴投到轨道的哪一侧。
此时沿作业方向(箭头3)跟随在后的、可调节高度的履带走行机构17在新的路基18上走行,同时也就将路基压实。履带走行机构17的两侧装有能围绕垂直轴线45转动的垂直挡板44,用于防止沿轨道纵向后续的轨枕运送装置21在辅放新轨枕22之前,横向传送带31或33从侧面投放的道碴又回流到路基18上(见图6)。此后利用未展示的其它机械将新钢轨撑放在新轨枕22上。
在图5所示的情形中沿箭头13的方向作业时,必须将道碴整平机23(连同装在上面的横向传送带31和33)围绕垂直轴线29转动180°。此时前面的轨枕运送装置21用于收取轨道2的旧轨枕20。为此还要在此处安装一个轨枕叉形臂46。此时沿轨道的纵向,确切地说沿作业方向后续的履带走行机构17在清除了旧轨枕20的道床43上走行。道床由后续的清碴链26予以整平。用这种方法新形成的路基18在铺放新轨枕22之前,利用装在轨枕运送装置19上能调节高度的夯实装置47予以夯实(夯实装置47如图4所示处于向上翻转的不工作状态)。此时挡板44也同样装在轨枕运送装置19上。运走旧轨枕20和送来新轨枕22,利用龙门吊车15,与图4(或图1和3)所述的方案类似。
道碴整平机23也可以设计为V形道碴犁(未单独展示的)。

Claims (5)

1.一种更新轨道(2)用的机械(1),它具有一个支承在轨行机构(4)上的机架(5),该机架配备有两套沿机械的纵向相隔一定距离的轨枕运送装置(19,21),分别用于收取旧轨枕(20)和铺放新轨枕(22),在轨枕运送装置之间有一个履带走行机构(17)和一个道碴整平机(23),其特征在于:道碴整平机(23)从所述机架(5)悬置并且在转动驱动装置(48)的驱动下能围绕一垂直轴线(29)转动180°。
2.根据权利要求1所述的机械,其特征在于:所述道碴整平机(23)是一条利用一个驱动装置(28)能在一个倾斜于轨道(2)的平面(27)内运转的循环式清碴链,该清碴链在沿垂直方向与轨道(2)相隔一定距离的投碴范围(32)内,配备有一条垂直于机械的纵向延伸的横向传送带(31)。
3.根据权利要求2所述的机械,其特征在于:所述横向传送带(31)通过一个与道碴整平机(23)相连的平行四边形连接装置(37)被支承,可围绕一根垂直于机械纵向的轴线(38)调节其高度。
4.根据权利要求2或3所述的机械,其特征在于:所述两条横向传送带(31,33)沿机械的纵向前后排列,沿机械的横向则是位置错开的,使位于轨道中心线上的相应道碴收取端(34,35)位于清碴链(26)投碴端(32)的下方。
5.根据权利要求1所述的机械,其特征在于:所述道碴整平机(23)是一个V形道碴犁。
CNB011214104A 2000-06-09 2001-06-07 更新轨道用的机械 Expired - Fee Related CN1148486C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT0043300U AT3879U3 (de) 2000-06-09 2000-06-09 Maschine zur erneuerung eines gleises
ATGM433/2000 2000-06-09

Publications (2)

Publication Number Publication Date
CN1329198A CN1329198A (zh) 2002-01-02
CN1148486C true CN1148486C (zh) 2004-05-05

Family

ID=3490459

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB011214104A Expired - Fee Related CN1148486C (zh) 2000-06-09 2001-06-07 更新轨道用的机械

Country Status (13)

Country Link
US (1) US6415720B2 (zh)
EP (1) EP1162312B1 (zh)
JP (1) JP4713017B2 (zh)
CN (1) CN1148486C (zh)
AT (2) AT3879U3 (zh)
AU (1) AU776179B2 (zh)
CZ (1) CZ294637B6 (zh)
DE (1) DE50103072D1 (zh)
DK (1) DK1162312T3 (zh)
ES (1) ES2222329T3 (zh)
PL (1) PL199479B1 (zh)
RU (1) RU2229550C2 (zh)
UA (1) UA73293C2 (zh)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT5708U3 (de) * 2002-07-17 2003-09-25 Plasser Bahnbaumasch Franz Maschine zur aufnahme von schwellen eines gleises
AT7114U3 (de) * 2004-06-07 2005-07-25 Plasser Bahnbaumasch Franz Verfahren und maschine zum ersetzen einer gruppe von altschwellen durch neuschwellen
EP1799909B1 (en) 2004-08-20 2016-03-09 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US7478596B2 (en) * 2005-03-30 2009-01-20 Franz Plasser Bahnbaumaschinen - Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
KR101222219B1 (ko) * 2005-08-11 2013-01-15 프란츠 플라세 바흔바우마쉬넨-인두스트리게젤샤프트 엠. 베. 하 선로의 리뉴잉을 위한 기계
AT504517B1 (de) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Verfahren und maschine zur absenkung eines gleises
FR2923223B1 (fr) * 2007-11-07 2010-09-03 Europ De Travaux Ferroviaires Systeme de depose, de manutention et de stockage de traverses bi-bloc usagees par moyens mecanises.
AT506078B1 (de) * 2008-02-04 2009-06-15 Plasser Bahnbaumasch Franz Schotterpflug zum einschottern eines gleises
DE102009039230A1 (de) * 2009-08-28 2011-03-17 Zürcher, Ralf Verfahren zum Erstellen eines Gleiskörpers
FR2998589B1 (fr) * 2012-11-23 2018-02-02 Europeenne De Travaux Ferroviaires (Etf) Degarnisseuse double flux et double sens et procedes de renouvellement de ballast et de traverses.
CN104499390B (zh) * 2014-12-25 2016-01-20 西南交通大学 一种焊轨车多段轨节焊连换铺施工方法
CN104963250A (zh) * 2015-07-02 2015-10-07 常州市瑞泰工程机械有限公司 收枕装置及其收枕方法
CN106283983A (zh) * 2016-08-30 2017-01-04 中国铁建大桥工程局集团有限公司 一种具有枕端清石装置之铁路养护小型机械
CN106320109A (zh) * 2016-11-05 2017-01-11 昆明学院 一种机电液一体化更换轨枕装置
CN108797238B (zh) * 2018-05-24 2020-06-05 潘龙 扒砟换枕机
RU2700298C1 (ru) * 2018-05-30 2019-09-16 Открытое Акционерное Общество "Российские Железные Дороги" Машина фронтальная портального типа для обработки грунта
CN110804909B (zh) * 2019-12-02 2020-07-24 浙江利恩工程设计咨询有限公司 一种铁路轨枕自动铺设装置
CN113399773B (zh) * 2021-07-09 2022-09-23 北京嘉弈德懋新能源科技发展有限公司 一种新管预制定位切割方法和新管预制定位切割设备
AT526696A1 (de) * 2022-10-25 2024-05-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Schotterräumvorrichtung und Verfahren für eine Gleisbaumaschine

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT321971B (de) * 1972-05-02 1975-04-25 Plasser Bahnbaumasch Franz Fahrbare einrichtung zum auswechseln bzw. erneuern eines aus schienen und querschwellen bestehenden gleises
AT340985B (de) * 1976-02-02 1978-01-10 Plasser Bahnbaumasch Franz Einrichtung zum verlegen oder abschnittsweisen auswechseln eines gleises
DE3168988D1 (en) * 1981-03-06 1985-03-28 Matisa Materiel Ind Sa Machine for renewing railway tracks, comprising a plough
EP0538760B1 (de) * 1991-10-24 1994-07-27 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Förder- bzw. Räumkettenanordnung für Gleisbaumaschinen
CH686144A5 (fr) * 1991-10-30 1996-01-15 Matisa Materiel Ind Sa Train de renouvellement d'une voie ferree.
DE9305927U1 (de) * 1993-04-20 1994-05-26 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien Maschine zum Erneuern bzw. Verlegen eines Eisenbahngleises
JP2909375B2 (ja) * 1994-02-10 1999-06-23 三菱重工業株式会社 道床更換機
US5664498A (en) * 1995-10-31 1997-09-09 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal machgine
DE59810204D1 (de) * 1997-06-27 2003-12-24 Plasser Bahnbaumasch Franz Maschine zum Verdichten und Profilieren der Schotterbettung eines Gleises

Also Published As

Publication number Publication date
AT3879U3 (de) 2001-03-26
CN1329198A (zh) 2002-01-02
CZ20012064A3 (cs) 2002-01-16
AU5181401A (en) 2001-12-13
PL347776A1 (en) 2001-12-17
DE50103072D1 (de) 2004-09-09
JP2002021006A (ja) 2002-01-23
AT3879U2 (de) 2000-09-25
EP1162312A1 (de) 2001-12-12
AU776179B2 (en) 2004-09-02
ATE272746T1 (de) 2004-08-15
DK1162312T3 (da) 2004-10-04
EP1162312B1 (de) 2004-08-04
CZ294637B6 (cs) 2005-02-16
RU2229550C2 (ru) 2004-05-27
JP4713017B2 (ja) 2011-06-29
US6415720B2 (en) 2002-07-09
PL199479B1 (pl) 2008-09-30
UA73293C2 (en) 2005-07-15
US20010050024A1 (en) 2001-12-13
ES2222329T3 (es) 2005-02-01

Similar Documents

Publication Publication Date Title
CN1148486C (zh) 更新轨道用的机械
CN1179091C (zh) 拆除旧轨道与铺设新轨道用的机械及作业方法
CN1050872C (zh) 更新或铺设轨道用的机械
AU2008266570B2 (en) Machine for the pick-up and storage of track fastenings of a track and method thereof
US4479439A (en) Mobile arrangement and method for improving a track bed
US4357874A (en) Mobile arrangement and method for improving a track bed
US4307667A (en) Railroad track relaying train
CA1074620A (en) Mobile apparatus for continuous track renewal
SU884578A3 (ru) Устройство дл замены рельсов и шпал железнодорожного пути
CN1090702C (zh) 轨排运送车
CN1152168C (zh) 更新由钢轨和轨枕组成的轨道用的机械
GB2024288A (en) Machine for replacing the rails and sleepers of a railway track
AU676914B2 (en) A work train for replacing old sleepers of a track with new sleepers
CN1041335C (zh) 整修轨道路基面的方法和设备
CN1152170C (zh) 拆除旧轨道和铺设新轨道用的机械
CN1086010C (zh) 挖掘轨道道床材料用的线路施工机械
CN1100922C (zh) 拆除旧轨道及铺设新轨道用的机械
CN1152169C (zh) 更新轨道用的机械
CN1159497C (zh) 更新一条由钢轨和轨枕组成的轨道用的机械
AU602104B2 (en) Mobile tie gang apparatus and tie exchange method
US20030205162A1 (en) Railway maintenance machine with multiple function capability
CN1023908C (zh) 带有道床犁装置的连续走行式轨道捣固机
CN108221513A (zh) 一种道岔钢轨施工运输机械
CN1066226C (zh) 整修道床或路基用的机械

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040505

Termination date: 20170607

CF01 Termination of patent right due to non-payment of annual fee