Machine for renewing a railroad track Download PDF

Info

Publication number
US20010050024A1
US20010050024A1 US09/873,678 US87367801A US2001050024A1 US 20010050024 A1 US20010050024 A1 US 20010050024A1 US 87367801 A US87367801 A US 87367801A US 2001050024 A1 US2001050024 A1 US 2001050024A1
Authority
US
United States
Prior art keywords
ballast
machine
longitudinal direction
ballast bed
machine frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
US09/873,678
Other versions
US6415720B2 (en
Inventor
Josef Theurer
Manfred Brunninger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Assigned to FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHAFT M.B.H. reassignment FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHAFT M.B.H. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRUNNINGER, MANFRED, THEURER, JOSEF
Publication of US20010050024A1 publication Critical patent/US20010050024A1/en
Application granted granted Critical
Publication of US6415720B2 publication Critical patent/US6415720B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/10Transporting, laying, removing or renewing sleepers under, or from under, installed rails for inserting or removing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers

Definitions

  • the present invention relates to a machine for renewing a railroad track on a ballast bed, which comprises a machine frame extending in a longitudinal direction, undercarriages for supporting the machine frame on the railroad track, a first tie transport device for receiving old ties and a second tie transport device for laying new ties, the tie transport devices being mounted on the machine frame and being spaced from each other in the longitudinal direction, and a crawler vehicle and ballast bed planing apparatus arranged on the machine frame between the tie transport devices.
  • Such a machine which may be operated in opposite driving directions, is disclosed in U.S. Pat. No. 5,357,867.
  • an old railroad track is renewed while a new railroad track is laid on a prepared planed surface in the opposite driving direction.
  • the machine is driven while supported by a crawler vehicle on a planed renewal track section from which the old track ties and rails have been removed, a ballast planing apparatus preceding the crawler vehicle in the driving direction for planing the ballast.
  • the new track is laid on the planed ballast bed behind the crawler vehicle.
  • the machine is driven in the opposite direction and must be retrofitted by mounting the crawler vehicle on the machine frame in front of the device for laying the new ties, in respect of the opposite driving direction.
  • the tie elevator for laying the new ties is turned around while the tie transport device for receiving the old ties and the ballast planing apparatus are raised into an inoperative position.
  • ballast bed planing apparatus is rotatable by 180° about a vertical axis.
  • Such a machine may be operated in opposite driving directions during a track renewal operation without any substantial retrofitting. This may be of considerable advantage, for example, when a double track is to be renewed. In this case, the machine may work back in the opposite direction on the other rail after one rail has been renewed, without having to engage in complicated and time-consuming retrofitting needed to turn the entire machine around. It is also advantageous to be able to drive from either side towards the renewal site to start the track renewal operation, depending on the prevailing conditions and without having to take into consideration the orientation of the machine.
  • the ballast bed planing apparatus may always be rapidly and readily turned in the driving direction to be in the proper operating position for planing the ballast.
  • FIGS. 1 and 2 are schematic side elevational views of a railroad track renewal machine operable in opposite driving directions for a track renewal operation;
  • FIG. 3 is a similar side elevational view of a tie storage and conveying car coupled to the machine of FIGS. 1 and 2.
  • FIGS. 4 and 5 are enlarged, fragmentary side elevational views showing details of the area of the machine where the ballast planing apparatus is located, in the respective positions of the ballast planing apparatus when the driving direction is reversed;
  • FIG. 6 is a sectional view along line VI in FIG. 4.
  • FIG. 1 there is shown machine 1 for renewing railroad track 2 on a ballast bed.
  • the machine is operated in a driving direction indicated by arrow 3 .
  • the machine comprises machine frame 5 , extending in a longitudinal direction, and undercarriages 4 , 4 for supporting the machine frame on the railroad track.
  • a first tie transport device 19 is provided for receiving old ties 20 and a second tie transport device 21 for laying new ties 22 .
  • the tie transport devices are mounted on machine frame 5 and are spaced from each other in the longitudinal direction.
  • a crawler vehicle 17 and ballast bed planing apparatus 23 are arranged on the machine frame between tie transport devices 19 , 21 .
  • the ballast bed planing apparatus is rotatable by 180° about a vertical axis.
  • Driver's and operator's cab 6 is mounted at one end of machine frame 5 while the opposite end of the machine frame is supported by universal joint 7 on frame 8 of tie conveyance car 9 .
  • the tie conveyance car frame is supported by undercarriage 10 running on track 2 .
  • the tie conveyance car is followed by car 11 holding the power source for the train, and this car is succeeded by a number of tie storage cars 12 .
  • a gantry crane 15 runs on rails 14 along cars 9 , 11 and 12 up to universal joint 7 to remove old ties from machine 1 and deliver new ties thereto, in an operation that is well known and described in the above-named U.S. patent.
  • Crawler vehicle 17 is vertically adjustably mounted on machine frame 5 .
  • the crawler vehicle is lowered to support the driven machine frame on a planed track bed surface from which the old track has been removed.
  • FIG. 2 illustrates the machine of FIG. 1, as it is adapted for operation in the opposite driving direction indicated by arrow 13 .
  • tie transport device 19 which was used in the operating mode of FIG. 1 to pick up old ties 20 , is now used to lay new ties 22 while tie transport device 21 picks up old ties 20 .
  • Ballast bed planing apparatus 23 has been turned 180° to face in the driving direction indicated by arrow 13 .
  • the ballast bed planing apparatus comprises endless ballast excavating chain 26 extending in plane 27 inclined relative to the ballast bed.
  • Drive 28 revolves the excavating chain in this plane, and drive 30 is connected to the excavating chain to enable it to be vertically adjusted.
  • Ballast excavating chain 26 has a ballast discharge point 32 vertically spaced from the ballast bed.
  • a conveyor band 31 extends transversely to the longitudinal direction and is arranged underneath ballast discharge point 32 to receive ballast from the ballast discharge point (see FIG. 6).
  • a second conveyor band 33 extends transversely to the longitudinal direction, and conveyor bands 31 , 33 are arranged one behind the other in the longitudinal direction and are vertically offset from each other. As shown in FIG. 6, each conveyor band has input end 34 , 35 in the middle of the railroad track underneath ballast discharge point 31 of excavating chain 26 .
  • the transversely extending conveyor bands 31 , 33 are mounted on common carrier frame 36 which is connected to the ballast bed planing apparatus by parallelogram linkage 37 for vertically adjusting the conveyor bands about axes 38 extending perpendicularly to the longitudinal direction.
  • excavating chain 26 of ballast bed planing apparatus 23 is revolved to remove the ballast to expose subgrade 18 .
  • a respective one of transversely extending conveyor bands 31 , 33 conveys the excavated ballast to a respective shoulder of the track and deposits it on the shoulder.
  • Which input end 34 or 35 of conveyor band 31 or 33 is positioned underneath discharge point 32 of excavating chain 26 can be determined by swinging the conveyor bands about axes 38 with parallelogram linkage 37 , and this determines on which shoulder the ballast is deposited.
  • Vertically adjustable crawler vehicle 17 which trails ballast bed planing apparatus 23 in the operating direction, runs on the subgrade and compacts the same.
  • vertical shields 44 are hinged to the sides of crawler vehicle 17 and may be pivoted about vertical axes 45 . This prevents the ballast to flow back from the shoulders to subgrade 18 before new ties 22 are laid by tie transport device 21 which trails the crawler vehicle. The new rails are then laid by machines following machine 1 (which are not illustrated).
  • ballast bed planing apparatus 23 With conveyor bands 31 , 33 connected thereto, is turned 180° about vertical axis 29 .
  • Tie transport device 21 now precedes the ballast bed planing apparatus and the crawler vehicle in the operating direction to remove the old ties, for which purpose tie pick-up device 46 is mounted on the tie transport device.
  • the trailing crawler vehicle now moves on ballast bed 43 , from which old track 2 has been removed, and ballast bed planing apparatus 23 trailing crawler vehicle 17 planes the bed.
  • the resultant subgrade 18 is compacted by compacting device 47 vertically adjustably mounted on tie transport device 19 before new ties 22 are laid by the tie transport device.
  • compacting device 47 is illustrated in its raised, inoperative position while it is shown in its lowered, operative position in FIG. 5.
  • the transport and conveyance of the old and new ties from and to machine 1 is the same as described hereinabove.
  • the ballast bed planing apparatus may be a V-shaped ballast plow, instead of an excavating chain.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

A machine for renewing a railroad track on a ballast bed comprises a machine frame extending in a longitudinal direction, undercarriages for supporting the machine frame on the railroad track, a first tie transport device for receiving old ties and a second tie transport device for laying new ties, the tie transport devices being mounted on the machine frame and being spaced from each other in the longitudinal direction, and a crawler vehicle and ballast bed planing apparatus being arranged on the machine frame between the tie transport devices, the ballast bed planing apparatus being rotatable by 180° about a vertical axis.

Description

    BACKGROUND OF THE INVENTION
  • 1. Field of the Invention [0001]
  • The present invention relates to a machine for renewing a railroad track on a ballast bed, which comprises a machine frame extending in a longitudinal direction, undercarriages for supporting the machine frame on the railroad track, a first tie transport device for receiving old ties and a second tie transport device for laying new ties, the tie transport devices being mounted on the machine frame and being spaced from each other in the longitudinal direction, and a crawler vehicle and ballast bed planing apparatus arranged on the machine frame between the tie transport devices. [0002]
  • 2. Description of the Prior Art [0003]
  • Such a machine, which may be operated in opposite driving directions, is disclosed in U.S. Pat. No. 5,357,867. In one driving direction, an old railroad track is renewed while a new railroad track is laid on a prepared planed surface in the opposite driving direction. During a track renewal operation, the machine is driven while supported by a crawler vehicle on a planed renewal track section from which the old track ties and rails have been removed, a ballast planing apparatus preceding the crawler vehicle in the driving direction for planing the ballast. The new track is laid on the planed ballast bed behind the crawler vehicle. For this purpose, the machine is driven in the opposite direction and must be retrofitted by mounting the crawler vehicle on the machine frame in front of the device for laying the new ties, in respect of the opposite driving direction. In addition, the tie elevator for laying the new ties is turned around while the tie transport device for receiving the old ties and the ballast planing apparatus are raised into an inoperative position. [0004]
  • SUMMARY OF THE INVENTION
  • It is the primary object of this invention to provide a railroad track renewal machine of the above-described type, which requires minimal retrofitting when driven in opposite directions. [0005]
  • The above and other objects are accomplished according to the invention with such a machine wherein the ballast bed planing apparatus is rotatable by 180° about a vertical axis. [0006]
  • Such a machine may be operated in opposite driving directions during a track renewal operation without any substantial retrofitting. This may be of considerable advantage, for example, when a double track is to be renewed. In this case, the machine may work back in the opposite direction on the other rail after one rail has been renewed, without having to engage in complicated and time-consuming retrofitting needed to turn the entire machine around. It is also advantageous to be able to drive from either side towards the renewal site to start the track renewal operation, depending on the prevailing conditions and without having to take into consideration the orientation of the machine. The ballast bed planing apparatus may always be rapidly and readily turned in the driving direction to be in the proper operating position for planing the ballast.[0007]
  • BRIEF DESCRIPTION OF THE DRAWING
  • The above and other objects, advantages and features of the present invention will become more apparent from the following detailed description of a now preferred embodiment thereof, taken in conjunction with the accompanying drawing wherein [0008]
  • FIGS. 1 and 2 are schematic side elevational views of a railroad track renewal machine operable in opposite driving directions for a track renewal operation; [0009]
  • FIG. 3 is a similar side elevational view of a tie storage and conveying car coupled to the machine of FIGS. 1 and 2. [0010]
  • FIGS. 4 and 5 are enlarged, fragmentary side elevational views showing details of the area of the machine where the ballast planing apparatus is located, in the respective positions of the ballast planing apparatus when the driving direction is reversed; and [0011]
  • FIG. 6 is a sectional view along line VI in FIG. 4.[0012]
  • DETAILED DESCRIPTION OF PREFERRED EMBODIMENT
  • Referring first to FIG. 1, there is shown [0013] machine 1 for renewing railroad track 2 on a ballast bed. In FIG. 1, the machine is operated in a driving direction indicated by arrow 3. The machine comprises machine frame 5, extending in a longitudinal direction, and undercarriages 4, 4 for supporting the machine frame on the railroad track. A first tie transport device 19 is provided for receiving old ties 20 and a second tie transport device 21 for laying new ties 22. The tie transport devices are mounted on machine frame 5 and are spaced from each other in the longitudinal direction. A crawler vehicle 17 and ballast bed planing apparatus 23 are arranged on the machine frame between tie transport devices 19, 21. According to the invention and as will be explained more fully hereinbelow in connection with the description of FIGS. 4 and 5, the ballast bed planing apparatus is rotatable by 180° about a vertical axis.
  • Driver's and operator's [0014] cab 6 is mounted at one end of machine frame 5 while the opposite end of the machine frame is supported by universal joint 7 on frame 8 of tie conveyance car 9. The tie conveyance car frame is supported by undercarriage 10 running on track 2. As shown in FIG. 3, the tie conveyance car is followed by car 11 holding the power source for the train, and this car is succeeded by a number of tie storage cars 12. A gantry crane 15 runs on rails 14 along cars 9, 11 and 12 up to universal joint 7 to remove old ties from machine 1 and deliver new ties thereto, in an operation that is well known and described in the above-named U.S. patent.
  • Crawler [0015] vehicle 17 is vertically adjustably mounted on machine frame 5. At the track renewal site, the crawler vehicle is lowered to support the driven machine frame on a planed track bed surface from which the old track has been removed.
  • FIG. 2 illustrates the machine of FIG. 1, as it is adapted for operation in the opposite driving direction indicated by [0016] arrow 13. As will be described in connection with FIG. 5, tie transport device 19, which was used in the operating mode of FIG. 1 to pick up old ties 20, is now used to lay new ties 22 while tie transport device 21 picks up old ties 20. Ballast bed planing apparatus 23 has been turned 180° to face in the driving direction indicated by arrow 13.
  • As clearly shown in FIG. 4, the ballast bed planing apparatus comprises endless ballast [0017] excavating chain 26 extending in plane 27 inclined relative to the ballast bed. Drive 28 revolves the excavating chain in this plane, and drive 30 is connected to the excavating chain to enable it to be vertically adjusted. Ballast excavating chain 26 has a ballast discharge point 32 vertically spaced from the ballast bed. A conveyor band 31 extends transversely to the longitudinal direction and is arranged underneath ballast discharge point 32 to receive ballast from the ballast discharge point (see FIG. 6).
  • A [0018] second conveyor band 33 extends transversely to the longitudinal direction, and conveyor bands 31, 33 are arranged one behind the other in the longitudinal direction and are vertically offset from each other. As shown in FIG. 6, each conveyor band has input end 34, 35 in the middle of the railroad track underneath ballast discharge point 31 of excavating chain 26. The transversely extending conveyor bands 31, 33 are mounted on common carrier frame 36 which is connected to the ballast bed planing apparatus by parallelogram linkage 37 for vertically adjusting the conveyor bands about axes 38 extending perpendicularly to the longitudinal direction.
  • In the operating stage illustrated in FIG. 4, [0019] machine 1 has been positioned with the aid of vertically adjustable auxiliary carriage 39 in operating site 16 from which the ties and rails have been removed, and crawler vehicle 17 has been lowered to support the machine in this track renewal site for movement in the direction indicated by arrow 3. As the machine advances in this direction, old rails 40 of old track 2 are lifted off old ties 20 by rail guide devices 41 (FIG. 1) which lead the lifted rails away from the machine. Under the control of an operator in cab 42, the old ties are then removed from ballast bed 43 with tie transport device 19, and the removed old ties are conveyed forwardly to tie transport car 9, shown in FIG. 3, where they are stored in stacks. The stacks of old ties 20 are then taken by gantry crane 15 to tie storage cars 12.
  • After [0020] old track 2 has thus been removed from ballast bed 43, excavating chain 26 of ballast bed planing apparatus 23 is revolved to remove the ballast to expose subgrade 18. As shown in FIG. 6, a respective one of transversely extending conveyor bands 31, 33 conveys the excavated ballast to a respective shoulder of the track and deposits it on the shoulder. Which input end 34 or 35 of conveyor band 31 or 33 is positioned underneath discharge point 32 of excavating chain 26 can be determined by swinging the conveyor bands about axes 38 with parallelogram linkage 37, and this determines on which shoulder the ballast is deposited.
  • Vertically [0021] adjustable crawler vehicle 17, which trails ballast bed planing apparatus 23 in the operating direction, runs on the subgrade and compacts the same. As shown in FIG. 6, vertical shields 44 are hinged to the sides of crawler vehicle 17 and may be pivoted about vertical axes 45. This prevents the ballast to flow back from the shoulders to subgrade 18 before new ties 22 are laid by tie transport device 21 which trails the crawler vehicle. The new rails are then laid by machines following machine 1 (which are not illustrated).
  • To assume the operating mode illustrated in FIG. 5, in which [0022] machine 1 is driven in the opposite direction indicated by arrow 13, ballast bed planing apparatus 23, with conveyor bands 31, 33 connected thereto, is turned 180° about vertical axis 29. Tie transport device 21 now precedes the ballast bed planing apparatus and the crawler vehicle in the operating direction to remove the old ties, for which purpose tie pick-up device 46 is mounted on the tie transport device. The trailing crawler vehicle now moves on ballast bed 43, from which old track 2 has been removed, and ballast bed planing apparatus 23 trailing crawler vehicle 17 planes the bed. The resultant subgrade 18 is compacted by compacting device 47 vertically adjustably mounted on tie transport device 19 before new ties 22 are laid by the tie transport device. In FIG. 4, compacting device 47 is illustrated in its raised, inoperative position while it is shown in its lowered, operative position in FIG. 5. The transport and conveyance of the old and new ties from and to machine 1 is the same as described hereinabove.
  • If preferred, the ballast bed planing apparatus may be a V-shaped ballast plow, instead of an excavating chain. [0023]

Claims (4)

What is claimed is:
1. A machine for renewing a railroad track on a ballast bed, which comprises
(a) a machine frame extending in a longitudinal direction,
(b) undercarriages for supporting the machine frame on the railroad track,
(c) a first tie transport device for receiving old ties and a second tie transport device for laying new ties, the tie transport devices being mounted on the machine frame and being spaced from each other in the longitudinal direction, and
(d) a crawler vehicle and ballast bed planing apparatus arranged on the machine frame between the tie transport devices,
(1) the ballast bed planing apparatus being rotatable by 180° about a vertical axis.
2. The machine of
claim 1
, wherein the ballast bed planing apparatus comprises an endless ballast excavating chain extending in a plane inclined relative to the ballast bed and a drive for revolving the excavating chain, the excavating chain having a ballast discharge point vertically spaced from the ballast bed, and further comprising a conveyor band extending transversely to the longitudinal direction and arranged underneath the ballast discharge point to receive ballast from the ballast discharge point.
3. The machine of
claim 2
, further comprising a parallelogram linkage connecting the conveyor band to the ballast bed planing apparatus for vertically adjusting the conveyor band about axes extending perpendicularly to the longitudinal direction.
4. The machine of
claim 2
, comprising a second conveyor band extending transversely to the longitudinal direction, the conveyor bands being arranged one behind the other in the longitudinal direction and vertically offset from each other, each conveyor band having an input end in the middle of the railroad track underneath the ballast discharge point of the excavating chain.
US09/873,678 2000-06-09 2001-06-04 Machine for renewing a railroad track Expired - Fee Related US6415720B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT0043300U AT3879U3 (en) 2000-06-09 2000-06-09 MACHINE FOR RENEWING A TRACK
ATGM433/2000 2000-06-09
AT433/00U 2000-06-09

Publications (2)

Publication Number Publication Date
US20010050024A1 true US20010050024A1 (en) 2001-12-13
US6415720B2 US6415720B2 (en) 2002-07-09

Family

ID=3490459

Family Applications (1)

Application Number Title Priority Date Filing Date
US09/873,678 Expired - Fee Related US6415720B2 (en) 2000-06-09 2001-06-04 Machine for renewing a railroad track

Country Status (13)

Country Link
US (1) US6415720B2 (en)
EP (1) EP1162312B1 (en)
JP (1) JP4713017B2 (en)
CN (1) CN1148486C (en)
AT (2) AT3879U3 (en)
AU (1) AU776179B2 (en)
CZ (1) CZ294637B6 (en)
DE (1) DE50103072D1 (en)
DK (1) DK1162312T3 (en)
ES (1) ES2222329T3 (en)
PL (1) PL199479B1 (en)
RU (1) RU2229550C2 (en)
UA (1) UA73293C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060219123A1 (en) * 2005-03-30 2006-10-05 Franz Plasser Bahnbaumaschinen Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
JP2009504945A (en) * 2005-08-11 2009-02-05 フランツ プラッサ バーンバウマシーネン−インダストリーゲゼルシャフト エムベーハー Machine for re-laying the track

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT5708U3 (en) * 2002-07-17 2003-09-25 Plasser Bahnbaumasch Franz MACHINE FOR RECEIVING SILLS OF A TRACK
AT7114U3 (en) * 2004-06-07 2005-07-25 Plasser Bahnbaumasch Franz METHOD AND MACHINE FOR REPLACING A GROUP OF SHUTTERS THROUGH NEW SHAFTS
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
AT504517B1 (en) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Method for controlled lowering of track, involves capturing and recording longitudinal slope of track in rear scanning location of measuring system according to displacement measurement
FR2923223B1 (en) * 2007-11-07 2010-09-03 Europ De Travaux Ferroviaires SYSTEM FOR REMOVAL, HANDLING AND STORAGE OF BI-BLOCK TRAVERS USED BY MECHANIZED MEANS.
AT506078B1 (en) * 2008-02-04 2009-06-15 Plasser Bahnbaumasch Franz SCHOTTERPFLUG FOR STICKING A TRAIL
DE102009039230A1 (en) * 2009-08-28 2011-03-17 Zürcher, Ralf Method for creating a track body
FR2998589B1 (en) * 2012-11-23 2018-02-02 Europeenne De Travaux Ferroviaires (Etf) DOUBLE FLOW AND DOUBLE SENSE BREAKER AND METHODS FOR RENEWING BALLAST AND TRAVERSES.
CN104499390B (en) * 2014-12-25 2016-01-20 西南交通大学 A kind of rail-welding vehicle multistage rail saves soldered replacement work method
CN104963250A (en) * 2015-07-02 2015-10-07 常州市瑞泰工程机械有限公司 Sleeper recycling device and sleeper recycling method
CN106283983A (en) * 2016-08-30 2017-01-04 中国铁建大桥工程局集团有限公司 One has the railway maintenance small-sized machine of pillow end clear stone device
CN106320109A (en) * 2016-11-05 2017-01-11 昆明学院 Mechanical-electronic-hydraulic integrated sleeper changing device
CN108797238B (en) * 2018-05-24 2020-06-05 潘龙 Ballast-removing sleeper-changing machine
RU2700298C1 (en) * 2018-05-30 2019-09-16 Открытое Акционерное Общество "Российские Железные Дороги" Frontal portal type machine for soil treatment
CN110804909B (en) * 2019-12-02 2020-07-24 浙江利恩工程设计咨询有限公司 Automatic laying device for railway sleeper
CN113322726A (en) * 2021-07-08 2021-08-31 中国铁路西安局集团有限公司安康工务段 Ballast sealing machine for railway ballast bed
CN113399773B (en) * 2021-07-09 2022-09-23 北京嘉弈德懋新能源科技发展有限公司 New pipe prefabrication positioning cutting method and new pipe prefabrication positioning cutting equipment
AT526696A1 (en) * 2022-10-25 2024-05-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Ballast clearing device and method for a track construction machine

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT321971B (en) * 1972-05-02 1975-04-25 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR REPLACEMENT OR RENEWING A TRACK CONSISTING OF RAILS AND SLEEPERS
AT340985B (en) * 1976-02-02 1978-01-10 Plasser Bahnbaumasch Franz DEVICE FOR LAYING OR CHANGING SECTIONS OF A TRACK
ATE11940T1 (en) * 1981-03-06 1985-03-15 Matisa Materiel Ind Sa DEVICE FOR REPLACING TRACKS INCLUDING A PLOW.
ATE109231T1 (en) * 1991-10-24 1994-08-15 Plasser Bahnbaumasch Franz FUNDING OR CLEARING CHAIN ARRANGEMENT FOR TRACK CONSTRUCTION MACHINES.
CH686144A5 (en) * 1991-10-30 1996-01-15 Matisa Materiel Ind Sa Renewal train a railway line.
DE9305927U1 (en) * 1993-04-20 1994-05-26 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien Machine for renewing or laying a railroad track
JP2909375B2 (en) * 1994-02-10 1999-06-23 三菱重工業株式会社 Roadbed changer
US5664498A (en) * 1995-10-31 1997-09-09 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal machgine
ATE254697T1 (en) * 1997-06-27 2003-12-15 Plasser Bahnbaumasch Franz MACHINE FOR COMPACTING AND PROFILING THE GRAVEL BED OF A TRACK

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060219123A1 (en) * 2005-03-30 2006-10-05 Franz Plasser Bahnbaumaschinen Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
US7478596B2 (en) * 2005-03-30 2009-01-20 Franz Plasser Bahnbaumaschinen - Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
JP2009504945A (en) * 2005-08-11 2009-02-05 フランツ プラッサ バーンバウマシーネン−インダストリーゲゼルシャフト エムベーハー Machine for re-laying the track

Also Published As

Publication number Publication date
UA73293C2 (en) 2005-07-15
AT3879U2 (en) 2000-09-25
JP2002021006A (en) 2002-01-23
JP4713017B2 (en) 2011-06-29
RU2229550C2 (en) 2004-05-27
DK1162312T3 (en) 2004-10-04
CN1148486C (en) 2004-05-05
CN1329198A (en) 2002-01-02
ATE272746T1 (en) 2004-08-15
AT3879U3 (en) 2001-03-26
DE50103072D1 (en) 2004-09-09
PL347776A1 (en) 2001-12-17
US6415720B2 (en) 2002-07-09
PL199479B1 (en) 2008-09-30
ES2222329T3 (en) 2005-02-01
EP1162312A1 (en) 2001-12-12
EP1162312B1 (en) 2004-08-04
CZ20012064A3 (en) 2002-01-16
AU5181401A (en) 2001-12-13
AU776179B2 (en) 2004-09-02
CZ294637B6 (en) 2005-02-16

Similar Documents

Publication Publication Date Title
US6415720B2 (en) Machine for renewing a railroad track
US6474241B2 (en) Machine and method for removing an old track and laying a new track
US4307667A (en) Railroad track relaying train
US5357867A (en) Machine for renewing or laying a railway track
AU2008266570B2 (en) Machine for the pick-up and storage of track fastenings of a track and method thereof
GB2024288A (en) Machine for replacing the rails and sleepers of a railway track
US5257580A (en) Arrangement and method for producing a protective layer on the subgrade of a track
AU601297B2 (en) Tie exchange machine
JP4786068B2 (en) Orbit changer
CA2019942A1 (en) Mobile ballast cleaning machine arrangement
JP4603202B2 (en) Equipment for removing old sleepers and laying new sleepers
US5664498A (en) Track renewal machgine
US4903608A (en) Machine for laterally displacing a track
US5778794A (en) Machine for laying a railroad track having multiple-part carrier frame connected by a disengageable joint
US5513452A (en) Installation for the rehabilitation of a ballast bed
US4774890A (en) Mobile track renewal installation
AU719850B2 (en) A machine for picking up bulk material lying on a track
CA1295187C (en) Mobile tie gang apparatus and tie exchange method
CA1313084C (en) Ballast cleaning machine
US5477787A (en) Mobile track working machine performing track lining and ballast tamping in a first direction and ballast sweeping and plowing in the opposite direction
US5553674A (en) Ballast cleaning machine
CA2570586C (en) Method for replacing old sleepers of a railway track by new sleepers
CA2139541C (en) Ballast cleaning machine

Legal Events

Date Code Title Description
AS Assignment

Owner name: FRANZ PLASSER BAHNBAUMASCHINEN-INDUSTRIEGESELLSCHA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:THEURER, JOSEF;BRUNNINGER, MANFRED;REEL/FRAME:011888/0882;SIGNING DATES FROM 20010423 TO 20010424

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20140709