CN1179091C - 拆除旧轨道与铺设新轨道用的机械及作业方法 - Google Patents
拆除旧轨道与铺设新轨道用的机械及作业方法 Download PDFInfo
- Publication number
- CN1179091C CN1179091C CNB011214120A CN01121412A CN1179091C CN 1179091 C CN1179091 C CN 1179091C CN B011214120 A CNB011214120 A CN B011214120A CN 01121412 A CN01121412 A CN 01121412A CN 1179091 C CN1179091 C CN 1179091C
- Authority
- CN
- China
- Prior art keywords
- sleeper
- old
- new
- track
- machinery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 8
- 241001669679 Eleotris Species 0.000 claims abstract description 177
- 230000005540 biological transmission Effects 0.000 claims description 10
- 230000001737 promoting effect Effects 0.000 claims 1
- 230000008878 coupling Effects 0.000 abstract 1
- 238000010168 coupling process Methods 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 230000007246 mechanism Effects 0.000 description 13
- 230000009183 running Effects 0.000 description 12
- 230000008901 benefit Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000007935 neutral effect Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000012857 repacking Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/06—Transporting, laying, removing or renewing sleepers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
一种用于拆除由旧钢轨和旧轨枕(23)组成的旧轨道(2)且同时又铺设由新钢轨(26)和新轨枕(27)组成的新轨道(3)用的机械(1),其具有第一轨枕运送装置(21),用于收取旧轨枕(23),这套轨枕运送装置配备有在作业时推入旧轨枕(23)和道床(28)之间的旧轨枕提升装置(36),用于从道床(28)上抓取和提升旧轨枕(23)。第二轨枕运送装置(25)用于在整平的道床(28)上铺放新轨枕(27)。在第一和第二轨枕运送装置(21,25)上均设有联结器(37,38),用于可拆地固定旧轨枕提升装置(36)。
Description
技术领域
本发明涉及一种拆除一条由旧钢轨和旧轨枕组成的旧轨道,同时又铺设一条由新钢轨和新轨枕组成的新轨道用的机械。该机械具有第一轨枕运送装置,用于收取旧轨枕。这套装置配备有作业时能推入旧轨枕和道床之间的旧轨枕提升装置,用于从道床上收取和提升旧轨枕。所述机械还具有第二轨枕运送装置,用于在整平的道床上铺放新轨枕。本发明还涉及一种铺设轨道的作业方法。
背景技术
这样一种机械已由欧洲专利EP 0621 371 B1公开。这部机械可以从两个方向驶向轨道施工地点,其中一个作业方向是用新轨枕和新钢轨替换旧轨道,而另一个相反的作业方向是将新轨道铺设在事先准备好的路基上。更新旧轨道时,机械利用履带走行机构在轨道改建空档内的路基表面上走行。这段路基表面是在拆除了旧钢轨和旧轨枕之后,用一部沿作业方向位于前面的道碴整平机形成的。履带走行机构后面铺设新轨枕和撑放新钢轨。为了沿相反方向铺设新轨道,机械必须进行改装。为此需将履带走行机构沿新的作业方向安设在铺放新轨枕用的轨枕运送装置的前面,并与机架固定在一起。另外,为了转移履带走行机构,需将新轨枕铺放装置的轨枕升降机转到另一个方向,然后调整旧轨枕收取装置和道碴整平机的高度,使之进入不工作状态。
发明内容
本发明的目的就是要创造一种拆除旧轨道和铺设新轨道用的机械,要求这部机械能用最短的时间完成改变作业方向的改装工作。
本发明的目的是采用上述类型的机械这样来实现的,即,提供一种用于拆除一条由旧钢轨和旧轨枕组成的旧轨道且同时又铺设一条由新钢轨和新轨枕组成的新轨道用的机械,它具有第一轨枕运送装置,用于收取旧轨枕,这套装置配备有作业时能推入旧轨枕和道床之间的旧轨枕提升装置,用于从道床上拆取和提升旧轨枕,所述机械还具有第二轨枕运送装置,用于在整平的道床上铺放新轨枕,其中:第一和第二轨枕运送装置均有联结器,用于脱开和固定旧轨枕提升装置。根据本发明的另一方面,提供一种用于拆除一条由旧钢轨和旧轨枕组成的旧轨道且同时又铺设一条由新钢轨和新轨枕组成的新轨道用的机械,它具有收取旧轨枕用的第一轨枕运送装置,这套装置有收取和提升道床上的旧轨枕用的旧轨枕提升装置,所述机械还具有第二轨枕运送装置,用于在整平的道床上铺放新轨枕,其中:第一和第二轨枕运送装置分别配备有旧轨枕提升装置,利用驱动装置可以有选择地使之从道床上收取旧轨枕的作业位转换为不工作位。
根据本发明的又一方面,提供一种机械的作业方法,用于沿第一作业方向拆除由旧钢轨和旧轨枕组成的旧轨道并同时又铺设由新钢轨和新轨枕组成的新轨道,其中,由第一轨枕运送装置的旧轨枕提升装置将旧轨枕从道床上提升后转送给第一轨枕传送装置,与此同时由第二轨枕传送装置将新轨枕送给第二轨枕运送装置,并由这套装置将新轨枕铺放在道床上,其中:为了改变机械的作业方向,将旧轨枕提升装置从第一轨枕运送装置上拆下并与第二轨枕运送装置相连接,此时两套轨枕传送装置的运转方向被反向。
采用这种结构的机械,就可以在进行旧轨道更新作业时,不必对机械进行许多的改装工作,就可以简单地调转作业方向。这一点在比如要更新一条复线的时候具有很大的优点。此时在拆除和更新了一条线路后,机械可在另一条线路上沿反方向进行作业,而无需花费人力和时间将整个机械设备进行调头。需要做的只是将旧轨枕提升装置从第一轨枕运送装置上脱开,然后安装在第二轨枕运送装置上。另外,从作业程序的逻辑性考虑也具有优点,就是施工地点如果根据情况可以从两端进入时,则无需特意去顾及机械的定向。
附图说明
本发明的其他优点可参看权利要求书和附图。
下面借助附图所示实施例对本发明予以详细说明,附图中:
图1为拆除旧轨道和铺设新轨道用的机械沿第一作业方向作业时的侧视图;
图2为与机械连接的轨枕运送车的侧视图;
图3为图1所示机械沿相反的第二作业方向作业时的侧视图,
图4为符合本发明的旧轨枕提升装置的联结器的详图,
图5为旧轨枕提升装置另一结构方案的详图。
具体实施方式
图1所示为拆除旧轨道2并同时铺设新轨道3用的机械1沿第一作业方向4作业的情况。旧轨道2由旧钢轨22和旧轨枕23组成,而新轨道3则由新钢轨26和新轨枕27组成。该机械1有一个可支承在轨行机构5上的机架6。机架的一端设有驾驶室亦即操作室7。如图2所示,机架6相对的另一端通过关节8支承在一辆利用轨行机构11在轨道上走行的轨枕运送车10的底架9上并能多方位地活动。与此车相连的有多辆轨枕运送车12(未做详细展示)。一龙门吊车13能在走行轨14上沿着上述车辆10和12一直走行到机械1机架6与关节8邻接的区域。轨枕运送车10上装设的中央能源15用于向走行驱动装置16,以及机械1的所有其他驱动装置提供动能。
作业时,利用驱动装置18调节高度的履带走行机构19使机架6在施工空档17内支承在腾空的路基20上,确切地说在腾空的路基上走行。沿机械的纵向,在履带走行机构19两侧装有作业机组,其中有沿作业方向4位于前面的第一轨枕运送装置21,用于收取旧轨枕,一部道碴整平机24和沿作业方向4位于后面的第二轨枕运送装置25,用于铺放新轨枕27。新轨枕铺放在事先用道碴整平机24整平的道床28上。
道碴整平机24装在机架6上,能围绕一根垂直的轴线29转动180°。整平机是一条循环式清碴链33,利用驱动装置31可使之按一定的角度倾斜于旧轨道2旋转,并利用另一驱动装置32调节其高度。清碴链33在沿垂直方向与道床28相隔一定距离的投碴范围内,配备有两条垂直于轨道纵向的横向传送带35。该传送带将清碴链33收上来的道碴送往轨道的一个边坡。两条横向传送带35装在一个共用的承载架30上,该承载架又通过与道碴整平机24相连的平行四边形连接器34装在机架上,并可围绕一根垂直于机械纵向的轴线调整其高度。
在第一轨枕运送装置21上设有一套旧轨枕提升装置36。作业时,可将旧轨枕提升装置36推入轨枕23与道床28之间,以便从道床28上抓取和提升旧轨枕23。叉形臂40形式的旧轨枕提升装置36利用联结器37(详见图4)可拆装地固定在第一轨枕运送装置21上。另一个联结器38设在另外的第二轨枕运送装置25上。如图4所示,联结器37主要是一根插栓39,它穿入叉形臂40上的和轨枕运送装置21上与之相配的插孔41,并在插孔内加以固定,使叉形臂可以固定不动也可以拆卸掉。在第二轨枕运送装置25上也有相应的插孔41。
图1所示作业时,利用一个能调节高度的辅助走行机构42,使机械1在施工空档17内就位,并支承在履带走行机构19上。机械1沿作业方向4前进时,用相应的钢轨导向装置43(图2)将旧轨道2的旧钢轨22从旧轨枕23上抬起并拆除,然后在操作室44范围内,由旧轨枕提升装置36和第一轨枕运送装置21从旧轨道2的道床28上将旧轨枕23取走,送到配属于第一轨枕传送装置55的轨枕传送带45上。这个轨枕传送带45具有使之产生第一个转动方向53的转动驱动装置46。轨枕传送带将旧轨枕23沿作业方向4向前送往轨枕运送车10(图2),并在那里码成垛。旧轨枕垛23即由龙门吊车13送往轨枕运送车12以便运走。
此后由道碴整平机24,确切地说由清碴链33清除道床28的表面,以形成路基20,并将清除的道碴通过横向传送带35投到轨道的边坡上(利用平行四边形连接器34可以选择使两条横向传送带中的哪一条处于清碴链33抛出道碴范围之内,就是说选择将收上来的道碴投到轨道的哪一侧)。
此时沿作业方向4跟随在后的、可调节高度的履带走行机构19在新的路基20上走行,同时也将路基压实。履带走行机构19的两侧装有能围绕垂直轴线48转动的垂直挡板47,用于防止沿轨道纵向后续的第二轨枕运送装置25在铺放新轨枕27之前,横向传送带35从侧面投放的道碴又回流到路基20上。新轨枕27由配属于第二轨枕传送装置56的新轨枕传送带50送来。这条传送带装有产生第一个运转方向53的转动驱动装置51。然后由装在机架6上的钢轨导轨49将新钢轨26撑放在新轨枕27上。
图3所示的情况是,为了使机械1沿相反于第一个作业方向4的第二个作业方向52作业,将道碴整平机24连同装在上面的横向传送带35一并围绕垂直轴线29转动180°。此时第二轨枕运送装置25用于收取旧轨枕23。旧轨枕上的旧钢轨22事先已借助钢轨导轨49拆除。为了收取旧轨枕,将旧轨枕提升装置36的叉形臂40从第一轨枕运送装置21上拆下,然后用联结器38将它固定在第二轨枕运送装置25上。此时将第二轨枕运送装置的轨枕传送带50的转动驱动装置51从第一个运转方向53转换成第二个运转方向54,然后将旧轨枕23通过第二轨枕传送装置56送往轨枕运送车10。
沿第二个作业方向52跟随在第二轨枕运送装置25后面的履带走行机构19,现在在拆除了旧轨枕23的、由随后的道碴整平机24的清碴链23整平的道床上滚行。此时挡板47装在第一轨枕运送装置21上,配属于此运送装置的第一轨枕传送装置55的轨枕传送带45(在将其转动驱动装置46转换成第二个运转方向54后)即沿第二个作业方向52运转,以便将新轨枕27送来,用于铺放新轨道3。其他作业过程与图1所示的方案相似。
在图5所示机械1的局部结构中,为简明起见,凡功能相同的零部件保留了图1至4中的附图标记。在这个拆除旧轨道和铺放新轨道用的机械的方案中,第一轨枕运送装置21和第二轨枕运送装置25均有自己的轨枕提升装置36,但图中只展示了两套旧轨枕提升装置中的第一套。旧轨枕提升装置36有一个叉形臂40,可有选择地从作业位转换成不工作位(用点划线示出)。作业时,将叉形臂推入旧轨枕23和轨道道床28之间,使旧轨枕23脱离道床。为了使叉形臂40进入不工作位,将它固定在轨枕运送装置21(或25)上,使之能围绕水平轴线57转动,同时与驱动装置58相连接,使叉形臂40得以向上翻转。当机械1沿反方向作业时,轨枕运送装置21用于铺放新轨枕,即需将叉形臂向上翻转。配备于第二轨枕运送装置25的旧轨枕提升装置36(在此未展示)的结构也与此类似。
Claims (6)
1.一种用于拆除一条由旧钢轨(22)和旧轨枕(23)组成的旧轨道(2)且同时又铺设一条由新钢轨(26)和新轨枕(27)组成的新轨道(3)用的机械(1),它具有第一轨枕运送装置(21),用于收取旧轨枕(23),这套装置配备有作业时能推入旧轨枕(23)和道床(28)之间的旧轨枕提升装置(36),用于从道床(28)上拆取和提升旧轨枕(23),所述机械还具有第二轨枕运送装置(25),用于在整平的道床(28)上铺放新轨枕(27),其特征在于:第一和第二轨枕运送装置(21,25)均有联结器(37,38),用于脱开和固定旧轨枕提升装置(30)。
2.根据权利要求1所述的机械,其特征在于:配属于第一或第二轨枕运送装置(21,25)用于运送旧轨枕或新轨枕(23,27)的轨枕传送带(45,50)配备有转动驱动装置(46,51),该转动驱动装置可以从第一运转方向(53)转换成相反的第二运转方向(54)。
3.一种用于拆除一条由旧钢轨(22)和旧轨枕(23)组成的旧轨道(2)且同时又铺设一条由新钢轨(26)和新轨枕(22)组成的新轨道(3)用的机械(1),它具有收取旧轨枕(23)用的第一轨枕运送装置(21),这套装置有收取和提升道床(28)上的旧轨枕(23)用的旧轨枕提升装置(36),所述机械(1)还具有第二轨枕运送装置(25),用于在整平的道床(28)上铺放新轨枕(27),其特征在于:第一和第二轨枕运送装置(21,25)分别配备有旧轨枕提升装置(36),利用驱动装置(58)可以有选择地使之从道床(28)上收取旧轨枕(23)的作业位转换为不工作位。
4.根据权利要求3所述的机械,其特征在于:配属于第一或第二轨枕运送装置(21,25)用于运送旧轨枕或新轨枕(23,27)的轨枕传送带(45,50)配备有转动驱动装置(46,51),该转动驱动装置可以从第一运转方向(53)转换成相反的第二运转方向(54)。
5.一种机械(1)的作业方法,用于沿第一作业方向(4)拆除由旧钢轨(22)和旧轨枕(23)组成的旧轨道(2)并同时又铺设由新钢轨(26)和新轨枕(27)组成的新轨道(3),其中,由第一轨枕运送装置(21)的旧轨枕提升装置(36)将旧轨枕(23)从道床(28)上提升后转送给第一轨枕传送装置(55),与此同时由第二轨枕传送装置(56)将新轨枕(27)送给第二轨枕运送装置(25),并由这套装置将新轨枕铺放在道床(28)上,其特征在于:为了改变机械(1)的作业方向(4,52),将旧轨枕提升装置(36)从第一轨枕运送装置(21)上拆下并与第二轨枕运送装置(25)相连接,此时两套轨枕传送装置(55,56)的运转方向被反向。
6.根据权利要求5所述的作业方法,其特征在于:为了改变机械(1)的作业方向(4,52),将位于第一和第二轨枕运送装置(21,25)之间的道碴整平机(24)围绕垂直的轴线(29)转动180°。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATGM432/2000 | 2000-06-09 | ||
AT0043200U AT3878U3 (de) | 2000-06-09 | 2000-06-09 | Maschine und verfahren zum entfernen eines altgleises und zur verlegung eines neugleises |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1329197A CN1329197A (zh) | 2002-01-02 |
CN1179091C true CN1179091C (zh) | 2004-12-08 |
Family
ID=3490437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB011214120A Expired - Fee Related CN1179091C (zh) | 2000-06-09 | 2001-06-07 | 拆除旧轨道与铺设新轨道用的机械及作业方法 |
Country Status (13)
Country | Link |
---|---|
US (1) | US6474241B2 (zh) |
EP (1) | EP1162311B1 (zh) |
JP (1) | JP4713016B2 (zh) |
CN (1) | CN1179091C (zh) |
AT (2) | AT3878U3 (zh) |
AU (1) | AU775686B2 (zh) |
CZ (1) | CZ296557B6 (zh) |
DE (1) | DE50104076D1 (zh) |
DK (1) | DK1162311T3 (zh) |
ES (1) | ES2228791T3 (zh) |
PL (1) | PL199480B1 (zh) |
RU (1) | RU2207423C2 (zh) |
UA (1) | UA73486C2 (zh) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT5708U3 (de) * | 2002-07-17 | 2003-09-25 | Plasser Bahnbaumasch Franz | Maschine zur aufnahme von schwellen eines gleises |
AT5769U3 (de) * | 2002-09-05 | 2003-09-25 | Plasser Bahnbaumasch Franz | Maschine zum abbau und verlegen eines gleises und verfahren |
US7350467B2 (en) | 2004-08-20 | 2008-04-01 | Loram Maintenance Of Way, Inc. | Long rail pick-up and delivery system |
US7478596B2 (en) * | 2005-03-30 | 2009-01-20 | Franz Plasser Bahnbaumaschinen - Industriegesellschaft Gmbh | Method and machine for replacing damaged rail sections of a track |
DE502006008191D1 (de) * | 2005-08-11 | 2010-12-09 | Plasser Bahnbaumasch Franz | Maschine zum erneuern eines gleises |
AT504517B1 (de) * | 2007-04-12 | 2008-06-15 | Plasser Bahnbaumasch Franz | Verfahren und maschine zur absenkung eines gleises |
AT505403B1 (de) * | 2007-06-19 | 2009-01-15 | Plasser Bahnbaumasch Franz | Maschine zur aufnahme und lagerung von kleineisen eines gleises sowie verfahren |
CH700126B1 (de) | 2008-12-16 | 2013-01-31 | Matisa Materiel Ind Sa | Maschine und Verfahren zum Erneuern eines Gleises. |
GB2468475A (en) | 2009-02-25 | 2010-09-15 | W & D Mcculloch | Apparatus for handling railway sleepers and placing them with a desired spacing on a railway bed |
RU2444586C2 (ru) * | 2010-06-03 | 2012-03-10 | Открытое Акционерное Общество "Российские Железные Дороги" | Шпалопитатель звеносборочной линии |
AT510423B1 (de) * | 2011-01-11 | 2012-04-15 | Franz Plasser Bahnbaumaschinen-Industriegesellscha | Verfahren und fahrzeug zum abschnittsweisen ersatz von altschwellen eines gleises durch neuschwellen |
AT511192B1 (de) * | 2011-08-18 | 2012-10-15 | Plasser Bahnbaumasch Franz | Maschine zur erneuerung eines gleises |
CN103835198B (zh) * | 2014-02-22 | 2015-12-02 | 冯世英 | 顶升式轨枕临时支撑器的制造和使用方法 |
CN103835200B (zh) * | 2014-02-22 | 2015-11-25 | 冯世英 | 立柱式轨枕临时支撑器 |
CN103835197B (zh) * | 2014-02-22 | 2015-10-21 | 冯世英 | 顶升式轨枕临时支撑器 |
CN103835199B (zh) * | 2014-02-22 | 2016-01-20 | 冯世英 | 立柱式轨枕临时支撑器的制造方法 |
CN103966930B (zh) * | 2014-04-16 | 2016-01-27 | 徐州徐工铁路装备有限公司 | 一种用于高速铁路无砟轨道的换板设备 |
CN107178015A (zh) * | 2017-07-06 | 2017-09-19 | 中铁上海工程局集团有限公司 | 一种钢梁明桥面合成树脂长轨枕更换施工装置及方法 |
FR3109128B1 (fr) * | 2020-04-11 | 2022-08-12 | Matisa Materiel Ind Sa | Wagon de transfert de traverses et véhicule ferroviaire associé |
CN113148572B (zh) * | 2021-03-16 | 2023-04-25 | 大唐七台河发电有限责任公司 | 一种电力企业加热器拆除运送组合装置的拆除运送方法 |
CN113512916B (zh) * | 2021-04-24 | 2023-03-31 | 于洋 | 一种用于自动化码头轨道安装的轨枕输送机器人 |
CN113399773B (zh) * | 2021-07-09 | 2022-09-23 | 北京嘉弈德懋新能源科技发展有限公司 | 一种新管预制定位切割方法和新管预制定位切割设备 |
AT526696A1 (de) | 2022-10-25 | 2024-05-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Schotterräumvorrichtung und Verfahren für eine Gleisbaumaschine |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT345878B (de) * | 1975-07-11 | 1978-10-10 | Plasser Bahnbaumasch Franz | Verfahren und vorrichtung zum abschnittsweisen auswechseln eines gleises |
CH598415A5 (en) * | 1976-03-25 | 1978-04-28 | Vanoli Carlo Ag | Railway sleeper and rail laying machine |
AT359541B (de) * | 1978-06-28 | 1980-11-10 | Plasser Bahnbaumasch Franz | Einrichtung zum auswechseln der schienen und schwellen eines gleises |
AT384445B (de) * | 1986-02-12 | 1987-11-10 | Plasser Bahnbaumasch Franz | Fahrbare anlage zur erneuerung der schienen und schwellen eines gleises |
US4829907A (en) * | 1986-10-13 | 1989-05-16 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Mobile installation for loading, transporting and unloading as well as exchanging railroad ties |
IT1210796B (it) * | 1987-06-08 | 1989-09-20 | Enrico Valditerra | Convoglio di rinnovamento di strade ferrate con mezzi di sostituzione totale o parziale delle traverse disostegno dei binari |
CH680865A5 (zh) * | 1989-09-26 | 1992-11-30 | Matisa Materiel Ind Sa | |
AT400161B (de) * | 1990-06-06 | 1995-10-25 | Plasser Bahnbaumasch Franz | Anlage zum kontinuierlichen ablegen von schwellen eines gleises |
AT400729B (de) * | 1990-08-24 | 1996-03-25 | Plasser Bahnbaumasch Franz | Maschine zum austauschen der schwellen eines gleises |
DE9305927U1 (de) * | 1993-04-20 | 1994-05-26 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien | Maschine zum Erneuern bzw. Verlegen eines Eisenbahngleises |
US5664498A (en) * | 1995-10-31 | 1997-09-09 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Track renewal machgine |
-
2000
- 2000-06-09 AT AT0043200U patent/AT3878U3/de not_active IP Right Cessation
-
2001
- 2001-04-26 DE DE2001504076 patent/DE50104076D1/de not_active Expired - Lifetime
- 2001-04-26 DK DK01890122T patent/DK1162311T3/da active
- 2001-04-26 ES ES01890122T patent/ES2228791T3/es not_active Expired - Lifetime
- 2001-04-26 AT AT01890122T patent/ATE279583T1/de active
- 2001-04-26 EP EP01890122A patent/EP1162311B1/de not_active Expired - Lifetime
- 2001-05-29 PL PL347777A patent/PL199480B1/pl unknown
- 2001-06-04 US US09/873,679 patent/US6474241B2/en not_active Expired - Lifetime
- 2001-06-05 RU RU2001114943/28A patent/RU2207423C2/ru not_active IP Right Cessation
- 2001-06-06 UA UA2001063846A patent/UA73486C2/uk unknown
- 2001-06-07 CN CNB011214120A patent/CN1179091C/zh not_active Expired - Fee Related
- 2001-06-07 JP JP2001172408A patent/JP4713016B2/ja not_active Expired - Fee Related
- 2001-06-08 CZ CZ20012066A patent/CZ296557B6/cs not_active IP Right Cessation
- 2001-06-08 AU AU51815/01A patent/AU775686B2/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
EP1162311B1 (de) | 2004-10-13 |
US20010050023A1 (en) | 2001-12-13 |
EP1162311A3 (de) | 2003-04-02 |
JP4713016B2 (ja) | 2011-06-29 |
US6474241B2 (en) | 2002-11-05 |
EP1162311A2 (de) | 2001-12-12 |
CN1329197A (zh) | 2002-01-02 |
ES2228791T3 (es) | 2005-04-16 |
AT3878U2 (de) | 2000-09-25 |
UA73486C2 (uk) | 2005-08-15 |
CZ296557B6 (cs) | 2006-04-12 |
PL199480B1 (pl) | 2008-09-30 |
DE50104076D1 (de) | 2004-11-18 |
RU2207423C2 (ru) | 2003-06-27 |
AU5181501A (en) | 2001-12-13 |
AU775686B2 (en) | 2004-08-12 |
DK1162311T3 (da) | 2005-01-17 |
JP2002021005A (ja) | 2002-01-23 |
PL347777A1 (en) | 2001-12-17 |
CZ20012066A3 (cs) | 2002-01-16 |
AT3878U3 (de) | 2001-02-26 |
ATE279583T1 (de) | 2004-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1179091C (zh) | 拆除旧轨道与铺设新轨道用的机械及作业方法 | |
CN1050872C (zh) | 更新或铺设轨道用的机械 | |
CN1148486C (zh) | 更新轨道用的机械 | |
RU2109101C1 (ru) | Рабочее транспортное средство для выполнения железнодорожных работ | |
CN1090702C (zh) | 轨排运送车 | |
CA2166438C (en) | Machine and an installation for implementing track maintenance operations | |
CN1066507C (zh) | 更新轨道旧枕用的作业方法及其作业列车 | |
GB2024288A (en) | Machine for replacing the rails and sleepers of a railway track | |
CN1100922C (zh) | 拆除旧轨道及铺设新轨道用的机械 | |
CN1333405A (zh) | 更新轨道用的机械 | |
CN1098398C (zh) | 挖掘道床材料用的线路施工机械 | |
CN1102978C (zh) | 铺放轨道用的机械 | |
CN1114114A (zh) | 用于轨道更新的轨道建筑机械 | |
CN1066794C (zh) | 用于更新或清理道床的机械 | |
CN1023908C (zh) | 带有道床犁装置的连续走行式轨道捣固机 | |
CN107804210A (zh) | 一种基于机械手的路锥自动收放车 | |
CN210117620U (zh) | 一种捣固车 | |
EP0768426A1 (en) | Railway truck assembly | |
CN108221513B (zh) | 一种道岔钢轨施工运输机械 | |
CN1211533C (zh) | 轨道工程机械 | |
CN113445464A (zh) | 一种铁路道床吸污装置及吸污车 | |
CN1389626A (zh) | 收取道床材料用的轨道施工机械 | |
CN209938592U (zh) | 一种预制平车系统 | |
CN1088132C (zh) | 整修轨道用的机械 | |
CN1396343A (zh) | 轨道施工机械 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20041208 Termination date: 20170607 |