CN113970001A - 集成组件 - Google Patents

集成组件 Download PDF

Info

Publication number
CN113970001A
CN113970001A CN202010726746.6A CN202010726746A CN113970001A CN 113970001 A CN113970001 A CN 113970001A CN 202010726746 A CN202010726746 A CN 202010726746A CN 113970001 A CN113970001 A CN 113970001A
Authority
CN
China
Prior art keywords
inlet
outlet
valve
integrated assembly
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010726746.6A
Other languages
English (en)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanhua Automotive Components Co Ltd
Original Assignee
Zhejiang Sanhua Automotive Components Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sanhua Automotive Components Co Ltd filed Critical Zhejiang Sanhua Automotive Components Co Ltd
Priority to CN202010726746.6A priority Critical patent/CN113970001A/zh
Priority to KR1020237005905A priority patent/KR20230042320A/ko
Priority to EP21849716.2A priority patent/EP4170208A4/en
Priority to JP2023501495A priority patent/JP2023533558A/ja
Priority to US18/005,655 priority patent/US12115836B2/en
Priority to PCT/CN2021/108076 priority patent/WO2022022408A1/zh
Publication of CN113970001A publication Critical patent/CN113970001A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K11/00Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves
    • F16K11/10Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves with two or more closure members not moving as a unit
    • F16K11/20Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves with two or more closure members not moving as a unit operated by separate actuating members
    • F16K11/22Multiple-way valves, e.g. mixing valves; Pipe fittings incorporating such valves with two or more closure members not moving as a unit operated by separate actuating members with an actuating member for each valve, e.g. interconnected to form multiple-way valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60HARRANGEMENTS OF HEATING, COOLING, VENTILATING OR OTHER AIR-TREATING DEVICES SPECIALLY ADAPTED FOR PASSENGER OR GOODS SPACES OF VEHICLES
    • B60H1/00Heating, cooling or ventilating [HVAC] devices
    • B60H1/00642Control systems or circuits; Control members or indication devices for heating, cooling or ventilating devices
    • B60H1/00814Control systems or circuits characterised by their output, for controlling particular components of the heating, cooling or ventilating installation
    • B60H1/00878Control systems or circuits characterised by their output, for controlling particular components of the heating, cooling or ventilating installation the components being temperature regulating devices
    • B60H1/00885Controlling the flow of heating or cooling liquid, e.g. valves or pumps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60HARRANGEMENTS OF HEATING, COOLING, VENTILATING OR OTHER AIR-TREATING DEVICES SPECIALLY ADAPTED FOR PASSENGER OR GOODS SPACES OF VEHICLES
    • B60H1/00Heating, cooling or ventilating [HVAC] devices
    • B60H1/00485Valves for air-conditioning devices, e.g. thermostatic valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60HARRANGEMENTS OF HEATING, COOLING, VENTILATING OR OTHER AIR-TREATING DEVICES SPECIALLY ADAPTED FOR PASSENGER OR GOODS SPACES OF VEHICLES
    • B60H1/00Heating, cooling or ventilating [HVAC] devices
    • B60H1/00642Control systems or circuits; Control members or indication devices for heating, cooling or ventilating devices
    • B60H1/00814Control systems or circuits characterised by their output, for controlling particular components of the heating, cooling or ventilating installation
    • B60H1/00878Control systems or circuits characterised by their output, for controlling particular components of the heating, cooling or ventilating installation the components being temperature regulating devices
    • B60H1/00899Controlling the flow of liquid in a heat pump system
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60HARRANGEMENTS OF HEATING, COOLING, VENTILATING OR OTHER AIR-TREATING DEVICES SPECIALLY ADAPTED FOR PASSENGER OR GOODS SPACES OF VEHICLES
    • B60H1/00Heating, cooling or ventilating [HVAC] devices
    • B60H1/32Cooling devices
    • B60H1/3204Cooling devices using compression
    • B60H1/3229Cooling devices using compression characterised by constructional features, e.g. housings, mountings, conversion systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • F16K27/02Construction of housing; Use of materials therefor of lift valves
    • F16K27/0263Construction of housing; Use of materials therefor of lift valves multiple way valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • F16K27/08Guiding yokes for spindles; Means for closing housings; Dust caps, e.g. for tyre valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K37/00Special means in or on valves or other cut-off apparatus for indicating or recording operation thereof, or for enabling an alarm to be given
    • F16K37/0025Electrical or magnetic means
    • F16K37/005Electrical or magnetic means for measuring fluid parameters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/20Disposition of valves, e.g. of on-off valves or flow control valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/40Fluid line arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/40Fluid line arrangements
    • F25B41/42Arrangements for diverging or converging flows, e.g. branch lines or junctions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/40Fluid line arrangements
    • F25B41/42Arrangements for diverging or converging flows, e.g. branch lines or junctions
    • F25B41/45Arrangements for diverging or converging flows, e.g. branch lines or junctions for flow control on the upstream side of the diverging point, e.g. with spiral structure for generating turbulence
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/40Fluid line arrangements
    • F25B41/42Arrangements for diverging or converging flows, e.g. branch lines or junctions
    • F25B41/48Arrangements for diverging or converging flows, e.g. branch lines or junctions for flow path resistance control on the downstream side of the diverging point, e.g. by an orifice
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B43/00Arrangements for separating or purifying gases or liquids; Arrangements for vaporising the residuum of liquid refrigerant, e.g. by heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02Header boxes; End plates
    • F28F9/026Header boxes; End plates with static flow control means, e.g. with means for uniformly distributing heat exchange media into conduits
    • F28F9/027Header boxes; End plates with static flow control means, e.g. with means for uniformly distributing heat exchange media into conduits in the form of distribution pipes
    • F28F9/0275Header boxes; End plates with static flow control means, e.g. with means for uniformly distributing heat exchange media into conduits in the form of distribution pipes with multiple branch pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/26Arrangements for connecting different sections of heat-exchange elements, e.g. of radiators
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D7/00Control of flow
    • G05D7/06Control of flow characterised by the use of electric means
    • G05D7/0617Control of flow characterised by the use of electric means specially adapted for fluid materials
    • G05D7/0629Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means
    • G05D7/0635Control of flow characterised by the use of electric means specially adapted for fluid materials characterised by the type of regulator means by action on throttling means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/16Receivers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/18Optimization, e.g. high integration of refrigeration components
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/30Expansion means; Dispositions thereof
    • F25B41/31Expansion valves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Power Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Temperature-Responsive Valves (AREA)
  • Valve Housings (AREA)

Abstract

一种集成组件,能够用于车辆热管理系统,包括连接部以及贮液部,连接部与贮液部连接为一整体,集成组件具有贮液腔,连接部具有孔道,孔道包括第一孔道和第二孔道,第一孔道与第二孔道独立设置,第一孔道包括第一进口和第一出口,工作介质自第一进口进入第一孔道,经过第一出口离开第一孔道;贮液腔能够与第二孔道连通,第二孔道包括第三出口,经过贮液腔的工作介质通过第三出口离开所述第二孔道;连接部具有安装座,安装座与第一孔道或所述第二孔道连通,使得热管理系统中的阀装置能够位于安装座;通过在连接部设置安装座以及孔道,为集成组件与车辆热管理系统组装提供多个接口方便集成组件的组装,简化组装工艺。

Description

集成组件
技术领域
本发明涉及一种车用热管理系统零部件,具体涉及一种集成组件。
背景技术
车辆热管理系统包括空调系统,空调系统包括贮液器和阀组件,贮液器和阀组件通常通过管路连接于系统中,这样零部件的安装较复杂,占用的空间加较大,在满足零部件的功能的情况下,如何简化安装以及使得结构紧凑是一个问题。
发明内容
本申请的目的在于提供一种集成组件,以简化安装和使结构更加紧凑。
为实现上述目的,本申请采用如下技术方案:一种集成组件,能够用于车辆热管理系统,所述集成组件包括连接部以及贮液部,所述连接部与所述贮液部连接为一整体,所述集成组件具有贮液腔,所述连接部具有孔道,所述孔道包括第一孔道和第二孔道,所述第一孔道与所述第二孔道独立设置,所述第一孔道包括第一进口和第一出口,工作介质自所述第一进口进入所述第一孔道,至少部分工作介质经过所述第一出口离开所述第一孔道;所述贮液腔能够与所述第二孔道连通,所述第二孔道包括第三出口,经过所述贮液腔的工作介质通过所述第三出口离开所述第二孔道;所述连接部具有安装座,所述安装座与所述第一孔道或所述第二孔道连通,使得所述热管理系统中的元器件能够位于所述安装座。
本申请的集成组件,连接部与贮液部密封连接,同时连接部具有安装座,安装座与第一孔道或所述第二孔道连通,使得热管理系统中的元器件能够位于安装座,连接部为集成组件与车辆热管理系统组装提供多个接口方便集成组件的组装,简化组装工艺;另外该集成组件结构简单紧凑,不需要额外设置连接管。
附图说明
图1是集成组件的第一种实施方式的一个立体结构示意图;
图2是图1的集成组件的俯视结构示意图;
图3是图2的集成组件的I-I剖面结构示意图;
图4是图2的集成组件的A-A剖面结构示意图;
图5是图2的集成组件的H-H剖面结构示意图;
图6是图1中连接部的一个立体结构示意图;
图7是图6的连接部俯视结构示意图;
图8是图7的连接部的C-C剖面结构示意图;
图9是图7的连接部的D-D剖面结构示意图;
图10是图6的连接部的主视结构示意图;
图11是图10的连接部的B-B剖面结构示意图;
图12是图5所示集成组件的另一种实施方式的结构示意图;
图13是集成组件的第二种实施方式的一个立体结构示意图;
图14是图13的集成组件的俯视结构示意图;
图15是图13的集成组件的D-D剖面结构示意图;
图16是图13的集成组件的C-C剖面结构示意图;
图17是图13的集成组件的主视结构示意图;
图18是图10的集成组件的B-B剖面结构示意图;
图19是图13中连接部的一个立体结构示意图;
图20是图19的连接部的俯视结构示意图;
图21是图20的连接部的A-A剖面结构示意图;
图22是图20的连接部的B-B剖面结构示意图;
图23是集成组件的第三种实施方式的一个立体结构示意图;
图24是图23的集成组件的俯视结构示意图;
图25是图24的集成组件的B-B剖面结构示意图;
图26是图24的集成组件的E-E剖面结构示意图;
图27是图24的集成组件的C-C剖面结构示意图;
图28是图23的集成组件的主视结构示意图;
图29是图28的集成组件的A-A剖面结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步说明:
本申请中的集成组件能够用于车辆热管理系统,这里的车辆可以为新能源车,参见图1-图29,集成组件100包括连接部10以及贮液部20,连接部10与贮液部20连接为一整体,连接部10具有孔道,孔道包括第一孔道111和第二孔道112,第一孔道111与第二孔道112独立设置,集成组件100具有贮液腔30,贮液腔30可以储存液态工作介质;第一孔道111在连接部10的壁的外表面形成有第一进口1111和第一出口1112和/或第二出口1113,工作介质自第一进口1111进入第一孔道111,至少部分工作介质经过第一出口1112和/或第二出口1113离开第一孔道111,贮液腔30能够与第二孔道112连通,第二孔道112在连接部10的壁的外表面形成第三出口1121,连接部10具有安装座,安装座与第一孔道111或第二孔道112连通;这样使得热管理系统中的元器件能够位于安装座,其中元器件包括阀部件和传感器等热管理系统包括零部件,阀部件可以包括第一阀部、第二阀部、第一单向阀以及第二单向阀,传感器可以包括第一温度传感器和第二温度传感器;本技术方案中的连接部10为集成组件与车辆热管理系统组装提供多个接口以及安装座,同时与贮液部组装实现贮液功能,方便集成组件的组装,简化组装工艺;另外该集成组件结构简单紧凑,不需要额外设置连接管。在以下的实施方式中,以上多个接口包括第一进口1111,第一出口1112以及以下的第二进口、第三出口1121、第三进口、第二出口1113,安装座可以包括第一安装座41、第二安装座42。其中第一进口1111可以与热管理系统中的压缩机出口连接,第一出口1112可以与室内冷凝器的进口连接,第二进口可以与室内冷凝器的出口连接,第三出口1121可以与中间换热器的入口连接;在与系统的对接过程中,连接部10能够提供连接支撑,比如接口位置设置螺柱,一端与连接部10固定,另一端凸出连接部10的表面,以方便与系统的管路对接。连接部10可以包括两个限位部1100,第一出口1112和第二出口1113成形于限位部1100,限位部能够对阀部的阀芯72进行支撑和限位。
参见图1-图12为集成组件的第一种实施方式,本实施例中,集成组件100包括第一阀部70、第二阀部80、连接部10以及贮液部20,连接部10具有孔道,孔道包括第一孔道111和第二孔道112,第一孔道111与第二孔道112独立设置,集成组件100具有贮液腔30,第一孔道111在连接部10的壁的外表面形成有第一进口1111、第一出口1112以及第二出口1113,工作介质自第一进口1111进入第一孔道111,经过第一出口1112和第二出口1113离开第一孔道111,贮液腔30能够与第二孔道112直接连通,第二孔道112在连接部的壁的外表面形成第三出口1121,连接部10具有安装座,安装座包括第一安装座41和第二安装座42,第一安装座41和第二安装座42均与第一孔道111连通,或者说部分第一阀部70位于第一安装座41并与连接部10固定连接,部分第二阀部80位于第二安装座42并与连接部10固定连接,第一阀部70和第二阀部80为两通阀,通过控制第一阀部70能够改变第一进口1111和第一出口1112之间的工作介质压力;通过控制第二阀部80能够改变第一进口1111和第二出口1113之间的工作介质压力。当然,集成组件也可以只包括一个阀部,即将第一调温阀70和第二调温阀80作为一个整体,该阀部为三通阀,至少部分该阀部位于安装座且位于第一出口1112和第二出口1113之间,通过控制阀部能够改变第一孔道111内工作介质压力。
结合图3至图12,本实施例中,集成组件10还包括单向阀和温度传感器,单向阀的数量为两个,命名为第一单向阀51和第二单向阀52,本实施例中温度传感器为第一温度传感器61。
连接部10具有第三孔道113和第四孔道114,第二进口1131为第三孔道113在连接部10的壁的表面形成的口,工作介质通过第二进口1131进入第三孔道113,第三孔道113与贮液腔30的进口连通;第一单向阀51全部位于第三孔道113,第一单向阀51与连接部10限位连接,第一单向阀51能够阻止工作介质自贮液腔30反流向第二进口1131;第二单向阀52全部位于第四孔道114,第三进口1141为第四孔道114在连接部10的壁的表面形成的口,工作介质通过第三进口1141进入第四孔道114,第四孔道114与贮液腔30的进口连通,第二单向阀52能够阻止工作介质自贮液腔30反流向第三进口1141。
第一温度传感器61的感应头位于第三孔道113,第一温度传感器61与连接部10固定连接,第一温度传感器61的感应头位于第二进口1131和第一单向阀51之间,第一温度传感器能够检测进入贮液腔腔工作介质的温度。
为了方便集成组件与系统的组装连接,第一进口1111与第三出口1121位于连接部10的同一侧,具体地,第一进口1111与第三出口1121位于连接部10的顶部且位于第一阀部70和第二阀部80之间,第一出口1112和第二进口1131位于连接部10的侧壁的同一侧,第三进口1141和第二出口1113位于连接部10的侧壁的同一侧;这样集成组件的接口两两设置,有利于热管理系统的接头两两连接,方便组装。
参见图5和图12,贮液部20包括集液管21,在图5中,集液管21与贮液腔30同轴设置,集液管21连通贮液腔30和第二孔道112,第二孔道112包括第一段1102和第二段1122,第一段1102和第二段1122相贯设置,或者说,第一段1102和第二段1122连通设置,其中第一段1102与集液管21垂直,第二段1122与集液管21平行;本实施方式中,集液管21的结构比较简单,第二孔道112相对复杂,本实施方式中,连接部10可以为型材加工而成,为了加工第一段1102,第一段1102与连接部10外周连通,为了防止工作介质泄露,设置有一堵头91。
参见图12,集液管21包括第一子部211、第二子部212以及过渡段213,第一子部211和第二子部212平行设置,第一子部211和第二子部212通过过渡段213连接,第一子部211与贮液腔30同轴设置,集液管21连通贮液腔30和第二孔道112,第二孔道112与集液管的第二子部212同轴设置。
结合图3、图6,连接部10包括筒状部12和主体部13,主体部13具有以上孔道,筒状部12自主体部13向下延伸,贮液部20具有外壳24,外壳24与筒状部12焊接密封,筒状部12内周形成贮液腔30的第一部分31,外壳24形成贮液腔30的第二部分32,外壳24与筒状部12的焊缝距离主体部设定距离,这样可以避免焊接的热量对于连接部10的安装元器件的影响,其中安装元器件包括第一单向阀和第二单向阀以及第一温度传感器。第三孔道113和第四孔道114在贮液腔30的形成的进口位于贮液腔30的中心轴和筒状部12的内壁之间,具体地,第三孔道113和第四孔道114在贮液腔30的进口位于贮液腔30的中心轴和筒状部12的内壁的二分之一处。
结合图3、图8,第一孔道111与筒状部12形成的贮液腔30的第一部分不连通,结合图3、图9,工作介质可以自第二进口1131通过第三孔道113进入筒状部12形成贮液腔30的第一部分31,工作介质可以自第三进口1141通过第四孔道114进入筒状部12形成贮液腔30的第一部分,参见图11,第一孔道111和第三孔道113以及第四孔道114的中心轴位于连接部10的同一水平面,该水平面可以为如图所示的截面,这样有利于利用同一加工基准。
本实施方式中,第一阀部70和第二阀部80均包括驱动部71和阀芯72,阀芯72呈球状,阀芯72具有阀芯通道721,驱动部71能够带动阀芯72转动,阀芯通道721使得第一孔道111连通,当然也可以通过调整阀芯通道721和第一孔道111的流通面积,进而调整第一孔道111内的工作介质压力,当然也可以调整第一孔道111的通断状态。阀部也可以为一个,选用三通球阀。
参见图13-图22为集成组件的第二种实施方式,与第一种实施方式相比,主要区别在于:贮液部20还包括盖体22,外壳24和盖体22密封连接,贮液腔30位于外壳24和盖体22之间,连接部10与盖体22密封连接,盖体22具有第一进口通道221和出口通道222,贮液腔30能够通过出口通道222与第二孔道112连通,第二进口1131为第一进口通道221在盖体22的上表面形成的口;盖体22还具有第二进口通道(图中未示出),第二进口通道与第一进口通道221结构相同,第三进口1141为第二进口通道在盖体22的上表面形成的口;
本实施例中,盖体22与连接部10插接定位,定位后焊接固定;连接部10位于贮液腔30的中心轴O-O的一侧,出口通道222包括第一子段2221、第二子段2222以及第三子段2223,第一子段2221与贮液腔30连通,第二子段2222位于第一子段2221和第三子段2223之间,第一子段2221的中心轴与贮液腔30的中心轴O-O同轴设置,第三子段2223的中心轴与贮液腔30的中心轴平行设置,第二子段2222的中心轴与贮液腔30的中心轴垂直设置;由于图15中截面位置的限制,图中第一子段2221、第二子段2222用虚线标识;盖体22为型材加工成形,集液管21结构简单,两者组合加工均相对容易。
第一单向阀51位于第一进口通道221并与盖体22限位连接,第一进口通道221与贮液腔30连通,盖体22还具有第二进口通道,第二单向阀(图中未示出)位于第二进口通道并与盖体22限位连接,第二进口通道与贮液腔30连通。
本实施例中,温度传感器为第二温度传感器62,第二温度传感器62的感应头位于第二孔道112,第二温度传感器62与连接部10固定连接;具体地,第二温度传感器62的感应头邻近第三出口1121,第二温度传感器能够检测贮液腔出口的工作介质的温度。
参见图15-图22,连接部10具有第一进口1111、第一孔道111、第二孔道112、第一安装座41、第二安装座42,第一孔道111包括第一出口1112、第二出口1113,第二孔道112包括第三出口1121、第二进口1131和第三进口1141位于盖体22,工作介质自第一进口1111进入第一孔道111,经过第一出口1112和第二出口1113离开第一孔道111,第一阀部70位于第一安装座41,第二阀部80位于第二安装座42,通过控制第一阀部70能够改变第一进口1111和第一出口1112之间的工作介质压力;通过控制第二阀部8能够改变第一进口和第二出口之间的工作介质压力;工作介质自第二进口1131和第三进口1141进入贮液腔30,贮液腔30内的工作介质通过集液管21以及出口通道222进入第二孔道112,通过第三出口1121离开第二孔道112。
为了减重,连接部10在第二孔道112与第一孔道111以及第二孔道112和安装座之间具有镂空部19。
参见图23-图29为集成组件的第三种实施方式,与第一种实施方式的主要区别在于:贮液部20还包括盖体22,外壳24和盖体22密封连接,贮液腔30位于外壳24和盖体22之间,连接部10与盖体22密封连接,连接部10与盖体22卡接定位并焊接固定,盖体22具有贯通孔201,第三孔道113和第四孔道114通过贯通孔201与贮液腔30连通。本实施例中,传感器包括第一温度传感器61和第二温度传感器62,第一温度传感器61的感应头位于第三孔道113,第一温度传感器61与连接部10固定连接,第一温度传感器61的感应头位于第二进口1131和第一单向阀之间,第二温度传感器62的感应头位于第二孔道112,第二温度传感器62与连接部10固定连接;具体地,第二温度传感器62的感应头邻近第三出口1121,另外本实施例中,第三出口1121位于连接部10的周侧,结合参见图27连接部10包括一凸起15,第三出口1121位于凸起,或者说第二孔道112在凸起15的外表面形成第三出口1121,这样可以利用凸起与系统其它零部件配合,定位更准确。
需要说明的是:以上实施例仅用于说明本发明而并非限制本发明所描述的技术方案,尽管本说明书参照上述的实施例对本发明已进行了详细的说明,但是,本领域的普通技术人员应当理解,所属技术领域的技术人员仍然可以对本发明进行修改或者等同替换,而一切不脱离本发明的精神和范围的技术方案及其改进,均应涵盖在本发明的权利要求范围内。

Claims (16)

1.一种集成组件,能够用于车辆热管理系统,所述集成组件包括连接部以及贮液部,所述连接部与所述贮液部连接为一整体,所述集成组件具有贮液腔,所述连接部具有孔道,所述孔道包括第一孔道和第二孔道,所述第一孔道与所述第二孔道独立设置,所述第一孔道包括第一进口、第一出口和/或第二出口,工作介质自所述第一进口进入所述第一孔道,至少部分工作介质经过所述第一出口和/或第二出口离开所述第一孔道;所述贮液腔能够与所述第二孔道连通,所述第二孔道包括第三出口,经过所述贮液腔的工作介质通过所述第三出口离开所述第二孔道;所述连接部具有安装座,所述安装座与所述第一孔道或所述第二孔道连通,使得所述热管理系统中的元器件能够位于所述安装座。
2.根据权利要求1所述的集成组件,其特征在于:所述连接部包括筒状部和主体部,所述主体部具有所述孔道,所述筒状部自所述主体部向下延伸,所述贮液部具有外壳,所述外壳与所述筒状部焊接密封,所述筒状部内周形成所述贮液腔的第一部分,所述外壳形成所述贮液腔的第二部分。
3.根据权利要求1所述的集成组件,其特征在于:所述贮液部包括外壳和盖体,所述外壳和所述盖体密封连接,所述贮液腔位于所述外壳和盖体之间,所述连接部与所述盖体密封连接,所述盖体具有第一进口通道和出口通道,所述贮液腔能够通过所述出口通道与所述第二孔道连通,所述第二进口为所述第一进口通道在所述盖体的上表面形成的口。
4.根据权利要求2或3所述的集成组件,其特征在于:所述连接部具有第三孔道,所述集成组件具有第二进口,所述第二进口为所述第三孔道在所述连接部的壁的表面形成的口,工作介质通过所述第二进口进入所述第三孔道,所述第三孔道与所述贮液腔的进口连通;所述元器件包括第一单向阀,所述第一单向阀全部位于所述第三孔道,所述第一单向阀与所述连接部固定连接,所述第一单向阀能够阻止工作介质自所述贮液腔向所述第二进口方向流动。
5.根据权利要求4所述的集成组件,其特征在于:所述元器件包括第二单向阀,所述连接部具有第四孔道,所述第二单向阀全部位于所述第四孔道,所述集成组件具有第三进口,所述第三进口为所述第四孔道在所述连接部的壁的表面形成的口,工作介质通过所述第三进口进入所述第四孔道,所述第四孔道与所述贮液腔的进口连通,所述第二单向阀能够阻止工作介质自所述贮液腔向所述第三进口方向流动。
6.根据权利要求5所述的集成组件,其特征在于:所述元器件还包括第一温度传感器;所述第一温度传感器的感应头位于所述第三孔道,所述第一温度传感器与所述连接部固定连接。
7.根据权利要求6所述的集成组件,其特征在于:所述贮液部包括集液管,所述集液管与所述贮液腔同轴设置,所述集液管连通所述贮液腔和所述第二孔道或所述出口通道,所述第二孔道包括第一段和第二段,所述第一段和所述第二段相贯设置,所述第一段与所述集液管垂直,所述第二段与所述集液管平行。
8.根据权利要求6所述的集成组件,其特征在于:所述贮液部包括集液管,所述集液管包括第一子部、第二子部以及过渡段,所述第一子部和第二子部平行设置,所述第一子部和所述第二子部通过所述过渡段连接,所述第一子部与所述贮液腔同轴设置,所述集液管连通所述贮液腔和所述第二孔道,所述第二孔道与所述集液管的第二子部同轴设置。
9.根据权利要求1-8任一项所述的集成组件,其特征在于:所述元器件包括阀部,所述阀部为三通阀,所述第二出口为所述第一孔道在所述连接部的壁的外表面形成的开口,至少部分所述阀部位于所述安装座且位于所述第一出口和所述第二出口之间,通过控制所述阀部能够改变所述第一孔道内工作介质压力。
10.根据权利要求1-8任一项所述的集成组件,其特征在于:所述元器件包括第一阀部和第二阀部,所述第一阀部和所述第二阀部为两通阀,所述安装座具有第一安装座和第二安装座,至少部分所述第一阀部位于所述第一安装座且位于所述第一进口和所述第一出口之间,通过控制所述第一阀部能够改变所述第一进口和所述第一出口之间的工作介质压力;所述连接部还具有第三进口和第二出口,所述第二出口为所述第一孔道在所述连接部的壁的外表面形成的开口,至少部分所述第二阀部位于所述第二安装座并且位于所述第一进口和所述第二出口之间,通过控制所述第二阀部能够改变所述第一进口和所述第二出口之间的工作介质压力。
11.根据权利要求10所述的集成组件,其特征在于:所述第一进口与所述第三出口位于所述连接部的顶部且位于所述第一阀部和所述第二阀部之间,所述第一出口和所述第二进口位于所述连接部的侧壁的同一侧,所述第三进口和所述第二出口位于所述连接部的侧壁的同一侧。
12.根据权利要求3所述的集成组件,其特征在于:所述盖体与所述连接部插接定位,所述连接部位于所述贮液腔的中心轴的一侧,所述出口通道包括第一子段、第二子段以及第三子段,所述第一子段与所述贮液腔连通,所述第二子段位于所述第一子段和第三子段之间,所述第一子段的中心轴与所述贮液腔的中心轴同轴设置,所述第三子段的中心轴与所述贮液腔的中心轴平行设置,所述第二子段的中心轴与所述贮液腔的中心轴垂直设置。
13.根据权利要求12所述的集成组件,其特征在于:所述元器件包括第一阀部和第二阀部,所述第一阀部和所述第二阀部为两通阀,所述安装座具有第一安装座和第二安装座,至少部分所述第一阀部位于所述第一安装座且位于所述第一进口和所述第一出口之间,通过控制所述第一阀部能够改变所述第一进口和所述第一出口之间的工作介质压力;所述连接部还具有第二出口,所述第二出口为所述第一孔道在所述连接部的壁的外表面形成的开口,至少部分所述第二阀部位于所述第二安装座并且位于所述第一进口和所述第二出口之间,通过控制所述第二阀部能够改变所述第一进口和所述第二出口之间的工作介质压力。
14.根据权利要求12或13所述的集成组件,其特征在于:所述集成组件包括第一单向阀,所述第一单向阀位于所述第一进口通道并与所述盖体限位连接,所述第一进口通道与所述贮液腔连通,所述盖体与所述连接部插接连接。
15.根据权利要求14所述的集成组件,其特征在于:所述盖体还具有第二进口通道,所述集成组件还包括第二单向阀,所述第二单向阀位于所述第二进口通道并与所述盖体限位连接,所述第二进口通道与所述贮液腔连通。
16.根据权利要求4或15所述的集成组件,其特征在于:所述集成组件还包括第二温度传感器,所述第二温度传感器的感应头位于所述第二孔道,所述第二温度传感器与所述连接部固定连接。
CN202010726746.6A 2020-07-25 2020-07-25 集成组件 Pending CN113970001A (zh)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN202010726746.6A CN113970001A (zh) 2020-07-25 2020-07-25 集成组件
KR1020237005905A KR20230042320A (ko) 2020-07-25 2021-07-23 일체형 부품
EP21849716.2A EP4170208A4 (en) 2020-07-25 2021-07-23 INTEGRATED COMPONENT
JP2023501495A JP2023533558A (ja) 2020-07-25 2021-07-23 集積ユニット
US18/005,655 US12115836B2 (en) 2020-07-25 2021-07-23 Integrated component
PCT/CN2021/108076 WO2022022408A1 (zh) 2020-07-25 2021-07-23 集成组件

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010726746.6A CN113970001A (zh) 2020-07-25 2020-07-25 集成组件

Publications (1)

Publication Number Publication Date
CN113970001A true CN113970001A (zh) 2022-01-25

Family

ID=79584620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010726746.6A Pending CN113970001A (zh) 2020-07-25 2020-07-25 集成组件

Country Status (6)

Country Link
US (1) US12115836B2 (zh)
EP (1) EP4170208A4 (zh)
JP (1) JP2023533558A (zh)
KR (1) KR20230042320A (zh)
CN (1) CN113970001A (zh)
WO (1) WO2022022408A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115848096A (zh) * 2023-01-06 2023-03-28 浙江银轮新能源热管理系统有限公司 流体控制集成装置基座及流体控制集成装置

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3209868B2 (ja) 1994-11-17 2001-09-17 株式会社不二工機 膨張弁
JP4496477B2 (ja) * 2005-03-01 2010-07-07 トヨタ自動車株式会社 ガス容器用バルブアッセンブリ
JP5386249B2 (ja) * 2009-07-03 2014-01-15 トヨタ自動車株式会社 車両用高圧タンクのバルブ装置
CN203532885U (zh) * 2013-08-30 2014-04-09 浙江敏特汽车空调有限公司 一种汽车空调热力膨胀阀
CN104728483B (zh) 2013-12-20 2018-10-19 杭州三花研究院有限公司 一种流量控制阀及其控制方法以及制冷系统
KR101734265B1 (ko) 2015-08-28 2017-05-11 현대자동차 주식회사 차량용 에어컨 시스템의 팽창밸브 및 이를 포함하는 차량용 에어컨 시스템
JP6430465B2 (ja) 2016-12-01 2018-11-28 カルソニックカンセイ株式会社 気液分離器
JP6539640B2 (ja) * 2016-12-27 2019-07-03 株式会社不二工機 冷媒容器
JP7116999B2 (ja) * 2018-10-24 2022-08-12 株式会社テージーケー 電動弁
KR102189058B1 (ko) * 2019-07-19 2020-12-09 현대위아(주) 통합 열관리용 리저버 탱크 및 이를 포함한 통합 열관리 모듈

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115848096A (zh) * 2023-01-06 2023-03-28 浙江银轮新能源热管理系统有限公司 流体控制集成装置基座及流体控制集成装置

Also Published As

Publication number Publication date
EP4170208A1 (en) 2023-04-26
EP4170208A4 (en) 2024-08-14
KR20230042320A (ko) 2023-03-28
US20230331063A1 (en) 2023-10-19
WO2022022408A1 (zh) 2022-02-03
JP2023533558A (ja) 2023-08-03
US12115836B2 (en) 2024-10-15

Similar Documents

Publication Publication Date Title
CN109838586B (zh) 流体管理组件及热管理系统
CN108068572B (zh) 流体换热组件及车辆热管理系统
CN109838585B (zh) 流体管理组件及热管理系统
CN108068581B (zh) 流体换热组件及车辆热管理系统
CN112428772B (zh) 流体控制组件及热管理系统
CN112432396B (zh) 流体控制组件及热管理系统
CN108626414B (zh) 车用空调系统电子膨胀阀
CN113970001A (zh) 集成组件
CN109838587B (zh) 流体管理组件及热管理系统
CN112431946A (zh) 流体控制组件及热管理系统
CN113175768B (zh) 流体控制组件
CN113969999A (zh) 集成组件
CN113970000A (zh) 集成组件
CN109425152B (zh) 板式换热器集成组件
CN216200844U (zh) 四通阀
CN108955313B (zh) 流体换热组件
CN215295918U (zh) 一种换热器
CN114593618A (zh) 一种换热组件及热管理系统
CN114056034A (zh) 一种换热组件及一种车辆热管理系统
CN215153777U (zh) 一种热管理组件
US20220003466A1 (en) Electronic expansion valve and thermal management assembly
CN216200948U (zh) 四通阀
CN215980946U (zh) 换向阀及制冷系统
CN221824584U (zh) 一种阀装置及集成组件
CN217841822U (zh) 一种出水室及发动机的冷却系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination