CN112805639A - 作业管理装置及作业管理方法 - Google Patents
作业管理装置及作业管理方法 Download PDFInfo
- Publication number
- CN112805639A CN112805639A CN201880098311.2A CN201880098311A CN112805639A CN 112805639 A CN112805639 A CN 112805639A CN 201880098311 A CN201880098311 A CN 201880098311A CN 112805639 A CN112805639 A CN 112805639A
- Authority
- CN
- China
- Prior art keywords
- time
- operator
- cycle time
- job management
- processable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims description 31
- 238000000034 method Methods 0.000 claims abstract description 101
- 238000004364 calculation method Methods 0.000 claims abstract description 58
- 238000003860 storage Methods 0.000 claims abstract description 25
- 238000012545 processing Methods 0.000 claims description 9
- 238000012800 visualization Methods 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 description 84
- 238000013500 data storage Methods 0.000 description 37
- 238000010586 diagram Methods 0.000 description 37
- 238000012937 correction Methods 0.000 description 14
- 238000004458 analytical method Methods 0.000 description 13
- 238000007405 data analysis Methods 0.000 description 10
- 230000015654 memory Effects 0.000 description 8
- 238000004891 communication Methods 0.000 description 5
- 239000000284 extract Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 3
- 238000012935 Averaging Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2018/037318 WO2020070867A1 (ja) | 2018-10-05 | 2018-10-05 | 作業管理装置および作業管理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112805639A true CN112805639A (zh) | 2021-05-14 |
Family
ID=70054588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201880098311.2A Pending CN112805639A (zh) | 2018-10-05 | 2018-10-05 | 作业管理装置及作业管理方法 |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP6747596B1 (ja) |
CN (1) | CN112805639A (ja) |
WO (1) | WO2020070867A1 (ja) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60234687A (ja) * | 1984-05-04 | 1985-11-21 | 株式会社アシックス | 生産工程管理システム |
CN101667283A (zh) * | 2008-09-05 | 2010-03-10 | Juki株式会社 | 作业分析装置 |
JP2010146256A (ja) * | 2008-12-18 | 2010-07-01 | Koyo Electronics Ind Co Ltd | 生産管理システム |
JP2012023414A (ja) * | 2010-07-12 | 2012-02-02 | Kozo Keikaku Engineering Inc | シミュレーション装置、シミュレーション方法、およびプログラム |
CN102385733A (zh) * | 2010-08-27 | 2012-03-21 | 冲电气工业株式会社 | 事务集中系统 |
CN103985004A (zh) * | 2013-02-07 | 2014-08-13 | 飞马缝纫机制造株式会社 | 无线式作业管理系统 |
CN104424348A (zh) * | 2013-09-05 | 2015-03-18 | 株式会社东芝 | 服务分析装置及方法 |
CN107315393A (zh) * | 2016-04-26 | 2017-11-03 | 株式会社捷太格特 | 作业指示系统 |
CN107728585A (zh) * | 2016-08-12 | 2018-02-23 | 富士通株式会社 | 生产线平衡装置、生产线平衡方法和计算机可读记录介质 |
CN108205730A (zh) * | 2016-12-16 | 2018-06-26 | 富士通株式会社 | 决定分配人数的装置、方法和非暂时计算机可读存储介质 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6478746A (en) * | 1987-09-18 | 1989-03-24 | Toshiba Corp | Production control device for production line |
JP2003288388A (ja) * | 2002-03-28 | 2003-10-10 | Sharp Corp | 作業支援システム、作業支援方法、作業支援処理プログラム及び作業支援プログラムを記録した記録媒体 |
JP2007293690A (ja) * | 2006-04-26 | 2007-11-08 | Sharp Corp | 人員配置システム、人員配置方法、コンピュータプログラム、および記録媒体 |
-
2018
- 2018-10-05 CN CN201880098311.2A patent/CN112805639A/zh active Pending
- 2018-10-05 JP JP2019537406A patent/JP6747596B1/ja active Active
- 2018-10-05 WO PCT/JP2018/037318 patent/WO2020070867A1/ja active Application Filing
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60234687A (ja) * | 1984-05-04 | 1985-11-21 | 株式会社アシックス | 生産工程管理システム |
CN101667283A (zh) * | 2008-09-05 | 2010-03-10 | Juki株式会社 | 作业分析装置 |
JP2010146256A (ja) * | 2008-12-18 | 2010-07-01 | Koyo Electronics Ind Co Ltd | 生産管理システム |
JP2012023414A (ja) * | 2010-07-12 | 2012-02-02 | Kozo Keikaku Engineering Inc | シミュレーション装置、シミュレーション方法、およびプログラム |
CN102385733A (zh) * | 2010-08-27 | 2012-03-21 | 冲电气工业株式会社 | 事务集中系统 |
CN103985004A (zh) * | 2013-02-07 | 2014-08-13 | 飞马缝纫机制造株式会社 | 无线式作业管理系统 |
CN104424348A (zh) * | 2013-09-05 | 2015-03-18 | 株式会社东芝 | 服务分析装置及方法 |
CN107315393A (zh) * | 2016-04-26 | 2017-11-03 | 株式会社捷太格特 | 作业指示系统 |
CN107728585A (zh) * | 2016-08-12 | 2018-02-23 | 富士通株式会社 | 生产线平衡装置、生产线平衡方法和计算机可读记录介质 |
CN108205730A (zh) * | 2016-12-16 | 2018-06-26 | 富士通株式会社 | 决定分配人数的装置、方法和非暂时计算机可读存储介质 |
Also Published As
Publication number | Publication date |
---|---|
JP6747596B1 (ja) | 2020-08-26 |
WO2020070867A1 (ja) | 2020-04-09 |
JPWO2020070867A1 (ja) | 2021-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4467880B2 (ja) | プロジェクトの評価システムおよび方法 | |
US9884721B2 (en) | Shipping order allocation apparatus | |
Cheng et al. | Survey of scheduling research involving due date determination decisions | |
EP1376422A2 (en) | System and apparatus for project risk management | |
US7440811B2 (en) | Dynamic-state waiting time analysis method for complex discrete manufacturing | |
WO2011009067A2 (en) | Project progress display and monitoring | |
US20200159194A1 (en) | Production line configuration change system and production line configuration change method | |
JP7509659B2 (ja) | 生産情報管理システムおよび生産情報管理方法 | |
JP2010250674A (ja) | 作業時間予測装置、方法、およびプログラム | |
US11593739B2 (en) | System and method for supporting production management | |
JP2016181039A (ja) | 計画決定方法、計画決定プログラムおよび計画決定装置 | |
CN112805639A (zh) | 作业管理装置及作业管理方法 | |
CN111754136A (zh) | 工厂排产方法、装置、电子设备和计算机可读存储介质 | |
US20200202232A1 (en) | Production record data analyzer | |
JPH10254962A (ja) | グループ別作業能力補正装置および作業割り当てシステム | |
JP2015079445A (ja) | プロジェクト管理装置、プロジェクト管理方法、およびプロジェクト管理プログラム | |
WO2021100284A1 (ja) | 生産シミュレーション装置 | |
JP7458903B2 (ja) | 性能分析装置および性能分析方法 | |
JP2022177408A (ja) | 作業時間推定装置、作業時間推定システム及び作業時間推定方法 | |
US11112779B2 (en) | Computer system and facility monitoring method | |
JP6695298B2 (ja) | 発注制御装置 | |
US20190384272A1 (en) | System section data management device and method thereof | |
JP7221796B2 (ja) | 生産管理装置及び方法 | |
JP2019079086A (ja) | 要員管理システム | |
JP2000207479A (ja) | 安全在庫量算出方法及び装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210514 |
|
RJ01 | Rejection of invention patent application after publication |